power people > TransGrid annual reporT 2009 meeting stakeholder + community expectations reliable...
Transcript of power people > TransGrid annual reporT 2009 meeting stakeholder + community expectations reliable...
TransGridannual reporT 2009
power people
successful business
World-class electricity transmission
socially responsible
high level expertise
efficient, safe, reliable
contents > TransGrid annual reporT 2009
meeting stakeholder + community expectations
reliable poWer supply
strong technical excellence
training future leaders
planning for the future
The Hon. Eric Roozendaal MLC The Hon. Joe Tripodi MP Treasurer Minister for Finance parliament House Minister for infrastructure Macquarie street Minister for regulatory reform sYdneY nsW 2000 Minister for ports and Waterways parliament House Macquarie street sYdneY nsW 2000
31 october 2009
dear shareholders,
We have pleasure in submitting to you the TransGrid annual report 2009 for presentation to parliament. The annual report includes the income statement for the year ended 30 June 2009 and the Balance sheet as at that date certified by the auditor-General of new south Wales.
The annual report was prepared in accordance with the requirements of section 24a of the State Owned Corporations Act 1989 and the Annual Reports (Statutory Bodies) Act 1984 and reporting regulations issued by new south Wales Treasury.
Yours sincerely
Mr Bruce Foy Mr Kevin Murray Chairman Managing director
TransGridannualreporT2009>Contents 1
2 AbouttrAnsGrid
8 HiGHliGHtsAndCHAllenGes
16 CHAirmAn’sAndmAnAGinGdireCtor’sreview
18 PlAnninGAFuturenetwork
23 buildinGsustAinAble,world-ClAssinFrAstruCture
30 drivinGCHAnGetHrouGHinnovAtion
33 mAkinGenvironmentAndCommunityAPriority
36 tAPPinGintoourCommunity
40 PromotinGourPeoPle’sCAPAbilities
53 CorPorAteGovernAnCe
71 2008/09FinAnCiAls
104index
106GlossAry
riGHtSophie Dowling, Graduate Engineer
CoverDaniel Burn, Graduate Engineer
conTenTs
2 AbouttrAnsGrid>TransGridannualreporT2009
meetinGstAkeHolder+CommunityexPeCtAtions
reliAblePowersuPPly
stronGteCHniCAlexCellenCe
trAininGFutureleAders
PlAnninGFortHeFuture
abouTTransGridourProFile
TransGridistheowner,operatorandmanagerofoneofthelargesthighvoltagetransmissionnetworksinaustralia,connectinggenerators,distributorsandmajorendusersinnewsouthWales.
ourpeopleplayacriticalroleinmaintainingourstrongtechnicalexcellence,ensuringthatwemeetstakeholderandcommunityexpectationsforareliablepowersupply.
toPriGHtMichael Stemmer, Tradesperson
toPleFtCharles Hitchen, Graduate Engineer
TransGridannualreporT2009>AbouttrAnsGrid 3
TransGrid’snetworkisinterconnectedtoQueenslandandVictoria,providingarobustelectricitysystemthatfacilitatesinterstateenergytrading.ThensWhighvoltagetransmissionnetworkisthehubofthenationalelectricityMarket,servingthelargeststateinthemarket.
TransGrid’sshareholder,thensWGovernment,hasasetofobjectiveswhichincludeanexpectationthatTransGridfulfilsitsroleintheplanning,developmentandmanagementofthehighvoltagenetwork.
TransGridisacommerciallyfocusedorganisationdeliveringreliableelectricitytransmissionservices.ThelargemajorityofTransGrid’srevenueisdeterminedbytheaustralianenergyregulator(aer).
TransGrid’sboardandmanagementsupportanenvironmentthatencouragesaccountabilityamongstallemployeestodeliveraservicethatisinthebestinterestsofshareholders,thecommunityandourstakeholders.
trAnsGrid’snetwork
TransMissionlineandsubsTaTionsTrucTures
FACtories
businesses
Homes
eleCtriCitysuPPliers
(enerGyausTralia,inTeGralenerGy,counTryenerGy,
acTeWaGl)
GenerAtinGsourCes
riGHtGavin Wood, Substations Grid Officer
4 AbouttrAnsGrid>TransGridannualreporT2009
YassMarulan
Yanco
Griffith
Buronga
Broken Hill
FinleyDeniliquin
Darlington Point
AlburyHume
Cooma
Munyang
Snowy Adit
Queanbeyan
TumutCanberra
Murrumburrah
Cowra
Kangaroo Valley
Panorama
Molong
Orange
Beryl
Parkes
Forbes
Wellington Bayswater Liddell
Dapto
Muswellbrook
Tamworth 330
Armidale
DumaresqLismore
Tamworth 132
Gunnedah
Narrabri
Moree
Inverell Glen Innes
Tenterfield
Koolkhan
Coffs Harbour
Nambucca
Kempsey
Port Macquarie
Taree
Balranald
Coleambally
Murray
Upper Tumut
Lower Tumut
ANMJindera
Guthega
Mt Piper 132
Wallerawang
Mt Piper 330
Avon
Wagga132 Burrinjuck
Wagga330
Redcliffs
Dederang
Wodonga
Bulli CreekMudgeeraba
Uranquinty
Gadara
OPERATING SYSTEM VOLTAGES 500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
INSET
Tomago
Eraring
Vales Point
Munmorah
Tuggerah
Sydney East
RegentvilleSydney West
Sydney South
NewcastleWaratah
West
Liverpool
Kemps Creek
Vineyard
Sydney North
Dapto
Ingleburn
Wallerawang
Yass Avon
Bayswater
Liddell
Beaconsfield West
Haymarket
INSET
Raleigh
Capital Wind Farm
OPERATING SYSTEM VOLTAGES 500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
ournetwork
TransGridannualreporT2009>AbouttrAnsGrid 5
OPERATING SYSTEM VOLTAGES 500kV Transmission Lines
330kV Transmission Lines
220kV Transmission Lines
132kV Transmission Lines
66kV Transmission Lines
330kV Underground Cable
Customer Exchange Point
Interstate Exchange Point
500kV Substations
330kV Substations
220kV Substations
132kV Substations
Tomago
Eraring
Vales Point
Munmorah
Tuggerah
Sydney East
RegentvilleSydney West
Sydney South
WaratahWest
Liverpool
Kemps Creek
Vineyard
Sydney North
Dapto
Ingleburn
Wallerawang
Yass Avon
Bayswater
Liddell
Beaconsfield West
Haymarket
INSETNewcastle
12,445kmHiGHVolTaGeoVerHeadTransMissionlines+underGroundcablinG
85subsTaTions+sWiTcHinGsTaTions
65connecTionpoinTsToGeneraTorsacrossTHesTaTe
354disTribuToranddirecTcusToMerconnecTionpoinTs
6inTerconnecTorsToVicToria+Queensland’sTransMissionneTWorks
ournetworkTransGrid’snetworkismadeupof:
> 12,445kilometresofhigh-voltageoverheadtransmissionlineandundergroundcableoperatingatvoltagesupto500kV.
> 85substationsandswitchingstations.> 65connectionpointstogenerators
acrossthestate.> 354distributoranddirectcustomer
connectionpoints.> 6interconnectorstoVictoriaand
Queensland’stransmissionnetwork.
TheenergydeliveredviaTransGrid’snetworkisusedbymorethanthreemillionhouseholdsandbusinessesinnsWandtheacT,aswellasusersinotherstates.
interconnectionswithotherstatesgivecustomersaccesstoimportedpowerduringperiodsofhighdemand,whichhelpstopromotemarketbenefitsthroughcompetitivepricing.
TransGrid’sheadofficeisbasedinsydney’scbdandweoperateatvarioussitesaroundnsW,includingHorsleypark,orange,WaggaWagga,yass,Tamworthandnewcastle.
6 AbouttrAnsGrid>TransGridannualreporT2009
ourCustomersTransGridplans,developsandmanagesthenetworktoensuretheservicesourcustomersexpectwillcontinuewellintothefuture.TransGrid’scustomersinclude:
> Thedistributionnetworkserviceproviders(dnsp’s)thatdistributepowertothemajorityofthepeopleofnsWandtheacT(actewaGl,countryenergy,energyaustraliaandintegralenergy).
> businessesthatgenerateelectricity(deltaelectricity,eraringenergy,MacquarieGeneration,snowyHydrolimited,originenergy).
> largeindustrialconsumersofelectricitythataredirectlyconnectedtoTransGrid’shighvoltagenetwork.
> businessesconnectedthroughinter-regionalinterconnectors.
> potentialnewcustomers,whohaveapproachedTransGridandhavemadeanapplicationtoconnecttoournetwork.
ourstAkeHoldersTransGridengagesawiderangeofstakeholdersinthedeliveryofitsmulti-billiondollarcapitalprogram.Thesestakeholdersincludeshareholdingministers,theaustralianenergyMarketcommission(aeMc),theaer,majorcustomers,media,thecommunity,governmentdepartments,otherTransmissionnetworkserviceprovidersandothernationalelectricityMarketparticipants.
TransGridappreciatesthatthedevelopmentofrelationshipswithourstakeholdersisanessentialactivitythatenablesboththeorganisationanditsstakeholderstoachievecommongoals.TransGrid’ssponsorshipprogramsrecogniseandreflectcommunityvaluesandsupportsustainablecommunitydevelopment.
TransGridunderstandstheimportanceofcommunicatingwithstakeholdersinawaythatinformsthemaboutourbusiness.
ourPeoPleTheachievementofTransGrid’sobjectivesandgoalsdependtoalargeextentonthecalibreofourpeople.TransGridcurrentlyemploysalmost1000employees,whoformahighlyskilledteamundertakingavarietyofprofessional,technical,tradeandadministrativeroles.ourpeoplehaveplayedavitalroleininitiatingandadaptingtotechnological,structuralandprocesschangessinceTransGrid’sformation.
TransGridpromotesaworkplacethatrewardsachievement,encouragescommitmentandpromotesdiversity,whichempowersourpeopletoachieveexcellence.Wearecommittedtolife-longlearningandthepursuitofdevelopmentopportunitieswhichattractandretainthehighestqualitypeople.
TransGridpromotesaworkplacethatrewardsachievement,encouragescommitmentandpromotesdiversity,whichempowersourpeopletoachieveexcellence.
Above (clockwise from top left)
Jeffree Cairns, Technical Support Engineer
Darren Ngo, Managing Director’s Scholarship holder
Sophie Dowling, Graduate Engineer
Kevin Murray, Managing Director
TransGridannualreporT2009> AbouttrAnsGrid 7
ourdirection
TransGrid’sdirectionisdefinedinitscorporateplan.ThisplanbuildsonTransGrid’sstrategicplanningframeworkandcontributestomeetingourlongtermandshorttermobjectives.TransGrid’sobjectivesreflectourcommitmentinensuringasafe,reliableandefficientelectricitytransmissionnetwork.Theyarelinkedtobusinessunitandgroupobjectivesaswellasindividualperformanceagreementssothatallemployeescanassesstheircontributiontoachievingtheobjectives.
TransGrid’sstrategiesarebasedontheknowledge,skillsandsystemsthatouremployeesneedtodelivervaluetoourcustomers.
ourvAluesourreputationdependsonthedecisionsmadeandtheactionstakenbypeopleeachday.ourvaluesinfluenceourdecisionsandhowTransGridconductsbusiness.Withoutcommitmenttoourvalues,wecannotachieveourvisionandmission.
Honesty and Integrity– To be truthful and consistent in all our dealings.
Trust and Respect– To recognise and have confidence in the ability of our colleagues, value their contributions and opinions, and accept the differences, as well as the similarities of people.
Open Communication– To share information in an open and transparent manner.
Professionalism– To undertake our tasks diligently, and to address competently the difficult as well as the ordinary issues that we face.
Fairness and Equity– To undertake our duties without fear or favour, and make decisions with impartiality and sensitivity.
Consideration– To treat people with understanding and consider their viewpoints when making decisions.
ourobjeCtives> Tobeasuccessful businessandto
operateatleastasefficientlyasanycomparablebusinesses.
> Toexhibitasenseofsocial responsibilitybyhavingregardfortheinterestsofthecommunity.
> Toprotecttheenvironment.> Toexhibitasenseofresponsibility
towardsregional development.> Tooperateefficient, safe and reliable
facilitiesforthetransmissionofelectricityandotherformsofenergy.
> Topromote effective accesstoourelectricitytransmissionfacilitiesbypotentialcustomers.
ourvisionToberecoGnisedasaWorld-classelecTriciTyTransMissioncoMpany.
ourmissionToproVidesafe,reliableandefficienTTransMissionserVicesandTobecoMMerciallysuccessful.
Above (left to right) John McCall, Northern Region Project Manager, and Michael Stemmer, Tradesperson.
8 HiGHliGHtsAndCHAllenGes>annualreporT2009
HiGHliGHTsandcHallenGes
deliVeredarecord
$217.4moperaTinGprofiT
GeneraTed
$652.8minreVenue
acHieVedaTransMissionneTWorkreliabiliTyexceedinG
99.999%acHieVed
97.2%ofrouTineMainTenance
acHieVeda
PositiveinCentivesCHemeouTcoMe,basedonTarGeTsseTbyourreGulaTor
iMpleMenTediniTiaTiVesTodeliVerreal
oPerAtionAleFFiCienCyiMproVeMenTs
ManaGedTHeouTcoMesofTHereVenuereseTprocessandseTupa
revenueresetimProvementcoMMiTTee
forMedTHe
CAPitAlProGrAmdeliveryiMproVeMenTcoMMiTTee
connecTed
3newGenerAtinGstAtionsToTransGrid’sneTWork
highlights2008/09
TransGridannualreporT2009>HiGHliGHtsAndCHAllenGes 9
deliveredmoretHAn60MajorcapiTalprojecTs
coMpleTedMajorcoMponenTsofTHe
western500kvProjeCtincludinGTHecoMpleTionofbaysWaTerandMTpipersubsTaTionsandproGressionofbannabyandWollarsubsTaTions
reduCedTHeseVeriTyofoccupaTionalinjuries
by35%
deVelopedandlauncHeda
ClimAteCHAnGestrAteGy
conTinuedTHeiMpleMenTaTionof
leAdersHiPdeveloPmentProGrAms
inCreAsedAPPrentiCenumbersfroM57To63
launcHedTHe
younGProFessionAlsProGrAm
inCreAsedGrAduAtenumbersfroM46To57
10 HiGHliGHtsAndCHAllenGes>TransGridannualreporT2009
results2008/09
05
06
07
08
09
451.2
478.5
506.7
573.0
652.8
inCome($million)
05
06
07
08
09
138.3
158.6
218.2
355.0
619.9
CAPitAlexPenditure($million)
2008/09ACtuAl sCitArGet
earningsbeforeinterestandTax($million) 320.5 318.1
operatingprofitbeforeTax($million) 217.4 204.5
dividend($million) 120.2 114.2
returnonassets 6.8% 7.1%
returnonequity 8.0% 7.8%
2008/09
income($million) 652.8
assetbase($million) 5,170.9
interestcover(times) 3.0
Gearingratio(%) 50.0
keyCommerCiAlPerFormAnCeindiCAtors
FinAnCiAlPerFormAnCe
incoMe
$652.8m$79.8Millionincrease
capiTalexpendiTure
$619.9m$264.9Millionincrease
TransGridannualreporT2009>HiGHliGHtsAndCHAllenGes 11
05
06
07
08
09
4.95
5.39
5.78
7.67
8.04
returnonequity(%)*
05
06
07
08
09
5.80
5.81
6.27
7.13
6.82
returnonAssets(%)**
reTurnoneQuiTy
8.04%0.37%increase
reTurnonasseTs
6.82%0.31%decrease
*returnonequitymeasuresacompany’sefficiencyinearningprofitsonbehalfofitsshareholders.itiscalculatedtakingintoconsiderationpost-taxprofit.
**returnonassetsmeasurestheefficiencywithwhichanentityusesitsassetstoproduceprofits.itiscalculatedtakingintoconsiderationnetborrowingcosts.
The2008/09yearhasbeenanotherverysuccessfulyearforTransGrid.Wehavemetorexceededallourobjectives.
AboveriGHt (clockwise from top left)
Ralph Meeks, Engineering Officer
David Fayyad, Corporate Relations Manager
Peter Clarke, Linesworker
Jayson Patrick, Professional Officer
12 HiGHliGHtsAndCHAllenGes>TransGridannualreporT2009
05
06
07
08
09
0.15
0.68
1.19
0.37
0.42
networkreliAbility(systemminuteslost)***
05
06
07
08
09
99.59
99.47
99.44
98.54
98.44 **
networkAvAilAbility(%)*
98.44%neTWorkaVailabiliTy
neTWorkreliabiliTy
0.42sysTeMMinuTeslosT
networkPerFormAnCe
*cumulativecircuitavailabilityasapercentagebasedonTransGridownedtransmissionlinesratedat132kVandaboveforplanned,forcedandemergencyoutages.
**availabilityhasbeenimpactedbyoutagesnecessarytoimplementthecapitalworksprogram.
***Historicalsystemreliabilityinsystemminutes.includessupplyinterruptionscausedbyTransGridonequipmentitowns.
results2008/09
oPPositeAbove (clockwise from top left)
James Bradley, Apprentice
Jenny Seage, Property Asset Manager
Daniel Bremner, Electrical Fitter
Tony Pinchen, Communication and Control Maintenance Manager
TransGridannualreporT2009>HiGHliGHtsAndCHAllenGes 13
05
06
07
08
09
2.1
3.7
1.6
3.7
3.5
sAFety(losttimeinjuryFrequencyrate)*
3.5losTTiMeinjuryfreQuencyraTe
PeoPle
CAteGorydesCriPtion 2009 2008 2007 2006 2005
administrativeofficers 150 151 162 158 165
apprentices 63 57 54 52 42
engineeringofficers 269 254 232 233 225
lineworkers 33 38 33 60 64
operators 22 24 26 27 30
professionalofficers 227 212 174 173 175
powerWorkers 44 49 52 54 59
seniorcontractofficers 90 91 94 101 106
Teamleaders–network 17 19 20 21 22
Tradespersons 76 73 95 64 65
Total 991 968 942 943 953
**staffnumbersdonotincludeindustrialworkexperiencestudentsandscholars.
stAFFnumbers–stAFFbyCAteGory30june2009**
TransGrid’sfocusonhealthandsafetyhasalwaysbeenparamountandweworktowardszeroinjuries,occupationalincidentsandillnesses.
* lostTimeinjury =frequencyrate
TotalnumberoflostTimeaccidentsfortheyearx1,000,000
averagenumberoffulltimeequivalentemployeesx2,000hours
14 HiGHliGHtsAndCHAllenGes>TransGridannualreporT2009
totalstaff P/tstaff equiv.F/tofP/t equiv.F/tstaff
administrativeofficers 150 20 12.38 142.38
apprentices 63 0 0 63
engineeringofficers 269 2 0.86 267.86
lineworkers 33 0 0 33
operators 22 0 0 22
powerWorkers 44 0 0 44
professionalofficers 227 5 3.65 225.65
seniorcontractofficers 90 0 0 90
Teamleaders–network 17 0 0 17
Tradespersons 76 1 0.79 75.79
Total 991 28 17.68 980.68
stAFFnumbers–ComPArisonoFstAFFbyCAteGory30june2009
PeoPle
Categorydescription no.ofemployees
females 146
Males 845
Total 991
*staffnumbersdonotincludeindustrialworkexperiencestudentsandscholars.
stAFFnumbersbyGender30june2009*
Categorydescription no.ofemployees
females 8
Males 82
Total 90
seniorContrACtstAFFbyGender30june2009
environment
Classification low medium High total reportable
numbers 16 7 3 26 3
**in2008/09therewere26environmentalincidentsreportedinTransGrid’sincidentnotificationsystem.Threeoftheseincidentswereofasignificancelevelthatrequirednotificationtoaregulator.allwereaddressedpromptlyandresolved.during2008/09therewerenoprosecutionsbroughtagainstTransGridunderanyenvironmentalstatutes.
environmentAlinCidentnotiFiCAtion2008/09**
results2008/09
TransGridannualreporT2009>HiGHliGHtsAndCHAllenGes 15
challenges2009/10>Worktowardsourgoalofzerooccupationalincidentsandillnesses.
>Maintainhighlevelsofreliabilityandavailabilityasweembarkonacapitalworksprogramwhichhasincreasedfrom$1.4billioninthe2004to2009regulatoryperiodto$2.4billioninthe2009to2014regulatoryperiod.
>Maintainstrongfinancialperformancewiththechallengeofagrowingassetbase.
>implementinitiativestofurtherimproveoperatingefficienciesandensureweexceedthenetworkperformancetargetssetbyourregulator.
>incorporatelessonslearnedfromtherevenueresetprocessintothebusiness.
>proactivelymanageTransGrid’simageandreputationtoenhancecustomerandstakeholderrelationships.
>activelymanagetheimpactsofclimatechangeonourbusiness.
>adoptamorestrategicapproachtobuildinglongterm,cooperativepartnershipswithlandownersandcommunities.
>implementbestpracticehumanresourcesinitiativestoassistintheattraction,retentionanddevelopmentoftalentedandskilledemployees.
AboveDavid Robinson, Tradesperson
16 CHAirmAn+mAnAGinGdireCtor’sreview>TransGridannualreporT2009
The2008/09financialyearhasbeenanotherverysuccessfulyearforTransGrid.Wehavemetorexceededallourobjectivesinayearinwhichwehavealsohadthechallengeofdeliveringarecordcapitalworksprogramandpresentingadetailedandexhaustiverevenuesubmissiontotheaerfortheperiod2009to2014.
Wearepleasedtoreportthatwehavecontinuedtoprovideasafe,secureandreliablenetworkservicetoconsumersinnsW.ThisincludedmeetingarecordnsWpeakdemandof14274MWon28july2008andachievingareliabilityofsupplyof99.999percent.
improvingtheefficiencyofthebusinesshascontinuedtobeamajorfocusoftheorganisationanditispleasingtoreportarecordoperatingprofitbeforetaxof$217.4million.ThisresultwasachievedatthesametimeasTransGridwasbenchmarkedasaworldleaderintermsofcostandservicelevels.
