PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE...

80
PowerPlantSim 2013 Conference Fossil Track January 28-30, 2013 Presented by: Robert Lancaster Simulation Program Director – GP Strategies 970.290.1754 [email protected] www.gpworldwide.com

Transcript of PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE...

Page 1: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

PowerPlantSim 2013 Conference

Fossil Track January 28-30, 2013

Presented by: Robert Lancaster Simulation Program Director – GP Strategies 970.290.1754 [email protected] www.gpworldwide.com

Page 2: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Using a High Fidelity Simulator to Study and Mitigate the

Effects of Frequent Cycling and Extended Unit Shutdown on

Large Coal Fired Units

Page 3: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Background

• With the changing electrical needs throughout the country and the construction of gas fired combined cycle units, some base loaded plants today are more often becoming load following units.

• With load following comes the need for different operational profiles for unit operation.

Page 4: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Develop and conduct a survey for both drum and once-through supercritical coal-fired units identifying the following: – Current problems and constraints – Operating experience – Problems to overcome – Significant problems or obstacles – Areas needing additional resolution

Page 5: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Develop a test strategy using: – Survey results – Best engineering practices

Page 6: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Outcome of Testing: – Strategies to minimize thermal fatigue during

frequent cycling – Establish methods to maximize unit turndown

optimizing unit operational flexibility

Page 7: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Testing Should Address: – Necessary boiler and turbine instruments – Possible modification to boiler process and

procedures – Mill configuration, firing rates, combustion

stability and heat distribution – Use of boiler vents and drains – Secondary air flow setting – Steam temperature control

Page 8: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Testing Should Address (cont’d): – Sootblowing strategies – Use of startup fuels – Water chemistry – Coal type – Air pollution control equipment performance

impact

Page 9: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Project

• Testing Should Address (cont’d): – Steam turbine process and procedure

modification including: • Expanded sliding pressure operation • Modified transfer point from partial to full arc

admission – Startup and Shutdown consideration – Operating limitations for boiler, turbine, and

emission control equipment

Page 10: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Simulator Selection Criteria

• Must be an EPRI Member • Simulator must:

– Be for a large coal fired unit – Contain the desired fidelity to perform low

power testing – Be portable to allow remote testing – Be fully emulated to limit the cost of third party

software

Page 11: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Other Factors

• Host utility must agree to allow use of their simulator models for the testing.

• Simulator vendor must agree to allow the simulator software to run on GP hardware.

• Host utility must be willing to provide plant specific data related to the simulated unit.

Page 12: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI Requirements

• The simulator must be able to provide accurate data at all turbine extraction points to allow detailed turbine stress analysis using EPRI software.

• The simulator must accurately reflect boiler pressure and temperature conditions throughout the unit load range.

Page 13: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

GP Involvement

• Provided the fidelity requirements needed on the simulator to perform the needed low power testing.

• Developed survey questions for the industry related to the need for low power testing and methods currently being used in the industry.

• Results from the survey would help provide the test criteria needed during the simulator testing.

Page 14: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Simulator Selection

• Progress Energy was willing to support the low power testing as an EPRI member and allow the use of one of their simulators for the testing.

• Roxboro Unit 2 simulator for a 670 MW Drum Coal Fired Unit was selected.

• Western Services Corporation (WSC) – The simulator vendor was willing to support the project.

Page 15: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Simulator Setup

• The WSC software was delivered to the GP office and installed on a single computer for initial testing and review.

• Additional computers were networked to the server to provide a more complete test environment.

Page 16: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Portable Simulator Setup

Page 17: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Initial Simulator Testing

• The unit simulated was of the following unit design: – CE Forced Circulation Drum Type Boiler – GE MHC Turbine Generator – Steam Driven Boiler Feed Pumps without a

DA between the Condensate and Feedwater System

Page 18: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

General Simulator Comments

• Most Fossil Power Pant Simulators are designed as training simulators and not as engineering tools.

• Since the simulators are designed as training simulators, testing of simulator fidelity only considers its effectiveness as an operator training tool.

Page 19: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Simulator Limitations

• Since a GE MHC unit was simulated, the ability to shift between FA and PA during the testing was lost.

• Turbine valve losses and nozzle efficiencies were not simulated since the unit could only operate in a PA mode.

• Turbine windage effects at low load on the turbine were not accurately simulated.

