![Page 1: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/1.jpg)
Power System
• Requirement is to develop a system that– Supplies required voltages and currents– Provide PS housekeeping measurements– Very low noise
• Present approach-- develop PS for T/V test that runs the electronics– Use VICOR recommended filtering (very likely
inadequate for ANITA flight)
• After T/V test, work on noise reduction
![Page 2: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/2.jpg)
Power System Components for T/V Test• DC-DC Converter Box
– 7 boards at present—Room in box for an additional 2 boards
• +12V at 1A• -12V at 1A• +5V at 30A• -5V at 2A• +3.3V at 25A• +2.5V at 16A• +1.5V at 2A
• Instrument Power Box– One DC-DC Converter; Room for two
more– Relays
Only three used for T/V test
– Charge controller- in box but not hooked up for test
• Cables• 24 V Input Cable--IP Box to DC-
DC Conv.Box; +24, +12, -12• cPCI Power Cable--DC-DC Conv.
Box to cPCI; +5, +3.3, GND• cPCI Power Cable--DC-DC Conv.
Box to cPCI; +12, -12, +5, +3.3• Turf power Cable--DC-DC Conv
Box to Turf; +3.3, +2.5, +1.5, -5• 2 Housekeeping Cables—DC-DC
Conv Box & IPB to HSK Cond box; HSK signals
• Cable into T/V made in Palestine
• Bus Bar Board• Originally suggested by PD, but
based on misconception of cPCI crate
• Not needed since cPCI crate provides excellent grounding
![Page 3: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/3.jpg)
![Page 4: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/4.jpg)
![Page 5: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/5.jpg)
![Page 6: Power System Requirement is to develop a system that –Supplies required voltages and currents –Provide PS housekeeping measurements –Very low noise Present.](https://reader035.fdocuments.in/reader035/viewer/2022062301/56649d775503460f94a584f6/html5/thumbnails/6.jpg)
DC=>DC Converter Boards