ppquest
Transcript of ppquest
-
8/3/2019 ppquest
1/19
Production Planning Questionnaire
Production Planning Questionnaire
InstructionsThis questionnaire is an online tool that you can use to collect information about your business that will
then be used for tailoring the R/3 System to your business needs. You will need Microsoft Word for
Windows to work with this document. Enter your answers in the fields after the questions, using the TAB
key to move from field to field. You may save, and later change, your answers in this questionnaire just asyou can with any other Word document. This document can be password-protected to allow entrance of
information only in the answer fields.
1 Enterprise Structure
1.1 Plants
A plant is an organizational unit that representsa production facility, warehouse, sale office, or
distribution center. In addition, MRP is
executed separately for each plant.
1.1.1List the different type of plants you will need,and briefly describe why each should be aseparate plant:
2.1 Basic Data
2.1.1Do you use engineering change managementfor your BOMs?
Yes No
2.1.2What application areas are your BOMs linkedto (for example, materials management, MRP,
costing, etc.)?
2.1.3Do you plan to use the default setting by SAPfor your BOMs validity or effectivity dates?
Yes No
If no, define your validity settings for your
BOMs.
2.1.4Do you maintain your BOMs using a CADsystem?
Yes No
If yes, explain.
1997 SAP Technology, Inc. 1
-
8/3/2019 ppquest
2/19
Production Planning Questionnaire
2.1.5Select the BOM types you maintain in yourorganization with associated units of measure.(i.e., pieces, each, die, etc.)
Material BOM
Equipment BOM
Functional location BOM
Document structure
Sales Order BOM
2.1.6BOM usage
Please select in what area(s) your BOMs willbe maintained.
Production
Engineering
Universal
Plant maintenance
Sales and Distribution
Costing
2.1.7Define material provisionindicators
Do your BOMs include material that is
provided by the customer?
Yes No
2.1.8Define explosion types
Select which BOM explosion type(s) your
company uses.
Phantom assembly off: you control how an
assembly with the Phantom assembly is exploded.
Phantom in planning: no dependent requirements
are produced for materials, and the materials are not
planned.
Collective order off: used to control how assemblycollective orders are exploded. (A collective order is
a structure of planned or production orders linked
over several manufacturing levels.)
Long term planning off: allows you to simulate
materials planning, in parallel to operational
materials planning, across all low-level codes. Thismeans that you can use the current bills of material to
determine the effects of a planned production
program on the material requirements and thecapacity load.
Individual/collective requirements:planning for
dependent requirements. This controls whetherindividual or collective customer requirements
planning is allowed for dependent requirements.
1997 SAP Technology, Inc. 2
-
8/3/2019 ppquest
3/19
Production Planning Questionnaire
2.1.9Will you be transforming BOM data from anexisting system into the SAP system?
Yes No
If yes, indicate the number of BOMs.
2.1.10 Are there several alternative BOMs forone material (different production processes or
proportions of quantities), or is this situationplanned for the future?
2.1.11 Are there BOM items that are not keptin stock, but are externally produced for orders?
Yes No
2.1.12 What are your requirements foradministering BOMs (copy functions, mass
changes, and so on)?
2.2 Work Center
2.2.1 If you are using Work Centers, select whatbusiness function(s) apply at your organization.
Costing
Scheduling
Capacity Planning
Printing Shop Floor Paper
Shop Floor Control
Confirmations
2.2.2Will you integrate Work centers with theHuman Resources sytem?
Yes No
If yes, briefly describe the type of data that will
be used (e.g., required skills).
2.2.3 List the type(s) of data that are maintained atyour work centers (i.e., costing or scheduling)
2.2.4Work centers can be categorized according totheir relevant use, for example, by maintenanceor inspection. Indicate how your work centers
are categorized and give the number of work
centers for each category.
2.2.5List the type(s) of parameters you use for yourvarious work center(s). (e.g., WC1=setup,machine & labor, WC2=labor only)
2.2.6What are the name(s) of the person or group ofpeople responsible for maintaining the data in
your work center(s)?
1997 SAP Technology, Inc. 3
-
8/3/2019 ppquest
4/19
Production Planning Questionnaire
2.2.7 If you are in a Kanban/JIT environment, list thenumber of supply areas you have, including a
brief description. (A supply area is used for
material replenishment and is situated on the
shop floor.)
2.2.8Select what default value(s) you plan tomaintain for your work center(s). (Defaultvalues help to simplify the maintenance of
work centers.)