Thelastyearwasbusierthannormalduetotheneedtosubmitarevenueproposaltotheaerfortheperiod2009to2014.Thiswasamajorone-offtaskontopofnormaloperationsandinvolveddetailedsubmissionsonoperatingandcapitalexpenditure,servicelevelsandratesofreturn.Thesesubmissionshavebeensubjecttoexhaustiveanalysisbytheregulatorandassociatedconsultants.nowthattheprocesshasbeenfinalised,TransGridispleasedtobeabletocommitwithcertaintytotheoperatingandcapitalexpenditurenecessarytomaintainareliablesupplyofelectricity.
deliveringtheincreasingcapitalworksprogramcontinuestobeamajorchallenge.Theprogramhassteadilygrownwiththeneedtoreplaceassetsbuiltinthe1960sand70scoupledwiththeneedtoaddadditionalcapacitytomeetreliabilitystandardsandmarketexpectations.TransGrid’scapitalworksprogramforthe2004to2009regulatoryperiodwas$1.4billionwith$590millionoccurringinthe2008/09financialyear.regulatoryapprovalhasbeengivenforarecordcapitalworksprogramof$2.4billionforthe2009to2014period.
ThereportingperiodsawthecompletionofanumberofmajorprojectsincludingthefirststageoftheWestern500kVprojectwhichinvolvesupgradingthebackboneofthensWgridfrom330kVto500kV.WealsocompletednewsubstationsatMacarthurandWagganorthandcommencedworkonnewsubstationsatTomago,WilliamsdaleandreplacementsubstationsatorangeandQueanbeyan.constructionhasalsocommencedonmajortransmissionlineprojectsincludingthenew330kVtransmissionlinefromWollartoWellingtonand132kVlinesbetweenportMacquarie,kempseyandcoffsHarbour.
AboveriGHtManaging Director, Mr Kevin Murray, and Chairman, Mr Bruce Foy.
CHAirmAn+mAnAGinGdireCtor’sreview
TransGridhasdeliveredonarecordinfrastructureprogramwhilstmeetingorexceedingallothercorporateobjectives.
review
TransGridannualreporT2009>CHAirmAn+mAnAGinGdireCtor’sreview 17
capacityupgradestomostotherpartsofnsWhavecommencedwithcommunityconsultationonanew330kVtransmissionlinkbetweendumaresqandlismoreandanew132kVlinkfromGleninnestoinverellinthenorthandfromManildratoparkesinthewest.a$105milliontransformerreplacementandaugmentationprogramatninemajorsubstationsisalsounderwayaspartofourongoingassetreplacementprogram.
WecontinuetomeetourobjectiveofimprovingrelationshipswithexistingandprospectivecustomerstofacilitatetheeffectiveoperationofthenationalelectricityMarket.Weassistedasignificantnumberofnewgeneratorproponentswiththeirconnectionoptions.Thisincludedtheconnectionofa660MWgasturbinestationaturanquintynearWagga,a600MWgasturbinestationatcolongraonthecentralcoastanda140MWwindfarmatbungendorenearcanberra.TransGridiscurrentlyprocessingmorethan30proposednewgeneratorconnectionsorupgrades,whichintotalconstituteapotentialofaround2500MWofadditionalcapacitythatcouldbeconnectedtothenetwork.
ofprimeimportancetoTransGridistheprotectionofourenvironment.TransGrid’senvironmentalstrategiesaretargetedatpreventingenvironmentalincidentsthroughtheidentificationandmanagementofenvironmentalrisks.TransGridhasaresponsibilitytomeetthecommunity’sneedforelectricitywhileminimisingtheenvironmentalimpactofworks.Weachievethisthroughactiveconsultationwithemployees,contractors,thecommunityandotherstakeholders.
Wehavetakenaproactiveapproachtoclimatechangewiththelaunchofourclimatechangestrategyinfebruary.Thestrategyfocusesonengagingemployeesandthecommunityregardingpotentialenvironmentalorculturalimpactsassociatedwithourworkstomaximiseresourceefficienciesandinsodoingreducetheimpactontheenvironment.
ourfocusonhealthandsafetyhasalwaysbeenparamountandweworktowardsourgoalofzeroinjuries,occupationalillnessesandincidents.althoughwehadsevenlosttimeinjuriesduringtheyear,itispleasingtoreportthatnoneoftheseresultedinlongtermabsences.ourlowlosttimeinjuryfrequencyrateof3.5isconsistentwithothernetworkbusinesses.inaddition,theseverityofinjuriesoverthepastyearhasfallenby35percentwithanaverageof7.7dayslostperinjury.
Withover600peopleworkinginthefieldtherehasbeenacontinuingfocusonmaintainingandimprovingthehealthandfitnessofourstaffthroughthefitforWorkprogramme.Wehavealsointroducedanewauditingprogramforourmajorconstructionprojectstofurtherimprovesafetyperformanceintheexecutionofourmajorcapitalworksprogram.
ThesuccessofTransGridlargelydependsonourpeople.oneofthekeyworkforcechallengesforTransGridisanageingworkforce.TransGridhasprogressivelyimplementedarangeofleadershipanddevelopmentprogramstoaddressthesechallengesandcontinuestoincreaseitsrecruitmentofgraduatesandapprentices.inparticular,theseniorleaders,futureleadersandyoungprofessionalsprogramshavebecomeavitalcomponentofourworkforceplanningstrategy.
ourworkforcehasgrownoverthelastyeartomeetthedemandsofourupcoming$2.4billioncapitalworksprogram.Wewelcomeallnewemployeesandatthesametimeweacknowledgethecommitmentandvaluedexperienceofourlong-servingemployeeswhocarryouttheirjobswithdedicationthatissecondtonone.ourpeoplecontinuetorisetothechallengeconfrontingthemthroughtheincreasingdemandsandexpectationsofourbusiness.
ThechallengesforTransGridoverthenextfewyearswillbetocontinuetoimprovetheefficiencyofourbusiness,deliverourincreasedcapitalworksprogramandmaintainourcurrenthighlevelsofsafetyandreliability.
ourthanksgototheboardandtheexecutiveleadershipteamfortheirabilitytodefineandleadthepursuitofcommonobjectives.althoughithasbeenachallengingyear,wecanlookbackpositivelyandbeproudofourachievements.
Mrbrucefoychairman
MrkevinMurrayManagingdirector
18 PlAnninGAFuturenetwork>TransGridannualreporT2008
planninGafuTureneTWorkourPlAnninGAPProACH
ThenewsouthWaleselectricitytransmissionnetworkhasbeenplannedanddevelopedbyTransGridforoverfiftyyears.TheexpertisegainedoverthishalfcenturyoftransmissiondeliveryenablesTransGridtotrulyclaimtobeaworld–classelectricitycompany.
AboveriGHtJim Coleman, Engineering Officer
oPPositePAGe (left to right) Projects Engineers Warick Schroder and Neil Mitchell with John McCall, Northern Region Project Manager.
TransGridannualreporT2009>PlAnninGAFuturenetwork 19
asindustrialdevelopmentandpopulationgrowthhavecontinuedtodriveupthedemandforelectricity,TransGridhascontinuedtodemonstratetheeffectivenessofitsforwardplanning.TransGriddoesthisbyassessingtheabilityofthenetworktomeetprojectedloadforecastsandplanstosatisfytheseemergingneeds.
ourplanningiscarriedoutoverbothashorttimeframe,fromonetofiveyears,andalsooveralongertermperiod,fromfiveto20years.shortertermplanningsupportscommitmentstonetworkdevelopmentswithrelativelyshortleadtimes.longertermplanningconsidersoptionsforfuturemajordevelopments.planningprocessesoverbothtimeframesensureseconomicallyefficientdevelopmentofthenetwork.
TransGridpreparesanannualplanningreporteachyear.TheannualplanningreportprovidesinformationtomarketparticipantsandinterestedpartiesonnsWenergydemandprojections;thenatureandlocationofemergingconstraintsinthensWnetwork;informationoncompleted,committedandplannedaugmentations;andproposednetworkdevelopmentsoverthenextfiveyears.ThisinformationallowsthemarkettoidentifypotentialdemandmanagementsolutionsandallowsTransGridtodevelopandimplementappropriateandtimelynetworksolutions.
TransGridalsopreparesafiveyearnetworkManagementplanwhichdescribesthemodelweusetomanageanddevelopitsassetsandtheassetmanagementstrategiesfornetworkenhancementandmaintenance.
inresponsetotheprojectedhighlevelofelectricityloadgrowth,TransGrid’splanninghasidentifiedtheneedforfutureaugmentationofthensWtransmissionnetwork.The2009to2014regulatoryperiodischaracterisedbysixmajorprojectswhichcollectivelyaccountforover50percentofthetotalexpenditureoftheexpected$2.4billioncapitalexpenditureprogram.Theseinclude:
> dumaresqtolismore330kVTransmissionline
> beaconsfieldWest330/132kVGasinsulatedswitchgear(Gis)substationrebuild
> HolroydGisandrookwoodroad330/132kVGissubstations
> Holroydtorookwoodroad330/132kVGiscables
> Tomago/stroud/TareeTransmissionlineprojects
> bannabytosouthcreek500kVTransmissionline.
20 PlAnninGAFuturenetwork>TransGridannualreporT2009
risinGeleCtriCitydemAndnsWisaustralia’smostpopulousstate.peakenergydemandinnsWhasbeengrowingatafasterratethantheaveragedemandandthistrendhasresultedinanincreasingdemandforelectricalservicesacrossallsectorsoftheeconomy.inparticular,thedevelopmentsintheresidentialsectorandtheincreaseinbusinesscentreslocatedprimarilyinsydney,newcastleandWollongonghasrequiredincreasedtransmissioncapabilitytosupportthem.
on28july2008,TransGridrecordedapeakwinterdemandof14,274MW.Thiswasfollowedbyapeaksummerdemandof14,106MWon6february2009.
Tomeetthisincreasingdemand,TransGridisembarkingonalargecapitalworksprogramthatwillseea24percentincreaseinthevalueofitsassetsoverthenextregulatoryperiod.Thisisexpectedtoincludeabout1000kilometresofnewhighvoltagetransmissionlinesand13newsubstations.
althoughTransGrid’ssuccessinmanagingitsassetsisreflectedinitsreliabilityofover99.999percent,itwillbeimportantforTransGridtocontinuetoimproveitsassetmanagementandmaintenancetechniquesinordertoproducethebestresultsfromitschangingassetbase.
10000
11000
12000
13000
14000
15000
16000
17000
18000
1900010% POE Projection (MW)
50% POE Projection (MW)
90% POE Projection (MW)
Actual
2018
/19
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
10000
11000
12000
13000
14000
15000
16000
17000
18000
1900010% POE Projection (MW)
50% POE Projection (MW)
90% POE Projection (MW)
Actual
2019
/20
2018
/19
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
10000
11000
12000
13000
14000
15000
16000
17000
18000
1900010% POE Projection (MW)
50% POE Projection (MW)
90% POE Projection (MW)
Actual
2019
/20
2018
/19
2017
/18
2016
/17
2015
/16
2014
/15
2013
/14
2012
/13
2011
/12
2010
/11
2009
/10
2008
/09
2007
/08
2006
/07
2005
/06
2004
/05
2003
/04
2002
/03
2001
/02
Summer Peak Demand (2001/02 – 2018/19)
Winter Peak Demand (2001/02 – 2018/19)
sch
edul
edd
eman
d(M
W)
sch
edul
edd
eman
d(M
W)
TransGridannualreporT2009>PlAnninGAFuturenetwork 21
demAndmAnAGementinitiAtivesViabledemandmanagementinitiativesarealwaysconsideredasalternativestoaugmentationoftheelectricitytransmissionnetwork.TransGridplacesahighpriorityonidentifyingopportunitiestoreducedemandgrowth.
demandmanagementprojectsthatTransGridislikelytoimplementduringthe2009to2014regulatoryperiodinclude:
> anetworksupportprojectcombinedwithdevelopmentoftheelectricitysupplytothesydneycbdandinnermetropolitanarea.
> aprojectwiththestate’sdistributorsforthedevelopmentandimplementationofefficientdemandsideresponsesolutionsandresponsestorequestsforproposals(rfp)fornon-networkalternatives.
> provisionofreactivepowersupportfrompowerstationsforthemainsystemnetwork.
> implementationofasystemprotectionschemetoimprovethepowertransfercapabilitybetweensnowyandyass/canberra.
ContributinGtonAtionAleleCtriCitymArketdeveloPmentTheprimaryregulatoryreviewsimpactingTransGridduringtheyearincluded:
> Theaerreviewofregulatedcostofcapital(Wacc)parameters.
> furtherdevelopmentofthenationaltransmissionplanningarrangementsaroundthenationalTransmissionplanner(nTp)functionwithinthenewlycreatedaustralianenergyMarketoperator(aeMo).
> TheestablishmentoftheregulatoryinvestmentTest–Transmission(riT-T).
reviewsofsignificance,whichwilldependonfuturedecisionsfromtheMinisterialcouncilonenergy(Mce),includethefinalisationofanationalframeworkfor
transmissionreliabilitystandardsandchangestonationalelectricitymarketarrangements.
TheestablishmentofthenTpisaimedatimprovingthecoordinationoftransmissionplanningacrosstheneM.ThisinitiativeiscomplementedbytheestablishmentoftheriT-T,toreplacetheregulatoryTest.akeyobjectiveofthenewtestistoensurethatmarketbenefitsaremorefullyaccountedforwhenassessingtransmissionaugmentationoptions.TransGridiscommittedtoworkingwiththeotherneMtransmissionserviceproviders,andaeMo,toensurethatthereformobjectivesareachievedtothemaximumextentpossible.
duringtheyear,theaeMcdelivereditsreporttotheMcerecommendinganationalframeworkforestablishingandreviewingtransmissionreliabilityplanningstandards.TheframeworkiscrucialinensuringatransparentaccountabilityframeworkfortransmissioninvestmentdecisionsacrosstheneM.
TheMcealsoinitiatedareviewofneMarrangementstoensurethattheyarenotimpedingthedeliveryofclimatechangepolicies.TheaeMcproduceditssecondinterimreporton30june2009whichincludesproposalstoimproveprocessesforconnectingremoterenewableenergysourcestotransmissionnetworks,establishtransmissionchargesbetweenregions,andintroduceatransmissionchargeforgeneratorsreflectingthetransmissioncongestionassociatedwithdifferentlocations.
CustomerConneCtionsGenerationconnectionactivityhascontinuedtoincreaseduringtheyear.Thisincludedconnectionenquiries,processingofconnectionapplications,andtheconnectionofthreenewgeneratingstationstoTransGrid’snetworkduringtheyear.specifically,600MWofnewgasturbinegenerationwasestablishedat
colongraonthecentralcoast;morethan660MWofnewgasturbinegenerationwasestablishedaturanquintyinsouthWesternnsW;and140MWofwindgenerationcapacitywasconnectedatthecapitalWindfarmnearbungendore.
also,over400MWofgasfiredgenerationwasestablishedatTallawarrawithTransGridworkingcloselywithintegralenergyandaeMotoensuresuccessfulconnectiontothetransmissionnetwork.
Thetotalofaround1800MWofgeneratorconnectionsduringtheyear(includingTallawarra)issignificantinthatitisthefirstmajoradditionofnewgenerationcapacityinnsWsincetheearly1990s.
progresswasalsomadeonmajorloadexpansionsduringtheyear.notablytheVisypulpMillnearTumutisundergoinganexpansionandisexpectedtodrawsignificantadditionalloadearlyin2009/10.longertermsystemdevelopmentisalsobeingplannedtoprovideimprovedreliabilityfortheexpandedVisyoperation.followingthecompletionofanoptionsstudy,theotherloadexpansionisnowlikelytoconnecttothelocaldistributionnetworkserviceprovider.
FAirPriCinGTransGrid’sallowablerevenueisseteveryfiveyearsbytheaer.eachyear,TransGridadjustsitsrevenueforinflationandthensetsitstransmissionprices.TransGrid’spricesfor2008/09werepublishedinMay2008,asrequiredbythenationalelectricityrules.
fromtheseannualrevenues,TransGridcalculatesitstransmissionpricesinaccordancewiththemethodologydescribedintherules.
Therewasamoderate2.3percentincreasefor2008/09totheaverageretailcustomer,whichequatestoapproximately$2.80perhouseholdperyearinrealterms.
nsWisaustralia’smostpopulousstatewithpeakenergydemandinnsWgrowingatafasterratethantheaveragedemand.
riGHt (clockwise from top left)
Jye Thornton, Graduate Engineer
Jo-Anne Harrison, Manager/Reporting and Financial Systems
Kathryn Pate, Environmental Officer
Garrie Chubb, Manager/Network Planning
22 PlAnninGAFuturenetwork>TransGridannualreporT2009
inProFile
ourfuturerevenueeveryfiveyears,TransGridsubmitsitsrevenuerequirementstotheaustralianenergyregulator(aer).TherevenueproposalseekssufficientfundsfromtheregulatortoallowTransGridtocontinuetodeliverworld-classnetworkreliability.on30april2009,theaerreleasedTransGrid’sfinalrevenueproposalforthe2009to2014regulatoryperiod.WearepleasedthattheaeracceptedthatTransGridisanefficientnetworkserviceproviderandapprovedthevastmajorityofourproposedcapitalexpenditureprogram.akeyaspectofthedecisionforTransGridhasbeenthesignificantreductionintheregulatedreturnonTransGrid’sassetbase.Thesignificantreductioninrevenueisaresultoftheglobalfinancialcrisiswhichhasseenadramaticreductioninthebondyieldsusedbytheaertodeterminetherateofreturn.
asaresultofourrevenueoutcome,TransGrid’stransmissionchargeswillincreasebysome2.3percentinrealterms,addingabout$2.80perannumtotheaverageresidentialcustomer’sbill.despitethis,weareproudofthefactthatthepeopleofnsWwillcontinuetoreceivethelowestpriceelectricitytransmissionserviceintheneM.
Thecoordinationoftherevenueresetwasasignificantundertakingthatrequiredbroadorganisationalinvolvement.adedicatedprojectteamwasresponsiblefortheoverallcoordinationofourproposalandmanagingtheongoingrelationshipwiththeaer.
Theprimarychallengehasbeenmanagingtherevenueresetprocessaspartofournormalbusinessprocesses.Toachievethis,therewaswideorganisationalinputfromallbusinessunitstoensurethelinkagebacktothebusiness.Weappreciatetheireffortandcommitmenttotheprocess.
Wearelookingattherevenueresetprocessasanopportunitytoimprovethewaywedothings.Tothisend,wehavesetupanimprovementcommitteetolookatthelessonslearnedandidentifyopportunitiesforbettermanagementofourprocessestoensurewecontinuetoprovidethebestpossibleelectricityservicetonsW.
Above (left to right)Members of the Revenue Reset Project: Raymond Chui, Meredith Sturman, David Trethewey, David Conroy, and Karman Fung.
TransGridannualreporT2009>buildinGsustAinAbleworld-ClAssinFrAstruCture 23
buildinGsusTainableWorld-classinfrasTrucTureTransGrid’smulti-billiondollarcapitalworksprogramisrequiredtoensureourtransmissionnetworkcontinuestodeliversafe,secureandreliableelectricity.TransGridalsohasamajoron-goingprogramofrefurbishmentandreplacementofageingassetstoensureefficientsupplytoallcustomers.
AboveriGHt (left to right)David Robinson, Tradesperson, and John McCall, Northern Region Projects Manager.
24 buildinGsustAinAbleworld-ClAssinFrAstruCture>TransGridannualreporT2009
Thecapitalworksprogramforthe2004to2009regulatoryperiodcomprisedmorethan120majorprojectswithatotalregulatedexpenditureofover$1.4billion.
duringthe2004to2009regulatoryperiodthenumberofactiveprojectsandtheannualexpenditureontheseprojectshasgrown,sothatin2008/09,thetotalannualcapitalprojectsexpenditurewas$590millionwithmorethan60projectsdelivered.
TheachievementofTransGrid’scapitalworkstargetsatteststotheskillsofourworkforceandcontractors.TransGrid’sstrategyforstronginternalgrowthsitsalongsidestrategiesofoursuppliersandcontractingpartnerstogrowtheircapabilitiesinthedeliveryofourcapitalworksprogram.
ThepastfiveyearshaveseenstronggrowthinTransGrid’sinternalandexternalprojectdeliverycapabilitiesandthesecapabilitiesformthebasefromwhichthisimportantcapitalprogramwillbedeliveredwithequalsuccess.
bestPrACtiCeAssetmAnAGementTransGridcontinuestoreviewandimproveitsassetmanagementandmaintenancetechniquesinordertoproducebestpracticeperformancefromourassets.
TransGrid’sassetmanagementandmaintenancestrategiesaredrivenbyournetworkManagementplan.ThisplanprovidesabasisforongoinganalysiswithinTransGridandforcontinualimprovementofthetransmissionsystem.
ariskmitigationapproachisusedinthedevelopmentofTransGrid’sassetmanagementstrategies.Thesestrategiesareevaluatedbyspecialistworkinggroupsandconsideraspectssuchasmaintenancecosts,expectedreliabilityperformanceandassetcapability.
TransGridhasawelldevelopedassetmanagementmodelwhichconsistsof:
> Theestablishmentofmaintenancepoliciesforeachtypeofassetclass.Theitemsinthemaintenanceplanareprioritisedtoensuretheirimpactonreliability,availability,safety,environmentalandeconomicfactorsareconsidered.
> planningandexecutingmaintenanceworkinaccordancewiththeWorksManagementsystemwithcoremaintenanceworkperformedbyhighlyskilledTransGridstaff.
> undertakingquarterlyassetperformancereviewswhichexaminethetrends,causesandimpactsofallforcedandemergencyoutagesofequipment.
> benchmarkingourassetmanagementandmaintenanceprocessesthroughtheinternationalTransmissionoperationsandMaintenance(iToMs)studyprogram.Thebenchmarkingiscarriedoutwithover25transmissionorganisationsworldwide.Themostrecentbenchmarkingstudy,iToMs2007,confirmsthesuccessofTransGrid’sassetmanagementstrategies,withTransGridwellpositionedinthe“bestperformer”quartile(lower-than-averagecostandabove-averagereliability).
overthe2009to2014regulatoryperiod,TransGridisexpectinga24percentincreaseinourmaintainableassets.TransGridisconfidentwewillmeetthischallengebycontinuingtotakeaproactiveapproachinassessingandmonitoringourassets.
Above Bannaby 500/330kV Substation
TransGridannualreporT2009>buildinGsustAinAbleworld-ClAssinFrAstruCture 25
inProFile
energisingtheWestern500kVprojectTomeetincreasingdemandinthesydney,newcastleandWollongongareas,TransGridhasmovedfullsteamaheadwiththeWestern500kVproject.atavalueof$320million,itisthelargestprojecteverundertakenbyTransGridoneveryscale.
TheprojectfocusesonupgradingthewesternbackboneofthecorensWtransmissionnetworkfrom330kVto500kVtomaximisetheusefulcapacityofallthetransmissionlinesthatsupplythenewcastle,sydneyandWollongongloadcentres.TheWestern500kVprojectistheculminationofplanninganddevelopmentbyTransGridoverthepast30years.
