    POWER PLANT EMERGENCY

    Every power plant generation unit or station tried to supply quality and reliable

    power to grid or customer. So after commercialization of unit, the operation engineersresponsibility increased manifold not only providing the quality and reliable power

    supply but also safety of all running equipments and unit.

    Operation engineers familiarized with problems and emergencies. Familiarization of all

    emergency is needed, some problems can be solved easily without losing generation.

    But some unforeseen incidents occurred in power plant. It requires immediateappropriate action to solve problem to avoid any generation loss or any damage to

    equipment.

    So, there are different type of emergencies

    1. Boiler emergencies

    2. Turbine emergencies3. Generator emergencies

    4. Electrical emergencies ( SWGR)

    5. Grid failure.

    6. Unit emergencies

  • 7/29/2019 Power Plant Emergency

    2/22

    Unit emergencies:-

    1. CW P/Ps tripped

    2. Compressor tripped

    3. Heavy lkg in DM make up line

    4. Any major fire in oil system of TDBFP /Main TG etc

    5. Failure of work station

    6. Loss of 220 V DC

    7. Loss of 24V TG8. Loss of 24V SG

    9. UPS failure

    10. 11 KV SWGR dead

    11. 3.3 KV SWGR dead

    12. USS/Unit Emergency SWGR dead

  • 7/29/2019 Power Plant Emergency

    3/22

    CW P/P tripped

    Unit/ Station condition

    All units running with 500 MW4 CW P/Ps are running

    I/C V/Vs are opened

    Case-1 : One CW P/P tripped

    Consequence:-

    suction pressure low to ACW P/P

    Low flow through Condenser Pass-A/B

    Temp may rise of TG PHE O/L results increasing oil/Brg temp, seal oil temp,

    Action:

    Start stand by pump immediately

    Observe all parameters

  • 7/29/2019 Power Plant Emergency

    4/22

    Case-2 : One CW P/P tripped and stand by p/p failed to start CW P/P-3B/3C tripped due to dead of 3UB busCW P/P-3B/3C tripped due to dead of 3UB bus and another p/p fails to startor under PTW

    Consequence:-

    Suction pressure low to ACW P/P

    Low flow through Condenser Pass-A/B

    Temp may rise of TG PHE O/L results increasing oil/Brg temp, seal oil temp,

    Action:

    Start stand by CW P/P

    Reduce unit load around 300 MW

    Observe condenser vacuum and all Brg and oil temp

    If necessary, throttled TGPHE ACW side v/v to avoid ACW P/P tripping

    If tripping of any unit due to temp like seal oil or PW etc, Close the

  • 7/29/2019 Power Plant Emergency

    5/22

    DM Water System

    Unit/ Station condition

    All units running with 500 MW

    Avg make up around 25-30 T/H to hot well

    ECW tank make lined from DM

    Normal/emergency make up lined up

    Case-1Leakage in DM header ( DM make up system isolation required)

    Consequence:

    Hindrance to DM make up to units wastage of DM water

    Action:

    Take DM water make up to ECW O/H tank in all units

    Take up make up in Hotwell and DA and maintain above normal level

    Start emergency make up system and check /ensure flow to Hotwell

    Isolate all units of Hotwell normal make V/v tp avoid air ingress

    Stop soot blowing of all units for that time

    Inform chemsitry SCE for not taking DM for CPU regenartion

  • 7/29/2019 Power Plant Emergency

    6/22

    Compressor- Instrument air system

    Unit/ Station condition

    All units running with 500 MW

    All Compressors are running

    I/C V/Vs are opened 10% at stage one end and full opened at stage-II end.

    Power Source of Compressor- Unit-3 (IAC-1,3,5, PAC-1)Unit-4( IAC-2,PAC-4)

    Unit-5( IAC-4,PAC-3,5)

    Unit-6( PAC-2,6)

    Cooling water sources:- IAC-1-5 and PAC-1-4 from all units

    and IAC-1-5 and PAC-1-4 from unit-5/6 ( stand by)

    PAC-5,6 from unit 5 and 6

  • 7/29/2019 Power Plant Emergency

    7/22

    Case-1

    Few IAC tripped due to some protection leads to maintain low header pressure

    Consequence:

