PowerPoint 演示文稿 - Firjan

27

Transcript of PowerPoint 演示文稿 - Firjan

Page 1: PowerPoint 演示文稿 - Firjan
Page 2: PowerPoint 演示文稿 - Firjan

Page 2

SOLUÇÕES INTEGRADAS PARA A CADEIA DE P&G

Greate ecological landscape for oil & gas field

Excellent capacity for global service delivery

High-End oil equipment R&D manufacturer across the industrial chain

Technology development system covering the world

Perfect global marketing and service network

Oil & Gas EPC construction building expert

Integrated oil & gas field service and solution provider

Page 3: PowerPoint 演示文稿 - Firjan

Page 3

CULTURA CORPORATIVA

Solidarity and Cooperation,Open and Innovative,

Quality Foremost,Integrity and Responsibility,

Win-Win.

Customer-based,

talent-oriented.

Core Values

One Fundamental Two Cores

Technology Leads Future,

Service Creates Value.

Page 4: PowerPoint 演示文稿 - Firjan

Page 4

Revenue from overseas market

PRESENÇA GLOBAL

Local service centers worldwide

Technical support centersGlobal branches

Canada

U.S.A

ColombiaSingapore

Russia

China

3357 7 70%

3900 Suppliers and partners

350+ Oilfield engineering and service companies

Petroleum companies220+

UAE

Page 5: PowerPoint 演示文稿 - Firjan

Page 5

CLIENTES

Page 6: PowerPoint 演示文稿 - Firjan

Page 6

High-end petroleum equipment

industrial park

2.4MM㎡

Oil & Gas Stimulation equipment

production base

Oil recovery machinery

production base

Drilling equipment production base

Natural gas compressor

production base

Wellhead and well control

production base

Oil & gas process production base

Houston coiled tubing equipment production base

PARQUE FABRIL

Page 7: PowerPoint 演示文稿 - Firjan

Page 7

TIME INTERNACIONAL

8000Employees

1000 3000Foreign

employees

51%Technical engineers

local employee rate

Foreign employees accounting for 12.5%

After-sales engineers accounting for 15%

Technical engineers accounting for 37.5%

Local employees accounting 51%

Widely drawing talents from around the world, KERUI continuously

conduct the core capacity training and practice and stimulate innovative

ideas through learning, communication and fusion with, each other,

making an efficient team with international business quality.

Page 8: PowerPoint 演示文稿 - Firjan

Page 8

COOPERAÇÃO COM INSTITUIÇÕES ACADÊMICAS E DESENVOLVIMENTO DE P&D

We have maintained long-term strategic

partnership with 20+ universities and research

institutions both at home and abroad and

focused on developing and reserving premium

talents to ensure our technology and

innovation capacity takes the lead.

20+Universities and

research institutions

Page 9: PowerPoint 演示文稿 - Firjan

Page 9

TIME DE P&D

• The Mobile & On-site Lab• The Petrophysics Lab• The Imaging Lab• The Petroleum Geochemistry Lab• The Reservoir Stimulation Lab• The Porous Media Flow Lab• The Rock Mechanics Lab• The Physical Simulation Lab

• Graduate students 40%

• Senior engineers 60%

• Technology developers 10+ years’30%

Scientific researchachievements

Patent technologys

Sales revenue going to R&D

4% 1500 1000

R&D employees

2000

16Scientific research

laboratories

• The Micro-simulation Lab• The Numerical Reservoir Simulation Lab• The Fracturing and Acidizing Lab• The Drilling Fluid Lab• The EOR Lab• The Oil Recovery and Gathering Lab• The Environmental Lab• Key Laboratory for Off-shore Petroleum Equipment

Page 10: PowerPoint 演示文稿 - Firjan

Page 10

FABRICANTE INTENACIONAL DE SONDAS DE PERFURAÇÃO

60 K m2 350

450+ 60

Production Base Technical R&D Staff

Global Sales Volume (Sets)