TheWestern500kVprojectcomprisesthefollowingworks:
> constructionof500kVswitchyardsatbayswaterandMtpiper> constructionofnew500/330kVsubstationsatbannabyandWollar> upgrading330kVequipmentatWallerawang330kVswitchingstation.
2009representsamilestonewithbayswatersubstationbeingcompletedduringjanuaryandtheupratingofWallerawangandMtpiperswitchyardscompletedduringMarch.inaddition,thefirstofthetwolinesbetweenbayswaterandMtpiperpowerstationswasplacedinserviceat500kV.
Thesecondmilestonefortheprojectwasachievedinjune2009whenMacquarieGenerationcompletedinstallationofthe500kVgeneratortransformerswhichconnectedthefirstoftwounitstothe500kVsystem.
TheWestern500kVprojectisanimpressiveprojectfromadesign,planning,environmentalandstakeholderperspective.acriticalcomponentoftheprojectisthedesignandsupplyofatotalof21500/330kVtransformers,byToshibajapan.duringtheyear,18oftheseunitswereshippedfromjapantonewcastleandthenbyheavyhaulageroadtransporterstobayswater,Mtpiperandbannaby.Thelastthreeunits,forWollar,areduetowardstheendof2009.
significantinvestmentsweremadetocommunityinfrastructureduringtheconstructionoftheproject.forinstance,inbuildingbannabysubstation,TransGridinvested$1.5millionintobuildingaroadlinkingTaralgawiththenewTransGridsubstationatbannaby.
TransGridworkedinpartnershipwiththecouncilsandthecommunitybypresentingthebenefitsandimpactsoftheprojectstothem.Wewereactiveinfacilitatingdiscussionswithlandownersandkeepingstakeholdersinformedoftheprojectthroughissuingpressstatementsandbrochures.
during2009/10,TransGridwillenergisethesecondlinebetweenbayswaterandMtpiperat500kV,reestablishtheMtpipertoWallerawang330kVline,completeandcommissionbannabysubstationandcompleteandenergiseWollarsubstation.
TheWestern500kVprojecthasinvolvedhundredsofTransGridandcontractstaffallofwhomaretobecommendedforthesignificantprojectachievementstodate.
TheachievementofTransGrid’scapitalworkstargetsatteststotheskillsofourworkforce.
ThepastfiveyearshaveseenstronggrowthinTransGrid’sinternalandexternalprojectdeliverycapabilities.
leFt Peter French, Engineering Officer
riGHt (clockwise from top left)
Raymond Selmes, Engineering Officer
Clare Mannion, Board and Executive Support Manager
Mathew Gorton, Apprentice
Ian Harris, Senior Audit Manager
26 buildinGsustAinAbleworld-ClAssinFrAstruCture>TransGridannualreporT2009
inProFile
newsubstationatMacarthurTransGridhasrecentlycompletedconstructionofanew$50millionsubstationatMacarthurtoreinforceelectricitysupplyintherapidlydevelopingsouthWestsydneyregion.Thenewsubstationwillprovidesydney’ssouthWestregionwithenoughpowertosupply100,000homesandbusinesses.Twostate-of-the-arttransformershavebeeninstalledandacustommaderoadwasbuiltofftheHumeHighwaytoensurethetransformersreachedthesite.
Theprojectinvolvedextensivecivilandlandscapingworks.Thecloseproximityofanumberofotherutilitiesintheareaplusthedifficultslopeofthesiterequiredinnovativedesignstoachieveaneffectiveoutcome.
Theprojectwassubjecttoextensivecommunityconsultation.acomprehensiveenvironmentalinvestigationwasmadebeforeconstructionbegan,whichtookintoaccounttheproximityofconstructiontotheMountannanbotanicGardens.Withthehelpofgardens’staffduringtheplanningprocess,TransGridestablishedalandscapeplanfortheareaaroundthesubstation.Thenativeflorahasprovidedanaturalhabitatforwildlife.
arangeofefficienttechniqueswereemployedintheproject,someofwhichincludedtheutilisationofaverycompactlayoutforthesubstationandthepaintingofhighersteelstructuresandthetransformersoundwallstoreducenoiseimpacts.
Thenewsubstationemployedover100localcontractorsduringitsconstructionandisabigpartofTransGrid’sannualcapitalworksprogram.
Macarthursubstationisoneofthemostmodernsubstation’sonTransGrid’snetworkwiththelatestadvancesinsafety,securityandenvironmentalprotection.
AboveMacarthur 330kV Substation Site
leFtMacarthur Substation Transformer
TransGridannualreporT2009>buildinGsustAinAbleworld-ClAssinFrAstruCture 27
inCreAsedreliAbilityForCentrAlnswWollar to Wellington 330kV Transmission LineTostrengthenelectricitysupplytocentralnsW,TransGridisconstructinga117km,330kVtransmissionlinebetweenanewswitchingstationnearWollarandtheexistingWellington330/132kVsubstation.
extensivecommunityconsultationwasundertakenduringtheplanningstage.partoftheanalysisrequiredTransGridtoconsideralternativeprojects,suchaslocalgasturbinegenerators,priortoproceedingwiththepresentproject.TransGridworkedcloselywithstakeholdersthroughoutthenumerousconsultationsandsubmissionswhichwererequiredtosecureapprovalfortheproject.
numerousalternatealignmentswereconsideredforthetransmissionline.Thetransmissionlinecrossespropertythatisownedoroperatedbyseveraldifferentminingorganisations,allofwhichhadanimpactonthefinaldesignandlocationsadoptedforthetransmissionline.
aconstructionenvironmentalManagementplan(ceMp)wasimplementedforthecontractandanindependentenvironmentalManagementrepresentativeappointed.Theprojectincludedseveralfaunacorridorsandarequirementthatcompensatoryhabitatbeprovided.
Theestimatedcostoftheprojectis$90millionwithcompletionexpectedbynovember2009.
newwAGGAnortHsubstAtionduringjuly2009,TransGridcompletedconstructionofabrandnew$23millionsubstationatWagganorthtomeetincreasingelectricitydemandintheregion.
constructiononthesubstationcommencedin2008aftermorethanfiveyearsofdetailedplanningbyTransGridandcountryenergy.ThenewWagganorthsubstationwillbeWagga’sthirdbulksupplypointforelectricity,supplyingseveralofcountryenergy’sruralzonesubstationsandprovidingpowertoaround14,000residentialandbusinesscustomersintheWaggaWaggaregion.
ThenewsubstationwasbuilttoanacceleratedprogramandisvitaltoincreasingpowersupplytosupportthefuturegrowthanddevelopmentinnsW’slargestinlandcity.
Thesubstationsite,locatedadjacenttotheexistingindustrialarea,providedTransGridwiththeopportunitytobuildincloseproximitytobothTransGrid’sandcountryenergy’sexistingelectricitynetworkinfrastructure.
duringtheplanningandconstructionphasestherewasanemphasisonpreservingexistingflora,includingtreesthatwereplantedneartheconstructionareaasacarbonoffset.consistentwithotherTransGridlocations,thesitewillbelandscapedwithnativetreesandshrubs,whichhavebeenselectedtoincreasebio-diversityinthearea.
boostinGPowertosoutHernnswYass to Wagga 132kV Transmission LineduringMarch2008,TransGridcommencedconstructionontheyasstoWagga132kVtransmissionlinereconstructionprojecttomodernisetheexistingtransmissionlineasitreachedtheendofitsserviceablelife.
Theprojectincludesdismantlingtheexistingwoodpolelineandconstructinganewlineusingsingleconcretepoles.Thelineisapproximately150kmlong.
TransGridactivelyconsultedwithaffectedpropertyownersonthemethodsofrebuildingthelineandasaresultofthisconsultationtwoownersrequestedminordeviationstotheexistingalignment.areviewofenvironmentalfactorswasundertakenandbecausetherebuildofthelineisalongtheexistingalignment,nonewenvironmentalimpactswereintroduced.
constructionofthenewlineisexpectedtobecompletedbyearly2010.Theestimatedcostoftheprojectis$27million.
AboveleFtWollar to Wellington 330kV transmission line construction
AboveriGHtWagga North 132kV Substation
28 buildinGsustAinAbleworld-ClAssinFrAstruCture>TransGridannualreporT2009
mid-nortHCoAstreCeivesPoweruPGrAdeKempsey to Port Macquarie 132kV Transmission LineThemid-northcoastisoneofnsWsfastestgrowingareas.
TransGridhascommencedconstructionofasecondsinglecircuit132kVlinebetweenkempseyandportMacquarietostrengthenpowersupplyintheregion.Theestimatedcostofthisprojectis$28million.
ThenewlinewillreplacetheexistingwoodpolelinebetweenkempseyandportMacquarie.Thenewlineisbeingbuiltwithconcretepoles,usingmodernmaterialsthatwillenableustobuildthemostcompactpowerlinepossiblewithintheexistingeasementarea.
Theextensiveworkundertakenindevelopingthefinalprojectsolutionpaidparticularattentiontotheenvironmentandcommunity.Thiswasevidentwhenweundertookthemorecomplextaskofrebuildingtheexistinglineratherthanestablishinganewgreenfieldroute.Thisdecisionresultedintheprojectreceivingsubstantialacceptancebytheexistinglandownersandcommunity.
TheprojectdrawsuponTransGrid’sextensiveprojectmanagementexpertise,withtheprojectteamhavingtoworkwithinsignificantoutageconstraintsandtackleproblemsarisingfromwetweatherandfloods.ThisrequiredTransGridtoinvestigatevarioustechniquessuchasspecialtrackedvehicleswiththeabilitytoworkonwetgroundwithminimalenvironmentalimpact.
Theprojectisexpectedtobecompletedin2010.
strenGtHeninGsuPPlytotHesoutHerntAblelAndsQueanbeyan 132kV Substationduringdecember2008,TransGridbeganworkonits$28millioninvestmentintothereconstructionofQueanbeyansubstation.
ThenewsubstationincorporatesthelatesttechnologytoensurethatthehighvoltageelectricitysupplytoQueanbeyan,canberra,easternacTandbraidwoodareascontinuestomeettheincreasingdemandintheregion.
Theoriginalsubstationwasbuiltin1957andhasprovidedreliablepowertoQueanbeyanandthesurroundingcommunityforover50years.ThisprojectisthefirstofanumberofmajorTransGridupgradesplannedforthesouthernTablelandsoverthenextfiveyears.
Themainobjectiveofthisprojectistorenewtheassetsatthesubstationwithmodernequivalents.Toachievethisobjective,thesubstationisbeingrebuiltonanewsite,adjacenttotheexistingsubstation.Thedesignofthesubstationisverycompactandwillincorporatethelatesttubulargantrystructuresinsteadofthemoreconventionalsteellatticetowers.
Theconstructionofthesubstationisdueforcompletionbyearly2010.
imProvinGreliAbilitytotHeCentrAlPlAinsreGionsManildra to Parkes 132kV Transmission LineTransGridisplanningtoconstructanew$30million132kVtransmissionlinebetweenManildraandparkes.Thetransmissionlinewillmeetincreasingpowerdemandsintheregion,directlybenefitingresidentsandbusinessesintheparkes,Manildra,forbesandcowraareas.
social,environmental,technicalandeconomicfactorswereallconsideredindeterminingthepreferredtransmissionlineroute,whichwasselectedinaugust2008.
environmentalconsultantshaverecentlycompletedadetailedenvironmentalassessment.Theseresultswerepresentedtothecommunityduringjuly2009andTransGridwasonhandtorespondtoanycommunityconcerns.TransGridhasbeenactiveinengagingthecommunitysincetheearlydaysoftheproject,seekingfeedbackandcommentthroughinformationsessionsandpublicnoticeseversinceprojectannouncement.TransGridhascontinuedtoholddiscussionswithpropertyownersthroughoutallphasesoftheproject.
Tominimisevisualimpact,thetransmissionlinewillbeconstructedwithsingleconcretepoleswithina45metrewideeasement.
constructionoftheManildratoparkestransmissionlineisduetocommenceinlate2009withcompletionduebyearly2011.
TransGridannualreporT2009>buildinGsustAinAbleworld-ClAssinFrAstruCture 29
reinForCinGsuPPlytotHeorAnGeAreAOrange 132/66kV Substation Augmentationinordertomeettheincreasingdemandinorangeandsurroundingareas,TransGridisupgradingitsorange132/66kVsubstation.
Theupgradeisvaluedat$14millionandincludesthereplacementoftheexistingtransformerswithlargerunits.Thefirsttransformerhasbeeninstalledandinservicesincefebruary2009.
Toensurecarefulconsiderationoftheenvironmentandcommunity,areviewofenvironmentalfactorshasbeenpreparedandanenvironmentalManagementrepresentativehasbeenappointedtocheckthatallmitigationmeasuresarebeingeffectivelyappliedandthattheworkiscompliantwithenvironmentalrequirements.TheopportunityhasalsobeentakentobringtheenvironmentalcontrolsonthesitetoTransGrid’scurrentstandards.
betterPowersuPPlytotHeACtWilliamsdale 330/132kV SubstationTransGridandactewaGlareprovidingasecondindependentelectricitysupplytotheacTthroughtheconstructionofanewsubstationatWilliamsdale.
Theprojectinvolvestheconstructionofa330/132kVsubstationatWilliamsdaleandconvertingtwo132kVlinesto330kV,toforma330kVconnectionbetweencanberraandWilliamsdale.actewaGlwillconstructthe132kVlinesfromWilliamsdaletostrengthenitsdistributionintheacT.
extensiveinvestigationwasundertakenintositeselectionforthesubstation.specialisedconsultantswereengagedtoprovideanenvironmentalassessment.compensatoryhabitatshallbeprovidedadditionaltothemitigationmeasuresidentifiedintheenvironmentalassessment.Thesitehasalsobeenselectedbasedonleastvisibilityfromthenearestroads.ThesubstationdesignisthemostcompactarrangementeverdevelopedforabankofthreetransformersandaimstominimiseimpactontheyellowboxandredGumgrassybushland.
constructionofthesubstationisexpectedtobecompletedbydecember2010.ThetransmissionlineconversionandcanberrabayextensionworksareexpectedtobecompletedbyMarch2011withenergisationexpectedduringapril2011.
Theestimatedcostoftheprojectis$48million.
stAte-widetrAnsFormerrePlACementAndAuGmentAtionProjeCtTomeetgrowingelectricitydemandacrossnsW,TransGridisexecutinga$105milliontransformerreplacementandaugmentationprogramacrossninemajorsubstationsthroughoutthestate.
ageingtransformersarebeingreplacedbymoreefficientunits,existingtransformersarebeingaugmentedwithnewtransformersandsurroundingauxiliaryequipmentisbeingupgraded.
Thereplacementprogramisparticularlychallengingasworkhastobecarriedoutwithintheconstraintsofexistingoperationalsubstations,whileensuringtheelectricitysupplytotheareaismaintained.
TransGridisstrengtheningenvironmentalcontrolsoneachsiteandinstallingthelatest“lownoise”transformers.
Highlyimproved,standardtransformercompounddesignshavebeendevelopedtoexpeditesubstationdesignsandprovideflexibilitywiththeallocationoftransformerstothevarioussubstations.
TransGrid’sstrategyforstronginternalgrowthsitsalongsidestrategiesofoursuppliersandcontractingpartnerstogrowtheircapabilitiesinthedeliveryofourcapitalworksprogram.
AboveriGHt (clockwise from top left)
Blake Cook, Apprentice
Jemmie Ong, Graduate Accountant
John McCall, Northern Region Projects Manager
Michael Bradbury, Planning Systems Manager
30 drivinGCHAnGetHrouGHinnovAtion>TransGridannualreporT2009
driVinGcHanGeTHrouGHinnoVaTionTransGridiscommittedtoworkingsmarterandachievingoperationalexcellenceinallfacetsofourbusiness.Wehaveworkedhardtowardsmanagingexpenditureinaglobalenvironmentofrisinginputcosts.
AboveleFt (left to right) Steve Varelis, Senior Technology Analyst, Greta Metz, Information Communications Technology Project Manager, Barry Gifford, Senior Information Communications Technology Project Manager, and Natalie Lukic, Information Technology Asset Management Coordinator.
TransGridannualreporT2009>drivinGCHAnGetHrouGHinnovAtion 31
enHAnCinGorGAnisAtionAleFFiCienCiesTransGridhasworkedhardtowardsmanagingexpenditureinaglobalenvironmentofrisinginputcosts.Thishasbeenachievedthroughimplementingefficientbusinessstrategies,benchmarkingourperformanceagainstotherTransmissionnetworkserviceproviders(Tnsps)andimplementingarangeofimprovementstooptimiseourprocesses.ThishasresultedinTransGridexceedingtheservicestandardssetbytheaerandachievingoperatingexpenditureoutcomesbetterthanthetargetsset.
costreductioneffortshaveincludedtheintroductionofprocessimprovements.initiativesputinplacetoachievetheseefficienciesincludeareviewofthecontrolroomshiftarrangements,leadingtoareductionincosts,centralisationofsupportfunctionsandrationalisationoftheinformationtechnologyoutsourcingarrangements.
TransGridisexpectinga24percentincreaseinitsmaintainableassetbaseoverthe2009to2014regulatoryperiod.Thecostsassociatedwiththesenewassets,includingsubstantialmaintenancecosts,willnotbeabletobefullyabsorbedthroughefficiencyimprovementsastheywereinthepreviousregulatoryperiod.However,TransGridisconfidentthatitwillachieveatargetedlevelofoperatingexpenditureequivalenttobestpractiseamongotherTnspsinaustraliaoverthenextfiveyears.benchmarkingwithotherorganisationsindicatesthatourperformancewillbeamongthebestintheworld.
enHAnCinGCAPitAlProjeCtdeliveryTransGrid’sregulatedcapitalworksprogramforthe2009to2014regulatoryperiodwillbe$2.4billion,whichrepresentsalmostadoublingofthecapitalworksprogramfromthe2004to2009regulatoryperiod.inaddition,themixofprojectsmakingupthe2009to2014capitalprogramhaschanged.Tothisend,TransGridhasintroducedimprovedprocessestoensurethatthecapitalprogramcomestofruitioninthemostefficientmanner.
TransGridhascontinuedwiththeimplementationofitscapitalexpendituregovernanceframework,whichincludes;
> clearlydefineddecisiongatesforallprojectsandformationofanexecutive-levelcapitalWorkssteeringcommittee.
> establishmentofadesignandconstructprojectdeliverymodel.
> strategiestoaddressresourceshortagesincludinginitiativestoincreaseinternalresources;anincreaseintheuseofexternalresourcesinprojectdesignandspecialistservices;andtheuseofdesignandconstructprojectcontracting.
in2008/09,acapitalprogramdeliveryimprovementcommitteewasestablishedtoimplementimprovementsindeliveringtheincreasedcapitalprogramonasustainablebasis.
Threeimprovementinitiativeswereselectedforimmediateactioningandincluded:
> TheadoptionofasingleTransGrid-widecapitalprogramplanningandresourcingTool.
> TheidentificationoftheresourcingrequirementsacrossTransGridtodeliverthecapitalprogramoutto2014onasustainablebasis.
> Theimplementationofimprovedstrategiesforthedeliveryofthegrowingtechnicalservicesandsecondarysystemsworksprogramthroughto2014andbeyond.
benCHmArkinGourreliAbilityTransGrid’shighlevelofnetworkreliabilityperformancehasbeensustainedovermanyyears.
TransGridregularlyparticipatesinbenchmarkingexercisesinordertodriveimprovementstothebusiness.asaresultofthis,TransGridhasbeenidentifiedasaleadingperformerinternationallyonbothserviceandcostmeasures.
Themostrecentbenchmarkingstudy,iToMs2007,confirmsthisperformancewithTransGridwellpositionedinthe“bestperformer”quartile(lowerthanaveragecostandaboveaveragereliability).comparisonwiththeaverageresultfortheasiapacificregionshowsTransGrid’snetworkperformanceisabovetheregionalaverage,withcostssubstantiallylowerthanaverage.
TransGrid’sreliabilityandavailabilityisachievedasaresultofgoodplanningandappropriatemaintenancepractices.TransGridhasapolicyofachievingbetterthan95percentoftheprogrammedmaintenanceinthefinancialyearinwhichitfallsdue,withanyoutstandingmaintenancecompletedinthefirstthreemonthsofthenextperiod.
below New TransGrid Control Room
32 drivinGCHAnGetHrouGHinnovAtion>TransGridannualreporT2009
drivinGinFormAtionteCHnoloGyFurtHerTransGridhascontinuedtostrengthenitsservicedeliverycapability,throughenhancementstobusinesssolutions,hardwareplatforminnovationsanddeliveryofmajorcapitalprojects.someexamplesinclude:
> successfulimplementationofmajorapplicationsthatsupportthebusinessactivitiesofnetworkperformanceandoperationsandnetworkservicestomanageoutages,HVpreparation,restorationinstructionsandoperators’logs.
> achieveda50percenttargetfileserveranddatastoragevirtualisationlevel,toreducepowerandspaceconsumptionandfacilitatemorecost-efficientadministration.Theremainderoftheworkisplannedfor2009/10.
> installationofvideoconferencingequipmentforsydneycbdandsydneyWestlocationstoreducetravel,therebysavingstafftimeandtransportcosts.
> deliveryofmajorinfrastructureprojectstoconsolidateandreduceserversandpartialupgradeofthecorporatedatanetworktoreduceoperatingcostandimproveservice.
> implementationofVoip(Voiceoverinternetprotocol)foramorecosteffectiveandflexibletelephonyservice.TheserviceisplannedtoberolledouttoremainingTransGridlocationsduring2009/10.
mAinsAndeAsementmAnAGementsystem(mems)MainsandeasementstaffarenowabletoviewenvironmentalandlineinformationandrecordtheirworkinthefieldthroughthenewMainsandeasementManagementsystem(MeMs).
ThenewsystemextractsinformationfromtheWorksManagementsystem(ellipse)andtheGeographicinformationsystem(TaMis)andpresentsittostaffonaportabletabletpc.itprovidesfieldstaffwiththetransmissionlineandenvironmentalinformationrequiredtoundertakeworkinanenvironmentallyconsciousmanner.
TheMeMsapplicationenablesemployeestohaveeasement,equipmentandpropertyowner/occupierinformationavailabletorecordinspectionsanddefects,aswellashavecontactwithpropertyownerswhileinthefield.
TheMeMssolutionreplacesanumberoflocalsystemsthatarecurrentlyusedwithinTransGridandisnowtheprimaryinterfacetothecorporateinformationsystemsformainsandeasementstaff.
