R.M.K. COLLEGE OF ENGINEERING AND TECHNOLOGYR S M Nagar,Puduvoyal 601 206

LECTURE PLAN 2013 - 2014. (VIII Semester / IV Year)

Individual Time Table Section A Days PeriodIIIIIIIVVVIVIIVIII

TuesdayPPCPPC

WednesdayPPCPPC

ThursdayPPCPPC

FridayPPCPPC

SaturdayPPC

Name of the Faculty : Dr. P. K .DEVANDepartment : MECHANICAL ENGG.Subject Code : ME 2036Subject Name : PRODUCTION PLANNING & CONTROL Year / Semester : IV /VIIIBranch : MECHANICAL ENGG.

Tentative dates for Unit tests and Model Exam.Unit Test I: 30.01.2014 to 05.02.2014

Unit Test II: 27.02.2014 to 05.03.2014

Model Exam: 31.03.2014 to 09.04.2014

Sl.NoProposed LectureTopics to be coveredTeaching Aids to be usedActual Lecture

Remarks by the facultySteps taken to cover the incomplete portions, if any Signature of the Staff Member

DatePeriod

BBOHPPPDatePeriod

UNIT I - INTRODUCTION

119.12.2013 - 24.12.201319.12.20131,2Objectives and benefits of planning and control-Functions of production controlx19.12.20131,2Signature of HoDSignature of The Principal

220.12.20131,5Types of production-job- batch and continuous-Product development and designx20.12.20131,5

321.12.20133Marketing aspect - Functional aspects-Operational aspect-Durability and dependability aspectaesthetic aspect.x21.12.20133

423.12.20133,4Profit consideration-Standardization, Simplification & specializationx23.12.20133,4

524.12.20132,4Break even analysis-Economics ofa new design.x24.12.20132,4

No.of hours planned : 9Actual hours taken: 9

Sl.NoProposed LectureTopics to be coveredTeaching Aids to be usedActual Lecture

Remarks by the facultySteps taken to cover the incomplete portions, if any Signature of the Staff Member

DatePeriod

BBOHPPPDatePeriod

UNIT II - WORK STUDY

126.12.2013 - 31.12.201326.12.20131,8Method study, basic procedure-Selection-Recording of process - Critical analysis,x26.12.20131,8Signature of HoDSignature of The Principal

227.12.20131,5Development - Implementation - Micro motion and memo motion studyx27.12.20131,5

328.12.20133Work measurement - Techniques of work measurementx28.12.20133

430.12.20133,4Time study - Production studyx30.12.20133,4

531.12.20132,4Work sampling - Synthesis from standard data - Predetermined motion time standards.x31.12.20132,4

No.of hours planned : 9Actual hours taken: 9

Sl.NoProposed LectureTopics to be coveredTeaching Aids to be usedActual Lecture

Remarks by the facultySteps taken to cover the incomplete portions, if any Signature of the Staff Member

DatePeriod

BBOHPPPDatePeriod

UNIT III - PRODUCT PLANNING AND PROCESS PLANNING

12.1.2014 8.1.20142.1.20141,8Product planning-Extending the original product informationx2.1.20141,8Signature of HoDSignature of The Principal

23.1.20141,5Value analysis-Problems inlack of product planning-Process planning and routingx3.1.20141,5

34.1.20143Pre requisite information neededfor process planning-Steps in process planningx4.1.20143

47.1.20142,4Quantity determination in batchproduction-Machine capacity,x7.1.20142,4

58.1.20143,4Balancing-Analysis of process capabilities in a multi product system. x8.1.20143,4

No.of hours planned : 9Actual hours taken: 9

Sl.NoProposed LectureTopics to be coveredTeaching Aids to be usedActual Lecture

Remarks by the facultySteps taken to cover the incomplete portions, if any Signature of the Staff Member

DatePeriod

BBOHPPPDatePeriod

UNIT IV - PRODUCTION SCHEDULING

19.1.2014 21 .1.20149.1.20141,8Production Control Systems-Loading and scheduling-Master Schedulingx9.1.20141,8Signature of HoDSignature of The Principal

210.1.20141,5Scheduling rules-Gantt charts-Perpetual loading-Basic scheduling problemsx10.1.20141,5

311.1.20143Line of balance - Flow production scheduling-Batch production scheduling-Product sequencingx11.1.20143

420.1.20141,5ProductionControl systems-Periodic batch control-Material requirement planning kanban Dispatchingx20.1.20141,5

521.1.20142,4Progress reporting and expediting-Manufacturing lead time-Techniques for aligning completion times and due dates. x21.1.20142,4

No.of hours planned : 9Actual hours taken: 9

Sl.NoProposed LectureTopics to be coveredTeaching Aids to be usedActual Lecture

Remarks by the facultySteps taken to cover the incomplete portions, if any Signature of the Staff Member

DatePeriod

BBOHPPPDatePeriod

UNIT V - INVENTORY CONTROL AND RECENT TRENDS IN PPC

122.1.2014 29 .1.201422.1.20143,4Inventory control-Purpose of holding stockx22.1.20143,4Signature of HoDSignature of The Principal

223.1.20141,8Effect of demand on inventories-Ordering procedures.x23.1.20141,8

324.1.20141,5Two bin system -Ordering cycle systemx24.1.20141,5

425.1.20143Determination of Economic order quantity and economic lot sizex25.1.20143

528.1.20142,4ABC analysis-Recorder procedure-Introduction to computer integrated production planning systemsx28.1.20142,4

629.1.20143,4elements of JUST IN TIMESYSTEMS-Fundamentals of MRP II and ERP.x29.1.20143,4

No.of hours planned : 11Actual hours taken: 11