PROJECT COST MANAGEMENT IN DELHI METRO RAIL PHASE I
Rohan Sakapal - 1023Lalit Sawant - 1038
5/12/2013
![Page 2: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/2.jpg)
Project Cost Management
• Method that uses technology to measure cost and productivity through the full life cycle of enterprise level projectsIt has six lines with total length 189.63 kilometers 142 stations in which 35 are underground
• PCM encompasses several specific functions of project management including estimating, job controls, field data collection, scheduling, accounting and design.
![Page 3: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/3.jpg)
Project Cost Management• Beginning with estimating, a vital tool in PCM, actual
historical data is used to accurately plan all aspects of the project. As the project continues, job control uses data from the estimate with the information reported from the field to measure the cost and production in the project. From project initiation to completion, project cost management has an objective to simplify and cheapen the project experience.PCM encompasses several specific functions of project management including estimating, job controls, field data collection, scheduling, accounting and design.
![Page 4: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/4.jpg)
Project Cost Management
There are 4 processes in this knowledge area including• Planning Cost Management• Estimating Costs• Determining Budget• Controlling Cost
![Page 5: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/5.jpg)
About DMRC
• DMRC is a rapid transit system in national capital region
• It has six lines with total length 189.63 kilometers 142 stations in which 35 are underground
![Page 6: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/6.jpg)
Line First
operationalLast Extension
Stations Length(km)
Terminals
Red Line December 24, 2002
June 4, 2008 21
25.15 Dilshad RithalaGarden
Yellow LineDecember 20, 2004
September 3, 2010
34
44.65 Jahangir HUDAPuri
Blue LineDecember 31, 2005
January 8, 2010
October 30, 2010
-0-
44
6
50
6.25
NoidaCity Dwarka CentreYamuna Anand vihar Bank
Green Line April 3, 2010 -0-
1518.46 Inderlok Mundka
Violet Line October 3, 2010
January 14, 2011 15
20.04 Central Secre-Tariat Badarp
![Page 7: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/7.jpg)
Management Structure• Chairman - Shri Navin Kumar • Managing Director - Dr. E. Sreedharan • Total Number of Directors - 16 • Nominee of Govt. of India - 5 • Nominee of Govt. of NCTD - 5 (Including MD) • Number of full-time functional Directors at present
including MD - 7 • The corporate office of the company is located at Metro
Bhawan, Fire Brigade Lane, Barakhamba Road New Delhi - 110001, India
![Page 8: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/8.jpg)
Mission
• To cover the whole of Delhi with a Metro Network by the year 2021.
• DMRC to be of world class standards in regard to safety, reliability, punctuality, comfort and customer satisfaction.
• Metro to operate on sound commercial lines obviating the need for Government support.
![Page 9: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/9.jpg)
History
• Delhi, national capital of India and fastest growing country in the world.
• Population more than 1.68 crores. • Continuously day by day number of vehicles
increasing • 5 persons killed and 13 injured everyday • Air and Noise pollution• Traffic conjunction
![Page 10: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/10.jpg)
History
• For solving these problems in 1970 when Central Road Research Institute (CRRI) done deep study on traffic and travel characteristics
![Page 11: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/11.jpg)
![Page 12: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/12.jpg)
Delhi Metro Phase I
• Line 1 Shahdara-Tri Nagar- Rithala (22.06 KM- 18 Stations)
• Line 2 Vishwa Vidyalaya-Central Secretarit (10.84 KM 10 Stations)
• Line 3 Indraprastha - Barakhamba Road- Dwarka City (32.10 KM 31 Stations)
• Total 65 KM with 59 stations
![Page 13: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/13.jpg)
![Page 14: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/14.jpg)
![Page 15: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/15.jpg)
Financing Delhi Metro
• Central and State Govt. Equity• Japan International Cooperation Agency (JICA) –
1.2 % interest rate, repayment period of 30 years• Property Development • Interest Free Subordinate Loan by Centre and
State Govt. for land acquisition• Govt. Grant• Total Budget Phase 1 - 10571 cr.
![Page 16: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/16.jpg)
JICA Loans
• Loan has been accompanied by a series of general contracts going to Japanese firms
• In May 1998-DMRC appointed Japan's Pacific Consultants International (PCI) as general consultant
• The general consultant's role is vital• It chooses the firm which will finally execute
the project
![Page 17: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/17.jpg)
DMCR Tax regimeDMRC pays:• Wealth Tax• Fringe Benefit Tax
Exempted from:• Property Tax• Sales Tax• Works’contract Tax• Income Tax• Capital Gains Tax• Customs• Excise
![Page 18: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/18.jpg)
Other Concessions to DMRC
• Interest free subordinate loans from:• GOI, GNCTD, HUDA, NOIDA• Concessional loans from Japan International
Cooperation Agency (JICA)• Exchange rate risk is borne by Government• No dividend is paid on GOI share of equity till the
senior debt is repaid fully by the twentieth year• Electricity at cost to serve basis (300P/kVAh)*
![Page 19: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/19.jpg)
Revenue
• From Tickets• Season Passes• Tourist Passes• Advertisement• Business Sectors
![Page 20: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/20.jpg)
Resources
• www.delhimetrorail.com• www.urbantransist.net• www.wikipedia.com
![Page 21: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/21.jpg)
QUESTIONS?
![Page 22: PPT Final](https://reader031.fdocuments.in/reader031/viewer/2022020202/577cc7571a28aba711a0a470/html5/thumbnails/22.jpg)
THANK YOU