TheMeMssystemhaslargelybeendevelopedwithin2008/09withfinalusertrainingandrolloutplannedforaugust2009.
ArtemistooldrivesCAPitAlworkseFFiCienCyTohelpdelivertheupcomingcapitalprogram,TransGridhasimplementedaprogrammanagementsystembuildingontheexistingprojectmanagementtool,artemis.TransGridhaswidenedtheuseofartemisthroughouttheorganisationtoprovideaviewofthewholeofTransGrid’sworkprogramsothatlongertermforecastsareavailable.
Themainbenefitofusinganintegratedsystemistobeabletoviewallprojectstogetherandseehowtheyinteract.furtherbenefitsareavailablewiththeday-to-dayallocationofskilledresourcesatthecriticalcommissioningstageofprojects.asthesystemdevelops,otherpartsofthebusinesswillseebenefitsinforecastingtheirworkloadandidentifyingwhenkeybusinessinformationwillbecomeavailablefromprojects.
Todate,theprojecthasstandardisedtheuseofartemiswithinthecapitalprogramdeliveryandnetworkbusinessunits,allowingthedevelopmentofusageacrossthebusiness.
Thesystemnowcontainsover80livecapitalprojects.
enHAnCementstotHeHiGHvoltAGePrePArAtionAndrestorAtioninstruCtionsAPPliCAtion(HvPri)TransGrid’soperationsstaffareexploringthenewfeaturesprovidedbytherecentenhancementstotheHVpriapplication.
akeyfeature,whichwascommissionedinaugust2009,isawizardwhichgeneratesHighVoltagepreparationandrestorationinstructions(switchinginstructions)forusebysystemoperatorsandfieldstaff.Throughinnovativetechniques,theHVpriwizardanalysestheswitchingrequirements,andwithafewuserinputs,generatesinstructionstoperformtheoutage.
efficienciesinbusinessprocesseshavebeenachievedwiththedirectprinting/faxingofinstructionstoremotesites,coupledwiththeabilitytoalterinstructionswithoutimpedingtheirexecution.
intotal,morethan40enhancementsweremadetotheoriginalapplication,someofwhichincludeelectronicpinningofhighvoltageoperatingdiagrams,improvementstosearchfunctionalityandanincreasednumberoftoolstoassistincodinginstructionsandoverallincreasedworkflowefficiency.
inProFile
newe-recruitmentTechnologyduringjuly2009,TransGridrolledoutabrandnewelectronicrecruitmentsystemtoallemployees.ThenewsystemincreasestheefficiencyofTransGrid’srecruitmentprocessallowingtransactionstobeperformedinrealtime,reducingthecostoftheprocess,theamountofpaperusedandthetimetakentoidentifyappropriatecandidates.ThesystemprovidesTransGridwitha24/7methodofcollectingresumesandactsasacentralisedstoragepointforallcandidateinformation.
TransGridhassuccessfullyusedthesystemforseverallargescalecampaignsincludingapprentices,graduateengineersandaccountants.anyexternalapplicantswhohavejoinedTransGridoverthelastsixmonthshavebeenapplyingviaerecruitment.
Theerecruitmentsystemhasprovedtobeveryefficient,savingtimeandeffortinvolvedintherecruitmentprocess,particularlyforhighvolumerecruitmentcampaigns.
comprehensivetrainingwasprovidedtoallhiringmanagersandstafftoensureaneasytransitiontothenewsystem.
TransGridannualreporT2009>mAkinGenvironmentAndCommunityAPriority 33
MakinGenVironMenTandcoMMuniTyaprioriTyourenvironmentAlCommitment
ofprimeimportancetoTransGridistheprotectionoftheenvironment.TransGrid’senvironmentalstrategiesaretargetedatpreventingenvironmentalincidentsandshiftingourenvironmentalculturefromonethatfocusesonlegislativecompliancetoonethatintegratesenvironmentalmanagementintoeverydaybusinessactivities.
34 mAkinGenvironmentAndCommunityAPriority>TransGridannualreporT2009
TransGridhascontinuedtoimprovetheefficiencyofourenvironmentalManagementsystem.during2008/09,TransGridsuccessfullyretainedouriso14001accreditedenvironmentalManagementsystemfollowingasurveillanceauditbyexternalauditors.aworkshopwasheldwithmanagement,technicalexpertsandstafftoidentifythesignificantenvironmentalrisksfacedbytheorganisation.
someoftheenhancementsmadetoTransGrid’senvironmentalManagementsystemincludethefollowing:
> TransGrid’senvironmentalpolicywasrevised.
> TransGrid’senvironmentalrulesformaintenanceworkoneasementsandinTransGridpremisescontinuedtobeimproved.TransGriddesignedanddeliveredtwocomputer-basedinteractivesystemsforthetraining,assessmentandauthorisationofstaffandcontractorsunderTransGrid’senvironmentalrulesforeasements.Theseonlineprogramsaredesignedtodevelop,train,maintain,andassesstheenvironmentalcompetenciesofstaffandcontractorsinamoreefficient,accurate,costeffectiveandreliableway.TransGrid’senvironmentalrulesareuniqueintheelectricityindustryandprovideahighlevelofassurancethatappropriateenvironmentalcontrolsareimplemented.
> TransGridhasenhancedtheenvironmentalrulesbyaddingthemanagementofhotworks.Thiswasundertakentoensureamoreconsistentapproachtotheidentificationofbushfireandsafetyrisksassociatedwithhotworks.
> aprocedureforoutliningtheresponsibilitiesforGreenhouseGasreportingdatacollectionforTransGridhasalsobeendevelopedtohelpTransGridmeetitsnationalGreenhouseandenergyreportingstandardsreportingrequirements.
> integratedenvironmentalmanagementconsiderationswereintegratedintoallaspectsofmanagingourassetsincludingtheirplanning,design,siting,construction,maintenance,operations,decommissioninganddisposal.
ClimAteCHAnGestrAteGyisHereTransGridhastakenaproactiveapproachtothemanagementofclimatechange.duringfebruary2009,TransGriddevelopedaclimatechangestrategyforthebusiness.
Takingawhole-of-businessapproach,thestrategylaysoutaseriesofinitiativesthathaveorwillbedevelopedandthenimplemented.during2008/09TransGridhas:
> completedaGreenhouseGasemissionsinventoryscopingstudyanddevelopedaprocedureforoutliningtheresponsibilitiesforGreenhouseGasreportingdatacollectioninpreparationfortheimplementationofthenationalGreenhouseenergyreportingact2007.
> begunassessingTransGrid’sGreenhousenon-networkemissionsfootprintandliabilitiesandinvestigatingstrategiestomovetowardbeingcarbonneutral.
> startedassessingclimatechangeimpactsonloadforecasts,networkratingsandperformanceunderarangeofscenarios.
> continuedtomonitorandmaintainanawarenessofcommunity,politicalandregulatorydevelopmentsrelatingtoclimatechange.
TransGridwillmonitoritsclimatechangestrategiestoensuretheyarestillrelevantasknowledgeofclimatechangecontinuestoimproveoverthecomingyears.
wAstereduCtionAndPurCHAsinGPoliCyTransGridhasanongoingcommitmenttoincorporatingtheprinciplesofthensWGovernment’sWastereductionandpurchasingpolicy(Wrapp)intoitsoperations.since1999,TransGridhasaimedtosupporttheWrappframeworkbymaximisingresourceefficiencyandreducingwastegenerationthroughavoidance,reduction,reuseandrecycling.
TransGrid’sWrappplanincludesthefollowingwastereductioninitiativesfortheofficeenvironment:
> reductioninpaperuse> anincreaseinrecycling> educationinitiativesthroughTransGrid’s
liveGreenprogramtoinformstaffaboutenvironmentalissuesincludingresourceconsumption.
intheoperationalenvironment,TransGrid’sWrappplanincludeswastereductionand/orrecyclinginitiativesformaintenanceandconstructionactivitiesincluding:
> vegetationmaterials> construction,demolitionandexcavated
materials.
trAnsGridFinAlistintoPenvironmentAlAwArdTransGridisproudtohavebeenselectedasafinalistintwocategoriesofthebanksiaenvironmentalawards.
Thebanksiaawardsareoneofaustralia’smostprestigiousenvironmentalawardswhichrecognisethosewhohavemadesignificantcontributionstotheenvironment.
inProFile
TransGridenvironmentalawardTheenvironmentalawardwasagainkeenlycontestedbyTransGridstaffwitheightnominationsin2008.Thisyearsawardwaswonbystevecunninghamforhisworkinthedevelopmentofmethodologytoreducesf6leakagefromequipment.sf6isagreenhousegasandbecauseoftheenvironmentalsignificancethereisaneedtoprovideaccurateusageinformationtorecordgreenhousegasemissionsandtodeveloparobustmanagementactionplantoreducefutureleakage.steveidentifiedpotentialsourcesofsf6lossesfromequipmentresultingfromequipmenthandlingandsamplingprocessesanddevelopedanumberofinitiativestominimisetheselossesby:
> redesigningandimprovinggasfillingequipment.> providingsf6managementenvironmentalawarenesssessionsforsubstationstaff.> developmentandtrialofcryogenicsf6recoverysystem.> assessingnewtechnologyandhowitcouldbeutilised.
asaresultoftheinitiatives,TransGridcandemonstrateareductioninitsgreenhousegasemissions.
AboveSteve Cunningham, TransGrid Environmental Award winner.
TransGridannualreporT2009>mAkinGenvironmentAndCommunityAPriority 35
TransGridwasselectedasafinalistintheWaterawardforprotection,conservationandenhancementsofaustralia’sfreshwaterfortheworkwehavebeendoingontheboorowariverrecoveryprogram.ThisinitiativehasmadetangibleimprovementstolandbiodiversityintheMurray-darlingbasinareas.
TransGrid’spartnershipwithGreeningaustralia,GreenGrid,wasalsoselectedasafinalistinthelandandbiodiversityawardfortheworkdoneinthere-establishmentofnativevegetationacross181sites.
TransGrid’senvironmentalperformanceisrecognitionofourcorporatepartnerships’abilitytoachievepositiveenvironmentalandcommunitybenefitsatbothalocalandregionalscale.
FutureenvironmentAlinitiAtivesduring2009/10,TransGridislookingateitherenhancingordevelopingthefollowingenvironmentalinitiatives:
> ourpartnershipwithGreeningaustralia,GreenGrid,whichfocusesonmakingtangibleimprovementstolandandbiodiversityintheMurray-darlingbasin.TransGridwillalsocontinuetobuildontheboorowariverrecoveryprogram.
> supportingtheearthwatchfellowship,whichsupportsscientificfieldresearchbyplacingvolunteersinthefieldtoworkwithscientists.
> sponsorshipofthescientistforadayprogramandtheclimateWatchprogram.
> enhancingtheliveGreenprogram.
inProFile
ourliveGreencampaignonWorldenvironmentday2009,TransGridlauncheditsliveGreenprogram.ourliveGreencampaignisallaboutincreasingemployees’awarenessoftheenvironmentalimpactsassociatedwiththevastrangeofworkactivitiesweundertakeandtoencouragethemtoembraceenvironmentallyfriendlyalternativesbothatworkandathome.Thecampaignhasbeenanexcellentopportunityfortheentireorganisationtoworkasateamtoachievepositivechange.
TheaimsoftheliveGreenprogramare:
> Toreduceresourceuseinouroffice,depotsandprojectsandprovidesustainablealternatives.
> Tomaintainandimprovethecurrentrecyclingsystem.> Tointroducethebestpossiblemethodsforreductionandunderstandhowto
implementthosemethodsatworkandathome.> ToestablishcleartargetsformeasuringtheeffectivenessofourliveGreenstrategies.> Toreducegreenhousegasemissionsattributabletoglobalwarming.> ToregularlycommunicateresultsofliveGreenperformancetoouremployees.> Toincreaseouremployees’knowledgeofenvironmentalissuesandsustainabilityat
bothworkandathome.
ThechallengeforTransGridoverthenextyearwillbetoimplementandreportonourliveGreentargetsandestablishclearstrategiesformeasuringthesuccessoftheprogram.
What is the Live Green proGram?TransGrid’s Live Green Program is about increasing employees’ awareness of the environmental impacts associated with the vast range of work activities we undertake and to encourage our employees to embrace environmentally friendly alternatives at work and home. It will be an excellent opportunity for all of us to work as a team to achieve positive change.
From July 2009, TransGrid will have in place targets for reducing energy and water usage within all offices as well as targets for reducing the production of waste matter. TransGrid will actively engage all employees in this initiative to ensure that we not only meet our targets but exceed them.
What are the aims of the Live Green proGram?> To reduce resource use in our office, depots
and projects and provide sustainable alternatives.
> To maintain and improve the current recycling system.
> To introduce the best possible methods for reduction and understand how to implement those methods.
> To establish clear targets for measuring the effectiveness of our Live Green strategies.
> To reduce greenhouse gas emissions attributable to global warming.
> To regularly communicate results of Live Green performance and provide updates in office greening practices.
> To increase our employees’ knowledge of environmental issues and sustainability at work and home.o
ur
Liv
e
Gr
ee
n
pr
oG
ra
m
reduce reuse recycLe
36 tAPPinGintoourCommunity>TransGridannualreporT2009
TappinGinToourcoMMuniTyCommunityConsultAtion
communityconsultationisanessentialelementinTransGrid’soverallplanningprocess.
TransGridhasaproudtrackrecordofinteractingwiththecommunityduringitsmajorcapitalworksprocess.WiththeresponsibilitytomaintainandcontinuallyplanasafeandsecureelectricitysupplythroughoutnsW,TransGridiscommittedtolisteningtothecommunitysothatitsconcernsareeffectivelyaddressedduringthedevelopmentstagesofaproject.
AboveleFt Kirsten Velthuis, Environmental Officer
AboveCentre Hayden Burgess, Greening Australia
AboveriGHtGarry Eyles, Substations and General Maintenance Team Leader with his wife, Joy Eyles.
TransGridannualreporT2009>tAPPinGintoourCommunity 37
eachTransGridprojectrequiresaunique,personalcommunityconsultationprocessascommunityconcernsvaryaccordingtothelocationofaproject.
Theseconcernscancoveranextensiverangeoftopicssuchaspositioningofsubstations,theroutingofoverheadlinesandcables,noiseanddustissues,accesstolandandhealthandsafetyissues.
newCAPitAlProjeCtinFormAtionPACksinanefforttocontinueengagingthecommunity,TransGridhasintroducedacomprehensivecapitalprojectinformationpack.ThepackprovidesthecommunitywithvitalinformationonkeyissuessuchasthenatureofTransGrid’scapitalprogramdeliveryprocess;commonlandownercompensationinquiries;activitiesthatmayormaynotbepermittedaroundeasementsandaguidetosuccessfullyplantingvegetationaroundeasements.
Thecapitalprojectinformationpackisplayingakeyroleinsupportingthecriticalworkthatourpeoplearedoingonthegroundwiththecommunity.
CommunityAndindustrysPonsorsHiPsTransGridbelievesinbuildingstrongandvaluablepartnershipsbyactivelyengagingandcontributingtocommunities.TransGrid’ssponsorshipframeworksupportsstrategicpartnershipswithactivitiesandorganisationsintheareasofindustry,education,communityandenvironment.
Weassesseachsponsorshiptoensurealignmentwithourcorporateobjectives.
TransGridhascontinuedthepartnershipwithGreeningaustralia,onewhichaimstocontributetotheenvironmentalwell-beingofthestate.TransGridhasgranted$165,000toGreeningaustraliaoverthelastyear.
TransGridhasmadetertiarycontributionstothefollowinguniversitiestocontributetothedevelopmentoftechnicalexpertisewithintheelectricityindustry:
> The University of Newcastle:sponsorshipforindigenousaustralianengineeringsummerschool($2,000)andfortheunissprogram($20,900).
> The University of New South Wales:sponsorshipofalunchattheaustralianuniversitiespowerengineeringconference($5,500).
> The University of Technology Sydney:sponsorshipofthe2009accountingprogram($46,800).
TransGridhasalsosponsoredthefollowingkeyeventsthathaveastrongpresencewithinthestateandprovideindustrynetworkingopportunitiestostrengthenthelinksbetweenTransGridandthecommunity:
> Electric Energy Society of Australia (EESA):sponsorshipofthensWenergyconference($16,500).
> Department of Premier and Cabinet:contributionwithenergyaustraliatothecostofhiringahelicopterfortheoperationblackbirdWeekendblitzonillegalTrailbikeridingintheHunterregion($6,000).
> Engineers Australia:sponsorshipoftheaustralianengineeringWeekcalendartopromoteWomeninengineering($962).
> Department of Ageing, Disability and Home Care:sponsorshipofthedon’tdisMyabilitycampaign($5,500).
> Cancer Council of NSW:sponsorshipforaustralia’sbiggestMorningTea($2,592).
> VariouspublicschoolsandTafe’sacrossthesouthernareaofnsW($1,950).
> Gauci Children’s Trust:oneoffdonationtothechildrenoftheGaucifamilyfollowingfamilytragedyintheGulgongarea($5,000).
inProFile
WorkingwiththecommunityatManildra-parkesinordertomeetthegrowingenergyneedsofthecentralWestslopesandplainsregionofnsW,TransGridisbuildinganewtransmissionlinefromManildratoparkes.TransGridhasbeenactiveinengagingthecommunitysincetheearlystagesoftheproject.inparticular,TransGridhas:
> developedacommunicationandconsultationstrategywhichformedthefoundationforallcommunityandstakeholderinteractions.
> soughtexpressionsofinterestfromtheenergymarkettoidentifypossiblenon-networksolutions.
> establishedadesignated1800numberfortheconsultations.> Hostedinformationsessionstoinformthecommunityofvariousaspectsofthe
project,includingcorridoroptions,andenvironmentalassessmentrequirements,inadditiontoseekingthecommunity’sfeedbackontheproject.
> issuedarangeofmaterialsincludingdisplaymaterial,advertisementsandprojectwebsiteinformation.
> engagedanenvironmentalconsultancytodevelopthereviewofenvironmentalfactors(ref)andspeciesimpactassessment(sis).
> consultedwithrelevantfederal,stateandlocalgovernmentagenciesinrelationtokeyenvironmentalaspectsoftheproject.
TransGrid Easement Guide
38 tAPPinGintoourCommunity>TransGridannualreporT2009
GreenGridGreenGrid,aprojectpartnershipbetweenTransGridandGreeningaustralia,isanaward-winningpartnershipwhichhasengagedmorethan335landholdersandoverathousandcommunityvolunteerswhocollectivelyhaveerected375kmsoffencing,planted224,000tubestock(200ha)anddirectseeded1726kms(600ha)oftreeline.
TheGreenGridpartnershiprepresentsasignificantcontributiontothecommunityandtheenvironmentwhichhasbeendevelopedovermanyyears.
Themultiplebenefitstolandandbiodiversityhavebeenconsiderable.so,too,thecarbonoffsets:itisestimatedthatfrom2003to2007,GreenGridhassequesteredsome16,000tonnesofcarbon.
ThefuturedirectionsofGreenGridwillcontinuetobuildonpastachievementswithafocusondevelopingthepartnershiptooffsetTransGrid’secologicalandcarbonfootprintsacrossthewholebusiness.
molonGGrAssywoodlAndCommunityrestorAtionProjeCtduringoctober,TransGridandGreeningaustraliahostedanon-sitecommunityeventtolaunchtheirnewMolongGrassyWoodlandcommunityrestorationproject,aimedatrevegetating30hectaresofendangeredGrassyboxWoodlandintheMolongdistrict.
Theprojectinvolvesrevegetationexperts,schoolstudents,landcaregroups,andstafffromTransGridandGreeningaustraliaundertakingactivitiestohelprestorethewoodland.
WithonlyfivepercentoftheoriginalGrassyboxWoodlandinthecentralWestremaining,TransGridisworkingwiththecommunitytopreserveandrevegetateareasstillcontainingtheendangeredspecies,suchastheMolongsite.Theprojectfocuseson25hectaresofwoodlandonapropertyownedbyTransGridwhichispartofthehighvoltageelectricitytransmissionnetworkinnsW.
TransGridisveryproudoftheworkalreadydoneandislookingforwardtoworkingfurtherwiththeMolongcommunitytorestoreandprovidelinkagestootherremnantvegetationinthelocalarea.
eArtHwAtCHTheearthwatchinstituteisanindependent,non-profitorganisationthatsupportsscientificfieldresearchbyplacingvolunteersinthefieldtoworkwithscientists.ThepartnershipbetweenTransGridandtheearthwatchinstitutewasinitiatedin2005tosupportTransGrid’sbusinesscommitmenttobeingenvironmentallyresponsible.Throughthispartnership,TransGridemployeeshaveparticipatedinearthwatchfieldresearchprojectsbasedaroundaustralia.
in2008,sixparticipantswerechosentoundertakevariousprojectsacrossthecountry.Thesewere:
> Gayledefaveri(corporate)–koalaecology
> kirstenVelthuis(network)–hawksbillturtles
> stephenpaddison(network)–koalaecology
> MarkGrierson(capitalprogramdelivery)–climatechangeintherainforest
> aadilGaniwalla(capitalprogramdelivery)–climatechangeintherainforest
> Tedadelman(businessservices)–hawksbillturtles.
ThispartnershipprovidesopportunitiesforTransGridstafftoadvancetheirunderstandingoflocalenvironmentalissues,engagewithleadingconservationscientistsaswellasprovideopportunitiesforpersonalandprofessionaldevelopment.
AboveleFt (left to right) Stuart Johnston, Toby Jones, John Tolhurst, Megan Calvert, Kirsten Velthuis, Geoff Bakewell, Peter Fawcett, Melinda Pickup, Bindi Vanzella, Suzanne Sheekey and Donna Johnston.
TransGridannualreporT2009>tAPPinGintoourCommunity 39
inProFile
operationblackbirdduringoctober2008,TransGridwasinvolvedinatwo-daypoliceoperationconductedacrossanumberofareasaroundthenewcastlearea,includingoneofTransGrid’seasementsatkillingworth.policeweresupportedbypeoplefromagenciesincludingnationalparksandWildlifeservice,departmentoflands,thensWfirebrigadeandTransGrid.
Theoperationwasco-ordinatedbythedepartmentofpremierandcabinetandtheHunterillegalTrailbikeridingforum.Theobjectiveoftheoperationwastohaveahighprofilemulti-agencypresencewithinthelakeMacquariepolicelocalareacommand,withpoliceeffortsdirectedatdetectingillegaltrailbikes,locatingandrecoveringstolenmotorvehicles,detectingarson,targetingunauthoriseduseofcrownlandsandutilityeasementsanddeterringvandalismtopublicpropertyandthenaturalenvironment.
