PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and...
Transcript of PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and...
![Page 1: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/1.jpg)
Address:
DC/18/05021
Land adjoining Tuffs Road
and Maple Way
EYE
Ref:
Slide 1
![Page 2: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/2.jpg)
Slide 2THE PROPOSAL [OUTLINE submission]
erection of up to 126 dwellings and associated infrastructure
[only ACCESS + ‘principle’ to be determined at this stage ]
PLEASE NOTE:
This application is a duplicate of DC/18/01777 for an identical development on the
same site. That application is now the subject of an appeal against non-
determination. PINS has yet to announce a start date for that appeal.
In determining this application Members will also be providing direction to officers as
to their position in respect of the application now at appeal.
REVISED
![Page 3: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/3.jpg)
Slide 2a
3.2m
6.0 m
Proposed Site Plan
revis
ion
![Page 4: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/4.jpg)
Slide 2b
THE SITE: access
Tuffs Road
Maple WayOak Cres.re
vis
ion
![Page 5: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/5.jpg)
Slide 2c
THE SITE: access
Tuffs Road
Maple WayOak Cres.re
vis
ion
![Page 6: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/6.jpg)
Slide 2d
THE SITE: access
revis
ion
![Page 7: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/7.jpg)
Slide 2e
THE SITE: access
revis
ion
![Page 8: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/8.jpg)
Slide 2e
THE SITE: access
revis
ion
![Page 9: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/9.jpg)
Slide 2f
THE SITE: access
revis
ion
![Page 10: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/10.jpg)
Slide 2f
THE SITE: access
revis
ion
![Page 11: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/11.jpg)
Slide 2f
THE SITE: access
revis
ion
![Page 12: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/12.jpg)
Slide 3UPDATES:
An organised Member site visit did take place on 18 December 2018. It was attended by:
• Councillor Gerard Brewster• Councillor Matthew Hicks [Chair]• Councillor Sarah Mansell• Councillor John Matthissen
ADDENDUM [separate sheet circulated to Members]
• Representation from Andy Robinson. [Eye Town Council Project Co-Ordinator DC/18/01777]
• Representation on behalf of residents from Jon Betts
• Petition [147 signatures]
• Representation from Dan Poulter MP
EYE TOWN COUNCIL and DC/18/05021
![Page 13: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/13.jpg)
Slide 4EYE TOWN COUNCIL and DC/18/05021
1. At least 10% of sites should be less than 1ha2. Maximise brownfield - all told 10 HLS. If approved
this site will prejudice brownfield sites3. NPPF requires sufficient supply and mix of sites
approving this one will reduce diversity 4. Development should contribute to wider social and
economic objectives bringing this greenfield site forward will prejudice that to detriment of brownfield sites
• Will prejudice healthcare improvements at health centre, chicken factory, Paddock House
5. Provision of Ah and sheltered on a broader range of sites makes delivery more likely
6. NPPF objectives should be delivered through Plan-Led system
7. Applicant has not engaged with community8. Unnecessary development in the SLA
![Page 14: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/14.jpg)
Slide 5MAIN ISSUES include….
• The Principle of Development; presumption in favour of
sustainable development & Settlement Pattern
• Housing Land Supply
• Impacts on residential amenity
• Consultation Draft Eye Neighbourhood Plan
• The New Joint Local Plan and Prematurity
• Highway Impacts, Connectivity and Sustainable Transport
• Affordable Housing
• Indicative Layout implications
![Page 15: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/15.jpg)
Slide 6THE SITE: residential [OUTLINE]
![Page 16: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/16.jpg)
Slide 7THE SITE: red and blue lines
![Page 17: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/17.jpg)
Slide 8THE SITE: geographic context
EYE
Diss
Bury St
Edmunds
Harleston
Stowmarket
Framsden
4.3 miles8.7 miles
10.8 miles
10.7 miles18.6 miles
approx. as the crow flies
![Page 18: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/18.jpg)
Slide 9EYE: settlement boundary
![Page 19: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/19.jpg)
Slide 10
3.2m
POLICY
![Page 20: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/20.jpg)
Slide 11
3.2m
Documents currently afforded little or no weight at this time
![Page 21: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/21.jpg)
Slide 12EYE AIRFIELD MASTERPLAN:
![Page 22: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/22.jpg)
Slide 13CHICKEN FACTORY SITE: Magdalen Street
ENPCD 18
![Page 23: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/23.jpg)
Slide 14CHICKEN FACTORY SITE: Magdalen Street
72
![Page 24: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/24.jpg)
Slide 15CONSTRAINTS: heritage assets – listed buildings
![Page 25: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/25.jpg)
Slide 16EYE: Heritage Impact
![Page 26: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/26.jpg)
Slide 17CONSTRAINTS: heritage assets - conservation areas & SLA
SLA
CA
![Page 27: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/27.jpg)
Slide 18
THE SITE: aerial
TUFFS
MAPLE
![Page 28: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/28.jpg)
Slide 19
THE SITE: access
Tuffs Road
Maple WayOak Cres.
