Power-‐to-‐gas. BIOMETHANE PRODUCTION
01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH 1
![Page 2: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/2.jpg)
Power-‐to-‐gas
§ “e-‐gas Project” at Werlte in Lower Saxony
the first industrial-‐scale power-‐to-‐gas plant
DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH 2 01-‐Oct-‐14
![Page 3: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/3.jpg)
Project Werlte – e-‐gas Audi
3 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
Filling station ► Customer can refuel at
regular natural gas filling stations
► Charges by financial system equal to green power
Electrolysis
e-gas Plant
Methanation
Production and feed-in ► Production of e-gas with
subsequent feed-in into the public natural gas grid
Vehicle ► When ordering the vehicle,
the customer can request “CO2 neutral mobility“
![Page 4: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/4.jpg)
Project Werlte – e-‐gas Audi
§ e-‐gas Audi driving factor: “CO2 neutral mobility.” “Power-‐to-‐gas technology links the electricity grid with the natural gas network.”
§ Increase of sustainability in fuel producTon for automoTve § The plant will power ca. 1500 Audi A3 g-‐tron for 15,000 km of CO2 neutral driving every year
4 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 5: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/5.jpg)
Project Werlte – e-‐gas Audi
5 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 6: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/6.jpg)
Project Werlte – e-‐gas Audi
Integra@on in the Power-‐to-‐Gas Plant of renewable CO2 from a biogas upgrading plant
6 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
Biomethane upgrading plant
CO2 Hydrolysis from renewable Power
H2 Reforming CH4
SNG
![Page 7: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/7.jpg)
Project Werlte – e-‐gas Audi
§ Upgrading Technology: unpressurized Amine Scrubbing for CO2 removal and Biomethane producTon
§ Biomethane produced is of idenTcal quality as fossil natural gas and is injected into the local gas grid – as well as the Audi e-‐gas (SyntheTc Natural Gas, SNG)
7 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 8: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/8.jpg)
Project Werlte – e-‐gas Audi
8 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 9: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/9.jpg)
Project Werlte – e-‐gas Audi
§ The Amine Scrubbing supplies high quality Biomethane and high purity CO2 (> 99,9 Vol.-‐%) § Another advantages is the CO2 outlet pressure of 5 bar (no addiTonal compression required). § The „waste stream“ CO2 from the Amine Plant offers great applicability within the Power-‐to-‐Gas process § CO2 is supplied directly to the methanisaTon plant without addiTonal pre-‐condiToning or compression.
9 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 10: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/10.jpg)
Project Werlte – e-‐gas Audi
10 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 11: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/11.jpg)
Project Werlte – e-‐gas Audi
Even more than CO2 neutral fuel, overall energy and heat op@misa@on with wider effect than just SNG
11 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
Wind / Solar overcharge e-‐grid
e-‐Peak Intelligent
process integraTon
Heat
![Page 12: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/12.jpg)
Project Werlte – e-‐gas Audi
12 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
§ In operaTon
![Page 13: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/13.jpg)
Project Werlte – e-‐gas Audi
13 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
§ In stand-‐by
![Page 14: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/14.jpg)
Project Werlte – e-‐gas Audi
§ The combinaTon of Amine Scrubbing and Power-‐to-‐Gas offers the highest energy efficiency. § Heat produced by the exothermal process of methanisaTon needs to be removed from the process conTnuously.
§ This heat is used for the regeneraTon of the Amine SoluTon. § Besides the CO2 demand of the methanisaTon also the heat demand of Amine Scrubbing is derived from a „waste stream“ (excess heat).
14 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 15: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/15.jpg)
Project Werlte – e-‐gas Audi
15 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 16: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/16.jpg)
Project Werlte – e-‐gas Audi
Performance Data Raw Biogas ProducTon 1.000 m³/h Biomethane ProducTon 675 m³/h CO2 ProducTon 325 m³/h Power Requirement Electrolyser 6,3 MWel H2 ProducTon 1.300 m³/h e-‐Gas ProducTon 325 m³/h
16 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 17: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/17.jpg)
Project Werlte – e-‐gas Audi
17 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 18: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/18.jpg)
Biomethane as a fuel BIOMETHANE PRODUCTION
DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH 18
![Page 19: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/19.jpg)
Biomethane as a fuel
§ Not only the Audi e-‐gas but also the Biomethane can be used as fuel for natural gas vehicles and therefore contributes to a sustainable mobility.
19 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
![Page 20: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/20.jpg)
MT-‐BioFuel Compact
20 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
A unique concept § Compact filling staTon seamless integrated § Gas upgrading § CNG compression 300 bar § Storage/DistribuTon
§ Developed to be used by any projects: industrial/agricultural
![Page 21: Power-to-Gas - Dr. Benoit Boulinguiez](https://reader033.fdocuments.in/reader033/viewer/2022052412/559497de1a28ab191f8b466e/html5/thumbnails/21.jpg)
MT-‐BioFuel Compact
21 01-‐Oct-‐14 DR. BENOÎT BOULINGUIEZ -‐ MT-‐ENERGIE GMBH
§ Membrane separaTon § High pressure and temperature resistance § Superior carbon dioxide and methane selecTvity § Best separaTon results