TransGridcommittedvariousresourcestotheoperation,includingthecharteringofahelicopterthatprovidedcriticalsupporttogroundcrews.
eventssuchasthesestronglysupportTransGrid’scommitmenttosocialresponsibilityandplayaroleinenhancingourrelationshipwithothergovernmentbodiesintheHunterregion.
inProFile
don’tdisMyabilityinternationaldayofpeoplewithadisabilitywascelebratedaroundtheworldon3december.itisatimeforpeoplewithadisability,theirfriends,familiesandcarerstocelebratetheirabilitieswiththewidercommunity.TransGridwasaproudsupporterofthensWGovernment’smonth-longcampaigncalleddon’tdisMyability.aspartofthiscampaign,TransGridhostedamorningteaforstaffduringdecember.
drMarkbagshawattendedthemorningteaaskeynotespeaker.MarkistheManagingdirectorofinnov8consultingGroupandwasformerlybusinessdevelopmentexecutiveforibM.Hisprimaryfocusistodemonstratetothebusinesscommunitythataddressingtheissuesfacedbypeoplewhoareeconomicallydisadvantagedisrightforoursocietyandmakesgoodbusinessandeconomicsense.
Theeventwasverywellattendedwithover50peoplefromsydneyofficerepresented.Thefeedbackontheseminarwasverypositiveandweareproudtohaveplayedaroleinraisingawarenessofwhatisbeingachievedbypeoplelivingwithadisability.
Thisinitiativewastrulyawhole-of-governmentapproachwiththesupportof32governmentagencies.
leFtTransGrid’s Kathryn Pate participating in Operation Blackbird.
AboveDr Mark Bagshaw presenting to TransGrid staff.
40 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
proMoTinGourpeople’scapabiliTiesPuttinGHeAltHAndsAFetyFirst
keepingouremployees,contractorsandthepublicsafeisessentialtothewaywedobusinessinTransGrid.
safetyisTransGrid’snumberonepriority.That’swhyourhealthandsafetyapproachisintegratedintobusinessdecisions,processesandeverydayactivities.
AboveleFtRachana Amin, Professional Engineer and Colin Mayer, Senior Project Manager.
AboveriGHt(left to right) Ian Harris, Senior Audit Manager, Clare Mannion, Board and Executive Support Manager, Cathy Hollamby, Strategic Development Manager, David van Beek, Corporate Risk and Audit Manager, and Lyndall Henry, Solicitor.
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 41
Unspeci�ed
Groin/Buttock
Stomach/Torso
Multiple Body Injury
Neck/Head/Face/Eye
Shoulder/Arm
Leg/Knee/Hip
Foot/Ankle
Back
Hand Injury
Hand Injury 18%
Back 16%
Foot/Ankle 14%
Leg/Knee/Hip 14%Shoulder/Arm 11%
Neck/Head/Face/Eye 11%
Multiple Body Injury 9%
Stomach/Torso 4%
Groin/Buttock 2%
Unspecified 1%
Body Location
Fracture
Multiple
Miscellaneous
Open Wound
Contusion/Bruising
Super�cial
Sprain and Strain
Sprain and Strain 37%
Superficial 16%
Contusion/Bruising 15%Open Wound 15%
Miscellaneous 9%
Multiple 7%
Fracture 1%
Injury Type
TransGrid’sstrategiesareaimedatcontinuallyimprovinghealthandsafetyperformanceandmaintainingamajorfocusonriskmanagement.ThisapproachisconsistentwithourHealthandsafetypolicy.
TransGrid’sgoaliszeroinjuries.Webelieveallaccidentsarepreventableonandoffthejob.
Thelosttimeinjuryrate(numberoflosttimeinjuriespermillionmanhoursworked)forthe2008/09yearwas3.5,whichwasanimprovementfrom3.7for2007/08.
Thehealthandsafetystrategiesforthenext12monthsaredesignedtoraiseawarenessandhaveapositiveimpactinreducingtheinjurylevels.Theseverityofinjuriesoverthepastyearhasalsoreducedby35percent,basedontheaveragetimeoffperinjury.
duringtheyear,35percentofallinjuriesacrossTransGridhaveresultedfromaslip,triporfalland37percentofallinjuriescausedastrainorspraintoouremployees.
2008/09
Total Lost Time Incidents (No. of accidents) 7
Total Days Lost (No. of days) 54
Average Lost Time Rate 7.71
42 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
TransGridislicensedbyWorkcovernsWasa“Worker’scompensationselfinsurer”.TransGridhasperformedwellinregardtoworker’scompensationcostswhichhavereducedby25percentfromthepreviousyear,and46percentsince2005/06.Thisfigurereflectsthe11percentreductioninthenumberofworker’scompensationclaimsoverthe2008/09year.
TransGrid’soccupationalHealthandsafetyManagementsystemiscertifiedtoaustralianstandardas/nZs4801.TransGridconductshealthandsafetysystemauditsthroughouttheyearandanynon-conformanceidentifiedbytheseauditsisactionedanditscompletiontracked.
TransGrid’soccupationalHealthandsafetyManagementsystemisoverseenbytheexecutiveoccupationalHealthandsafetycommitteewhichmeetsquarterly.ThiscommitteeischairedbytheManagingdirectorandincludestheGeneralManageroraseniormanagementrepresentative.
TransGridimplementsanannualcorporateHealthandsafetyplan,whichisbasedonthehealthandsafetyrisksandkeyinitiatives.eachbusinessunitdevelopsitsowncustomisedplanwhichaddressesthebusinessspecifichealthandsafetyrisks,basedonthecorporateHealthandsafetyplanobjectives.
overtheyear,TransGridhasbeenfocusingonanumberofhealthandsafetyinitiatives,alldesignedtoreduceworkplacerisksandimprovethehealthofouremployeesandcontractors.WehavebeencontinuingtoimplementTransGrid’sfitforWorkprogrammeforourlineworkerstohelpimprovefitnesswithafocusondiet,corestrengthandflexibility.Thisprogrammehasbeenembracedbyallthoseemployeesinvolved.
inProFile
safetydaycompetitionaWinnerover100peoplefrom21teamsacrossTransGridcompetedinfirstaid,firefightingandriskassessmenteventsatTransGrid’sannualsafetydayinseptember.Thesafetydaywaslargerthanever,witheventsinvitalemergencyresponseandriskassessmentdisciplines,aswellasdisplaysofTransGrid’ssafetyequipmentandinitiatives.ThensWfirebrigadewasonhandtojudgeteamsastheybattledacontrolledfire.representativesfromWorkcoverwerealsopresentasactorssimulatedvariousinjuries,creatingconfrontingchallengesforcompetitors.
TransGrid’ssafetydayhelpstovalidateoursafetyprincipleof“noshortcutsWhenitcomesTosafety”.Thedayhelpstohoneoursafetyskillswhichpositivelyinfluencesasustainedsafetycultureinallourworkplaces.italsoprovidesTransGrid’sboard,executiveandseniorleaderswiththeopportunitytoreinforcetoourpeopletheirpersonalcommitmenttoemployees’safety.
Wecongratulateouryassteamwhowerethestandoutwinnersofthesafetyshield.
during2008/09,TransGridhasconcentratedonimprovingcontractormanagementsystemsandprocesses.anewauditingprogramforourmajorconstructionprojectswasintroducedduringtheyear,raisingthebaronthehealthandsafetyperformanceofourcontractors.
seasonalhealthandsafetythemescontinuedacrosstheorganisationtoprovideeveryonewithinformationonrelevanthealthandsafetytopicsandpromotewellbeingacrosstheorganisation.examplesofthethemesarelistedbelow.
Year Quarter Health Theme Safety Theme
2008 spring Quit!doyourselfafavour spring!cleanyourWorkspace
2008 summer checkThosespots sunsenseandsafety
2009 autumn stretchbeforeyoustrain besafe-WatchyourMate
2009 Winter WinterWarm-uppepsyouup HazardscanHurt-bealert
belowSafety Day Competition
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 43
inProFile
TransGridsafetyawardTheannualsafetyawardrecognisesanindividualorteamwhohavemadeasignificantcontributiontosafetyinTransGridandwhohavedevelopedorappliedsafetysolutionsinaninnovativeorpracticalway.ifwasverydifficulttoselectonlyoneofthesolutionsthatwerenominated.However,thisyeartheawardwaspresentedtoGlennroberts.Glenn,adraftingofficerfromournorthernregioninnewcastle,developedadeviceforthesaferemovalandreplacementofcabletrench,roadcrossinganddraincovers.Thisinitiativeprovidedasolutiontoreducingthemanualhandlingissuesassociatedwiththerepetitivetaskofremovingheavyandawkwardsteelcovers.
everynewemployeeisrequiredtocompleteanumberofmandatorytrainingcourses,aftercompletingtheirinduction,thataredesignedtoincreasesafetyawarenessandunderstanding.Thesecoursescovertopicssuchasfireawareness,ManualHandlingandriskassessment.
Theannualchildren’sdrawingandcalendarcompetitionreceived106entriesforthe2009calendar.ouremployees’childrenprovidedacolourfulinsighttothetheme:“Howcouldweimprovesafetyandhelpourenvironmentwhenweareonholidaysorathome”.
TransGridbelievethatbyinvolvingfamiliesandchildren,theywilllearntheimportanceofsafetyinallaspectsoftheirlives.
FutureCHAllenGesinthecomingyear,anumberofnewinitiativeswillbedevelopedandimplementedthataredesignedtoconsolidatetheexistinghealthandsafetyprogrammes.akeyinitiativeforthenextyearwillbetoimprovehealthandsafetycommunicationthroughtheimplementationofadedicatedHealthandsafetycommunicationstrategy.Thisstrategyaimstoimprovehealthandsafetyawarenessateverylevel,keepingitattheforefrontofpeople’sconsciousness.
anotherinitiativefornextyearwillbetodevelopandintroduceaWellbeingprogramintegratingcurrentemployee’sservicesandhealthprogramswhileintroducingnewaspectsofwellbeing.Thisprogramwillhelpouremployeeskeepfocusedontheirrolesandprovidewaystomanagepersonalissues,thereforereducingtheriskofworkplaceinjury.
understandingthesafetycultureinanorganisationisakeyfactorindevelopingwaystoreducehealthandsafetyrisks.duringthecomingyear,TransGridplanstodevelopaprojectdesignedtoassess,measureandimprovesafetyculture.
TransGrid’sgoaliszeroinjuries.Webelieveallaccidentsarepreventableonandoffthejob!
leFtGlenn Roberts
riGHt(clockwise from top left)
Adam Vaux, Graduate Engineer
Roger Braunton, Engineering Officer
Erica Hetherington, Engineering Trainee
Charles Hitchen, Graduate Engineer
44 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
PlAnninGAworkForCeFortHeFutureTransGridfacesanumberofchallengesoverthecomingyearstoensurethatwehavetherightskillsandcapabilitiestodriveourmulti-billiondollarcapitalworksprogramtofruition.
oneofthekeyworkforcechallengesforTransGridisanageingworkforce.TransGrid’sworkforceprofileshowsanaverageageof47.7yearswithasignificantnumberofretirementspredictedoverthenextfivetotenyears.TransGridisalsooperatinginanenvironmentwheremanyoftheskillsandcompetenciesthatareneededtomeetcurrentandfuturebusinessneedsarecompetitivelysoughtafterbyotherorganisations.Wehaveputinplaceanumberofprogramstoaddressthesechallengesincludingtheimplementationoftargetedleadershipdevelopmentprogramsandincreasedrecruitmentofdevelopmentlevelemployeesinspecialisedareas.
leAdersHiPdeveloPmentProGrAmsTransGridhasbeenprogressivelyimplementingarangeofleadershipprogramstoaddresstheabovechallenges.Theseprogramswereimplementedthroughout2008/09withagreatresponsereceivedfromemployees.Theprogramsseektoensurethatleadershipisaddressedatawiderangeoflevelsacrosstheorganisation.duetothesuccessoftheseprogramsin2008TransGridwillbeupdatingthemandofferingthesedevelopmentactivitiestomoreemployeesin2009/10.
Executive Leaders ProgramTheexecutiveleadersprogramisanexecutive-levelcoachingprogramdesignedforexecutivemanagerswithinTransGridwhohavebeenidentifiedaspotentialsuccessorstomoreseniorexecutivepositions.
eachoftheparticipantshashadanindividualcoachselectedforthembasedonpre-coachingassessmentsandinterviews.Theparticipantandcoachareabletoagreeonanyfurtheruseofpsychometrictestingof360degreefeedbackaswellassettingkeygoalsandmilestones.
Senior Leaders ProgramTheseniorleadersprogramisastructuredprogramdesignedtoprovidedevelopmenttoselectedseniormanagersidentifiedaspotentialsuccessorstoseniorpositionssuchasgeneralmanagersorgroupmanagers.
Theprogramcommencedinseptember2008andinvolvedparticipantstakingpartinindividualdevelopmentassessments.Thisassessmentprocessincludedundertakingaverychallengingassessmentcentreexercise,360degreesurveysandpsychometrictesting.followingthisassessment,eachindividualwasmatchedwithacoachandprovidedwithadevelopmentplansettingoutappropriateactivitiesand/ortraining,includingattendanceatatrainingcourseorappropriateworkplaceactivities.Tenemployeeshavebeenthroughtheprogramoverthelastyear.
Above(left to right)Jemmie Ong, Graduate Accountant, Justin Holland, Engineering Trainee, Joseph Diver, Graduate Engineer, Adam Vaux, Graduate Engineer, and Erica Hetherington, Engineering Trainee.
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 45
Future Leaders ProgramTransGrid’sfutureleadersprogramfocusesondevelopingleadersfromwithintheorganisationandplaysavitalroleinensuringthattherearesuitableemployeestomoveintoleadershiproles,inthemediumtolongerterm.
Theprogramlooksatleadershipacrossallfacetsoftheorganisationandseekstogaincommitmentfromemployeestoactivelyparticipateintheirowndevelopment.TransGridunderwentextensivebenchmarkingagainstotherorganisationstodevelopaleadershipcapabilityprofileforourcompany.
Thepilotprogramcommencedinoctober2007and20candidatesfromacrossTransGridparticipatedintheprogram.participantstookpartinindividualdevelopmentplanningsessionsandundertookgrouptrainingincommondevelopmentareas.inaddition,allcandidateswereassignedtoworkonastrategicorganisationalprojectwhichwaspresentedtotheTransGridexecutiveTeaminearly2009.
duetothesuccessofthisprogramTransGridintendstohaveasecondintakeoffutureleadercandidatesin2009.
develoPinGourGrAduAtesduring2008/09TransGridmaintaineditscommitmenttograduateandscholarshipdevelopmentprograms.TheseprogramsplayakeyroleinsupportingTransGrid’sresourceplanningthroughtheprovisionofholisticonthejoblearninganddevelopmentinthedisciplinesofengineeringandaccountancy.
TransGridcurrentlyemploys45electricalengineeringgraduates,twocivilengineeringgraduatesand10accountinggraduates.
TransGrid’sgraduatesareprovidedwithstructuredtraininganddevelopmentinavarietyofareasincludingleadershipdevelopment,individualdevelopmentplansandsupporttogaincharteredstatuswithengineersaustralia.
Theplannedrotationsprovidegraduateswithauniqueexperienceallowingthemtogainaninsightintodifferentareasofthebusiness,aswellasthechancetoworkwithourmanydifferentsubjectexperts.
during2008/09TransGridcontinuedtoofferscholarshipsinelectricalengineering.TransGridcurrentlyhastwoscholarshipholdersatnewcastleuniversity,oneattheuniversityofWollongongandtwoattheuniversityofTechnologysydney.TransGridalsocontinuestosupportascholarshipholderinenvironmentalstudieswiththeuniversityofnewengland.
trAineeenGineerinGoFFiCersduring2008/09TransGridhascontinuedthesuccessfulTraineeengineeringofficerprogramwithfournewentrantsbeingaccepted.Thefouryearprogramcurrentlyhas10traineesundertakingtheadvanceddiplomaofelectricalTechnologyandworkinginvariousengineeringandprojectgroups.TodatefivetraineeshavesuccessfullycompletedthecourseandhavetakenupengineeringofficerpositionsinTransGrid.
APPrentiCesHiPsTransGridcontinuedtohaveastrongfocusonapprenticeshipprogramsduringtheyear.
atotalof63apprenticesareemployedbyTransGrideachatdifferentlevelsofprogress.The2009intakeof13apprenticeswasinkeepingwithTransGrid’scommitmenttobothorganisationalresourceplanningandsocialresponsibility.
TransGrid’sapprenticesarepartofaprogramtoaddressskillsshortagesacrosstheelectricityindustry.apprenticeshipsarealignedwithnationalTrainingpackagesinvolvingbothonandoffthejobtraining.
TransGrid’sgraduateprogramprovidesholisticonthejoblearninganddevelopmentandthechancetoworkwithmanydifferentsubjectexperts.
AboveriGHt(clockwise from top left)
Ainslee Scott, Business Manager/Corporate
Daniel Bremner, Electrical Fitter
Kayle Mabagos, Executive Management Support Officer
Warick Schroder, Projects Engineer
46 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
inProFile
youngprofessionalsprogramlaunchedTransGridhascommencedtheimplementationofastructureddevelopmentprogramforyoungprofessionals.Whilstthisprogramwillhaveasignificantfocusongraduatesitwillalsoprovidedevelopment,trainingandsupportforemployeesrangingfromundergraduateworkexperienceemployeestotraineesandthoseintheirfirstroleafterthegraduateprogram.
developmentwillfocusonadvancinganemployee’soverallunderstandingaswellasassistinginplacementsorjobroles.businessunitswillprovideresourcesintheformofexpertsforboththeseminarsandtrainingprograms.accessforhighpotentialgraduates(andGrade2levelemployees)toTransGrid’stargetedleadershipprogramswillalsobeconsidered.
someimprovementsinthisareahavealreadytakenplacethroughtherestructuringoftheGraduatecommittee,nowtheyoungprofessionalscommittee,toincreasethefocusontraininganddevelopmentaswellastobroadenthefocusbeyondgraduatesandtheimplementationofnewactivitiessuchasthenewGraduateinductionprogramandworkplaceseminarseriesforyoungprofessionals.
Theprogramisexpectedtohaveadditionalbenefitsinprovidingemployeeswithachancetonetworkwithothersandbuildtheirunderstandingoftheorganisation,assistingengagementandretention.
apprenticescompletingtheirapprenticecontracthaveawiderangeofcareeropportunitiesavailablerangingfromtradespersontoManagingdirector’sscholar.Theirqualificationsmakethemeligibletoapplyforpositionsaustralia-wide.
PerFormAnCemAnAGementarecentreviewofTransGrid’sperformancereviewandemployeedevelopmentprogramhighlightedthattheprogram,whichwasintroducedin2006,continuestobewellreceivedandissuccessfullyembeddedintheorganisation.
However,improvementopportunitieshavebeenidentifiedincludingtheprovisionofanonlineformtoassistwiththecompletionandtrackingoftheprocess.TransGridisplanningtotrialtheimplementationofanonlinesysteminlate2009.
Toassistmanagersindevelopingemployees,TransGridisplanningtooffertrainingduringlate2009oncoachingandmanagingemployeedevelopmentaswellastheimplementationoftheoutcomesfromatrainingneedsanalysisconductedforTransGridin2008/09.
reCoGnisinGourPeoPleTransGridrecognisedtheserviceofouremployeesbyhostinga25-yearand40-yearrecognitiondinnerinsydney’scbd.
during2008,25peoplewererecognisedfortheirservicetoTransGrid.Thisincludesnineemployeeswith25yearsserviceand16with40yearsservice.Thedinnerofferedanopportunityfortheorganisationtosaythankyouforthecommitmentandloyaltyouremployeesbringtotheindustry.
TransGrid’sManagingdirector,kevinMurray,attendedthedinnerandcommentedonouremployees’dedicatedservicebystating:“it’sthehardworkoftheselongstandingemployeeswhichhasbeeninstrumentalinTransGridbeingaleadingperformerintheelectricityindustry”.
althoughtheseeventsmarkasignificantmilestoneforourexemplaryemployees,TransGridiscommittedtopassingdownknowledgeandexperiencetoitsyoungerworkforce.TheseemployeeshavebeenvaluablerolemodelstotheyoungerstaffmembersatTransGrid,andmanyhavebeeninstrumentalintheirpersonalandprofessionalcareerdevelopment.
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 47
stAFFenGAGementAPriorityTransGridhasbeenactiveinconsideringhowwecanbetterengageourpeople.
internalcommunicationhasproventobeavitalfunctionwithinTransGrid,andforthisreason,TransGridhasimplementedanewinternalcommunicationsframework.itisdesignedtoensurethatallemployeescanbetteridentifywithTransGrid’sstrategicdirectionandachievementsandassistindeliveringourvalueofopencommunication.
Therewerevariouslevelsofconsultationinthedevelopmentoftheframework,includingasurvey,invitingemployeestooffertheirviewsoncommunicationmethods.
Theinternalcommunicationsframeworkhasbeenayearinthemakingandwehavebeentriallingtheapplicationofarangeofcommunicationchannelsoverthattime.WehaveintroducednewelectroniccommunicationchannelswhichhavebeenvaluableinengagingouremployeesandsolicitingtheirfeedbackonthekeyissuesforTransGrid.
TransGridlooksforwardtocontinuingtostrengthenourinternalcommunicationchannelsoverthenextyear.
imProvinGemPloyeeserviCesTransGridiscommittedtoprovidingitsemployeeswitharangeofdiverseservicestoensureongoingengagement.
Manyofouremployeeshavetakentheopportunitytoenterintosalarysacrificearrangementsforthepurchaseoflaptopsandforthepaymentoftheirelectricitybills.employeeshavealsobeensalarysacrificingnewmotorvehiclesthroughanexternalleasingprovider.Thepopularityofoursalarysacrificebenefitshascontinuedtoincreaseoverthelastfewyears.
employeeshavecontinuedtobeapartoftheTransGridemployeesWelfarefund.Throughasmallweeklycontribution,employeescanreceivesupportforthemselvesandtheirfamiliesintimesofhardshipandaccesstoarangeofwelfareandrecreationalfacilities.
TransGridhascontinuedwiththeimplementationofitsemployeeassistanceprogram.Thefree,confidentialcounsellingserviceisavailabletoallemployeesandtheirimmediatefamilyforanypersonalproblemsorconcernstheymayhave.
