 PP50 Rev A Page 1 of 10 © COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING. . LM Gas Turbine Load Accept Guidelines Introduction The LM Aero Gas turbine provides good load acceptance capability from zero load and partial load for customers who have island load type applications and for starting up balance of plant during black out conditions. This position paper provides load accept capability information for the LM2X, LM6000 and LMS100 products, Description The GE Aero LM gas turbine products are 2 and 3 shaft type designs with control systems that have very robust fuel control acceleration and deceleration schedules that can maintain decent stall margins. The high-pressure shaft is aerodynamically coupled to the low-pressure shaft; therefore, the AC generator frequency output is controlled via the speed of the low-pressure turbine. From zero load, the LM2500 and LM6000 can accommodate 6 to 7 MW load acceptance and stay within 5% of 1PU frequency range for 1 to 2 seconds. Larger load acceptance can be accomate by deploying heavy inertia generator rotors. The LMS100 gas turbine, due to its high-pressure ratio and heavy duty fuel schedules, can accommodate 18 to 21 MW load acceptance from zero load. Load acceptance performance is enhanced when the GT has certain amount of base load connected. During this condition the fuel control valve is tracked off of minimum stop when there is load applied to the GT, which provides the valve with a wider range Therefore, with load applied with base load connected, the GT transient response and recovery is improved. Reference Figures 1 and 2 for LM2500 load acceptance performance capability curves for 50 and 60 Hz applications respectively. Curves represent typical connected generator inertia load of 700 slug ft^ 2  and are based on s tandard ISO day. Recovery time back to 1 PU frequency during load acceptance transients is typically around 2 to 4 seconds. Reference Figure 3 and 4 for LM6000 load acceptance performance capability curves 50 and 60 Hz applications respectively. Curves represent typical connected generator inertia load of 881 slug ft^ 2  and are based on standard ISO day. Recovery time back to 1 PU frequency during load acceptance transients is typically around 2 to 4 seconds. GE Energy Aero Energy Division Position Paper #50 Rev A Date: January 16, 2009 16415 Jacintoport Blvd Houston, TX 77015 USA T 001-281-864-2803 F 001-281-864-2459

description

pp50

Transcript of pp50

  • PP50 Rev A Page 1 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    .

    LM Gas Turbine Load Accept Guidelines

    Introduction The LM Aero Gas turbine provides good load acceptance capability from zero load and partial load for customers who have island load type applications and for starting up balance of plant during black out conditions. This position paper provides load accept capability information for the LM2X, LM6000 and LMS100 products,

    Description The GE Aero LM gas turbine products are 2 and 3 shaft type designs with control systems that have very robust fuel control acceleration and deceleration schedules that can maintain decent stall margins. The high-pressure shaft is aerodynamically coupled to the low-pressure shaft; therefore, the AC generator frequency output is controlled via the speed of the low-pressure turbine.

    From zero load, the LM2500 and LM6000 can accommodate 6 to 7 MW load acceptance and stay within 5% of 1PU frequency range for 1 to 2 seconds. Larger load acceptance can be accomate by deploying heavy inertia generator rotors. The LMS100 gas turbine, due to its high-pressure ratio and heavy duty fuel schedules, can accommodate 18 to 21 MW load acceptance from zero load.

    Load acceptance performance is enhanced when the GT has certain amount of base load connected. During this condition the fuel control valve is tracked off of minimum stop when there is load applied to the GT, which provides the valve with a wider range Therefore, with load applied with base load connected, the GT transient response and recovery is improved.

    Reference Figures 1 and 2 for LM2500 load acceptance performance capability curves for 50 and 60 Hz applications respectively. Curves represent typical connected generator inertia load of 700 slug ft^2 and are based on standard ISO day. Recovery time back to 1 PU frequency during load acceptance transients is typically around 2 to 4 seconds.

    Reference Figure 3 and 4 for LM6000 load acceptance performance capability curves 50 and 60 Hz applications respectively. Curves represent typical connected generator inertia load of 881 slug ft^2 and are based on standard ISO day. Recovery time back to 1 PU frequency during load acceptance transients is typically around 2 to 4 seconds.