Basic Data (General data)
Default operation
Scheduling
Capacity data
2.2.9Control keys allow you to determine thebusiness functions you want to carry out with
an operation and how the operation is to be
processed. Which business function(s) will be
processed at your operations?
Scheduling
Capacity planning
Costing
External processing
Completion confirmation (whether the
operation is confirmed)
Printing of time tickets
2.2.10 If you are using the HR module inSAP or if you are not planning to maintain
wages or salaries of your employees, skip this
question.
The wage and salaries of employees can be
calculated based the wage type (e.g., hourly,salary and bonus) What wage type(s) do you
maintain at your company?
2.2.11 In the SAP system, performanceefficiency rates are used in costing and in
capacity planning. What are the expected
efficiency rates that typically occur at several
work centers in your company? (e.g., 90, 100,
or 110%)
2.2.12 Define capacitycategories
What capacity categories are maintained atyour work center(s)? (e.g., machine, labor,
setup crew, emissions)
2.2.13 Determine capacityplanner
List the name(s) of people or groups of people
responsible for planning capacity at your
1997 SAP Technology, Inc. 4
-
8/3/2019 ppquest
5/19
Production Planning Questionnaire
company.
1997 SAP Technology, Inc. 5
-
8/3/2019 ppquest
6/19
Production Planning Questionnaire
2.2.14 Define shift sequence
Using the table below, indicate what shift
definition(s) are common for several work
centers at your company.
Shift Description Start Finish Break Wrk. Hrs.(e.g.)Day1 Normal Day 08:00:00 16:00:00 Noon 8.00
2.2.15 Indicate the work center formula(s)that you use in the following areas. (e.g.,
Machine Requirements = Machine* Operation
Qty. / Base Qty.)
Setup time
Machine time
Labor time
Setup Requirements
Machine Requirements
Labor Requirements
2.3 Routing
2.3.1 If you choose not to use the number rangeassignment in SAP, list your number range(s)
for internal and/or external routings.
2.3.2Skip this question if you are not using repetitivemanufacturing.
If you choose not to use the number range
assignment in SAP, list your number range(s)
for internal and/or external routings. (Rate
routings are used in repetitive manufacturing.)
2.3.3Profiles with default values are proposed when
you create a new routing. This data can eitherbe saved or overwritten. To assist when
creating a routing profile, fill in the data.
Unit of measure
Status (select one) Created
Released for Production
1997 SAP Technology, Inc. 6
-
8/3/2019 ppquest
7/19
Production Planning Questionnaire
Operation increments (e.g., 10, 20, 30)
Base quantity
Currency
2.3.4Select which material type(s) will be used inyour organization.Finished products: materials that are produced andsold to the customer
Semi-finished products: materials that can be sold
to the customer, or used in a higher assembly
Trading goods: materials that you buy and
sell without any manufacturing
Configurable material: the selectable
items form a BOM that are used to make a
Finished product in various combinations.(i.e., a car)
Non-stock material: material that you buy
and track qty., but in value is not kept.
Raw material: material you buy to producesomething with
2.3.5What are the name(s) of people or group ofpeople that are responsible for maintaining your
routings?
2.3.6The control key for an operation is used tocarry out business functions and dictate how an
operation is to be processed by the system.
What business functions are processed at the
operation level in your organization? (Selectwhere applicable.)
Scheduling
Costing
Inspection characteristics
Print operation
External Processing
Automatic goods receipt
Capacity Planning
Time tickets
Rework
Confirmation
Print Confirmation
2.3.7Reduction strategies are used to determine howthe opeation lead time can be reduced step by
step. Do you use reduction strategies in
manufacturing at your company?
Yes
No
1997 SAP Technology, Inc. 7
-
8/3/2019 ppquest
8/19
Production Planning Questionnaire
If yes, please explain.
3 Sales and Operations Planning
3.1 Master Data
3.1.1 If currency conversion is required, which typeof exchange rate will be used?
Average rate
Buying rate
Selling Rate
3.1.2Should capacity information be displayed? Yes
No
3.1.2.1 If yes, which type of resources willrequire resource leveling?
Work Centers
Materials
Production Resources and Tools
Costs
3.1.3Will SOP data be transferred from any non-SAP systems/sources?
Yes
No
3.1.4Which plant should be used as the planningplant when no other plant is identified?
3.2 Functions
3.2.1Will sales quantities be transferred from the R/3Sales Information System (SIS)?
Yes
No
3.2.2Which transfer strategy will be required whentransferring SAP data to Demand Management?