TransGrid’semployeeshavecontinuedtoreapthebenefitsofourvariousregionalsportsandsocialclubs.Theclubs’mainobjectivesaretoprovideemployeeswiththeopportunitytomeetsociallyandhavefun.Theclubs’offerawiderangeofdiscountedticketstosportingevents,theatreshowsandconcerts.Varioussocialnightsareorganisedaswellastrivianights.
FuturePeoPlestrAteGiesinlinewithitsstrategicHumanresourcesplan,TransGridwillbeintroducingarangeofpeoplestrategies.foreachoftheseareasTransGridwillcontinueorrefinecurrentprogramsandwherenecessarydevelopnewinitiatives.
Progress on Workforce Planning StrategiesTransGridhascommencedaprojecttoinvestigatethebestprocessestodevelopandimplementamoreappropriatemethodofworkforceplanning.Thekeystageswillincludeidentificationofplanningtools,identificationandanalysisofdatasourcesonworkforceneedsandcommunicationandtrainingtomanagersandotherkeycontactsontherevisedprocess.
New Manager Induction and TraininginadditiontoleadershipdevelopmentTransGridisconcentratingonmanagementtraininginanumberofkeyareas.Thistrainingwouldbepracticalinnature,withinformationprovidedthrougheitheranewmanagerinduction,grouptrainingonkeyorganisationalareasoridentifiedindividualdevelopment.
itisproposedthatthisprogramwillcommenceinthelaterhalfof2009withtheassistanceofanexternalprovidertoidentifykeyareastobeincludedintheprogramandappropriatetrainingmethodsfordelivery.
TransGridhasbeenactiveinconsideringhowwecanbetterengageourpeople.internalcommunicationhasproventobeavitalfunctionwithinTransGridandTransGridhasimplementedawholenewinternalcommunicationsframework.
oPPositetoPFuture Leaders Program candidates (left to right) Graeme Ludewig, Commodity Manager, Michael Bradbury, Planning Systems Manager, Judy Green, Manager/Business Services, Jo-Anne Harrison, Manager/Reporting and Financial Systems, and Kevin Hinkley, Protection Systems Engineer.
oPPositeleFtAdam Vaux, Graduate Engineer and Jemmie Ong, Graduate Accountant.
AboveriGHt(clockwise from top left)Kathryn Pate, Environmental Officer
Vijendra Prasad, Project Manager
Rhys McKay, Technical Support Assistant
Kevin Murray, Managing Director
48 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
inProFile
Managingdirectorsscholarshipduringfebruary,TransGridawardedaManagingdirectorsscholarshiptodarrenngo(substationsTeam/Wallgrove).
Thescholarshipprogramcommencedin2006andisawardedonanannualbasistoaTransGridapprenticewhohasdemonstratedhighacademicachievement,leadershipqualitiesandaninterestinfurtheringtheirstudies.
followingcompletionofyear10,darrenembarkedonanelectricalapprenticeshipatWallgrovewhichherecentlycompleted.inhisowntime,darrenhasalsocompletedhisdiplomainelectricalengineeringatTafe.duringhistimeatTafe,darrendemonstratedhighacademicexcellenceandwaspresentedwithanawardforoutstandingstudentatGranvilleTafe.
ThroughtheManagingdirectorsscholarship,darrenwillnowcommenceabachelorofengineering(electrical)attheuniversityofnsW.itisverygratifyingtoseedarrenwho,throughhardworkandcommitmenttostudyisbeingrewardedandgivenanopportunitytofurtherhisstudyandcareer.
TransGridcommendsdarrenonhiscommitmentanddedicationandwisheshimthebestinhisfuturecareer.
AboveDarren Ngo and Kevin Murray
Employee Engagement Strategies and ProgramsTransGridwillcontinuetolookatemployeeengagementandtherolethisplaysinretainingemployeesandinfluencingoutcomesfortheorganisation.Whilstanumberofexistingprogramssuchastheemployeeperformancereviewandtheleadershipprogramsareseenaskeytoemployeeengagement,anumberofnewprogramsoractionswillalsobeundertakenin2009/10.
TransGrid Alumni or Keep in Touch Programsduring2009,TransGridwillprovideaprocessforkeepingintouchwithanumberofdifferentgroupstoassistinmaintainingTransGridasapossibleemployerofchoiceinpeople’smindsandthereforeattractingthembacktotheorganisation.
TheprogramwillallowTransGridtoprovideex-employeesand/orothergroupswithtargetedmessagesandinformationoncurrentprojectsandrecruitmentpositions.Theerecruitmentprogramwillallowsuchinformationtobetargetedtoeachgrouptoensuremaximumimpactofmessages.
On-boarding Processduring2009/10,TransGridislookingtointroducearevised“on-boarding”processcoveringhowemployeesaremanagedduringtheirfirst3-6months.Thisrevisedprocesswillincluderevisedface-to-faceinductions,anupdatedon-lineinductionprocess,streamlinedprobation/entryphasereviewandrevisedentryandexitinterviews.
TransGridwillbeintroducingarangeofpeoplestrategies.foreachoftheseareasTransGridwillcontinueorrefinecurrentprogramsandwherenecessarydevelopnewinitiatives.
leFt(clockwise from top left)Adam Long, Surveyor
Paul Phillips, General Manager/Business Services
Lyndall Henry, Solicitor
Graeme Buxton, Tradesperson
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 49
equAlemPloymentoPPortunity(eeo)disClosures1
Table 1. Trends in the representation of EEO groups2 % of Total Staff3
EEO Group Benchmark or target
2007 2008 2009
Women 50% 14 14 15
aboriginalpeopleandTorresstraitislanders 2% 1.1 0.9 0.8
peoplewhosefirstlanguagewasnotenglish 19% 17 19 20
peoplewithadisability 12% 7 5 6
peoplewithadisabilityrequiringwork-relatedadjustment
7% 0.8 0.5 0.5
Table 2. Trends in the Distribution of EEO Groups4 Distribution Index
EEO Group Benchmark or target
2007 2008 2009
Women 100 92 93 92
aboriginalpeopleandTorresstraitislanders 100 n/a5 n/a n/a
peoplewhosefirstlanguagewasnotenglish 100 106 104 104
peoplewithadisability 100 97 103 105
peoplewithadisabilityrequiringwork-relatedadjustment
100 n/a n/a n/a
Notes1 Theformatfortheeeodisclosures2009hasbeenadjustedtomeetcurrentreporting
requirements.2 staffnumbersareat30june2009.3 excludescasualstaff.4 adistributionindexof100indicatesthatthecentreofthedistributionoftheeeogroup
acrosssalarylevelsisequivalenttothatofotherstaff.Valueslessthan100meanthattheeeogrouptendstobemoreconcentratedatlowersalarylevelsthanisthecaseforotherstaff.Themorepronouncedthistendencyis,thelowertheindexwillbe.insomecasestheindexmaybemorethan100,indicatingthattheeeogroupislessconcentratedatlowersalarylevels.
5 n/arepresentsavaluethatisnotstatisticallyvalid.
embrACinGdiversityTransGridvaluesitsdiverseworkforceandoursuccessdependsuponit.TransGrid’sdiverseworkforcehasbeensteadilygrowingoverrecentyears,withthenumberoffemaleshavingrisenfrom124to146overthelastfiveyears.
TheobjectiveofTransGrid’sWorkforcediversitystrategyistoimproveemploymentandcareerdevelopmentopportunitiesforpeoplewhoareunder-representedinourworkforcethroughspecificprogramsandtomakeallstaffawareoftheirrightsandresponsibilitieswithregardstoallaspectsofdiversity.
TransGridreviewsthestrategyannuallytoensureourworkforcediversityobjectivesarebeingmet.Workforcediversitydatacollectionformscontinuetobeforwardedtoallnewemployeestofacilitatethecollationofworkforcediversitydata.
aprimarycomponentofthestrategyisourreferralofficers,whoassistemployeesinexploringoptionsinrelationtogrievances,harassmentand/ordiscriminatorybehaviour.referralofficersprovideinformationandconfidentialsupporttoemployeesregardingTransGrid’sGrievanceManagementprocedure.
AboveRachana Amin, Professional Engineer and Colin Mayer, Senior Project Manager.
50 PromotinGourPeoPle’sCAPAbilities>TransGridannualreporT2009
AboriGinAlemPloymentdeveloPmentstrAteGyTransGrid’saboriginalemploymentanddevelopmentstrategyisanintegralcomponentofTransGrid’sWorkforcediversitystrategy.
TheaboriginalemploymentanddevelopmentstrategyhasbeendevelopedwithreferencetotheMaking it Our Business – NSW Policy Statement 2006/08issuedbythensWpremier’sdepartment.
TransGridiscommittedtoachievingmeaningfulandsustainableimprovementsinindigenousemploymentbyfocusingonprovisionofdevelopmentopportunitiesandsupporttoenableaboriginalandTorresstraitislanderpeopletodeveloptheirfullcareerpotential.
disAbilityACtionPlAnTransGridhasadisabilityactionplanwhichdemonstratesTransGrid’scommitmenttotheobjectivesofthensWGovernment’sdisabilitypolicyframework,theNSW Disability Services Act 1993andtheNSW Anti-Discrimination Act 1977.
TheplanhasstrategieswhichhavebeenimplementedbyTransGridtorespondtotheneedsofdisabilitiesofpeoplewithinnsW.
TofurtherraiseawarenessofTransGrid’sdisabilityactionplan,TransGridsupportedthensWGovernment’sdon’tdisMyabilitycampaignduringtheyear.
etHniCAFFAirsPrioritystAtement(eAPs)TransGridcarriesoutcommunityconsultationonproposedmajorprojectstoensurepublicunderstandingandidentificationofrelevantconcerns.
keyindicatorsapplicabletoeapsincludethemaintenanceofmerit-basedrecruitmentpractices,flexibleworkarrangementsandaccommodatingtheneedsofemployeesinregardstoculturalorreligiouscustoms.
eeoACHievements–2008/09> awarenesssessionswereprovidedto
staffontheapplicationofthecodeofethicsandconduct.
> informationonharassmentanddiscriminationpreventionwasupdatedandmadeavailableonTransGrid’sintranet.
> TheWomen@TransGridprogramandassociatedcommitteewasformedandimplemented.
> allnewemployeesattendedaninductionprogramwhichprovidesexposuretoTransGrid’spoliciesandconditionsofemployment.
> allhumanresourcesprocedureswerereviewedregularlytoreflectchangesinworkforcediversitypractice.
> Theapprenticeintakefor2009encouragedindigenousandfemaleapplications.
> sponsorshipofthedon’tdisMyabilitycampaign.
> sponsorshipoftheengineersaustralia’sengineeringWeekcalendartopromotewomeninengineering.
> promotionofeeoachievementsthroughvariousinternalcommunicationchannels.
> developmentofacapitalprojectinformationpackaspartofourcapitalworkscommunityconsultationprocess.
eeoPlAnnedinitiAtives–2009/10> reviewallcurrentWorkforcediversity
strategiesandplans.> includeWorkforcediversitydata
collectionsurveyintheinductionprogramforallnewemployees.
> continuedsupportfortheWomen@TransGridprogramwithinTransGrid.
> implementationofnewpoliciesoneeo,Harassment,discriminationandbullying.
> implementationoftrainingforallemployeesandmanagersonmattersofeeo,Harassment,discriminationandbullyingbothatpointofinductionandongoing.
> revisionofthecurrentGrievanceManagementprocessincludingincreasingtheprofileofthereferral/contactofficernetwork.
> developabroaderadvertisingstrategyforvacantpositionstoencourageapplicationsfromfemale,disabledandindigenousapplicants.
AboveTransGrid apprentices Thomas Paine, Michael Cross, and Ryan Dunn.
TransGridannualreporT2009>PromotinGourPeoPle’sCAPAbilities 51
inProFile
Women@TransGridprogramTheWomen@TransGridprogramwasimplementedduring2008/09toprovideamechanismforcommunicationbetweenmanagementandfemaleemployeesonissuesofinterestaffectingtherecruitment,developmentandcareerprogressionofwomenwithintheorganisation.committeemembersplayakeyroleinassistingwithanyagreedactivitiessuchasworkingparties,researchandpromotionalactivities.TheyalsoconsultwiththefemaleemployeesintheirbusinessunitsregardingcurrentissuesandprovidefeedbackontheprogressofWomen@TransGridprogram.
TheprimaryroleoftheWomen@TransGridprogramisto:
> identify,reviewanddevelopstrategiestoassistinprovidingcareeropportunitiesandprogressionforwomeninTransGridacrossallgradesandprofessions,includingtheidentificationandpromotionofdevelopmentactivities.
> identify,reviewanddevelopstrategiestoassistinprovidingincreasedrepresentationofwomenwithinalllevelsofmanagementofTransGridaswellaswithinnon-traditionalareassuchastradesandengineering,includingtheidentificationandpromotionofrelevantdevelopmentandrecruitmentactivities.
> informseniormanagementofissueswhichmayberestrictingthedevelopment,progressionandrecruitmentofwomenwithinTransGridacrossallareas,regions,professionsandgrades.
> facilitateorganisationalsupportandunderstandingforfemaleemploymentandcareerprogressionthroughpromotionofthecommittee’sactivitiesacrosstheorganisation.
TheWomen@TransGridprogramaimstoprovidecareeropportunitiesandprogressionforallwomeninTransGrid.
AboveleFt Top Row: (left to right) Kate Edwards, Tanya Snowdon, Monica Lonergan, Louise Birkmann, Angela Klepac, Kersha Levi, Roslyn Ryan, and Leanne Keene.
Bottom Row: (left to right) Bobbi Peter, Sophie Dowling, and Judy Green.
riGHt(clockwise from top left)Jenny Do, Land Economist
Rachana Amin, Professional Officer
Jenny Seage, Property Asset Manager
Jo-Anne Harrison, Manager/Reporting and Financial Systems and Judy Green, Manager/Business Services
TransGridannualreporT2009>CorPorAteGovernAnCe 53
corporaTeGoVernanceleAdinGresPonsiblyAndwitHACCountAbility
TransGrid’sboardandmanagementsupportanenvironmentthatencouragesaccountabilityamongstallemployeestodeliveraserviceinthebestinterestsofshareholders,thecommunityandourstakeholders.
AboveriGHtPeter French at Bannaby Substation.
54 CorPorAteGovernAnCe>TransGridannualreporT2009
msmAtinAPAPAtHAnAsiou(bComm,ll.b)Director MsMatinapapathanasiouwasappointedtotheTransGridboardon13thdecember2004.
Matinahasover20yearsfundsmanagementandinvestmentbankingexperienceandhasspecialisedintheinfrastructuresectorwithsignificantexperienceintheenergysector.MatinaisemployedbyQicasapartneroftheGlobalinfrastructureinvestmentteam,whichmanagesover$2.5billionofinvestmentsinglobalunlistedinfrastructure.priortojoiningQic,MatinawasemployedbytheaMpcapitalinfrastructureteamasHeadofstrategy.shewasalsoamemberofaMpcapital’screditinvestmentcommittee.previously,MatinawasemployedatbankersTrustandMacquariebankintheirprojectadvisoryandstructuredfinancegroupsfocussingoninfrastructure.shecommencedhercareerwitharthurandersenwhereshewasemployedasataxadviser.
Matinaholdsabachelorofcommerce(majoringinaccounting,financeandsystems)andabacheloroflawsfromtheuniversityofnewsouthWales.in1985shewasadmittedasasolicitorofthesupremecourtofnewsouthWales(australia).Matinaiscurrentlyadirectorofbrisbaneairport,Westlink(M7Tollroad)andisontheboardandinvestmentcommitteeoftheinfrastructureindiaHoldingsfund.
MatinabringstotheTransGridboardstrongexperienceinfinance,governance,commercialnegotiationsandregulation.
mrnevillebetts(GAiCd)Director MrnevillebettswasappointedtotheTransGridboardon30thjune1998.
nevilleiscurrentlytheassistantsecretaryoftheelectricalTradesunionofaustraliansWbranch.nevillehasbeenaunionofficialsince1984.Heisalsoamemberofthedivisionalcouncilpowerindustrycommittee,deputychairmanoftheacTutilitiesandlightManufacturerindustryTrainingadvisoryboard(iTab),amemberofthenationalTrainingadvisoryGroup(nTaG)fortheelectricalTransmissionanddistributionindustry,VicepresidentofunionsacTandamemberoftheacTlaborcouncilexecutive,andformermemberoftheacTGovernmentindustrialrelationsadvisorycommittee.inaddition,nevilleisamemberoftheaustralianinstituteofcompanydirectorsandaGraduateoftheMountelizabusinessschool.
neville’sin-depthunderstandingoftheelectricityindustry,anditsassociatedindustrialrelations,trainingandunionactivities,isaninvaluableresourceoftheboard.
mrbruCeFoy(bComm,ll.b)Director and ChairmanMrbrucefoywasappointedtotheTransGridboardon15thdecember2005andwasTransGrid’sactingchairmanfrom1stfebruary2008untilbeingappointedchairmanon30thjune2009.
brucehasheldvariouspositionswithinthebankingindustry,mostrecentlyasManagingdirectorcountryHeadoftheinGbankn.V,apositionhehelduntil2005.currently,bruceisadirectorofthefinancialplanningassociationofaustralialtd,adirector/TrusteeofthefirststatesuperannuationTrusteecorporationandadirectorofThedoctorsHealthfundltdandsouthernuraniumltd.
brucewasadmittedasabarristerofthesupremecourtofnsWin1989andholdsabacheloroflawsandabachelorofcommerce,bothfromtheuniversityofQueensland.
bruceisalsoafellowoftheaustralianinstituteofcompanydirectors.brucebringstotheTransGridboardextensiveexperienceincorporateandfinancialmanagement.
ourboArdoFdireCtors
TransGridannualreporT2009>CorPorAteGovernAnCe 55
tHeHon.joHnPriCeAm,(mAiCd,jP,imareng,ieng,oFieAust.)Director TheHon.johnpriceaMwasappointedtotheTransGridboardon5thfebruary2008.
priortohisappointmenttotheboard,johnbeganhiscareeratthestatedockyardleavingin1982asassistantGeneralManagerandengineeringManagertotakeupaconsultingrole.in1984,hewaselectedtothensWlegislativeassembly,firstlyastheMemberforWaratah,andin1999,astheMemberforMaitland,retiringin2007asdeputyspeaker.
john’spreviousdirectorshipsincludenewcastlefMptyltdand2Hdbroadcastersptyltd.Heservedaschairmanofbothcompaniesfrom1997to1999.johnisalsoamemberofthecounciloftheuniversityofnewcastleandchairofHunteruni-clinicsproprietarylimited.
johnbringstotheboardawealthofknowledgefromhislengthycareerinpolitics,alongwithastrongcommercialandadministrativebackground.
mrmiCHAelnuGent(FCPA,AiCd)Director MrMichaelnugentwasappointedtotheTransGridboardinaugust2008andisalsocurrentlyadirectoroflivecorpwhichprovidesservicestotheliveanimalexportsector.
Michaelwasformerlyanon-executivedirectoroferaringenergy,railaccesscorporationandsnowyMountainsengineeringcorporationintheenergyandinfrastructuresector.HewaspreviouslythechiefexecutiveandanexecutivedirectorofGoodmanfielderlimited(1990–1994)andtheManagingdirectorofeldersagribusinessandanexecutivedirectorofitsparentcompanyfostersbrewingGrouplimited(1983-1990).Healsoheldanumberofgeneralmanagement,marketingandfinancialpositionsinthefood,transportandvehicleindustriesrespectivelywithHenryjonesixllimited,brambles,ansettandthebritishleylandMotorcorporation(1965–1982).earlyinhiscareerheworkedforpeatMarwicknowkpMG(1961–1965)andsubsequentlycompletedhisprofessionalaccountingtrainingin1968andiscurrentlyanfcpa.
MichaelbringstotheTransGridboardabroadrangeofskillsandexperience:inmanagement,strategy,governance,marketingandfinance.Healsohasexperienceininfrastructureandtheexecutionoflargecapitalprojectsacrossabroadrangeofindustries.
mrkevinmurrAy(beelec,dipbusinessstudies,FAiCd)Executive Director and Managing Director MrkevinMurraywasappointedasanexecutivedirectorontheTransGridboardon10thjune2005.
asManagingdirectorofTransGrid,kevinisresponsibleforthedevelopment,operationandmaintenanceofthensWbulkelectricitytransmissionnetwork.
sincehisappointmentthemainfocusoftheorganisationhasbeenonsuccessfullydeliveringanenlargedcapitalworksprogram,improvingefficiency,maintainingreliabilityandpreparingaprofessionalandcrediblerevenueresetsubmissiontotheaustralianenergyregulatorfortheperiod2009to2014.Therehasalsobeenacontinuingfocusonsafetyandenvironmentaswellasanemphasisonsuccessionplanningwithasubstantialincreaseintherecruitmentoftrainees.
kevinischairmanofTransGrid’sexecutiveoccupationalHealthandsafetycommitteeandexecutiveenvironmentcommittee.kevinalsorepresentsTransGridonanumberofexternalindustryrelatedcommittees,includingneMMco’sparticipantadvisorycommitteeandGridaustralia.HeisacurrentdirectoroftheenergynetworkassociationandtheenergyindustriessuperannuationschemeboardandapastdirectorofthenationalsafetycouncilofaustraliaandthenewsouthWalesenergyandWaterombudsmanboard.
kevinisalsoafellowoftheaustralianinstituteofcompanydirectors.
kevinbringstotheTransGridboard40yearsexperienceinthetransmissionbusiness.
msClAremAnnion(b.ed)Board Secretary MsclareMannionwasappointedasboardsecretaryinseptember2008.clarehaseightyearsexperienceatTransGridinavarietyofadministrativeroles.clareisagraduateoftheMountelizabusinessschoolandiscurrentlyinherfinalsemesteroftheGraduatediplomainappliedcorporateGovernanceatcharteredsecretariesaustralia.
