POWER PLANT POWER ST. - City of Red Bud, IL › uploads › 3 › 8 › 4 › 1 › ...2 Bid Set...
Transcript of POWER PLANT POWER ST. - City of Red Bud, IL › uploads › 3 › 8 › 4 › 1 › ...2 Bid Set...
SCALE
DESIGN
CHECKED
DATE
DRAWN
APPROVED
RE
VIS
IO
N/IS
SU
E
NO
.D
AT
E
SEAL
JOB NO.
SHEET OF
DRAWING NO.
G-1
1 3
Job #1904
NONE7/11/18
PJH PJH
VJB VJB
RE
D B
UD
, IL
LIN
OIS
RE
PL
AC
EM
EN
T O
F F
IV
E S
UB
ST
AT
IO
N
FE
ED
ER
U
ND
ER
GR
OU
ND
E
XIT
S
0C
lie
nt R
evie
w7
/1
1/1
8
1M
an
ho
le
u
pd
ate
s9
/5
/1
8
2B
id
S
et
3/2
5/2
0
BID SET
CO
VE
R S
HE
ET
SPRINGFIELD, IL
RED BUD, IL
PROJECT:
REPLACEMENT OF FIVE
SUBSTATION FEEDER
UNDERGROUND EXITS
FOR:
CITY OF RED BUD
200 EAST MARKET STREET
RED BUD, ILLINOIS 62278
WWW.CITYOFREDBUD.ORG
LOCATION MAP
STATE LOCATION PLAN
INDEX OF DRAWINGS
GENERAL
G-1 COVER SHEET
ELECTRICAL
E-1 REPLACEMENT OF FIVE SUBSTATION FEEDER
UNDERGROUND EXITS - SITE PLAN
E-2 REPLACEMENT OF FIVE SUBSTATION FEEDER
UNDERGROUND EXITS - MANHOLE DETAILS
HWY 154 (W. MARKET ST)
RT
E 159
MA
DIS
ON
S
T.
PO
WE
R S
T.
SUBSTATION
POWER PLANT
DUCT BANK
ROESLEIN
PROPOSED
JB-1
Existing 12KV #4/0 AWG AL in existing
conduit. Circuit I
MH5
MH4
MH2
MH3
MH6
Circuits A,B,D,E & I
Ex. poles/structures
to be removed
Circuits A,B,E,D
Str. #5
MH-1
Circuits A,B,D & E
Str. #3
Str. #4
Ex. Str.
to remain.
Str. #1
Str. #1A
Ex. Str.
to remain.
Str. #2
Circuit I
Circuits E & I
Circuits B & D
1
3
2
3
3
4 Circuit D
4 Circuit I
4
4
4
Circuit D
Circuit B
4
Circuit I
4Circuit E
Circuit A
6
6
6Circuit A
6Circuit A
6
6
270'
140'
340'
300'
Ex. Switchgear to remain
150'
955'-0"
Str. #9
Str. #10
Str. #7A
Str. #8A
Str. #8B
Str. #7B
5
5
Str. #6
6
Str. #2A
7 Circuit B & D
Str. #3A
Str. #4A
60'
90'100'
Str. #2B
JB-2
Circuit D
100'
115'
Circuit D390' 4
4
Switchgear Note:
The existing 4-5kV circuits in 4" GRS conduit
exiting the switchgear, will transition to new
6" Sch 40 PVC conduit to MH-5. One (1)
existing spare 4" GRS conduit will transition to
new 6" Sch 40 PVC conduit to JB-2. Expose all
existing conduit as required.
SCALE
DESIGN
CHECKED
DATE
DRAWN
APPROVED
RE
VIS
IO
N/IS
SU
E
NO
.D
AT
E
SEAL
JOB NO.
SHEET OF
DRAWING NO.
E-1
2 3
Job #1904
AS NOTED7/11/18
PJH PJH
VJB VJB
RE
D B
UD
, IL
LIN
OIS
RE
PL
AC
EM
EN
T O
F F
IV
E S
UB
ST
AT
IO
N
FE
ED
ER
U
ND
ER
GR
OU
ND
E
XIT
S
0C
lie
nt R
evie
w7
/1
1/1
8
1M
an
ho
le
u
pd
ate
s9
/5
/1
8
2B
id
S
et
3/2
5/2
0
SCALE: 1/64"=1'-0"
64' 32' 0 100' 200'
Str. #1
Existing: 50' pole with double circuit-3Ø tangent (N/S)
Install: 50'-2
C7A (S) (Circuit I)
UC5-1 w/ GOAB (12kV riser)
2-E1-2 L=35'N
TA-2H
M2-11
Transfer: Existing primary conductor (top - Circuit I) (S).
Remove: Existing pole, pole top units, double circuit
primary conductor (top & bottom - Circuits E & I) (N)
and all attachments.