• Among China Top 3 drill rig solution providers

• International marketing service system

• Serving global famous petroleum companies and oilfield service companies

A trustworthy partner for

our customers

Exported To 60 Countries and

Regions Throughout The World

Page 11: PowerPoint 演示文稿 - Firjan

Page 11

Conventional Land Rig Special Land Rig Truck-mounted Rig Workover Rig 9000m Conventional Land Rig

Arctic Drilling Rig

FABRICANTE INTERNACIONAL DE SONDAS DE PERFURAÇÃO

Presenter
Presentation Notes
科瑞石油钻井装备生产基地,占地60 万平米,拥有 350 余名技术研发人员、400 多套生产设备, 配套使用性能 先进、稳定可靠的国际知名品牌部件,致力于为您提供专业 定制化、高效能的钻井装备和服务。 科瑞已向全球60 多个国家和地区提供了450 多套钻修 井装备;与沙特阿美、美国NOV、德国Bentec、威德福、 达尔马等80 多个国际知名石油公司建立了战略合作伙伴关 系。 3000 马力沙漠快移钻机KY720 液压钻机高寒钻机快移钻机ZJ40 车载钻机常规陆地钻机 1
Page 12: PowerPoint 演示文稿 - Firjan

Page 12

Fracturing Spread

Nitrogen Generation Equipment Liquid Nitrogen Pump Unit

Cementing Unit

Coiled Tubing Unit Fracturing Pump, Cementing Pump

Annual production capacity (sets)

Annual production of membrane-separation

nitrogen generator (sets)

Market share of nitrogen generator in China

200800

70%

FABRICANTE DE EQUIPAMENTOS DE ESTIMULAÇÃO DE POÇOS

Page 13: PowerPoint 演示文稿 - Firjan

Page 13

FABRICANTE DE EQUIPAMENTOS DE CABEÇA E CONTROLE DE POÇO

Bop & Bop Control System Subsea Wellhead Equipment

140 30000

Wellhead Equipment

Design and R&D staff

Annual design and production capacity of high-end wellhead

equipment (sets)

100+Patent technology

onshore offshore subsea

Page 14: PowerPoint 演示文稿 - Firjan

Page 14

PROVEDOR DE SOLUÇÕES DE COMPRESSÃO DE GÁS NATURAL

Generator UnitReciprocating Compressor Centrifugal Compressor Screw Compressor

Hour/year year MPA ℃℃

8000 25 70 -60 120 50+

Authorized to Package

10+ years’experience account

Page 15: PowerPoint 演示文稿 - Firjan

Page 15

PROVEDOR PARA PROJETOS INTEGRADOS DE P&G

Pakistan's largest natural gas treatment project(EPCC)

Project Quick Quotation and Economic Analysis

ENR Top 225 International Design Firms

Financing Program

Standardized &Modular Design

ENR Top 250 International Contractors

Natural Gas Treatment

Oil & Gas Storageand Transportation

Oil Refining

Page 16: PowerPoint 演示文稿 - Firjan

Page 16

Project Management Design Capability Procurement Capability Construction Capability

•we have word-lead design team, complete international design software. high efficient management system; •On oi l& gas engineering area, we can provide on-stop technical service of consultation ,conceptual design, feasibility study ,basic design, detailed design, management of design project and project evaluation.•24 patents in gas processing engineering.

•1800 suppliers worldwide;

•Global sourcing and in-factory

supervision, by Kerui purchasing

centers in Asia, Europe and;

America;

• International logistics platform

and Kerui exclusive direct

customs station

•More than 10 years of

construction experience,

working with local regulations

and local teams;

• Integrating local resources;

•Experienced management

team

•Rich experienced project

management specialists and

team ;

•Advanced localization strategy;

•High efficient cost control

measures;

•Complete project management

system to guarantee the smooth

execution of project

PROJETOS EPC

Speed Efficiency Cost Integration

Page 17: PowerPoint 演示文稿 - Firjan

Page 17

Pakistan Natural Gas Processing Plant EPCCEngineering, procurement, construction, commissioning and startup for the gas plant including gas treatment, LPG extraction, gas compression, power generation and auxiliary facilities.• Capacity: 7.6 MMSCMD

• Sale gas production: 6.4 MMSCMD

• Condensate production: 5058BPD

• LPG production: 413MTPD

Page 18: PowerPoint 演示文稿 - Firjan

Page 18

Gabon TRCP Natural Gas Injection Station

• Capacity: 600,000 SCMD

• Duration: 10 months

Engineering, procurement, installation and commissioning of the natural gas compression and injection station, including 4 reciprocating compressor packages, separators, flares and auxiliary equipment as well as interconnecting pipes.

