A PRESENTATION ON VOCATIONAL TRAINING AT –
NTPC UNCHAHAR
P
PRESENTENTED BY
AMIT KUMAR
![Page 2: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/2.jpg)
ABOUT NTPC• NTPC is the largest power generating company in india,
was set up in 1975 to accelerate power development in the country.
• NTPC has installed capacity of (47228 MW).
• NTPC has 18 coal based power stations (35085 MW).
• NTPC has 7 gas based power stations (4077 MW).
• NTPC has 7 power stations in joint ventures (6966 MW).
NTPC has 9 Solar based Power stations(360MW).
• In 2010 , Government of india granted NTPC status of ‘MAHARATNA’.
![Page 3: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/3.jpg)
ABOUT NTPC, UNCHAHAR• It has energy generating capacity by – -coal based thermal plant is 1050 MW .
• It has 3 stages consisting 5 units of coal based thermal plant .
-stage 1 –unit 1 and unit 2(2 x 210MW) -stage 2-unit 3 and unit 4(2 x 210MW). -stage 3 –unit 5 (210MW).• It’s 6th unit is under construction (500MW).
![Page 4: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/4.jpg)
DIFFERENT PHASES OF TRAININGSWITCHYARDMAIN PLANT GENERATOR BOILER TURBINEELECTROSTATIC PRECIPITATORCOAL HANDLING PLANT
![Page 5: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/5.jpg)
DIFFERENT COMPONENT IN SWITCHYARD CIRCUIT BREAKER
IT IS USED TO BREAK OR MAKE THE CURRENRT
TYPE OF CIRCUIT BREAKER SF6
![Page 6: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/6.jpg)
LIGHTINING ARRESTOR IT IS USED TO PROTECT OUR EQUIPMENT FROM
LIGHTINING SURGES MADE UP OF ZNO
AIR BREAK SWITCH
IT IS USED TO GROUND THE CIRCUIT AND TO DISCHARGE CB WHEN IT IS OFF
VOLTAGE RATING 245KV CURRENT 10 KA
![Page 7: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/7.jpg)
CAPACITIVE VOLTAGE TRANSFORMER
USED FOR METERING AND PROTECTION REACTER ARE CONNECTED IN SERIES
WAVE TRAP IT IS USED TO TRAP FREQUENCY ABOVE 50 HZ
CURRENT TRANSFORMERUSED FOR MEASUREMENT OF CURRENT AND PROTECTION OF
EQUIPMENTTURNS RATIO 800/1
ISOLATORSWITCH THAT CAN MAKE OR BREAK CIRCUIT BUT DO NOT
REQUIRE ANY POST CONDITION
![Page 8: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/8.jpg)
TURBO GENERATOR
![Page 9: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/9.jpg)
EXCITATION SYSTEM
STATIC EXCITATION SYSTEM -UNIT 1 AND 2 HAVE THIS ARRANGEMENT WHICH USES SLIP RING AND BRUSHES
BRUSHLESS EXCITATION SYSTEM- UNIT 3 4 AND 5 HAVE THIS SYSTEM
IT CONTAIN 2 EXCITOR ONE IS MAIN EXCITOR AND OTHER IS PILOT EXCITOR
TRANSFORMER CONVERT ELECTRICAL ENERGY FROM ONE CIRCUIT TO
ANOTHER HIGH EFFICIENCY RATING 250 MVA
![Page 10: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/10.jpg)
ACCESSORIES OF TRANSFORMER
CONSERVATOR BREATHER BUCHCHOLTZ RELAY TEMPERATURE INDICATOR
STATION TRANSFORMER RATING 40 MVA USED FOR DEVICE OF OUR PLANT
![Page 11: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/11.jpg)
BOILER IT IS A PLACE WHERE WATER IS CONVERTED TO STEAM STEAM GOES UP AND COLLECTED IN BOILER DRUM IT THEN GO TO TURBINE TO ROTATE ITS BLADE AND CONVERT
HEAT ENERGY TO ELECTRICAL ENERGY FD AND PA FAN HELP IN THIS PROCESS
ELECTROSTIC PRECIPITATOR USED TO PRECIPITATE THE DUST FROM FLUE GASFLUE GAS IS PASSED THROUGH DISCHARGE ELECTRODE
(EMITTING) TO COLLECTING ELECTRODE . DUE TO CORONA ELECTRODE IS IONISED AND ATTRACTED DUST
PARTICLE AND GET ACCUMULATED ON ITA SYN MOTOR IS ATTACHED TO ELLIMINATE THE DUST PARTICLE
![Page 12: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/12.jpg)
COAL HANDLING PLANT
TOTAL AREA 200ACRECONVEYER LENGTH 13 KM TOTAL COAL CONSUMED IN 24 HRS- 12000MTPURPOSE IS TO CONVEY COAL TO BUNKER IN SIZE NOT
MORE THAN 20 MMAVERAGE COST IS RS 5/KGFIRSTLY COAL FROM WAGON GET ACCUMULATED IN
TRACK HOPPER SIZE IS 300 MMPRIMARY CRUSHER CONVERT FROM 300 MM TO 150
MM. USES OF 170KW 6.6 KV MOTORSECONDARY CRUSHER CONVERT SIZE INTO 20 MM.
USES OF 700 KW MOTOR IS USED
![Page 13: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/13.jpg)
.
COAL THEN PASSED THROGH METAL DETECTOR TO REMOVE
FEROUS PARTICLE
THEN ACCORDING TO OUR NEED WE STORE SOME COAL IN
STACKER AND SEND REMAINING PART TO MILL WHICH CONVERT
COAL IN PODERED FORM AND SEND TO BOILER
![Page 14: ppt by amit 5 from iet lko](https://reader035.fdocuments.in/reader035/viewer/2022062412/58ed57321a28abdf048b45cd/html5/thumbnails/14.jpg)
.
THANK YOU