Page 20: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Limitations Continued

• Since the temperature effects at the turbine first stage were not modeled for FA and PA operation, the effects of this concept could not be utilized.

• Since on an MHC unit, the turbine valve operation is limited to a fix cam rotation, all four control valves and their nozzles were not fully simulated.

Page 21: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Limitations Continued

• The metal mass in the main turbine was not fully modeled limiting the simulators response to the following: – Shell Expansion Rate – Rotor Expansion Rates – Differential Expansion Indications

Page 22: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

General Simulator Limitations

• The combustion process inside the boiler is very complex and unpredictable for this reason the following limits are expected: – Flame stability prediction is difficult, especially

with the varying coal qualities used in firing a typical boiler.

– Boiler soot conditions and soot locations are almost impossible to predict and optimum soot conditions are assumed in the simulator.

Page 23: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Unit Sliding Pressure Testing

• Since the simulator models were not fully tested in a sliding pressure shutdown, testing was conducted to verify boiler responses during sliding pressure.

• Plant data was obtained for a plant shutdown for a boiler tube leak when pressure was dropped to 600 psig prior to coming off line.

Page 24: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Test Results

• The boiler model responded and followed plant data within expected tolerances including: – Boiler firing rates – Air flows – Mill configurations – Superheat and reheat attemperator rates – Burner tilt setting – Turbine valve positions

Page 25: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Test Results

• Certain boiler conditions could not be fully verified such as the soot conditions on the water walls, superheaters, reheaters and economizers.

• Assumptions were made that boiler soot blowing had been conducted prior to the shutdown since boiler work was required to repair boiler tube leaks.

Page 26: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Model Modification Made

• Turbine models were modified to add all four control valves and the nozzles associated with each steam admission point into the turbine first stage.

Page 27: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout
Page 28: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Model Modification Made

• Turbine models were modified to add all four control valves and the nozzles associated with each steam admission point into the turbine first stage.

• Model modifications were made to allow operation of the GE turbine as an Admission Mode Select (AMS) turbine design.

Page 29: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout
Page 30: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Model Modification Made

• Turbine models were modified to add all four control valves and the nozzles associated with each steam admission point into the turbine first stage.

• Model modifications were made to allow operation of the GE turbine as an Admission Mode Select (AMS) turbine design.

• Turbine models tuned to reflect the GE predicted curves for FA vs. PA operation throughout the turbine load range.

Page 31: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Model Modification Made

Page 32: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Model Modification Made

• Turbine models were modified to add all four control valves and the nozzles associated with each steam admission point into the turbine first stage.

• Model modifications were made to allow operation of the GE turbine as an Admission Mode Select (AMS) turbine design.

• Turbine models tuned to reflect the GE predicted curves for FA vs. PA operation throughout the turbine load range.

• Turbine first stage temperature was verified to follow the GE expected sliding pressure operating curves.

Page 33: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

GE Predicted 1st Stage Steam

Page 34: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Turbine Testing

• After the turbine valve configuration modifications were made, the turbine and boiler operation during sliding pressure down to 600 psig were compared using plant data.

• Turbine extraction pressure and temperatures were also compared with heat balance drawing at full unit load and minimum load of 165MW.

Page 35: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Turbine Testing

• At the minimum load point of 165MW, the 2nd low pressure heater extraction point temperature was off by139°F. – Since all other LP heaters were within 0.5%

this was determined to be a plant instrument problem.

• The high pressure heater extraction temperatures were approximately 30°F lower than plant data. (approximately 5% lower).

Page 36: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Turbine Testing

• Comparison of the simulator data with the plant heat balance at the same load point indicated that all parameters were well within 0.5%.

• The difference indicated some drop in turbine efficiency for initial design data.

• It was decided that the turbine and boiler models were representative of a large coal fired unit and satisfactory to perform the needed testing.

