PowerPoint Presentationseminar.gunadarma.ac.id/wp-content/uploads/2020/05/... · dinding ke timur =...
Transcript of PowerPoint Presentationseminar.gunadarma.ac.id/wp-content/uploads/2020/05/... · dinding ke timur =...
1
22
33
4
Regions of Indonesia
4
55
Promote & Stewards: market transformation
Educate: the industry & public
Forums: for Industry dialog
Builds: Community
Provides: tools & expertise
66
REDUCTION OF ENERGY CONSUMPTION
PASSIVESingle Room Concept
Optimum Space/Volume
Open Spaces and Compact Building Shell
Thermal Mass, Self Shading
REDUCTION OF ENERGY CONSUMPTION
ACTIIVE → HYBRID ACTIVE - ACTIVEEfficient Equipment (MAPS, MEPS)
High Efficient Chillers (Maglev, Three Rotors, Multi
Stages, Ceramic Bearings, etc.)
Additional EE Devices (VSD, BAS, HE, etc.)
REDUCTION OF ENERGY CONSUMPTION
HYBRID PASSIVE - ACTIVEMovable/Assessable Shading System
Solar Cooling / HVAC with Heat Recovery
DOAS, Heat Pipe, Ice Storage, PCM Systems
Slab / Desiccant / Displacement Cooling
INCREASE OF ENERGY GAIN
ACTIVERooftop Solar PV, Geothermal Energy
Building Integrated Photovoltaic System
Wind Turbine / Other Renewable Energy
Utilization of Rain Water
7
8
9
10
11
12
13
14
15
16
EC=1EC=1.2-1.4
T1= 18oC
T2= 26oC
T2= 24oCT1= 13oC
17
Manufacturing Research Center (MRC-UI)
18
19
Osaka
20
21
22
Luas lantai (ft2)
BTU/jam
(PK)
Tembok tebal Tembok biasa
100
125
150
175
200
250
300
400
500
4.550 (0,48)
5.150 (0,54)
5.700 (0,60)
6.200 (0,65)
6.500 (0,68)
7.550 (0,80)
8.300 (0,87)
9.700 (1,02)
11.000 (1,12)
5.300 (0,56)
6.100 (0,64)
6.800 (0,72)
7.500 (0,79)
8.100 (0,85)
9.300 (0,98)
10.400 (1,10)
12.400 (1,31)
14.250 (1,50)
1 ft2 = 0,09290 m2 1 BTU = 3142 kWh 1 PK ~ 9000 – 10.000 BTU/h
Koreksi :
dinding ke timur = 0,95 Langit-langit > 3 m = 1,1 Ruang teduh = 0,8
22
2323