    GE Energy Aero Energy Division

    Position Paper #50

    Rev A

    Date: January 16, 2009

    16415 Jacintoport Blvd

    Houston, TX 77015

    USA T 001-281-864-2803

    F 001-281-864-2459

  • PP50 Rev A Page 2 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Reference Figure 5 and 6 for LMS100 load acceptance performance capability curves with heavy inertia connected load. These plots depict these load acceptance transients with heavy inertia rotor generator application. Typical heavy inertia rotor inertia load connected to LMS100 is 3300 slug ft^2 for Brush model 98-330ER and Hitachi model GH1550A generator offerings.

    Reference Figure 7 and 8 for LMS100 load acceptance performance capability curves with low inertia connected load. These plots depict these load acceptance transients with heavy inertia rotor generator application. Typical heavy inertia rotor inertia load connected to LMS100 is 2226 slug ft^2 for Brush 82-445ER generators.

    The generator voltage response and recovery is typically 8 to 10 % with recovery to 1 PU within 1 to 2 seconds. If needed, incorporating high voltage PMG or static excitation can accommodate improved generator voltage response.

    Conclusion GE Aero can provide dynamic modeling studies of gas turbines during transient loads, acceptance and rejection for site-specific applications. GE Aero can provide special load transient dynamic performance for applications by deploying heavy inertia generators, as needed

    References: PP14B, LM6000 Full Load Rejection Guidelines PP36A, LMS100 Full Load Rejection Guidelines

  • PP50 Rev A Page 3 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 1, LM2500 Load Acceptance Capability 50 Hz application

  • PP50 Rev A Page 4 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 2, LM2500 Load Acceptance Capability 60 Hz application

  • PP50 Rev A Page 5 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 3, LM6000 Load Acceptance Capability 50 Hz application

  • PP50 Rev A Page 6 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 4, LM6000 Estimated Load Acceptance Capability 60 Hz Application

  • PP50 Rev A Page 7 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 5, LMS100 Load Acceptance Capability 50 Hz application High Inertia Rotor

  • PP50 Rev A Page 8 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 6, LMS100 Load Acceptance Capability 60 Hz application High Inertia Rotor

  • PP50 Rev A Page 9 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 7, LMS100 Load Acceptance Capability 50 Hz application Low Inertia Rotor

  • PP50 Rev A Page 10 of 10

    COPYRIGHT, 2009, GE PACKAGED POWER, L.P.,ALL RIGHTS RESERVED. THIS DRAWING IS THE PROPRIETARY AND/OR CONFIDENTIAL PROPERTY OF GE PACKAGED POWER, L.P., AND IS LOANED IN STRICT CONFIDENCE WITH THE UNDERSTANDING THAT IT WILL NOT BE REPRODUCED NOR USED FOR ANY PURPOSE EXCEPT THAT FOR WHICH IT IS LOANED. IT SHALL BE IMMEDIATELY RETURNED ON DEMAND, AND IS SUBJECT TO ALL OTHER TERMS AND CONDITIONS OF ANY WRITTEN AGREEMENT OR PURCHASE ORDER WHICH INCORPORATES OR RELATES TO THIS DRAWING.

    Figure 8, LMS100 Load Acceptance Capability 60 Hz application Low Inertia Rotor

    HomeGE Power.comMain Table Of ContentsTab LM SeriesPPIndexPP01PP02PP03PP04PP10PP16PP17PP20PP21PP26PP31PP32PP33PP34PP35PP37PP38PP39PP42PP45PP46PP47PP48PP49PP50PP51PP53PP54PP56PP59PP60PP61PP64

    Tab LM 6000PP05PP06PP07PP08PP09PP11PP14PP23PP25PP28PP43PP55PP57PP58PP62

    Tab IEC NEC TCP 50/60 HzPP12PP13PP15

    On-line HelpSearch HelpNavigate HelpZoom Help