56 CorPorAteGovernAnCe>TransGridannualreporT2009
NETwORk SERvICESvic Galea
CAPITAL PROGRAm DELIvERY
Chris FitzGerald
NETwORk PERFORmANCE
AND OPERATIONSLionel Smyth
CORPORATEmichael Gatt
mANAGING DIRECTORkevin murray
NETwORk DEvELOPmENT AND
REGuLATORY AFFAIRSPeter mcIntyre
CHIEF FINANCIAL OFFICER/COmmERCIAL
Tony meehan
BuSINESS SERvICESPaul Phillips
mrPetermCintyrebsc,be(Hons),mbA(technologymanagement),FieAust,GAiCdGeneral Manager/Network Development and Regulatory Affairs responsibleforplanningthedevelopmentofthetransmissionnetwork,includingitstelecommunicationsandsupportinginfrastructureandsystems,andtheassociatedregulatoryprocesses.ThebusinessunitalsomanagesTransGrid’sregulatorystrategyandrelationships,neMcompliance,transmissionpricingandcustomerconnectionprocesses.aprimarychallengeforthebusinessunithasbeenthemanagementofTransGrid’srevenueapplicationtotheaerfortheperiod2009to2014.
ourexeCutiveleAdersHiPteAm
mrCHrisFitzGerAldbsc,be(Hons),me,Graddip(busAdmin),FieAust,CPengGeneral Manager/ Capital Program DeliveryresponsibleforsupportingtheongoingperformanceofTransGrid’shighvoltagetransmissionassetsandassociatedprotection,meteringandcommunicationsecondarysystems,throughtheexecutionofTransGrid’sMajorcapitalWorksprogram.capitalprogramdeliveryalsoprovidestechnicalsupporttootherbusinessunitsthroughthedeliveryofdesignsandadviceforminorprojects,replacementprojectsandotherassetmanagementactivities.Thebusinessunit’sspecialisedexpertiseandcapabilitiesarealsoappliedtonon-regulatedprojectsassociatedwithTransGrid’sassets.
mrviCGAleAbe(elec),GAiCdGeneral Manager/Network Services responsibleformanagingandmaintainingTransGrid’shighvoltagetransmissionsystemassetsandassociatedprotection,metering,controlandcommunicationsecondarysystemsinaccordancewithcorporatepoliciesandstrategicdirections.Thebusinessunitisalsoresponsibleforthemaintenanceofpropertyandeasementsassociatedwiththenetworkassets,thefieldmanagementandcommissioningofcapitalprojectsandundertakingexternalworkthatisconsistentwithitsexpertise.Theseobjectivesareachievedsoasnottocompromisesafety,communityandenvironmentalcommitments.
TransGridannualreporT2009>CorPorAteGovernAnCe 57
mrmiCHAelGAttAdv.Certelectrotechnology,dip.elecengineering,b.Comm,(business)General Manager/Corporate responsibleforrepresentingTransGridasacorporateentity,bytakinganactiveroleinhowTransGridinteractswithstakeholders,thecommunity,shareholders,andthegeneralpublic.Thisbusinessunitisprimarilyresponsibleforproperty,corporaterelations,publicaffairs,corporatecommunication,strategicdevelopment,corporatesocialresponsibility,corporateriskandaudit,stakeholderManagement,publications,legalandMedia.
mrtonymeeHAnb.CommCPAChief Financial Officer responsibleformanagingTransGrid’scommercialandcorporatefinancialinterests.ThisincludesimplementingandmanagingTransGrid’sinvestment,banking,debtportfolioandinsurancearrangements.itincludesresponsibilityforcorporateaccounting,taxation,accountingsystemsandthedevelopmentoffinancialstrategies,policiesandsystems.Thecommercialbusinessunitalsoincorporatestheprocurementfunction.
mrlionelsmytHbe(elec),Gradmgtqual,GAiCdGeneral Manager/ Network Performance and OperationsresponsibleforensuringthesecurityandreliabilityoftheelectricitytransmissionnetworkthroughoutnewsouthWalesinaccordancewiththenationalelectricityrules.Thebusinessunitdeterminesoperatingpolicy,strategiesandinstructionsfornetworkoperation;developsfacilitiesformonitoringandcontrol;operatesthesystemfromthecontrolcentres;liaiseswithneMMcoanddistributorstoensureeffectivecoordinationofoperatingactivitiesanddevelopsappropriatemaintenanceandassetmanagementstandards.
mrPAulPHilliPsbe(Hons),bsc,mmgtGeneral Manager/Business ServicesresponsibleforawiderangeofcorporateandbusinesssupportfunctionswithinTransGridintheareasofenvironmentalcomplianceandservices,healthandsafety,humanresources,informationtechnologyservicesandbusinesscommunicationservices,regionalprocurement,fleetmanagement,logisticsandqualityandexecutiveservices.businessservicesdevelopspoliciesinaconsultativemannerthroughanumberofexecutivecommittees.
58 CorPorAteGovernAnCe>TransGridannualreporT2009
CorPorAteGovernAnCeourCHArterTransGridwasestablishedasastatutorystateownedcorporationon14december1998,operatingundertheEnergy Services Corporations Act 1995.
section6coftheEnergy Services Corporations Act 1995givesTransGrid,asanenergytransmissionoperator,twoprincipalfunctions,whichare:
> toestablish,maintainandoperatefacilitiesforthetransmissionofelectricityandotherformsofenergy.
> toprovideservicesforthetransmissionofelectricityandotherformsofenergyinaccordancewiththerelevantregulatoryregime.
ThesectionalsoempowersTransGridtoutiliseanddevelopitselectricitytransmissionfacilitiestocarryouttelecommunicationsservices.
TheprincipallegislationgoverningTransGrid’soperationsaretheEnergy Services Corporations Act 1995,theElectricity Supply Act 1995andtheState Owned Corporations Act 1989.
oursHAreHoldersTransGrid’sboardandexecutivebelievethatgoodgovernanceisvitalforahigh-performingandsustainableorganisation.
TheboardisaccountabletothevotingshareholdersfortheperformanceofTransGrid.Therearetwovotingshareholdersatanyonetime,eachholdingthesamenumberofsharesandthesamerights.TheshareholdersholdtheirsharesonbehalfofthensWGovernment.
asat30june2009,TransGrid’sshareholderswere:
> TheHon.ericroozendaal,Mlc,Treasurer
> TheHon.joeTripodi,Mp,Ministerforfinance.
ourministerfrom1july2007to30june2008,TransGridformedpartoftheportfoliooftheHon.ianMacdonaldMlc,Ministerforprimaryindustries,Ministerforenergy,MinisterforMineralresources,andMinisterforstatedevelopment.
boArdoFdireCtorsThe board is responsible for providing effective guidance and direction; independence in decision making; an effective system of corporate governance and executive development and succession planning.
Board CharterTheprincipalobjectivesandfunctionsofTransGridandthestructureandcompositionoftheTransGridboardarelaidoutintheEnergy Services Corporations Act 1995 No. 95;theState Owned Corporations Act 1989 No. 134andTransGrid’sconstitution.
TransGrid’sboardoperatesinaccordancewiththebroadprinciplessetoutinitsboardcharter.Thischarterdetailstheboard’sstructureandresponsibilitiesandisreviewedonanannualbasis.inaddition,theboardhasacodeofconducttowhichalldirectorsmustadhereandwhichisalsoreviewedonanannualbasis.
Board StructureThe Energy Services Corporations Act 1995providesfortheboardofTransGridtoconsistof:
> theManagingdirector> onedirectortobeappointedby
thevotingshareholdersontherecommendationofaselectioncommitteecomprising:i. twopersonsnominatedbythe
portfolioministerii. twopersonsnominatedbythe
laborcouncilofnewsouthWales,eachbeingapersonselectedbythecommitteefromapanelofthreepersonsnominatedbythelaborcouncil
> atleasttwoandnotmorethanfiveotherdirectorstobeappointedbythevotingshareholdersattheirdiscretion.
Theperiodofappointmentofnon-executivedirectorsisatthediscretionofthevotingshareholders.
onedirectoristobeappointedchairpersonoftheboard.
Board ResponsibilitiesTheresponsibilitiesoftheboardareoutlinedintheboardcharter.Themainresponsibilitiesinclude:
> providingstrategicguidanceanddirectiontothecorporationincludingcontributingtothedevelopmentofandapprovingthecorporatestrategy.
> reviewingandapprovingbusinessplans,theannualbudgetandfinancialplansincludingcapitalexpenditureinitiatives.
> overseeingandmonitoring:– organisationalperformanceand
achievementofstrategicgoalsandobjectives
– compliancewiththecorporation’scodeofethicsandconduct
– progressonmajorcapitalexpenditureandothersignificantcorporateprojects.
TransGridannualreporT2009>CorPorAteGovernAnCe 59
> financialperformance.> ensuringthataneffectivesystemof
corporategovernanceexists.> ensuringeffectivemanagement
processesincludingexecutivedevelopmentandsuccessionplanning.
Chairman and Managing DirectorTheboardcharteroutlinestheroleofthechairmanandManagingdirector.
Thechairmanistoprovideleadershipandpromotethecohesivenessandeffectivenessoftheboard.keyrolestobeperformedbythechairmaninclude:
> assistingtheboardtodevelopgoodrelationshipswiththeshareholdingministersandportfoliominister,withtheManagingdirectorandwithotherkeystakeholdersandinterestedparties.
> assistingindividualdirectors,andtheboardasawhole,tounderstandtheirrole,responsibilitiesandaccountabilities.
> Helpingdirectorsunderstandtheirrisksandliabilitiesasindividualmembersandasaboard.
> ensuringacomprehensiveagendaispresentedtoeachmeetingoftheboard.
section20l(2)oftheState Owned Corporations Act 1989andarticle16.7(a)ofTransGrid’sconstitutionprovidethattheManagingdirectorisresponsibleforthedaytodaymanagementoftheoperationsofTransGridinaccordancewiththegeneralpoliciesandspecificdirectionsoftheboard.
Board InductionupontheirappointmenttotheTransGridboard,directorsundergoaninductionprogramtoenablethemtoclearlyunderstandtheexpectationsandrequirementsoftheboard.briefingswiththechairman,theManagingdirectorandtheboardsecretaryarearranged.anumberofessentialdocumentsarealsoprovidedduringthistime,including:
> aletterofappointment> adeedofindemnity> alistoffellowdirectorsandthechairand
contactdetails> acopyofthebusiness’sconstitution> acopyoftheboardcodeofconduct> copiesoftheboard’sandcommittee
charters> acopyofthemostrecentstatement
ofcorporateintentandannualreport> Theboardandcommitteemeeting
schedule> organisationcharts> acopyofthepreviousmonth’smeeting
papersandminutes.
Terms of Office and Remunerationinaccordancewithschedule8,clause5oftheState Owned Corporations Act 1989,adirectormaybeappointedtoholdofficeforaperiodnotexceedingfiveyears.
Theremunerationofeachnon-executivedirectorispaidoutofTransGridfunds,andisdeterminedbytheshareholders.Thetotalincomereceived,orduereceivable,byalldirectorsofTransGridislistedinthenotestothefinancialstatements(note26).TheManagingdirectorisnotentitledtoanyadditionalremunerationforbeinganexecutivedirector.
CommitmentTwelveboardmeetingsandoneadditionalboardandexecutivecorporateplanningsessionwereheldintheyearending30june2009.ofthetwelveboardmeetings,twowereheldatthesydneyWestregionaloffice.Thefirstofthesewasheldinseptember2008tocoincidewiththeTransGridsafetydayandthesecondindecembertomeetwithstaffandtopresentthechairman’ssafetyandenvironmentalawards.
Conflict of InterestTheboardcodeofconductstipulates
thatadirectormustdiscloseintereststotheboard(whichincludespositionsandpecuniaryinterests)incorporations,partnershipsorotherbusinessesthatmayberelevanttotheactivitiesoftheboardoranassociatedcommittee.aregisterofsuchinterestsismaintainedbyTransGrid.
Thefollowingconflictsofinterestweredeclared:
> attheboardmeetingheldonTuesday17thfebruary2009,jpricedeclaredaconflictofinterestwiththeagendaitem‘TamworthtoGunnedah66kVTransmissionlinerefurbishment’.
> attheboardmeetingheldonTuesday16thjune2009,MnugentdeclaredaconflictofinterestwiththeagendaitemonepuronWindfarm.
Therehavebeennootherconflictsofinterestdeclaredfortheyearended30june2009.
Independent Professional Advicedirectorsandboardcommitteeshavetheright,inconnectionwiththeirdutiesandresponsibilities,toseekindependentprofessionaladviceatTransGrid’sexpense.
Disclosure ObligationsTransGridhasaframeworkinplacetoensurethatitmeetsitsdisclosurereportingobligationstoshareholdingministers.
TheTransGridboardaimstoensurethatourshareholdingministersareinformedofallmajordevelopmentsaffectingTransGrid’sstateofaffairs.Thisisprimarilyfacilitatedthrougharangeofdisclosureandreportingtoolsincludingmeetings,progressreports,theTransGridannualreport,regulatorydocumentsandtheTransGridwebsite.
Meetings of the BoardThenumberofmeetingsoftheboardofdirectorsheldduringtheyearended30june2008,andthenumberofmeetingsattendedbyeachdirectorisdisclosedonpage60.
Theboardisresponsibleforprovidingeffectiveguidanceanddirection;independenceindecisionmaking;aneffectivesystemofcorporategovernanceandexecutivedevelopmentandsuccessionplanning.
riGHt(clockwise from top left)Jon Anderson, Civil Inspector
Gregory Spence, SCADA EMS Asset Manager
Dean Jabarin, Apprentice
Lauren Law, Graduate Accountant
60 CorPorAteGovernAnCe>TransGridannualreporT2009
Name TransGrid BoardBoard Audit and Risk Committee
Board Committee – Remuneration and
StructureBoard Regulatory
Committee
meetings Attended
meetings Entitled to Attend
meetings Attended
meetings Entitled to Attend
meetings Attended
meetings Entitled to Attend
meetings Attended
meetings Entitled to Attend
mr B E Foy 12 12 5 5 4 4 6 6
mr k N murray 12 12 5 5 4 4 6 6
ms m Papathanasiou 10 12 4 5 x x 6 6
mr N Betts 9 12 x x x x 6 6
The Hon. J Price 11 12 5 5 4 4 1x 1x
mr m Nugent* 10 10 1x 1x 4 4 1x 1x
* appointed1/08/08x notamemberofrelevantcommittee1 directorattendedcommitteemeetingasaninvitee
Strategic Planningonanannualbasis,theTransGridboardandexecutivefacilitatestrategicplanningconferencestoidentifytheorganisationscorporateobjectivesforthefollowingyear.TheoutcomesofthisplanningisreflectedintheStatement of Corporate Intent(sci)andtheCorporate Plan.
ThesciandcorporateplansetoutTransGrid’sstrategicdirectionwhichbecomesthebasisforindividualbusinessunitplans.TransGrid’scorporateplandefinesthekeyobjectives,strategicinitiativesandperformancetargetstomeasureachievement.italsoincludesadetailedoverviewofourcapitalworksprogramfortheforthcomingyear.
boththesciandcorporateplanarepresentedtotheshareholdingministers.
Board CommitteesToassisttheboardinfulfillingitscorporategovernanceresponsibilities,itutilisestheexecutiveboardcommittee,theboardauditandriskcommittee,theboardcommittee–remunerationandstructureandtheboardregulatorycommittee.achartergovernsthesecommitteesandtheboarddelegatesspecificpowersandprocedures.eachcharterdetailsthecommittee’sprimaryfunction,structureandresponsibilities.eachcharterisreviewedonanannualbasis.
Theboardauditandriskcommittee,theboardcommittee–remunerationandstructureandtheboardregulatorycommitteemeetonatleastaquarterlybasisoratsuchtimesasconsideredappropriate.
Theexecutiveboardcommitteemeetsasandwhenrequired.
non-executivedirectorschairtheboardcommittees.seniorexecutivesandmanagementmaybeinvitedtoattendcommitteemeetings.TheManagingdirectorisalsoamemberoftheboardcommittees(excepttheboardauditandriskcommittee).
areportdetailingtheitemsconsideredbythecommitteeistabledatthefollowingboardmeeting.
Executive Board CommitteeTheexecutiveboardcommitteeconsistsofthefollowingdirectors:
Mr B Foy (Chair of the Committee)
Mr K Murray
Theprimaryfunctionoftheexecutiveboardcommitteeistoconsidermattersbetweenboardmeetingswhichwouldotherwiserequireboardapproval.Thematterisdelegatedtotheexecutiveboardcommitteeatthepriorboardmeetingandareportisprovidedtotheboardatthemeetingfollowingtheexerciseofthedelegation.
Board Audit and Risk CommitteeTheboardauditandriskcommitteeconsistsofthefollowingdirectors:
The Hon. J Price (Chair of the Committee)
Mr B Foy
Ms M Papathanasiou
leFt(clockwise from top left)Michael Cross, Apprentice
Greta Metz, Information Communications Technology Project Manager
Michael Stemmer, Tradesperson
Graeme Ludewig, Commodity Manager
oPPositePeter Sutrin, Apprentice
onanannualbasis,theboardandexecutivefacilitatesstrategicplanningconferencestoidentifytheorganisations’corporateobjectives.
TransGridannualreporT2009>CorPorAteGovernAnCe 61
Theprimaryfunctionoftheboardauditandriskcommitteeistoassisttheboardinfulfillingitsoversightresponsibilitiesbyreviewingtheoverallauditprocessofthecorporation;thesystemofinternalcontrolwhichmanagementandtheboardofdirectorshaveestablishedandthefinancialinformationwhichwillbeprovidedtotheshareholdingministersandothers.
Board Committee – Remuneration and StructureTheboardcommittee–remunerationandstructureconsistsofthefollowingdirectors:
Mr B Foy (Chair of the Committee)
The Hon. J Price
Mr N Nugent
TheprimaryfunctionofthisboardcommitteeistoassisttheboardindeterminingtheremunerationandemploymentconditionsofTransGrid’sexecutiveandseniormanagementandreviewingtheorganisationalstructureofthecorporation.
Board Regulatory CommitteeTheboardregulatorycommitteeconsistsofthefollowingdirectors:
Ms M Papathanasiou (Chair of the Committee)
Mr N Betts
Mr B Foy
Mr K Murray (Managing Director)
Thisboardcommitteeassiststheboardinmanagingandreviewingregulatorychangesand/orregulatorydecisionsarisingfromthenationalelectricitylaw,rulesandregulations.duringtheyearending30june2009thiscommittee’smainfocuswasonoverseeingthepreparationoftherevenuesubmissiontotheaer.ThiscommitteewasdisbandedinMay2009uponcompletionofthe2009to2014revenueresetprocess.
Remuneration of Directorsnon-executivedirector/–Mrbrucefoy $129,148
non-executivedirector–MsMatinapapathanasiou $76,844
non-executivedirector–TheHon.johnprice $76,012
non-executivedirector–Mrnevillebetts $72,549
non-executivedirector*–Mrnugent $58,050
*appointed1staugust2008.
exeCutiveleAdersHiPteAmPerformance Statementsmr k murray, managing Director,wasassessedbytheboardashavingachievedallkeyperformancecriteriasetinthecorporateplanandthestatementofcorporateintentwiththensWGovernment.Thisincludedmeetingthecapital,operating,reliabilityandefficiencytargetssetbytheaerforthe2004to2009periodandthesubmissionandfinalisationofTransGrid’srevenuedeterminationforthe2009to2014period.
mr P mcIntyre, General manager/Network Development and Regulatory Affairs,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,includingachievementofthetransmissionplanninganddevelopmentrequirementstofacilitateTransGrid’ssignificantcapitalprogram,theproductionofthe2009annualplanningreport,theimplementationofthelargestnetworksupportarrangementinthenationalelectricityMarket,improvedcustomerandstakeholderrelationships,theeffectivemanagementofTransGrid’sinputtothedevelopmentoftheregulatoryregimefortransmissionintheneMandthemanagementofTransGrid’s2009to2014revenueresetprocesswiththeaer.
62 CorPorAteGovernAnCe>TransGridannualreporT2009
mr C FitzGerald, General manager/Capital Program Delivery,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,withthehighlightbeingthesuccessfulachievementofthemajorcapitalworksprogramforthe2004to2009regulatoryperiodwithmorethan$500millioninexpenditureonover60projectsduring2008/09.includedinthemajorcapitalworksprogramforthispastyeararethecriticalWestern500kVprojectbeingdeliveredontimeandtobudget,withbayswaterandMtpiperswitchyardsbeingenergisedat500kVandalsotheMacarthurandWagganorthsubstationsreachingpracticalcompletionduringthistime.significantprogresshasbeenalsomadeonthedeliveryofthechallenging2009to2014capitalprogramwithmorethan80percentofexpenditureinthe2009/10yearalreadycommittedwithcontractsandthesupplytothecbdprojectprogressingtoschedule.Theincreasedcapabilityofthecapitalprogramdeliverybusinessunittocontinuetodeliverthelargeprogramofworkshasbeenkeytotheseachievements.
mr P Phillips, General manager/Business Services,wasassessedbytheManagingdirectorashavingachievedallperformancecriteriaincludingwarehouserationalisation,resourceplanning,implementationoftheseniorManagerandexecutivedevelopmentprogramsandongoingmanagementofthefutureleadersprogram,leadingtheinformationandcommunicationTechnologyenhancementprograms;TransGrid’ssafetyandenvironmentalcommitmentsandmaintainingcertificationsofTransGrid’ssafetyManagementsystemtoas4801,theenvironmentalManagementsystemtoiso14001andQualitysystemtoiso9001.
mr v Galea, General manager/Network Services,wasassessedbytheManagingdirectorashavingachievedallkeynetworkreliability,availability,maintenanceandconstructiontargetswithinapprovedbudgetsandtimeframeswhilemaintaininghighlevelsafetyperformanceandenvironmentalcompliance.Hedeliveredandcommissionedallplannedmajorprojectsandassetreplacementprograms.Hedevelopedstrategiesandnewconceptsthatwillimproveproductdeliveryprocessestomanagefuturecapitalworksobjectivesandreducesomeoperationalcosts.HemaintainedasustainablestrategicHumanresourceplanthatincludessuccessfulplanstomeetfuturerequirements.
mr T meehan, Chief Financial Officer,sincenovember2008,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,includingtheeffectivemanagementofallTransGrid’sfinancialfunctions;reviewofTransGrid’sdebt,foreignexchangeandcommodityriskmanagementstrategiesandtheimplementationofnewpolicyarrangements;developmentoffinancialstrategiesforthe2009to2014regulatoryperiod;developmentofnewarrangementsforpricingofnegotiatedservicesandrestructureofthecommercialbusinessunittomeetbusinessrequirements.
mr L Smyth, General manager/Network Performance and Operations,wasassessedbytheManagingdirectorashavingachievedallperformancecriteriaincludingnetworkreliabilityandavailabilitytargets;improvingthesystemsandprocessesacrossthebusinessunitincludingrealtimelineratinganddigitalaerialinspectiontechnologies;producinganewnetworkManagementplan;upgradingthestatecontrolcentreandprovidingcontinuedleadershipinrestructuringofthebusinessunitandrefiningtheVirtualcontrolroom.
mr m Gatt, General manager/Corporate,wasassessedbytheManagingdirectorashavingachievedallperformancecriteria,includingassessingtheneedsofstakeholders;managingmediaandgovernmentrelationsactivities;deliveringeffectivecorporatecommunications,thepropertyportfolio,legalservicesandcorporateplanningfunctions.Thecorporatebusinessunitalsorefinedprocessesformembershipsandstakeholdermanagementaswellasemergencycommunicationsprotocols.