Str. #1A
Existing: 50' pole with double circuit-3Ø tangent (N/S)
Install: 50'-2
C1-2 (no neutral) (top - Circuit I)
C7A (S) (bottom - Circuit E)
UC5-1 w/GOAB (4kV riser)
2-E1-2 L=35'N
TA-2H
M2-11
Transfer: Existing primary conductor (top - Circuit I) (N/S) &
(bottom - Circuit E) (S)
Remove: Existing pole, pole top units, primary conductor
(bottom - Circuit E) (N) and all attachments.
Str. #2
Existing: 40' pole with 3Ø tangent (N/S) and 3Ø deadend (W)
COs, down guy & anchor.
Install: 40'-2
C7A (SE)(low neutral)
C7A (W)
2-E1-2 L=35' (NW)
2-E1-2 L=35' (E)
2-TA-2H
M2-11
Transfer: Existing primary conductor (W/S) & COs.
Remove: Existing pole, pole top units, primary conductor (N),
down guy, andchor and all attachments.
Str. #2A
Existing: 40' pole with 3Ø double deadend (E/W), xfmr, CO
LA, bracket, street light, secondary, down guy
& anchor.
Install: 40'-2
C7A (E)
3-M5-24 (W)
1-M5-25 (W)
4-M42-13 (W)
UC5-1 w/ GOAB (4kV riser)
100' of #1/0 AWG triplex to Str. #2B
K14C
M2-11
Transfer: Existing primary conductor (E/W),street light &
secondary. Transfer xfmr, bracket, CO, LA to Str. #2B.
Remove: Existing pole, pole top unit, down guy, anchor and all
attachments.
Str. #2B
Existing: 40' pole with 3Ø tangent (E/W).
K14C
Str. #3
Existing: 45' pole with double circuit-3Ø tangents (E/W), area
light and secondary.
Install: 45'-2
C7A (E) (no neutral) (top - Circuit B)
3-M5-24 (W)
3-M42-13 (W)
C7A (E) (bottom - Circuit D)
3-M5-24 (W)
1-M5-25 (W)
4-M42-13 (W)
M2-11
Transfer: Existing double circuit conductor (E), area light and
secondary.
Remove: Existing pole,pole top units, double circuit primary
conductors (W) and all attachments.
Str. #3A
Install: 45'-2
C7A (E) (Circuit B)
UC5-1 w/ GOAB (4kV riser)
2-E1-2 L=35' (W)
TA-2H
M2-11
Str. #4
Existing: 45' pole with double circuit-3Ø tangent (E/W), COs
& capacitor bank.
Install: 45'-2
C1-2 (Circuit B) (no neutral)
C9-2 (E) (Circuit D)
M2-11
Transfer: Existing conductor (E/W). capacitor bank & COs.
Remove: Existing pole, pole top units and all attachments.
Str. #4A
Install: 45'-2
C1-2 (Circuit B) (no neutral)
C7A (E) (Circuit D)
UC5-1 w/ GOAB (4kV riser) (Circuit D)
2-E1-2 L=35' (W)
TA-2H
M2-11
Str. #5
Existing: 45' pole with 3Ø tangent (E/W)
Install: 45'-2
C7A (W) (Circuit D)
UC5-1 w/GOAB (4kV riser)
2-E1-2 L=35' (E)
TA-2H
M2-11
Transfer: Existing conductor (W)
Remove: Existing pole, pole top unit, primary conductor (E)
and all attachments.
Str. #6
Install: 45'-2
C7A (E) (Circuit D)
UC5-1 w/GOAB (4kV riser)
2-E1-2 L=35' (W)
TA-2H
M2-11
Str. #7A
Existing: 40' pole with 3Ø tangent (E/W)
Remove: Existing pole, primary conductor (E/W) and
all attachments.
Str. #7B
Existing: 40' pole with 3Ø tangent (E/W)
Remove: Existing pole, primary conductor (E/W) and
all attachments.
Str. #8A
Existing: 50' pole with double circuit-3Ø deadend (N/W),
down guys and anchors.
Remove: Existing pole, pole top units, primary conductor (N/W),
down guys, anchors and all attachments.
Str. #8B
Existing: 50' pole with double circuit-3Ø deadend (N/W),
3Ø deadend (E), down guys and anchors.
Transfer: Existing primary conductor (E) to Str. #9.
Remove: Existing pole, pole top units, primary conductor (N/W/E),
down guys, anchors and all attachments.
Str. #9
Existing: 40' pole with 3Ø tangent (E/W), 3Ø primary
riser, pole mount xfmr, COs, LAs, 1Ø
service riser, meter & street light.
No Change
Str. #10
Existing: 45' pole with 3Ø deadend (W), 3Ø primary
riser, down guy & anchor.