![Page 29: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/29.jpg)
Slide 20THE PROPOSAL
![Page 30: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/30.jpg)
Slide 21
3.2m
6.0 m
THROUGH ROAD or NOT?
![Page 31: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/31.jpg)
Slide 22
DEALING WITH ROAD NARROWINGS
![Page 32: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/32.jpg)
Slide
23
THE PROPOSAL
![Page 33: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/33.jpg)
Slide 24
CONSTRAINTS: public rights of way [PRoW]
![Page 34: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/34.jpg)
Slide 25
SITE PHOTOGRAPHS
![Page 35: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/35.jpg)
Slide 26
SITE PHOTOGRAPHS
![Page 36: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/36.jpg)
Slide 27
SITE PHOTOGRAPHS
![Page 37: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/37.jpg)
Slide 28
Church of St Peter & St Paul
F.P.
IMPACT on VIEWS of the CHURCH of ST. PETER & ST.PAUL
54m94m488m
2 mins.7 mins.80 secs 40 secs
![Page 38: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/38.jpg)
Slide 29
SITE PHOTOGRAPHS
![Page 39: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/39.jpg)
Slide 30
SITE PHOTOGRAPHS
![Page 40: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/40.jpg)
Slide 31
SITE PHOTOGRAPHS
Maple Way
![Page 41: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/41.jpg)
Slide 32
AERIAL PHOTOGRAPH: Oak Crescent pinch point
3.2m
6.0 m
![Page 42: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/42.jpg)
Slide 33
DEALING WITH ROAD NARROWINGS
![Page 43: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/43.jpg)
Slide 34
VIDEO
EYEMidSuffolk
![Page 44: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/44.jpg)
Slide 35
VIDEO
EYEMidSuffolk
![Page 45: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/45.jpg)
Slide 36
MORPHOLOGY
1976 19841957
![Page 46: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/46.jpg)
Slide 37
MORPHOLOGY
early 2000’s
late 70’s
20’teens
1980’s
20’teens
![Page 47: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/47.jpg)
Slide 38
3.2m
6.0 m
‘CALL FOR SITES’ March 2018
this carries no status as a material planning
consideration at this stage
![Page 48: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/48.jpg)
Slide 39
Eye
Town
Centre
SITE
CONNECTIVITY
900m13 minutes 544m
8 minutes
800m12 minutes
![Page 49: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/49.jpg)
Slide 40
TUFFS
MAPLE
BUS STOPS
Bellands Way
Century Road
![Page 50: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/50.jpg)
Slide 41
3.2m
6.0 m
Jon Betts: Buffer
![Page 51: PowerPoint Presentation · THE PROPOSAL [OUTLINEsubmission] erection of up to 126 dwellings and associated infrastructure [only ACCESS + ‘principle’ to be determined at this stage](https://reader036.fdocuments.in/reader036/viewer/2022071018/5fd254be927d653e08676ea8/html5/thumbnails/51.jpg)
Slide 42
3.2m
6.0 m
PUBLIC TRANSPORT
Railway Stations
StowmarketElmswellThurstonBury St EdmundsDiss