  • 7/29/2019 Power Plant Emergency

    8/22

    SL.NO NTPC TAG SERVICE ACTION

    1CD-67 COND SPRAY TO HDFT MODULATING

    SD-62 BCW LP DRAI MANIF DRAIN V/V ON/OFF

    2DR-18 HPH-5A DRAIN TO HPFT CV

    MODULATING

    AIR TO CLOSE

    3DR-25 HPH-5B DRAIN TO HPFT CV

    AIR TO CLOSE

    4DR-5 HPH-6A DRAIN TO HPFT CV

    5DR-11 HPH-6B DRAIN TO HPFT CV

    6DR-31 LPH-3 DRAIN TO LPFT C/V

    7DM-1 DM N M UP TO HOTWELL C/V

    8DR-15 HPH-5A DRAIN TO D/A CV

    MODULATING

    AIR TO OPEN

    9DR-22 HPH-5B DRAIN TO D/A CV

    AIR TO OPEN

    10DR-28 LPH-3 DRAIN TO LPH-2 C/V

    11DMCW-90 ECW PUMP(SG) I/O HDR DP C/V

    AIR TO OPEN

    12SD-61 BCW ECW LINE INLETV/V

    ON/OFFAIR TO OPEN

    13SD-62 BCW LP DRAI MANIF DRAIN V/V

    AIR TO OPEN

    14DR-37 LPH-2 DRAIN TO LPFT C/V MODULATING

    AIR TO CLOSE

    15DR-48 D/A OVERFLOW LPDFT ON/OFF

    AIR TO CLOSE

    16CD-10 CEP-A M/N R/C C/V

    MODULATING

    17CD-12 CEP-B M/N R/C C/V

    18CD-14 CEP-C M/N R/C C/V

    AIR TO CLOSE

    19CD-39 GSC M/N R/C C/V

    20CD-43 HOTWELL SPILL LVL C/V

    AIR TO CLOSE

    21DR-2 HPH-6A DRAIN TO HPH-5A CV

    MODULATING22

    DR-8 HPH-6B DRAIN TO HPH-5B CV

    23DR-34 LPH-2 DRAIN TO LPH-1 C/V

    AIR TO OPEN

    24DM-2 DM E M UP TO HOTWELL C/V

    AIR TO OPEN

    25SD45 SH SPRAY C/V LEFT

    MODULATING

    Air to Open

    26

    SD44 SH SPRAY C/V LEFT

    Air to Open

    27SD46 SH SPRAY C/V RIGHT

    Air to Open

    28SD47 SH SPRAY C/V RIGHT

    Air to Open

    33AS-8 AUX STEAM TO D/A C/V MODULATING

    29FD14 LOW LOAD FEED C/V MODULATING

    30CD-22 D/A LVL C/V MAIN

    MODULATING

    Air to Open

    31CD-25 D/A LVL C/V STANDBY

    Air to Open

    32DMCW-100 ECW PUMP(TG) I/O HDR DP C/V

    Air to Open

    34CRH-6 CRH STEAM TO D/A C/V MODULATING

    Air to Open

    35CD-72 GLAND SEALING C/V MODULATING

    36SD-43 SH SPRAY BLOCK V/V ON/OFF Air to Open

    SD-48 RH SPRAY BLOCK V/VON/OFF

  • 7/29/2019 Power Plant Emergency

    9/22

    An emergency power system/ stand by is anindependent power generation system that is

    legally required to feed equipment or systems

    whose failure may present a life safety hazard

    to persons or property.

  • 7/29/2019 Power Plant Emergency

    10/22

    FAILURE OF UPS

    AC

    ( Inverter)

    LOAD

    AC(Inverter)

    DC(Rectifier)

    DC(Rectifier)

    AC supply ,USSAC supplyEMCC

    Bypass AC supplyUSS

    Bypass AC supplyEMCC

    Battery Bank

  • 7/29/2019 Power Plant Emergency

    11/22

    ACPDB-01 (CCR)

    ACPDB-02 (CCR)

    ACPDB-03 (PRGMR ROOM)

    ACPDB-04(UCP)

