Page 1: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the
Page 2: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

2013-2014 2019

Term

vessels

Spot

vessels

Term

vessels

Spot

vessels

Supply (PSV) 27 5-10 19 5-15

Stand-by (ERRV) 17 0 8 0-2

Anchor handling

(AHTS)4 0-10 2 0-10

Guard duties x x x x

Total 48 5-20 29 5-25

Page 3: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

500,000

2008 2011 2012 2013 2014 2015 2016 2017 2018 2030

CO2 emission

Supply Extra supply Anchor handler Standby Total Linear (Total)

31% reductions compare to 2011 adjusted for activity level pr October 2019

Ambition JOS LE: reduce CO2 with 50% compared with 2011 for vessel in LE MO in 2030

IMO: reduce the total annual GHG emissions by at least 50% by 2050 compared to 2008. 44% red not activity adjusted

Page 4: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the
Page 5: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

Subject Minimum requirement Optimum requirement

CLEAN Design Clean Class Clean Design

Optimum engines size for environmental friendly speed, please

specify speed, solutions and number of engines running.

Loading condition to vessel draft matching 50% of DWT on

board.

SCR or similar/ other system (LNG) to reduce emissions in

place - Please specify compliance IMO Tier 3

Low Voltage Shore Connection (LVSC) according to NEK

IEC 80005-3 (Landstrøm). This do not have to be installed at

vessel before the supply base has the facilities for Low Voltage

Shore Connection. Notation Shore Power (DNVGL or equal) compliance compliance

Battery installed for hybrid operating, preferable prepared

for spinning reserve in DP-operation. Indicate potential fuel

saving. Installed and fully operated after contract award. (to be

agreed with Equinor) Battery safety notation Battery power notation

Vessels should be registered in ESI

http://www.environmentalshipindex.org/Public/Home compliance compliance

Port generator min 600 kW N/A Compliance

Vessel shall have a Nox measurement not older than 5 year at

all time (not for LNG vessels).

Compliance Compliance

Fuel measure/Ecometer (kjøre computer) on bridge please specify.

Installed flow meters for accurate measurements (+-1%) to

engines and feedback to bridge for optimal used of engines/ fuel

consumption. Please specify system

Compliance Compliance

Fuel incentive / fuel commitment Info Compliance

Page 6: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

-

100

200

300

400

500

600

700

800

Transit Max Speed DP operation Standby Port Linear ( Transit) Linear ( DP operation)

Page 7: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

Fuel consumption 275 kg/hrX kg/hr

X kg/hr

Several vessel with this agreement

Contract requirement in some tenders

E.g. baseline 275kg/hr -+ X%

Page 8: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the

Page 9: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the
Page 10: PowerPoint Presentation · Low Voltage Shore Connection (LVSC) according to NEK IEC 80005-3 (Landstrøm). This do not have to be installed at vessel before the supply base has the