Page 37: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Summary of Shutdown Testing

• Three cases were used in the low power testing: – Case 1 – Typical Load Drop

• Full Pressure Operation • Partial Arc Turbine Operation

– Case 2 – Sliding Pressure – Pre-Programmed Controls

• Slide Start at 425 MW dropping to 1500 Psig at 200 MW

• Full Arc Turbine Operation – Case 3 – Modified Sliding Pressure

• Slide pressure to maintain CV opening > 90% • Full Arc Turbine Operation

Page 38: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Maximum Turndown Test Results

• 185 MW Net – Normal SCR Operation – No Support Fuel Required

• 60 MW – Minimum Sustainable Load – Support Fuel Required – Below SCR ammonia flow limits

Page 39: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: Full Pressure 283 MW Net

2400 PSIG – Partial Arc - First Stage @ 773°F

Page 40: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 2: Programmed Sliding Pressure 185 MW

1500 PSIG – Full Arc - First Stage @ 890°F

Page 41: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 3: Modified Sliding Pressure 185 MW

870 PSIG – Full Arc - First Stage @ 911°F

Page 42: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: Full Pressure 60 MW Net

2400 PSIG – Partial Arc - First Stage @ 589°F

Page 43: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 2: Programmed Sliding Pressure 60 MW Net, 1500

PSIG – Full Arc – First Stage @ 863°F

Page 44: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 3: Modified Sliding Pressure 60 MW Net,

800 PSIG – Full Arc - First Stage @ 942°F

Page 45: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Summary of Turndown Test Results

• The following table represents the steam temperature, gas temperature and turbine temperatures during the three tests while at 60 MWs

Page 46: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Unit 8 Hours Into Shutdown

• Boiler bottled up at shutdown • Turbine vacuum at atmospheric with gland

seal steam removed • Drum level controlled using condensate

pumps

Page 47: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: After 8 Hour Shutdown 430 PSIG – First Stage @

506°F

Page 48: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 2: After 8 Hour Shutdown 186 PSIG – First Stage @

700°F

Page 49: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 3: After 8 Hour Shutdown 135 PSIG – First Stage @

775°F

Page 50: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Summary of Unit Cool Down

• The following table represents the first stage metal temperature, reheat bowl and crossover temperatures achieved by each test; after 1 hour, and after 8 hours shutdown

Parameter Case 1 at 1 HR on SD Case 2 at 1 HR on SD Case 3 at 1 HR on SD

1st Stage Metal 559 823 903

RH Bowl 783 850 865

Crossover 513 545 550

Parameter Case 1 at 8 HR on SD Case 2 at 8 HR on SD Case 3 at 8 HR on SD

1st Stage Metal 504 700 775

RH Bowl 734 730 755

Crossover 475 520 525

Page 51: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Boiler Startup Case 1 and 3

• Utilized lower mills associated with the warm-up guns on Roxboro Unit 2.

• Established turbine drains to prevent any possible turbine water induction.

• On start of second mill the tilts were used to limit the main steam and reheat temperature ramps.

• Gas flow bypass the economizer to bring the SCR temperatures up for establishing ammonia flow.

Page 52: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Factors Effecting Turbine Stress During Startup after 8 hours

• Turbine Metal Temperature at the startup • Boiler Steam Pressure and Temperature

(Enthalpy) during startup • Rate of unit startup • Turbine Valve Operation • Initially the HP and IP turbines cooldown

until the steam temperature at the respective turbine inlet are greater than metal temperatures.

Page 53: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Steam Pressure and Temperature Response on

Startup

Page 54: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: Restart Metal Temperatures

Page 55: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 3: Restart Metal Temperatures

Page 56: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Results From Testing

• Case 1: Normal Start – 4.5 Hours Required to Reach 300 MW – 2.75 Hours of Support Fuel (Light Oil)

Required

• Case 3: Normal Start – 2.5 Hours Required to Reach 300 MW – 1.25 Hours of Support Fuel (Light Oil)

Required

Page 57: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

“SAFER” Software Program (Stress and Fracture Evaluation

of Rotors)

• Developed in 1976-1980 following burst of TVA Gallatin IP/LP rotor in 1974.

• Evaluates remaining life for the following type of cracks: – Near-Bore Cracking (Primary Use) – Periphery Groove Cracking – Low Temperature Shrunk-On Disk Bore/Keyway SCC – High Temperature Blade Attachment Creep

Page 58: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

1. GEOMETRY DATA: a) Radial/Axial dimensions of rotor cross-section including bore profile. b) Total Rim load for each stage (or #Blades, weight, length and C.G.). c) Seal Clearance diagram: need seal Height, and Radial/Axial clearances

for each stage. 2. OPERATIONAL DATA

a) Steam inlet and outlet conditions (T, P) as a function of time during a typical cold start of the unit (i.e., from the time the turbine is taken off turning gear to full load).

b) Approximate rotor metal temperature at startup (when the turbine is rolled off turning gear).

c) Rotor RPM versus time during the typical cold start. d) Heat balance diagram for the unit at partial and full load conditions. e) Overspeed trip settings for the unit. f) Projections for future operation of the unit: Number of Hours and Starts

per year.