    ACPDB-05 C&I-MAINT

    ACPDB-06 CHIMNEY

    BHEL PDB-1 MTM

    BHEL PDB-2 MTM

    BHEL PDB-4 AIR HEATER

    SWAS

    PA SYS 01

    PA SYS 02

    VMS-CER

    MASTER CLOCK CER

    ACPDB-11 BNKR LVL

    PAH-A AIR MOTOR BMCC

    PAH-B AIR MOTOR BMCC 3.3R 2.2R

    SAH-A AIR MOTOR BMCC 2.4R

    SAH-B AIR MOTOR BMCC 4.3R

    VMS-II CER

    SG/TG MMI WS POSE CAB

    BOILER FLAME SENSING SYSTEM

    ACCOUSTIC PYROMETER

    BLR MAIN WORK STATION

    BPOS

    VIB ANALYSER

    GCC02 SEAL OIL ISNT CAB

    GCC03 STATOR WATER INST. CAB

  • 7/29/2019 Power Plant Emergency

    12/22

    STATOR END WNDG VIB SYS

    VFD C&I PANEL ID-A

    VFD C&I PANEL ID-B

    TUBE LIFE ASSESMENT SYSTEM

    CJJ13 MARSHELLING PANEL

    TSI FOR BFPDT 1&2

    TSC PC & PRNTR.

    GAS ANALYSE

    PDB FOR APRDS CJCB

    PARTIAL DISCH. MONITORING

    MDBFP SCOOP KE3

    ACPDB-19 BRNR TILT

    ACPDB-21 HPH LVL SW

    ACPDB-22 LPH LVL SW

    ACPDB-23 D/A LVL SW

    ACPDB-24 HOTWELL LVL SW

    BHEL PDB-3 BCW P/P

    CWPNL VMS

    FLAME SCANER CJF-07

    VAC. P/P -1

    SMART ACT. STN (U#3 ONLY)

    MILL A TO E LVL SW ACPDB

    MILL F TO K LVL SW ACPDB

    MILL REJECT SYSTEM

  • 7/29/2019 Power Plant Emergency

    13/22

    Case-1

    In case of any one channel failed to supply power, supply will getextend from the other source and alarm will come. No problem is

    envisaged.

    In case of both channel failed to supply, then direct sources (

    unregulated 415V AC Power) comes in service, no immediate

    problem will occur but regular supply has to be restored as soon aspossible.

  • 7/29/2019 Power Plant Emergency

    14/22

    Case-2

    If there is total failure of power supply from UPS, the following events will happen

    All BFP will get trip on D/A level-Low since supply of DA Lvl switch from UPS

    Boiler will trip on All BFP OFF from FSSS ( SG 24V source)

    Turbine will trip on MFT of boiler and generator will trip on Low Forward Power

    ID fans will trip due to loss of supply from UPS to VFD, FD fans will trip on interlock

    Mills and PA fan will trip on MFT

    No command will be executed from MMI and parameters will not be available for

    BHEL CRT, For DDCMIS, HMI/LVS screens will be available for 30 mins

    Vertical panels will be available for operation.

    Turbine lube oil pumps. Seal oil pumps, barring gear will be available

    HP/Lp bypass will be available for operation

    TSI parameters will not available.

  • 7/29/2019 Power Plant Emergency

    15/22

    Action

    Ensure by checking at local, Main TG, TDBFP lube oil pumps, seal oil

    pumps, air pre heater motors, scanner air fans etc are in service. And check

    barring gear v/v opened.

    Inform C & I and EMD ( battery and Charger group) for

    rectification.SCE/DGM/AGM(O)

  • 7/29/2019 Power Plant Emergency

    16/22

  • 7/29/2019 Power Plant Emergency

    17/22

    FIRE NEAR TG ON ACCOUNT OF OIL LEAKAGE

    OR FIRE IN LUBE OIL SYSTEM/TDBFP/MAIN TG

    CASUE

    Oil lkg in pipe line, bearing etc

    Wet cotton which was used for cleaning purpose filter or bearing

    Above these, high temp of steam lkg and contact with bared high

    temp steam line.

  • 7/29/2019 Power Plant Emergency

    18/22

    ACTION

    Oil fire spread very fast, so that

    machine should be stopped

    immediately

    Oil supply should be cut off, DC oil

    pump should kept off.

    Steam supply should be cut off.Incase of towards , Main TG

    trip main TG, H2 purged out.

