Page 1: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

Circuit Reliability Review

Mammoth Lakes

2020

Page 2: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

Reliability Overview

8

Page 9: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CityList1Communities in the BISHOP District

MESA

MONO COUNTY

ROUND VALLEY

TUOLUMNE DISTRICT 4

BIG PINE

BISHOP

BISHOP PAIUTE TRIBE

BISHOP RESERVATION

BRIDGEPORT PAIUTE INDIAN COLONY

DARWIN

BENTON PAIUTE TRIBE

WEST BISHOP

WILKERSON

DIXON LANE-MEADOW CREEK

INYO COUNTY

KEELER

MAMMOTH LAKES

11

Page 12: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CircuitList1Overview of Mammoth LakesThere are 12 circuits that serve Mammoth Lakes 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

AUTUMN(12KV) 2,089 - - -

BOBSLED(12KV) 1,782 - - -

CRAWFORD(2.4KV) 56 - - -

CROWLEY(12KV) 239 - - -

FALLS(2.4KV) 13 - - -

HURLEY(12KV) 831 - - -

NORDIC(12KV) 1,360 - - -

SITZMARK(12KV) 1,304 - - -

SLALOM(12KV) 1,370 - - -

SLOPE(12KV) 1,064 - - -

SNOWDRIFT(12KV) 748 - - -

SPORTSMAN(12KV) 13 - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Grand Total 10,869

13

Page 14: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Mammoth Lakes

Reliability History of Circuits Serving Mammoth Lakes (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

109.0219.1

18.3

1608.9

134.5 139.7 136.8 178.0

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

1400.0

1600.0

1800.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

0.5

2.6

0.2

3.1

1.1 1.20.9

1.0

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

SAIFI

(average

frequency of

sustained

interruptions)

2.0

2.9

1.9

2.4

1.61.8

1.4 1.4

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

MAIFI

(average

frequency of

momentary

interruptions)

14

Page 15: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Mammoth Lakes

2019

3rd Party

0.1%

Equipment Failure

50.0%

Operation

1.7%

Other

46.6%

Vegetation /Animal

0.4%

Weather /Fire

/Earthquake

0.3% PSPS

1.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

15

Page 16: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Mammoth Lakes

2019

3rd Party

0.5%

Equipment Failure

50.5%

Operation

4.4%

Other

40.4%

Vegetation /Animal

2.5%

Weather /Fire

/Earthquake

1.4% PSPS

0.4%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

17

Page 18: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

18

Page 19: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

Back-up Slides

Reliability Histories of Circuits Serving Mammoth Lakes

Updated through Dec 2019

19

Page 20: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

109.0 0.5 2.0 219.1 2.6 2.9 18.3 0.2 1.9 130.5 0.2 1.8 43.8 0.4 0.2 802.2 1.4 0.3 632.4 1.0 0.1 1608.9 3.1 2.4

3rd Party 3% 1% 1% 1% 3% 6% - - 6% 1% 7% - - - - - - - - - - 0% 0% -

Equipment Failure 9% 8% 2% 37% 14% 11% 26% 31% - 94% 84% 15% 71% 56% 0% 4% 11% 81% 97% 98% 100% 50% 50% 25%

Operation 15% 32% - 11% 24% 7% 29% 28% 6% 4% 6% 16% 4% 1% - 3% 8% 19% 0% 0% - 2% 4% 14%

Other 48% 30% 14% 26% 42% 42% 10% 16% 40% 1% 2% 70% 5% 17% 41% 93% 80% - - - - 47% 40% 55%

Vegetation/Animal 6% 8% 81% 1% 2% 27% 17% 10% 38% - - - 13% 18% 31% 0% 0% - - - - 0% 3% 3%

Weather/Fire/Earthquake 20% 22% 2% 25% 15% 7% 19% 14% 10% - - - 7% 8% 28% 0% 1% - - - - 0% 1% 3%

PSPS - - - - - - - - - - - - - - - - - - 3% 1% - 1% 0% -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

12 Circuits Serving Mammoth Lakes -- Total

Customers: 10,869

Average Reliability of 12 Circuits Serving Mammoth Lakes

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

20

Page 21: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

AUTUMN(12KV) - Customers: 2,089 319.6 1.2 3.9 184.8 1.5 3.8 13.9 0.1 3.2 512.3 0.5 0.9 - - - 948.9 1.3 1.0 697.0 1.0 - 2158.2 2.8 1.9

