2018/10/24 1
2018/10/24 2
SAFE DEAD WORK
• “SAFE DEAD WORK”………….. What is this?
• There are two practical options…..
• NRS 097-2-1 compliance (switch off and break before you make)
• What is the Dead Grid Safety Lock?
• How does the Dead Grid Safety Lock work?
• Is installation net-energy throttling functions as a safety feature?
Electrical Installation Regulations
Point of
Supply
Point of
Control
Two Points of Supply
Utility
Point of
Supply
EG
Point of
Supply
LV Dead - Safe Work Practice
• Identify circuit
• Open circuit
• Isolate circuit
• Tag circuit
• Lock out circuit
• ( DO NOT USE EARTHING & BONDING )
• Test at location
• Work
7
Locked Out and Tagged
Typical LV Locking and Tagging Equipment
2018/10/24 9
Test to Proof Voltage = 0 Volt = Safe
2018/10/24 10
Single Customers per MV-LV Transformer
• Employ standard LV safe procedure as given above:
• I.e. Isolation of the installation
2018/10/24 11
Multi-Customer LV Networks
2018/10/24 12
Complex and Impossible to
Employ the normal safe work
procedure
Typical Over Head LV Networks
2018/10/24 13
Where are the EG ?
2018/10/24 14
The only feasible Approach:
Secure - Automated
Safety Systems
How do we automate this?
2018/10/24 15
Contactor
C
NO
With the Utility side dead, a live EG cannot feed
power back
Simple example of one embodiment of the
principle.
UTILITY
NETWORK
CUSTOMER
INSTALLATION
Automated LV Safe Work Practice
• Normal upstream safety procedure
• Test at location + Automated Dead-Grid Lock
• Work
16
2018/10/24 17
Dead-Grid Lock
The Purpose of the DEAD-GRID LOCK is to ensure that power cannot flow back from a EG once a utility worker has proofed that this part of the LV network is safe to work on.
It relies on the EG to power down automatically when the utility power fails. ( Anti-islanding and out of bounds requirements)
Dead-Grid Lock
If this does not happen, the safe work procedure will detect the condition and further steps is to be taken to make the installation safe.
The sole purpose of this device is to secure that once the network is proven to be safe to work on- that it remains so, regardless of any actions or failure of equipment during this time on the EG’s side.
Test to Proof Voltage = 0 Volt
2018/10/24 20
The Critical Step : Test – once dead AND Utility supply locked
out –The automatic Dead Grid Safety Lock
ensures safety from the EG’s side.
Cable to EG
On / Off
AC
Disconnector
Dead-Grid Safety-Lock
Dead-Grid Safety-Lock
2018/10/24 22
8.9 kVA
On
PF .98
DC side
Arresters
PV
Str
ing
In
sta
llati
on
Main DB
Connection
Inverter
DGSL Installation on a PV Inverter
Safe Even when it is DEAD
24
2018/10/24 25
LV Live - Safe Work Practice
2018/10/24 26
Multi customer feeder -Minimum Safety Requirements
MAIN DB
POS
POC
Locked in
Grid-Tied-Mode
EG - DB
PE PE
Structural lighting
protection and
bonding of PV
panels