PPT JESSE JACKSON 2
-
Upload
jesse-jackson -
Category
Documents
-
view
33 -
download
1
Transcript of PPT JESSE JACKSON 2
![Page 1: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/1.jpg)
Jesse W. Jackson Power Transformer Tester
I am a power transformer tester that trained and worked in Ulsan, South Korea for Hyundai Heavy Industries (HHI) in the Electro Electric Systems Division. I have tested power transformers out in the field and inside the protected confines of a test bay.
![Page 2: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/2.jpg)
Control Room Working the controls in the control room with Mr. Park,
Chief Test Engineer in the 500kV control room. This room is equipped with Hipotronics RIV - Partial Discharge Equipment and Haefely Impulse Generator PC Controls with High Resolution Impulse Analyzing System and Generator Controls.
![Page 3: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/3.jpg)
Control Room
Observing voltage and current readings during No-Load Current No-Load Loss testing. Performing calculations for No-Load Impedance.
![Page 4: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/4.jpg)
500kV Test Bay
Checking the connections before lightning impulse testing and observing the stage connections on Haefely Impulse Voltage Generator.
![Page 5: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/5.jpg)
200kV Test Bay
Connecting cables on the TV side for No-Load Current No-Load Loss testing.
![Page 6: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/6.jpg)
200kV Test Bay
Making connections to the B phase on the TV side during the Lightning Impulse testing.
![Page 7: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/7.jpg)
500kV Test Bay
Standing on 1100MVA power transformer studying the delta LV bushings.
![Page 8: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/8.jpg)
Doble Engineering Equipment Experience using the
M4100 for power factor and 10kV excitation current testing on bushings and transformers.
Experience using M5300 and M5200 for Sweep Frequency Response Analysis.
![Page 9: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/9.jpg)
Experience with DTA software
![Page 10: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/10.jpg)
Experience interpreting SFRA graphs
![Page 11: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/11.jpg)
Experience using Tettex / Raytech and Meggar for winding resistance and core ground testing
![Page 12: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/12.jpg)
Experience using Tettex / Raytech and Meggar equipment for transformer turn ratio testing
![Page 13: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/13.jpg)
Experience using the Fluke IR Thermometer, Digital Multimeter and Thermal Imager
![Page 14: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/14.jpg)
Experience working with ABB bushings, IEEE Std C57, IEC Std and Maschinenfabrik Reinhausen tap changers
![Page 15: PPT JESSE JACKSON 2](https://reader036.fdocuments.in/reader036/viewer/2022070523/58ed6d171a28ab574a8b46cd/html5/thumbnails/15.jpg)
Certification