3rd Party 5% 2% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 6% 8% 6% 11% 7% 2% - - - 100% 100% 100% - - - 2% 3% 100% 89% 95% - 54% 54% 100%

Operation 10% 33% - 33% 84% - 51% 32% - - - - - - - 3% 13% - - - - 2% 6% -

Other 58% 33% 11% 46% 1% 55% 49% 68% 37% - - - - - - 93% 80% - - - - 41% 36% -

Vegetation/Animal - - 78% - - 26% - - 32% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 21% 24% 5% 10% 7% 16% - - 32% - - - - - - 1% 4% - - - - 0% 2% -

PSPS - - - - - - - - - - - - - - - - - - 11% 5% - 3% 2% -

BOBSLED(12KV) - Customers: 1,782 13.2 0.0 2.0 352.1 3.1 2.0 2.7 0.0 1.0 39.8 0.2 1.7 35.9 0.5 0.5 902.9 2.1 - 633.6 1.0 - 1612.2 3.8 2.2

3rd Party - - - - - 50% - - - 20% 55% - - - - - - - - - - 1% 2% -

Equipment Failure - - - 9% 2% - - - - - - - - - - 7% 6% - 100% 100% - 43% 30% -

Operation 9% 7% - - - - 25% 25% - 80% 45% 100% - - - - - - - - - 2% 2% 78%

Other - - - 36% 65% - - - - - - - - - - 93% 94% - - - - 52% 53% -

Vegetation/Animal 91% 93% 100% 1% 1% 50% 75% 75% 100% - - - 100% 100% 100% - - - - - - 2% 12% 22%

Weather/Fire/Earthquake - - - 54% 32% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CRAWFORD(2.4KV) - Customers: 56 76.5 1.0 3.0 23.1 1.0 3.0 - - 2.0 - - 1.0 - - - 876.4 1.0 - 625.9 1.0 - 1502.3 2.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - 100% - - - - - - 100% 100% - 42% 50% 100%

Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - 66% - - 50% - - - - - - 100% 100% - - - - 58% 50% -

Vegetation/Animal - - 100% - - 34% - - 50% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CROWLEY(12KV) - Customers: 239 10.4 0.0 2.0 856.4 3.2 7.2 159.9 1.0 2.0 652.9 1.2 1.8 21.2 0.1 - 692.7 1.0 - 621.5 1.2 0.8 1988.3 3.4 2.6

3rd Party - - 50% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 15% 10% - 7% 4% 44% - - - 91% 83% - - - - - - - 100% 84% 100% 61% 57% 31%

Operation - - - - - - - - - - - - 49% 50% - - - - 0% 16% - 1% 7% -

Other - - 50% 1% 1% 14% - - 100% 9% 17% 100% 51% 50% - 100% 100% - - - - 38% 36% 69%

Vegetation/Animal - - - 1% 1% - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 85% 90% - 92% 94% 42% 100% 100% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Mammoth Lakes - 1 of 3

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

21

Page 22: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

FALLS(2.4KV) - Customers: 13 4967.8 10.3 7.1 987.0 5.0 10.0 - - 3.2 4289.3 1.0 - - - - 1602.6 1.0 - 2233.9 2.1 - 8125.8 4.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 30% 30% - 25% 20% - - - - 100% 100% - - - - - - - 29% 50% - 61% 49% -

Operation 2% 10% - 37% 40% - - - - - - - - - - - - - - - - - - -

Other 47% 40% 43% - - 30% - - 71% - - - - - - 100% 100% - - - - 20% 25% -

Vegetation/Animal - - 42% - - 10% - - 29% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 22% 20% 14% 38% 40% 60% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - 71% 50% - 19% 25% -

HURLEY(12KV) - Customers: 831 168.0 1.0 0.0 76.0 3.0 0.0 1.5 0.0 - 42.0 0.1 1.0 - - 0.0 883.7 2.0 0.7 662.2 1.1 - 1587.9 3.2 1.7

3rd Party - - - 23% 32% - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 29% 32% - 93% 89% - 100% 100% 100% - - 100% - - - 100% 100% - 44% 38% 59%

Operation - - - 30% 4% - - - - - - - - - - 20% 49% 100% - - - 11% 30% 41%

Other 100% 100% 100% 18% 32% 100% - - - - - - - - - 80% 51% - - - - 44% 32% -

Vegetation/Animal - - - - - - 7% 11% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

