Presentation
• CAES Aquifer Technology• Geological Framework of Iowa• Dallas Center Structure• Results of CAES Feasibility
Simulation• ISEP CAES Development Plan
![Page 3: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/3.jpg)
How Does CAES Work?
![Page 4: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/4.jpg)
CAES Turbo-Machinery Operating Requirements
Equipment Manufacturer
Plant Size (MW)
Min. Inlet Pressure (psi)
Min. Flow Rate (lbs/MW/hr)
Total Min. Flow Rate (lb/hr)
Allison 15 200 9500 142,500
MAN Turbo 50 50 9500 475,000
Dresser Rand 134 830 9500 1,273,000
Alston 300 900 9500 2,850,000
Westinghouse (501D5) 350 750 9500 3,325,000
Westinghouse (501F) 450 750 9500 3,275,000
![Page 5: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/5.jpg)
Earth Storage System Designs
All based on the concept of multiple geologic and hydrologic barriers.
![Page 6: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/6.jpg)
DESIGN CRITERIA
• Capacity: 5 to 10 BCF Total Vessel Volume• Integrity of Vessel: <4% of Volume over a year• Fluid Deliverability
– 400#/sec = 464 MMscfd– Minimum Pressure - 830 psi
![Page 7: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/7.jpg)
CAES Aquifer Storage System
![Page 8: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/8.jpg)
Geology of Iowa
![Page 9: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/9.jpg)
Mt. Simon Sandstone
Jordan Sandstone
St. Peter SandstoneGlenwood Fm.
![Page 10: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/10.jpg)
Precambrian Geology of Iowa
Dallas Center StructureDallas Center Structure
Stanhope StructureStanhope Structure
Dallas Center StructureDallas Center Structure
Stanhope StructureStanhope Structure
![Page 11: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/11.jpg)
Iowa's Underground Hydrocarbon Storage Structures
++
![Page 12: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/12.jpg)
Dallas Center Structure
Geological Evaluation
![Page 13: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/13.jpg)
DallasCounty
elevation of the topof the Devonian
geology of thePrecambriansurface
Thurman-RedfieldFault System
Perry-HamptonFault System
sea level
1,000 ft
-900 ft
-2,000 ft
Dallas CenterStructure
Dallas CenterStructure
![Page 14: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/14.jpg)
![Page 15: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/15.jpg)
Dallas Center Mt. Simon StructureMount Simon Elevation
Well location
ft. msl
1855000 1860000 1865000 1870000
595000
600000
605000
610000
615000
620000
625000
-2340
-2300
-2260
-2220
-2180
-2140
-2100
-2060
-2020
-1980
-1940
-1900
-1860
-1820
-1780
![Page 16: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/16.jpg)
Dallas Center CAES Simulation
Approach1. Redfield Gas Storage SimulationDallas Center CAES Simulation
![Page 17: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/17.jpg)
Bubble Development & Air Cycling Plan
Create a Bubble Cycle Air
Potential Pressure Spike: Solution– Well Configuration– Staged Development
Well Configuration
![Page 18: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/18.jpg)
Conclusions from Model• Dallas center CAES project
technically feasible.• Adequate geological storage
structure to support two 134 MWe CAES units.
• CAES system performance feasible-good match to turbines.
• Complex development plan.• Site merits further
investigation
![Page 19: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/19.jpg)
Dallas Center CAES Development Plan
![Page 20: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/20.jpg)
Exploratory Drilling Program• Site, lease and permit exploratory
test wells (two wells)• Drilling Contract Bid• Drill & Coring 2 Exploratory Wells• Geophysical Logging• Laboratory Core Analysis• Conduct Water Pumping Test• Eventually Test Inject Air into
Structure• Model Test Results for CAES
Design
![Page 21: PowerPoint Presentation - Department of Energy 2009 Peer Review... · Presentation • CAES Aquifer Technology ... surface. Thurman-Redfield Fault System ... Mount Simon Elevation:](https://reader031.fdocuments.in/reader031/viewer/2022011802/5b1497147f8b9a437c8dc31d/html5/thumbnails/21.jpg)
Develop Dallas Center CAES Plant
• Project & Environmental Permitting
• Design Power Plant & Order Equipment
• Drill & Construction 11 New Air Injection/Withdrawal Wells
• Pump Air Into Structure to Create Commercial Air Bubble
• Build Power Plant• Operate Power Plant