Page 19: PowerPoint 演示文稿 - Firjan

Page 19

Uzbekistan CNG StationsEngineering, procurement, installation, commissioning

and startup of CNG stations cluster.

• Capacity: 50.000 SCMD /each station

• Land area: 4.000m2 /each station

• Quantity: 46 stations

Page 20: PowerPoint 演示文稿 - Firjan

Page 20

More Efficient in Oil & Gas Extraction

Gas Treatment Project in Middle EastEngineering, procurement, installation and commissioning of the TEG

dehydration unit in the natural gas conditioning plant.• Capacity: 3.45MMSCMD

• Design life: 30 years

• Performance: water dew point reducing to -20℃

Page 21: PowerPoint 演示文稿 - Firjan

Page 21

Sichuan Dew Point Control Modular Plant

• Capacity: 500,000 SCMD • The plant includes process equipment, auxiliary

facilities and utilities. • Process modules:

Low temperature separation unitPropane refrigeration unitGlycol regeneration unitCondensate stabilization unit

Page 22: PowerPoint 演示文稿 - Firjan

Page 22

Hengyang Zhongyou LNG Pretreatment Plant

• Capacity: 200,000 SCMD• Scope of work: Process engineering, construction engineering• Process: Acid gas removal by MEDA, dehydration by molecular sieve

CNPC Xingjiu Natural Gas Processing Plant

• Capacity: 500,000 SCMD• Scope of work: Process engineering, construction engineering• Process: LPG extraction

Page 23: PowerPoint 演示文稿 - Firjan

Page 23

450,000TPA Methanol 300MMSCM/Y LNG Plant

EPCC project of coke oven gas to methanol and LNG.

Project investment: 260million USD

Page 24: PowerPoint 演示文稿 - Firjan

Page 24

SERVIÇOS DE FINANCIAMENTO

Major financial institutions in China have become our partners to support our strategy of “Going beyond China”; on the condition that all

risks are under controlled, KERUI uses its investment and financing service to help customers solve funding bottleneck issues arising during

the development.

Page 25: PowerPoint 演示文稿 - Firjan

Page 25

SOFISTICADO SISTEMA DE GESTÃO DA QUALIDADE

Engineering Design,consulting,Management Qualification

Management System Certification

Production and Manufacturing System Certification

•American petroleum institute (API) Q1

•Quality management system ISO 9001

•Environmental management system ISO

14001

•Occupational health and safety

management system OHSAS18001

•ASME quality management system

•TSG quality guarantee system

•CNAS laboratory accreditation

•American Petroleum Institute (API) 4F/7K/8C/11E/6A/16A/16C/6D/5DP

•ASME U/ U2/S qualification•EU CE marking•Custom Union CU-TR certification•CCC certification•Pressure vessel design license (A1/A2 level)

•Pressure vessel manufacturing license (A1/A2 level)

•Pressure tubing parts manufacturing qualification (A/B level)

•Production license for blow-out preventer and blow-out preventer control device

•Production license for pumping unit•Metering standard assessment certificate

•Foreign contracting engineering qualification certificate of People’s Republic of China

• International Association of Drilling Contractors (IADC) qualification certification

•QHSE certification•Safety production license•EPC Qualification for chemical and petroleum projects

•Engineering design qualification•EPC qualification for chemical and petrochemical industry projects

•Special equipment design license of People’s Republic of China

•Access license for engineering construction contractor of CNPC

Page 26: PowerPoint 演示文稿 - Firjan

Page 26

Obrigada!

Contatos Kerui Brasil:

Julia Paletta [email protected]

Saul [email protected]

Page 27: PowerPoint 演示文稿 - Firjan

Page 27