NORDIC(12KV) - Customers: 1,360 42.0 0.3 2.0 564.8 3.0 1.6 26.9 0.3 1.0 - - - 245.0 1.8 - 574.7 1.0 - 607.0 1.0 - 1426.7 3.8 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 69% 50% - 95% 34% 38% 94% 98% - - - - 100% 100% - - - - 100% 100% - 60% 74% -

Operation 31% 50% - 4% 33% - - - - - - - - - - - - - - - - - - -

Other - - - 1% 33% - - - - - - - - - - 100% 100% - - - - 40% 26% -

Vegetation/Animal - - 100% - - 62% 6% 2% 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SITZMARK(12KV) - Customers: 1,304 83.4 0.8 2.0 102.7 4.7 2.0 34.0 0.4 3.0 25.1 0.3 - 25.9 0.3 - 801.6 2.1 0.3 624.3 1.0 - 1476.8 3.6 0.3

3rd Party - - - - - - - - 33% - - - - - - - - - - - - - - -

Equipment Failure 1% 1% - 21% 21% - - - - 100% 100% - - - - 20% 50% 100% 100% 100% - 55% 64% 100%

Operation 3% 5% - 28% 22% 21% 89% 72% 33% - - - - - - 0% 3% - - - - 0% 2% -

Other - - - 46% 48% 51% 11% 28% - - - - - - - 80% 47% - - - - 43% 27% -

Vegetation/Animal 24% 30% 100% 4% 9% 28% - - 33% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 71% 63% - - - - - - - - - - 100% 100% - - - - - - - 2% 7% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Mammoth Lakes - 2 of 3

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

22

Page 23: PowerPoint Presentation - SCESCE’S vision to help California achieve a carbon neutral future Carbon neutrality is achieved through deep decarbonization of electricity, transportation

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SLALOM(12KV) - Customers: 1,370 8.6 0.1 2.0 55.5 3.0 1.0 10.2 0.1 1.0 - - - 4.1 0.0 - 767.5 1.0 - 625.5 1.0 - 1397.1 2.0 -

3rd Party - - - 9% 1% - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 29% 39% - - - - - - - - - - 100% 100% - 45% 49% -

Operation - - - 42% 33% - 12% 5% - - - - 100% 100% - - - - - - - 0% 1% -

Other - - - 11% 33% - - - - - - - - - - 100% 100% - - - - 55% 49% -

Vegetation/Animal 100% 100% 100% - - 100% 59% 57% 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 39% 33% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SLOPE(12KV) - Customers: 1,064 83.3 0.7 1.0 76.7 1.0 6.9 16.7 0.0 3.0 - - 7.0 30.1 0.7 0.3 708.1 1.0 - 585.8 1.0 0.3 1324.1 2.7 7.6

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - 14% - - - - - - - - - - - - 100% 100% 100% 44% 36% 4%

Operation 88% 92% - - - 14% - - - - - - 27% 2% - 0% 1% - - - - 1% 1% -

Other 4% 5% 100% 100% 100% 57% - - 100% - - 100% 73% 98% 100% 99% 96% - - - - 55% 62% 96%

Vegetation/Animal 8% 4% - - - 14% 100% 100% - - - - - - - 0% 3% - - - - 0% 1% -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SNOWDRIFT(12KV) - Customers: 748 - - 1.0 42.7 1.0 6.0 17.5 0.1 3.0 - - 7.0 7.6 0.0 2.0 688.6 1.0 - 533.6 1.0 1.0 1229.8 2.0 10.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - 17% 82% 54% - - - - 100% 100% - - - - 100% 100% 100% 44% 51% 10%

Operation - - - - - 17% - - - - - - - - - - - - - - - - - -

Other - - 100% 91% 96% 67% - - 100% - - 100% - - 50% 100% 100% - - - - 56% 49% 80%

Vegetation/Animal - - - 9% 4% - 18% 46% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - 50% - - - - - - - - 10%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SPORTSMAN(12KV) - Customers: 13 - - 1.0 81.0 1.0 6.0 33.8 1.0 2.9 - - 6.5 - - 1.0 715.6 1.0 - 540.5 1.0 1.0 1256.1 2.0 8.5

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - 17% 100% 100% - - - - - - - - - - 100% 100% 100% 43% 50% 12%

Operation - - - - - 17% - - - - - - - - - - - - - - - - - -

Other - - 100% 100% 100% 67% - - 100% - - 100% - - 100% 100% 100% - - - - 57% 50% 88%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Mammoth Lakes - 3 of 3

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019