Direct from the sales plan
From the sales plan as a proportion of the
product group of which it is a member
Direct from the production plan
From the production plan as a proportion of
the product group of which it is a member
From an Information Structure
1997 SAP Technology, Inc. 8
-
8/3/2019 ppquest
9/19
Production Planning Questionnaire
3.2.3Application Link Enabling(ALE)
Will Sales and Operations plans (information
structures) be distributed to remote systems?
Yes
No
3.2.4Maintain planning types
Will more than one view of the planning table
be required?
Yes
No
If Yes, define the following for each user:
Planning Start Date
Number of time periods to plan
3.2.5Where will planning quantities be copied from? Sales Information SystemProfitability Analysis (CO/PA)
3.2.6Will non-SAP data be copied into the SAPplanning table?
Yes
No
4 Master planning
4.1 Planning Strategy4.1.1What type(s) of Planning Strategies are used
your company? (e.g., make-to-stk., make-to-
order, repetitive, etc.)
4.1.2What planning time fence duration is requiredfor planned independent requirements?
4.1.3Will planned independent requirements betransferred from the legacy system?
Yes
No
4.2 MPS4.2.1What individuals or groups of individuals will
be responsible for the monitoring of material
availability (MPS)? Identify the materials that
will be managed by each individual or group.
4.2.2What is the desired planning time fence forMRP processing? Should out-of-date plannedorders and firm planned orders in future periods
Yes
No
1997 SAP Technology, Inc. 9
-
8/3/2019 ppquest
10/19
Production Planning Questionnaire
be deleted before each material planning run?
4.2.3What evaluations (on-line reports) need to beprovided for the analysis of MPS results? How
should the report be structured?
5 Material requirements planning
5.1 Master Data
5.1.1Define MRP controllers
What individuals or groups of individuals will
be responsible for the monitoring of material
availability (MRP)?
5.1.2What individuals or groups of individuals will
be responsible for the processing of missingparts (MRP)?
5.1.3Will any of the following conditions exist formaterials produced in-house?
phantom assembly
production in an alternative plant
external reservation (withdrawal from an
alternative plant)
independent requirements
5.1.4Will any of the following conditions exist formaterials procured externally?
consignment
subcontracting
stock transport
5.1.5 In what time bucket is your horizon? (i.e., days,weeks, months)
5.1.6What is the required duration of the planningtime fence for each plant?
5.1.7For each plant, what percentage of safety stockshould be available for material planning?
5.1.8Should stock in transfer and/or blocked stock(material that is not available) be included in
the net requirements calculation as available
stock?
Yes
No
5.1.9For each plant, what is the desired maximumnumber of purchase order proposals that should
be created during the material requirements
planning run?
1997 SAP Technology, Inc. 10
-
8/3/2019 ppquest
11/19
Production Planning Questionnaire
5.1.10 Which lot-sizing procedures will beutilized?
static lot-sizing
period lot-sizing
optimizing lot-sizing
5.1.11 Will the proposed lot-sizes for anymaterials need to be adjusted to match the
deliverable/transportable units? For example, amaterial can only be delivered in crates of 10
pieces.
Yes
No
5.1.12 Should the system continue to utilizethe backward scheduling procedure even when
a planned start date lies in the past?
Yes
No
5.1.13 What is the maximum number of daysallowed between MRP runs?
5.1.14 Will R/3 be interfaced to an externalassembly cord system?
Yes
No
5.1.15 Will the hardware system environmentallow the splitting of the MRP planning run
process among multiple R/3 application
servers?
Yes
No
6 Production Orders
6.1 Master data
6.1.1Define order types
6.1.1.1 Do you use order settlement (planned vs.actual) for production orders?
Yes
No
6.1.1.2 What type of number assignment do youuse for production orders?
Internal (assignment automatically by the
system)
External (assigned by the user)
6.1.1.3 Define the length and format of yourproduction order numbering scheme.
6.1.1.4 If routing selection is required, will it beprocessed automatically or manually?
1997 SAP Technology, Inc. 11
-
8/3/2019 ppquest
12/19
Production Planning Questionnaire
6.1.1.5 Will batch determination be required priorto releasing a production order to the shop
floor?
Yes
No
6.1.1.6 Do you use the same scheduling data fromyour planned orders for your production dates?
Yes
No
6.1.1.7 Do you use external processing in youroperations? If so, would you prefer to use one
purchase requisition per operation or one
collective purchase requisition per order?
6.1.1.8 Indicate below where you would want torecord change status to a document.
The document records:
which status changed
who changed the status
when the status was changed
Order Status
Operation Status
Material Status
Production Resources Tool (assigned to an
operation, e.g., tools, jigs and fixtures,
inspections, devices and drawings)
6.1.1.9 Indicate at which point(s) you conductmaterial inspection.
Goods receipts inspection
Deliver to customer
6.1.1.10 Do you document goods movements with
reference to an order? If so, select whereapplicable.