No Change
Breaker Connection inside Switchgear
Install: 9 - Terminations (3 for each breaker) for #4/0 AL UG to
NEMA 2 hole pad (Circuits A,B & E)
6 - Terminations for #4/0 AL UG to NEMA 2 hole pad (Circuit D)
(3 breaker terminations to MH-5 & 3 breaker
terminations to JB-2)
Note: Tape each breaker connection as required.
BID SET
LEGEND:
3ɸ Junction Box
New pole
Existing pole - Not being moved or replaced.
Existing pole - Being removed
New Manhole - Refer to Dwg. E-2 for Details
Existing Manhole
KEY NOTES:
1
2
Install 4-5kV feeders, (Circuits A,B,D & E), each w/ 3 phase
#4/0 AWG AL from existing breaker. Install an additional
5kV feeder (using existing spare conduit) (from Circuit D breaker),
w/ 3 phase #4/0 AWG AL, to JB-2. Abandon (1) existing spare
conduit in place.
Refer to "Switchgear Note" on drawing for conduit information.
Install new duct bank w/ 4-5kV feeders (Circuits A,B,D & E)
and 1-15kV feeder (Circuit I), each w/ 3 phase #4/0 AWG AL
in 6" conduit) and 1- spare 6" conduit.
Existing duct bank to be abandoned. Remove existing
4-5kV feeders.
Install new 6" conduit w/ 3-15kV #4/0 AWG AL.
Existing overhead conductor to be removed.
Existing overhead primary conductor to remain.
Install new 7 - 336.4kcmil ACSR conductor (double circuit).
3
4
5
6
JB-1 (field verify location)
Install: ND-450 junction box
3-600A 4pt junctions
6-600A elbows #4/0 AWG AL
6-600A insulating caps
2-UM48-2 ground
Transfer: Existing underground conductor
(Circuit I) and terminate in JB-1.
JB-2 (field verify location)
Install: ND-450 junction box (Circuit D)
3-600A 4pt junctions
9-600A elbows #4/0 AWG AL
3-600A insulating caps
2-UM48-2 ground
MH-1
Existing: Manhole location.
Remove: Existing poles, above ground conduit,
OH conductor, UG cable and
all attachments.
Note: Abandon manhole in place
MH-2
Existing: Manhole location.
Remove: UG cable.
Note: Abandon manhole in place
MH-3
Existing: Manhole location.
Remove: UG cable.
Note: Abandon manhole in place
MH-4
Existing: Manhole location.
Remove: Existing poles, above ground conduit,
OH conductor, UG cable and
all attachments.
Note: Abandon manhole in place
MH-5
Install: Precast vault (Circuits A,B,D,E & I)
15-600A 2pt junctions (Circuits A,B,D,E & I)
30-600A elbows #4/0 AWG AL
2-UM48-2 ground
MH-6
Install: Precast vault (Circuits A,B,D,E,I)
2-UM48-2 ground
SIT
E P
LA
N
7
ELECTRICAL
TOP VIEW
MATCH EXISTING LANDSCAPE
CONDUIT
LADDER
CONDUIT
MATCH EXISTING LANDSCAPE
PEA GRAVEL
PULL IRONS
PULL IRONS
LADDER
COMPACTED FILL
PEA GRAVEL
CAST IRON MANHOLE
CONDUIT
PULL IRON
PULL IRON
CAST IRON MANHOLE
(4) DUCT BANK KNOCKOUTS
DUCT BANK
SECTION VIEW
SECTION VIEW
2'-9"
4'
A/6'
PVC SUMP
2'
6'
6'
A/12'
CONDUIT
A/13'-4"
A/7'-4"
OPENING
OPENING
B/17'-4"
B/9
'-4"
B/8'
B/16'
1'-6"
1'-6"
2'
3'-6"
3'-6"
CONCRETE
ENCASED
SCALE
DESIGN
CHECKED
DATE
DRAWN
APPROVED
RE
VIS
IO
N/IS
SU
E
NO
.D
AT
E
SEAL
JOB NO.
SHEET OF
DRAWING NO.
E-2
3 3
Job #1904
AS NOTED7/11/18
PJH PJH
VJB VJB
RE
D B
UD
, ILLIN
OIS
RE
PL
AC
EM
EN
T O
F F
IV
E S
UB
ST
AT
IO
N
FE
ED
ER
U
ND
ER
GR
OU
ND
E
XIT
S
0C
lie
nt R
evie
w7
/1
1/1
8
1M
an
ho
le
u
pd
ate
s9
/5
/1
8
2B
id
S
et
3/2
5/2
0
BID SET
MA
NH
OL
E #
5 &
#
6 D
ET
AIL
S
NOTES:
1. DIMENSIONS MARKED WITH 'A' FOR MANHOLE #6.
DIMENSIONS MARKED WITH 'B' FOR MANHOLE #5.
2. MANHOLE #5 TO HAVE ADDITIONAL CABLE RACKING
NOT SHOWN.