    Extinguish fire with help of available

    of fire extinguisher

    Inform to fire station

    Inform HOD of OPRN/EMD/TMD

    Revise DC

  • 7/29/2019 Power Plant Emergency

    19/22

    Fire protection-1

    Generator breaker OFF andEither MOT Lvl V Low or Fire protection

    PB(1/2) pressed

    Casue

    Opens the vacuum breaker on protection

    Stops the HPCF pumpsStops HPCF heater

    Stops HPCF recirculation pumps

    Trips the turbine

  • 7/29/2019 Power Plant Emergency

    20/22

    Fire protection-2

    Either MOT Lvl V Low or Fire protection

    PB(2) pressed

    Cause

    Switch off the SGC oil supply program

    Stops AOP-1 on protection

    Auto off SLC AOP-1

    Stops AOP-2 on protection

    Auto OFF SLC AOP-2

    Auto On SLC EOPAuto OFF SLC jOPs

    Stops JOP-1 on protection

    Stops JOP-2 on protection

    Starts JOP-3 on protection

    Auto OFF SLC JOP-3

    Auto OFF SLC turning gearTrips the turbine

    Opens the vacuum breaker on protection

    Stops the HPCF pumps

    Stops HPCF heater

    Stops HPCF recirculation pumps

    Trips the turbine

  • 7/29/2019 Power Plant Emergency

    21/22

  • 7/29/2019 Power Plant Emergency

    22/22

    SL.NO NTPC TAG SERVICE ACTION

    1CD-67 COND SPRAY TO HDFT MODULATING

    SD-62 BCW LP DRAI MANIF DRAIN V/V ON/OFF

    2DR-18 HPH-5A DRAIN TO HPFT CV

    MODULATING

    AIR TO CLOSE

    3DR-25 HPH-5B DRAIN TO HPFT CV

    AIR TO CLOSE

    4DR-5 HPH-6A DRAIN TO HPFT CV

    5DR-11 HPH-6B DRAIN TO HPFT CV

    6DR-31 LPH-3 DRAIN TO LPFT C/V

    7DM-1 DM N M UP TO HOTWELL C/V

    8DR-15 HPH-5A DRAIN TO D/A CV

    MODULATING

    AIR TO OPEN

    9DR-22 HPH-5B DRAIN TO D/A CV

    AIR TO OPEN

    10DR-28 LPH-3 DRAIN TO LPH-2 C/V

    11DMCW-90 ECW PUMP(SG) I/O HDR DP C/V

    AIR TO OPEN

    12SD-61 BCW ECW LINE INLETV/V

    ON/OFFAIR TO OPEN

    13SD-62 BCW LP DRAI MANIF DRAIN V/V

    AIR TO OPEN

    14DR-37 LPH-2 DRAIN TO LPFT C/V MODULATING

    AIR TO CLOSE

    15DR-48 D/A OVERFLOW LPDFT ON/OFF

    AIR TO CLOSE

    16CD-10 CEP-A M/N R/C C/V

    MODULATING

    17CD-12 CEP-B M/N R/C C/V

    18CD-14 CEP-C M/N R/C C/V

    AIR TO CLOSE

    19CD-39 GSC M/N R/C C/V

    20CD-43 HOTWELL SPILL LVL C/V

    AIR TO CLOSE

    21DR-2 HPH-6A DRAIN TO HPH-5A CV

    MODULATING22

    DR-8 HPH-6B DRAIN TO HPH-5B CV

    23DR-34 LPH-2 DRAIN TO LPH-1 C/V

    AIR TO OPEN

    24DM-2 DM E M UP TO HOTWELL C/V

    AIR TO OPEN

    25SD45 SH SPRAY C/V LEFT

    MODULATING

    Air to Open

    26SD44 SH SPRAY C/V LEFT

    Air to Open

    27SD46 SH SPRAY C/V RIGHT

    Air to Open

    28SD47 SH SPRAY C/V RIGHT

    Air to Open

    33AS-8 AUX STEAM TO D/A C/V MODULATING

    29FD14 LOW LOAD FEED C/V MODULATING

    30CD-22 D/A LVL C/V MAIN

    MODULATING

    Air to Open

    31CD-25 D/A LVL C/V STANDBY

    Air to Open

    32DMCW-100 ECW PUMP(TG) I/O HDR DP C/V

    Air to Open

    34CRH-6 CRH STEAM TO D/A C/V MODULATING

    Air to Open

    35CD-72 GLAND SEALING C/V MODULATING

    36

    SD-43 SH SPRAY BLOCK V/V ON/OFF

    Air to OpenSD-48 RH SPRAY BLOCK V/V

    ON/OFF