Good receipt for a purchase order
Good receipt for a completed order
Planned goods issue
Unplanned goods issue
6.1.2 If you choose not to use the predefined numberranges in SAP, list your order types and their
number range(s).
6.1.3Define number ranges forconfirmations
If you choose not to use the predefined numberranges in SAP, list your number range(s) foroperation confirmations.
6.1.4Define number ranges forreservations
If you choose not to use the predefined number
ranges in SAP, list your number range(s) for
component reservations. (Only internal number
1997 SAP Technology, Inc. 12
-
8/3/2019 ppquest
13/19
Production Planning Questionnaire
assignment is allowed for reservation number
within production orders.)
6.1.5Define number ranges foroperations
If you choose not to use the predefined numberranges in SAP, list your number range(s) for
operations.
6.1.6Define number ranges forcapacity requirements
If you choose not to use the predefined number
ranges in SAP, list your number range(s) for
tracking capacity requirements.
6.1.7Define control key
Indicate which business functions you will usein your routing.
Scheduling
External processing
Capacity planning
Printing shop papers
Inspection characteristics
Costing
Automatic goods receipt
Processing of confirmations
6.1.7.1 Are setups used in capacity planning? Yes
No
6.1.7.2 Are formulas used for variable size items? Yes
No
6.1.8Define (standard) triggerpoint usage
Trigger points are used to trigger certain
functions, (i.e., operation release, insertion of
reference operation sets) when the status of
operation changes. A trigger point can be
assigned to an order or routing.
6.1.9Are you planning to use trigger points?
Yes
No
If yes, please give some examples as to how
1997 SAP Technology, Inc. 13
-
8/3/2019 ppquest
14/19
Production Planning Questionnaire
you will use trigger points.
6.2 Operations
6.2.1Select which criteria you use for routingselecting.
When creating a routing using the copy
function
At the time of order creation (prior to
release)
During scheduling
During costing
6.2.2Select automatically
Will you use automatic routing selection for
alternative routing?
Yes
No
6.2.3 If yes, what type of criteria will you use?
6.2.4Availability check
How do you process availability checks for
material/components when creating production
orders? Select where applicable.
All material must be available prior to
creating/releasing order
Create/release with shortages (not all
material available)
User decides on whether to release
Check material in groups (grouping materialbased on material and/or MRP type)
Material quantities confirmed in the
availability check are to be locked
Check ATP quantities
Check accumulated ATP quantities
Take into account replenishment lead time
Take into account stock categories
Take into account purchase requisitions-
MRP
Take into account purchase orders-MRP
Take into account planned orders-MRP
6.2.5What process do you use for checkingbackorders?
6.2.6Are capacity requirements (work orders, Yes
1997 SAP Technology, Inc. 14
-
8/3/2019 ppquest
15/19
Production Planning Questionnaire
planned orders) taken into consideration when
scheduling?
No
6.2.7Specify scheduling type
When scheduling production orders, what
criteria does your organization use? Selectwhere applicable.
Forwards
Backwards
Only capacity requirements
Current dates (The system schedules
backwards from the basic date and then
forward from the current date.)
6.2.8Define time units
Do you use time units for scheduling (i.e.,
second, minute, decade, etc.)?
Yes
No
If yes, list time units.
6.2.9Define key for performanceefficiency rate
Do you use performance efficiency rates (actual
work done by an employee vs. average work
done)?
Yes
No
6.2.10 Define schedulingmargin key
Select which type(s) of floats/buffers you use
when scheduling order(s).
Float before production: This is the time between
the order start date and the schedule start date.
Float after production: This is the time between the
order finish date and the scheduled finish date.
Release period: Number of working days in the
release period of an order.
6.2.11 Define move timematrix
Does your organization use move time betweenwork orders?
Yes
No
6.2.12 Define reductionstrategies
Will you use reduction strategies reduces lead
time if the basic dates given are not adhered to,or schedule dates lie outside of the basic dates?
Yes
No
If you are currently using reduction strategies,
what is your process?
1997 SAP Technology, Inc. 15
-
8/3/2019 ppquest
16/19
Production Planning Questionnaire
6.2.13 Define confirmation
parameters
Confirmations are used for order monitoring.
They can be performed at the operation and
sub-operation level. Partial confirmation is the
confirmation of an order that can still be
processed.
Select the area(s) in which your organizationuses confirmation control.