EPRI SAFER Code – Inputs Needed

Page 59: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI SAFER Code – Inputs Needed (cont’d.)

3. ROTOR MATERIAL DATA: a) Chemical composition (Nominal) b) Yield & Ultimate strength c) Fracture Toughness: FATT, and, Charpy V-Notch (CVN)

impact energy data or fracture toughness (KIc) values (if available)

4. NDE DATA:

a) Bore visual inspection & magnetic particle inspection results b) Boresonic results: Bore Profile (Diameter versus axial position) c) Indication Location (R, Theta, Z), Size and Axial Reference for

NDE data (from coupling face).

Page 60: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

EPRI SAFER Code – Geometry Module

• Uses geometry templates to quickly assemble components into 2D Axisymmetric FE model

Page 61: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

0 5000 10000 150000

20

40

60

80

Time (Sec)

KIC

(ksi*

sqrt

(inch))

KIC

comparison with fracture toughness - ac =0.1 inch

Fracture toughness (Normal)

KIC

(Normal,504 degF metal temp)

Case 1: HP Normal Startup with 504 Deg F Metal Temperature – Stress Intensity

Page 62: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

0 1000 2000 3000 4000 5000 6000 7000 80000

20

40

60

80

Time (Sec)

KIC

(ksi*

sqrt

(inch))

KIC

comparison with fracture toughness - ac =0.1 inch

Fracture toughness (Normal)

KIC

(Normal,765 degF metal temp)

Case 3: HP Normal Startup with 765 Deg F Metal Temperature – Stress Intensity

Page 63: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

0 1000 2000 3000 4000 5000 6000 7000 8000-20

0

20

40

60

80

Time (Sec)

KIC

(ksi*

sqrt

(inch))

KIC

comparison with fracture toughness - ac =0.1 inch

Fracture toughness (normal)

KIC

(normal,815 degF metal temp)

Case 3: IP Normal Startup with 815 Deg F Metal Temperature – Stress Intensity

Page 64: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature – Stress Intensity

0 1000 2000 3000 4000 5000 6000 7000 80000

20

40

60

80

Time (Sec)

KIC

(ksi*

sqrt

(inch))

KIC

comparison with fracture toughness - ac =0.1 inch

Fracture toughness (Fast)

KIC

(Fast,504 degF metal temp)

Page 65: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Temperature Plot @ 100 Sec.

Page 66: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Temperature Plot @ 4000 Sec.

Page 67: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Temperature Plot @ 8000 Sec.

Page 68: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Stress Plot @ 100 Sec.

Page 69: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Stress Plot @ 3000 Sec.

Page 70: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Stress Plot @ 5000 Sec.

Page 71: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP Fast Startup with 504 Deg F Metal Temperature - Stress Plot @ 8000 Sec.

Page 72: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

0 1000 2000 3000 4000 5000 6000 7000 800010

20

30

40

50

60

70

80

Time (Sec)

KIC

(ksi*

sqrt

(inch))

KIC

comparison with fracture toughness - ac =0.1 inch

Fracture toughness (Fast)

KIC

(Fast,70 degF metal temp)

Failure occurs !!

Case 1: HP FAST Startup with 70 Deg F Metal Temperature – Stress Intensity

Page 73: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Temperature Plot @ 100 Sec.

Page 74: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Temperature Plot @ 4000 Sec.

Page 75: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Temperature Plot @ 8000 Sec.

Page 76: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Stress Plot @ 100 Sec.

Page 77: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Stress Plot @ 1500 Sec.

Page 78: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Stress Plot @ 2000 Sec.

Page 79: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Case 1: HP FAST Startup with 70 Deg F Metal Temperature - Stress Plot @ 8000 Sec.

Page 80: PowerPlantSim 2013 · PDF fileconstruction of gas fired combined cycle units, some base ... GE turbine as an Admission Mode Select (AMS) turbine ... for FA vs. PA operation throughout

Questions or Comments

Presented by: Robert Lancaster Simulation Program Director – GP Strategies 970.209.1754 [email protected] www.gpstrategies.com