Powerhouse
Click here to load reader
-
Upload
mishal-limbu -
Category
Documents
-
view
5 -
download
1
description
Transcript of Powerhouse
Notes:
1. All dimensions are in m, level are in meters above sea level.
2. The wall of Power house is of Stone Masonry in 1:4 cement mortar, 0.3 m thickness.
3. The mark, in volume, used for concrete shall be as follows:
M15 - 1:2:4 (cement : sand : coarse aggregate)
M25 - 1:1:2 (cement : sand : coarse aggregate)
PCC- 1:2:4 (cement : sand : coarse aggregate)
Cement plaster - 1:4 (cement : sand ) in inner wall of Power house
4. Finishing of inner surface should be done with 12.5 mm Cement plaster
T
G
D
W1
W1
W2
D
W1
W1
Opening Schedule
S.N
Symbol Designation
Number Size
1W1 Window
41.0X1.2
2
3
W2
Window
Door
D2
1.5X1.2
1.0X2.0
1
Machine Hall (5.5 m X 4m)
Operator Room(5.5 m X 4m)
ELC
BT
Co
ntro
l B
oa
rd
& M
ain
S
witch
Tawa Khola Micro Hydropower Project (97 kW)
Surumkhim VDC,Taplegunj
GL
GL
PLAN
0.1 m thick PCC
0.2 m flat boulder lining
75 mm thick M15 blinding concrete
C
C
0.1 m thick PCC
0.2 m thick flat boulder lining
75 mm thick M15 blinding concrete
M25 RCC
8.90
4.000.30 0.30 4.00 0.30
1.65
1.00
0.20
1.00
1.65
0.30
0.30
6.10
Tailrace
Canal
1.50
5.50
1.20
1.00
1.00
2.00
0.20
0.80
0.30
0.801.15
0.720.60
3.00
0.940.60 0.14
0.850.80
SECTION C - C
FRONT ELEVATION
POTENTIAL STUDY OF TAWA KHOLA MHP, TAPLEJUNG
TAWA KHOLA MICRO HYDROPOWER PROJECT,97 kW
POWER HOUSE
PLAN, SECTION AND DETAIL
SHEET 1 OF 1
Civil Drawings
KATHMANDU UNIVERSITY
School of Engineering
Department of Civil and Geomatics Engineering
Tawa Khola MHP Study Group,CIEG 2010
Dhulikhel,Kavre
Designed:
Drawn:
Checked:
Tawa Khola MHP Study Group, CIEG 2010
Tawa Khola MHP Study Group, CIEG 2010
Drawing No:
TKMHP-PH-01
ALL DIMENSIONS ARE IN m UNLESS OTHERWISE SPECIFIED.
0 1 1.5 2 3 4meters meters
SCALE