Check dates
Logs only warning messages or
information messages
Goods movement system to display all
components assigned to the operation.
Variances:
Scrap on a quantity basis
Excess consumption of activities
Longer execution time
6.2.14 What inventory valuation does yourorganization use?
Price control (standard cost) delivered
quantity is valuated with the standard cost.
The difference between inventory valuation
and credit posting to order is posted to the
cost differences.
Moving average cost.
7 Kanban
7.1 Will any stock points be situated directly at theproduction line or work center(s)?
Yes
No
If yes, how many are there are how and they
identified/named?
7.2 ReplenishmentStrategies
7.2.1Which of the following will be used to controlthe production of Kanban materials?
Kanbans (cards) and a cost collector
Planned orders and a cost collector
Production orders
7.2.2How will stock transfers need to be carried out? using a stock transfer reservation
using a direct transfer posting
1997 SAP Technology, Inc. 16
-
8/3/2019 ppquest
17/19
Production Planning Questionnaire
7.2.3For each status change, which of the followingshould occur?
Automatic goods receipt
Print Kanban card
8 RepetitiveManufacturing
8.1 Basic Settings
8.1.1Define number ranges forrun schedule headers
If you choose not to use the predefined number
ranges in SAP, list your number range(s) for
run schedule headers.
8.1.2Define number of thenumber ranges for backlogs
If you choose not to use the predefined number
ranges in SAP, list your number range(s) forbacklogs.
8.1.3Define number of numberrange for document log
If you choose not to use the predefined number
ranges in SAP, list your number range(s) for
document logs.
8.1.4What repetitive manufacturing profile(s) doesyour organization use or will use?
The data and costs incurred in productionare assigned to the run schedule header andare settled.
All the costs incurred in production are
assigned to the cost collector where they are
settled. (Production orders are not required.)
8.1.5Select how cost collectors are created at yourcompany.
Automatically, when creating the run
schedule header
Manually, in the CO system.
1997 SAP Technology, Inc. 17
-
8/3/2019 ppquest
18/19
Production Planning Questionnaire
8.1.6Specify control data forrepetitive manufacturingprofiles.
Select the repetitive manufacturing profiles
your organization plans to use.
Activities are automatically backflushed to
the cost collector
Discrepancies in backflushing are corrected
manually
The withdrawal of an item with a
discrepancy is refused
Master plan is reduced after a goods receipt
Planned orders are recreated when reversinga backflush
Reporting points for backflushes
Goods receipt is automatically posted at the
last reporting point backflush
Goods receipt and a goods issue is posted
when backflushing
Only post goods receipt
8.2 Planning
8.2.1Define planning periodicity
Select which planning period or buckets your
organization uses when creating a run schedule
header. (A run schedule header is an order in
repetitive manufacturing for the production of
finished products or semi-finished products that
are produced on a repetitive basis over a longerperiod).
Day
Week
Month
Posting period
8.2.2 If you do not use capacity planning in repetitivemanufacturing, skip this section.
You have two options for executing capacity
leveling. Select which option(s) you plan to use
in your organization.
via the planning table (spreadsheet format)
via the graphic table that you access via the
planning table
8.2.3How will requirements be distributed?Select one only.
Continuously (lineraly)
Discretely to defined points
1997 SAP Technology, Inc. 18
-
8/3/2019 ppquest
19/19
Production Planning Questionnaire
8.2.4Define distributionaccording to usage time
The distribution of orders is based on operating
time that takes available capacity into account
and shifts. Do you use operation time todistribute orders?
Yes
No
If yes, what is your process?
8.2.5When backflushing, what sequence for materialwithdrawal do you or will you use in your
organization? Indicate using 1 3
withdrawal of unrestricted stock-use stock
withdrawal of consignment stock
withdrawal of pipeline material
8.2.6Select which movements type you plan to use
in repetitive manufacturing. (Movements typesare automatically used for backflushing.)
goods receipts
goods issue
scrap
by-products
movements referring to individual customer
orders
8.3 Cost Object Controlling
8.3.1Define generation of costlog
Does your organization log costs in repetitive
manufacturing when backflushing activities?
Yes
No
8.3.2Select which distribution rule for settlementyou will use.
full settlement
settlement by period specifies variancecalculation is done out by period
8.3.3Select which cost collector your organizationwill use for backflushing in repetitive
manufacturing.
cost collector is created automatically by the
system, no search is required
use search strategy to define which cost
collector is used. If selected, choose one
option below:
on material is settled to one cost
collector
one material and one production version
are settled using several cost collectors
1997 SAP T h l I 19