Remuneration Objective TheobjectiveofTransGrid’sexecutiveremunerationframeworkistoensurethatrewardforperformanceiscompetitiveandappropriatefortheresultsdelivered.Theframeworkalignsexecutiverewardwiththeachievementofstrategicobjectivesandthecreationofshareholdervalue,anditconformstomarketbestpracticefordeliveryofreward.
Theboardcommittee–remunerationandstructuredeterminesexecutiveremuneration.eachyearthecommitteecommissionsareportfromanexternalexecutiveremunerationconsultantdetailingequivalentmarketremunerationandarecommendationonsuitableremunerationlevelsforallexecutiveofficers.
allexecutiveofficershaveinplaceawrittenperformanceagreementalignedtoTransGrid’scorporategoals.performanceoutcomesarematchedtoperformancetargets,withremunerationbasedondocumentedperformancelevels.
TransGridannualreporT2009>CorPorAteGovernAnCe 63
Remuneration Paid
Name Title Remuneration Paid (2008/09)
MrkevinMurray executivedirectorandManagingdirector $654,842
MrpeterMcintyre GeneralManager/networkdevelopmentandregulatoryaffairs $322,637
MrchrisfitzGerald GeneralManager/capitalprogramdelivery $314,301
Mrpaulphillips GeneralManager/businessservices $292,908
MrVicGalea GeneralManager/networkservices $300,802
MrTonyMeehan chieffinancialofficer $265,911
Mrlionelsmyth GeneralManager/networkperformanceandoperations $279,409
MrMichaelGatt GeneralManager/corporate $261,560
Mrjohnbyrne(retired22/8/08) GeneralManager/commercial $58,771
Qualifications
Name Position Qualifications
MrkevinMurray executivedirectorandManagingdirector be(elec),dipbusstudies,faicd
MrpeterMcintyre GeneralManager/networkdevelopmentandregulatoryaffairs bsc,be(Hons),Mba(TechnologyManagement),fieaust,Gaicd
MrchrisfitzGerald GeneralManager/capitalprogramdelivery bsc,be(Hons),Me,Graddip(busadmin),fieaust,cpeng
Mrpaulphillips GeneralManager/businessservices be(Hons),bsc,MMgt
MrVicGalea GeneralManager/networkservices be(elec),Gaicd
MrTonyMeehan chieffinancialofficer b.comm,cpa
Mrlionelsmyth GeneralManager/networkperformanceandoperations be(elec),GradMgtQual,Gaicd
MrMichaelGatt GeneralManager/corporate adv.certelectrotechnology,dip.elecengineering,b.comm(business)
faicd–fellowaustralianinstituteofcompanydirectorsGaicd–Graduateaustralianinstituteofcompanydirectors
oPPosite(left to right) Garrie Chubb, Manager/Network Planning and David Fayyad, Corporate Relations Manager.
riGHt(clockwise from top left)
Peter McIntyre, General Manager/Network Development and Regulatory Affairs
Joseph Diver, Graduate Engineer
David Gazzard, Engineering Officer
Gavin Thomas, Graduate Accountant
64 CorPorAteGovernAnCe>TransGridannualreporT2009
GuArAnteeoFserviCeTransGridhasdefinedservicecommitmentswithourcustomersthroughourconnectionagreements.TransGrid’sservicelevelsaremonitoredbytheaerandthensWdepartmentofWaterandenergy(dWe).
leGislAtiveCHAnGesAustralian Energy Market Amendment (AEMO and Other Measures) Act 2009ThisactamendedtheRenewable Energy (Electricity) Act 2000andTrade Practices Act 1974toreplacereferencetothenationalenergyMarketManagementcompanylimitedwiththeaustralianenergyMarketoperatorlimited,toreflectthecommencementofasinglenationalenergymarketoperatorforboththeelectricityandgassectorsfrom1july2009.Thisisanimportantreformfortheenergysector.TheaeMowillassumetheresponsibilitiesandfunctionsofexistinggasandelectricitymarketoperators,includingthenationalelectricityMarketManagementcompany.
Carbon Pollution Reduction Scheme Bill 2009 (and other associated proposed legislation)Thisbillispartofapackageofsixbillstogiveeffecttothecarbonpollutionreductionscheme.Thebillgiveseffecttoaustralia’sobligationsundertheunitednationsframeworkconventiononclimatechangeandthekyotoprotocolbyoutlining:entitiesandemissionscoveredbythescheme;liableentities’obligationtosurrenderemissionunitscorrespondingtotheiremissions;limitsonthenumberofemissionsunitsthatwillbeused;thenatureandallocationofaustralianemissionsunits;mechanismstocontaincosts;linkingtootheremissionstradingschemes;assistanceinrelationtoemissions-intensivetrade-exposedactivitiesandcoal-firedelectricitygenerators;voluntaryinclusionofreforestationactivitiesunderthescheme;theaustraliannationalregistryofemissionsunits;andmonitoringandenforcement.
TransGridhasalreadycommencedproactivelymanagingtheimpactofclimatechangeonitsoperationsandwillbewellplacedtorespondtolegislativechangeaffectingit.
ConsumerresPonseTransGridreceivespropertyinformationinquiriesfromsolicitors,conveyancersandthegeneralpublicregardingTransGrid’srightsandintereststhatmayaffecttitletoland.fortheyearending30thjune2009,TransGridrespondedto51,220suchinquiries.responsetimeswerewithindesignatedtimeframes.
Morethan90percentoftheseinquirieswereprocessedusingonlineaccessfacilitiesprovidedbythecentralregisterofrestrictionsadministeredbythedepartmentoflands.
judiCiAldeCisionsTherewerenojudicialdecisionsaffectingTransGridduringtheyear.
ConsultAntFeesduringtheyear,$53,526wasspentonconsultingservicesrelatingtothepreparationofenvironmentalimpactassessments.
riskmAnAGementAndinsurAnCeTheexecutiveauditandriskcommitteeisresponsibleforensuringTransGrid’srisksareidentifiedandeffectivelymanaged.implementationofriskmanagementstrategiesaretheresponsibilityofalllevelsofmanagementwithinTransGridandaframeworkexiststoensurethatallrisksareproactivelyandexplicitlymanagedonanongoingbasis.
Thecorporateauditandriskgroupprovidesassistanceinthedevelopmentandmaintenanceofenterprise-wideriskmanagementplans,trainingstaffinallaspectsofriskmanagementandtheongoingverificationandreviewofriskmitigationactionsacrosstheorganisation.
TransGrid’sinsurancestrategyistoobtainthemostcomprehensiveinsurancecoverageavailableatthemosteconomicalcost.eachyear,TransGridexaminestherisksforwhichitispreparedtoseekcover,theavailableinsurancecoverageorothermeanstomeettheremainingrisksandthecostsofcoveringtheserisks.
implementationofriskmanagementstrategiesaretheresponsibilityofalllevelsofmanagementwithinTransGrid.
leFt(clockwise from top left)
Steve Varelis, Senior Technology Analyst
Sean Nicolas, Engineering Officer
Justin Holland, Engineering Trainee
Lindsay Fulwood, Civil Inspector
oPPosite(left to right) Graduate Engineers: Charles Hitchen, Connie Liang, Jeremy Blackford, Omar Hassanein, Owen Crampton
TransGridannualreporT2009>CorPorAteGovernAnCe 65
FrAudPreventionTransGridwillnottoleratefraudorfraudulentconduct,regardlessofwhetherthefraudhasbeenperpetratedonitbyitsemployeesorbyexternalstakeholders.
appropriatestepswillbetakentoprotecttheorganisationfromtheriskoflossarisingfromfraud.
ToachievethisTransGridhasafraudpreventionstrategy/planwhichhassevenmainelementsincluding:
> organisationalresponsibility> fraudriskassessments> notification/reportingsystems
– internal– external
> detectionsystems> assessmentsandinvestigations> conductanddisciplinarysystems,and> awareness
– employeeawareness– communityandcustomerawareness
akeycomponentisthecodeofethicsprogram.
TransGridconductsitsbusinessbaseduponitsvalues.Thesevaluesarethedrivingforcesthatensurethatwecontinuetoaimforthehigheststandardsofintegrity,honestyandfairnessinthewayweworkandinourdealingswithourmanycustomers,contractorsandsuppliers.
TransGridmaintainsasuiteofcodes:
> TransGriddirectorscodeofethicsandconduct–guidelinesforboarddirectorsandassociatedboardcommittees
> ourcodeofethicsandconduct–guidelinesforallemployees
> businessethics–aguidetocontractors,customersandsuppliers.
during2008eachofthesecodeswerereviewedandreissued.
allemployeeswereprovidedwithacopyofourcodeofethicsandconductandwereprovidedwithabriefingfromtheirmanager/teamleaderontherevisedcode.
allnewemployeesreceiveacopyofourcodeofethicsandconductandaremadeawareoftheimportanceofmaintaininghighethicalstandardsthroughdiscussionswiththeirmanager/teamleader,aswellasthroughanonlineinductionprogramwhichrelaystheimportanceofTransGrid’simageandreputationandtheparttheycanplayinthis.
TransGridisalongstandingcorporateMemberofthestjamesethicscentreandprovidesaccessforallemployeestopublicationsfromthecentrebothinhardcopyandviapublicationonourintranet.
TransGridmaintainsa24-hourethicsHelplinewhichallowseasyaccessforstafftoseekethicaladviceorrelayconcernsinaconfidentialmanner.in2008therevisedcodeofethicsandconductandthereviewedbusinessethicsGuidealsopublishedthecontactdetailsforthestjamesethicscentreethic-call,providingemployeeswithanotheroptiontoreceiveconfidentialadviceonanyethicalsituationthattheymaybefacing.
FreedomoFinFormAtionTransGridreceivedtwofreedomofinformation(foi)applicationsundertheFreedom of Information Act 1989in2008/2009.
ThefollowingtableprovidesanoverviewofresponsestorequestsmadeundertheFreedom of Information Act 1989.
TOTAL
FOI Requests 2008–09 2007–08
numbersofrequestsreceived
2 0
broughtforward 0 0
completed 0 0
Transferredout 0 0
unfinished(carriedforward)
0 0
Grantedinfull 0 0
partiallygranted 2 0
refused 0 0
feesreceived $35 0
duringthe2008/2009year:
> TheimpactoftherequirementsoftheactonTransGrid’sactivitieswasminor.
> noissuesaroseinconnectionwithTransGrid’scompliancewiththerequirementsoftheact.
> nodeterminationbyTransGridwasthesubjectofreviewbytheombudsman,theadministrativedecisionsTribunalorthesupremecourt.
allfreedomofinformationrequestscanbedirectedto:
freedomofinformationofficer201elizabethstreetpoboxa1000sydneysouthnsW1235
66 CorPorAteGovernAnCe>TransGridannualreporT2009
stAtementoFAFFAirsinformationrequiredundersection14(2)oftheFreedom of Information Act 1989,islocatedasfollows:
> Theagency’sstructureandfunctions:aboutTransGrid
> Thewayitsfunctionsaffectthepublic:environmentandcommunity
> Howthepublicmayparticipateinagencypolicydevelopment:planning,environmentandcommunity
> Thekindsofdocumentstheagencyholds:promotion
> Howmembersofthepubliccanaccessandamendagencydocuments:freedomofinformation.
PrivACyTransGridiscommittedtoadherencewiththeprinciplesofsoundprivacypracticetoensurethatpersonalinformationismanagedinaccordancewiththePrivacy and Personal Protection Act 1998.
TransGridhasaprivacyManagementplaninplacetofacilitateadherencetotheprinciplesoftheactandtocommunicatetoouremployeeshowprivacyismanagedwithintheorganisation.
TransGrid’sprivacyManagementplanisavailabletoallofouremployeesviathecompanyintranet,Transnet.
siGniFiCAntCommitteesExecutive Audit and Risk CommitteeTheexecutiveauditandriskcommitteeensuresthattheeffectivenessofmanagementcontrolismaintained.itoverseesthesettingofpolicies,co-ordinationandcommunicationofriskmanagementstrategiesandensuresthatTransGrid’soverallriskmanagementframeworkoperateseffectively.
Executive Occupational Health and Safety CommitteeTheexecutiveoccupationalHealthandsafetycommitteeprovidesdirectiononpoliciesandproceduresrelatingtooccupationalhealthandsafetymatters,andprovidesexecutivesupporttolocationmanagersandoccupationalHealthandsafetycommittees.
Executive Revenue Reset CommitteeTheexecutiverevenueresetcommitteeimplementsanddevelopstherevenueresetproposalinaccordancewiththestrategyapprovedbytheboard.Thecommitteeendorsestherevenueproposal’skeymessagesandstructure.itdeterminesbusinessunitresponsibilitiesandprovidesresourcesfortherevenueresetproject.
Executive Environment CommitteeThepurposeoftheexecutiveenvironmentcommitteeistosetcorporateenvironmentalpolicyandmonitortheeffectivenessofenvironmentalmanagementwithinTransGrid.
Capital Works Program Steering CommitteeThecapitalWorksprogramsteeringcommitteemonitorsthecapitalworksprogram in TransGrid and facilitates andcoordinatesthedeliveryoftheprogramandspecificindividualprojectsasrequired.Thecommitteealsomonitorstheefficiencyandeffectivenessofthecapitalworksdeliveryprocess.
Executive Protective Security CommitteeTheexecutiveprotectivesecuritycommitteeoverseesandcoordinatesprotectivesecurityandbusinesscontinuityactivitieswithinTransGrid.
Information Technology Executive Committee TheinformationTechnologyexecutivecommittee(iTec)isthegoverningbodyforiT-relatedserviceandinvestmentswithinTransGrid.TheiTecsetsTransGrid’sstrategicdirectionforinformationtechnology.TheiTec’skeyroleistoensurethatiTinvestmentsalignwithbusinessprioritiesanddelivervaluetoenhancebusinessperformance.Toexecutethisrole,theiTecrequiresbusinessunitstoprovideinformationoniTperformanceandcosts.ThisreportingimprovestransparencyandaccountabilityforiTcostsacrossTransGrid.
TransGridannualreporT2009>CorPorAteGovernAnCe 67
Exe
cutiv
e Te
am
Exe
cutiv
e A
udit
and
R
isk
man
agem
ent
Co
mm
ittee
Exe
cutiv
e O
ccup
atio
nal
Hea
lth a
nd S
afet
y C
om
mitt
ee
Exe
cutiv
e R
even
ue
Res
et C
om
mitt
ee
Exe
cutiv
e E
nviro
nmen
t C
om
mitt
ee
Cap
ital w
ork
s P
rog
ram
(CA
PE
X)
Ste
erin
g C
om
mitt
ee
Exe
cutiv
e P
rote
ctiv
e S
ecur
ity
Co
mm
ittee
Info
rmat
ion
Tech
nolo
gy
Exe
cutiv
e C
om
mitt
ee (I
TE
C)
kevinMurray ~ ~ ~ ~ ~ ~ ~
chrisfitzGerald ~ ~ ~ ~ ~ ~
VicGalea ~ ~ ~ ~ ~ ~ ~ ~
MichaelGatt ~ ~ ~ ~ ~ ~ ~
peterMcintyre ~ ~ ~ ~ ~ ~
paulphillips ~ ~ ~ ~ ~ ~
lionelsmyth ~ ~ ~ ~ ~ ~ ~ ~
TonyMeehan ~ ~ ~ ~ ~ ~
davidvanbeek ~
ianHarris ~
kennethMccall ~
johnrobinson ~
WayneGlanville ~
kevindodds ~ ~
johnHowland ~ ~
stuartjohnston ~
Megancalvert ~
donpaton ~
danielsartor ~
stevenjones ~ ~
andrewkingsmill
~
MichaelMilne ~
peterHolland ~
Garriechubb ~
TransGrid’sexecutivecommitteesplayavitalroleinensuringtheongoingachievementofourcorporateobjectives.
riGHt(clockwise from top left)
Barry Gifford, Senior Information Communications Technology Project Manager
Jemmie Ong, Graduate Accountant
Lionel Smyth, General Manager/ Network Performance Operations
Natalie Lukic, Information Technology Asset Management Coordinator
68 CorporateGovernanCe>TransGrid annual reporT 2009
overseasvisitsBelow is a listing of the overseas visits undertaken by TransGrid employees over the reporting period.
overseas visits provide TransGrid with the opportunity to benchmark our performance with other leaders in the industry and learn from them. overseas visits play a key supporting role in helping TransGrid determine the most efficient processes in building a safe, reliable and secure transmission network.
Name Title Countries Purpose of Visit
d. Guille engineering officer new Zealand inspection of materials and drawings for the 500kV Mt piper and Bannaby/Wollar 500kV substation projects.
K. dodds Manager new Zealand participation in the asia pacific utilities Group steering Committee Meeting.
p. phillips General Manager russia Meetings with psC-opTen on phase 3 of the aerial laser survey project.
d. novakovic project engineer russia Meetings with psC-opTen on phase 3 of the aerial laser survey project.
e. lamplough professional officer austria and Germany Witness testing of siemens 145kV shunt reactor for the Beaconsfield West substation.
J. Mouatt professional officer Japan Witness testing of the phase-shifting transformer for armidale substation.
G. saluja professional officer Japan Witness testing of the phase-shifting transformer control system for armidale substation.
n. smith Manager usa attendance at the electric power research institute safety switching Conference.
H. allen engineering officer Finland Witness testing of reactors for the sydney north and sydney east capacitor installations.
C. stevens professional officer Japan Witness testing of the phase-shifting transformer control system for armidale substation.
s. Jones Manager new Zealand attend CiGre High Voltage equipment panel meeting.
M. Grierson engineering officer Thailand Witness testing of 132kV transformer for supply to Coffs Harbour substation.
G. spence Manager sweden sCada / eMs upgrade project design review Meeting.
a. Hammond sCada specialist sweden sCada / eMs upgrade project design review Meeting.
W. Goldsmith sCada specialist sweden sCada / eMs upgrade project design review Meeting.
T. Meehan Chief Financial officer uK undertake work associated with placement of TransGrid’s insurance coverage.
a further two trips, of which the majority of costs were funded by other organisations, were undertaken by TransGrid officers.
Name Title Countries Purpose of Visit
M. Grierson engineering officer Germany Witness testing of 330kV current transformers at the areVa factory.
a. Manglick Manager indonesia attendance at the aorC-CiGre and study Committee C1 Meetings.
overseas visits provide TransGrid with the opportunity to benchmark our performance with other leaders in the industry.
left(clockwise from top left)
Ryan Dunn, Apprentice
Meredith Sturman, Manager/Reset Process Improvement
Ralph Meeks, Engineering Officer
Don McKay, Network Control Manager
TransGridannualreporT2009>CorPorAteGovernAnCe 69
CreditCArdusAGecreditcardusageinTransGridisinaccordancewithitsdetaileddocumentedprocedures.TransGridcontinuestopromotethecorrectusageofitscorporatecreditcardsandthereisacontinuousreviewofusagecharacteristicsandauthorisations.
rePortinGexemPtionsThefollowingreportingexemptionshavebeengrantedbynsWTreasurytoenablefinancialreportingrequirementsthatapply,tobebroadlyconsistentwithcorporationsactreportingrequirements,giventhattheentityoperatesinthecompetitivenationalelectricityMarket:
Statutory Requirements Act/Regulation References Comments
Budgets
• detailedbudgetfortheyearreportedon
s.7(1)(a)(iii)arsba
• outlinebudgetfornextyear s.7(1)(a)(iii)arsba
• particularsofmaterialadjustmentstodetailedbudgetfortheyearreportedon
cl6arsbr
reportofoperations s.7(1)(a)(iv)arsba exemptionsubjecttotheconditionthatinformationrelatingtothe“summaryreviewofoperations”istobedisclosedinasummarisedform.
Managementandactivities schedule1arsbr exemptionsubjecttotheconditionthatrelevantinformationistobedisclosedinasummarisedform.
researchanddevelopment schedule1arsbr
Humanresources schedule1arsbr
consultants schedule1arsbr exemptionsubjecttotheconditionthatthetotalamountspentonconsultantsistobedisclosedalongwithasummaryofthemainpurposesoftheengagements.
landdisposal schedule1arsbr
paymentofaccounts schedule1arsbr
Timeforpaymentofaccounts schedule1arsbr
reportonriskManagementandinsuranceactivities
schedule1arsbr exemptionsubjecttotheconditionthatrelevantinformationistobedisclosedinasummarisedform.
investmentperformance cl12arsbr
liabilityManagementperformance cl13arsbr
Abbreviations:arsba annualreports(statutorybodies)act1984arsbr annualreports(statutorybodies)regulation2005
70 CorPorAteGovernAnCe>TransGridannualreporT2009
eleCtroniCserviCedeliveryTransGridprovideselectronicservicestoourstaffandpartners.Thisincludesfacilitatingtheabilitytosecurelyaccesselectroniccorporateapplicationsremotelyandthroughtheinternet.
PromotionTransGridiscommittedtoprovidingavarietyofcommunicationvehiclestoinformthepublic,customers,stakeholders,employeesandsuppliers.Throughoutthereportingperiod,publicationsincluded:
> annualreport> nsWannualplanningreport> corporateplan> networkassetManagementplan> easementGuide
> eMfbrochure> capitalWorksprocessbrochure> Varietyofbrochuresandadvertisements
informingstakeholdersaboutTransGrid’sprojects(e.g.factsheets,projectnewsletters).
industriAlrelAtionsPoliCiesAndPrACtiCesTransGridcontinuedtoconsultwithunionsandemployeesonarangeofindustrialmatters.Thisconsultativeapproachhasresultedinnotimelostasaresultoforganisationalindustrialdisputesduringthereportingperiod.
HeritAGemAnAGementTransGriddoesnothaveanyassetslistedasheritageitemsasdefinedunderthelegislation.
CostoFAnnuAlrePortTransGrid’sannualreportwasproducedundertheguidanceofTransGrid’scorporatecommunicationsManagerinconjunctionwithanexternalgraphicdesignfirm.Thetotalexternalcostincurredintheproductionoftheannualreportwas$45,268.
TheannualreportisavailableonTransGrid’swebsite(www.transgrid.com.au).
lAnddisPosAlThefollowingsurpluslandwasdisposedofduring2008/09:
Name Lot DP Sale Date New owner Comment
augmentationofkempseysubstation
partlot102dp866563disposednowformspartoflot1indp1121926
sale/landswap
sale/landswap
11.07.08 countryenergy
lot1isnow1.290hatoinclude604squaremetresfromtheformerlot102transferredtoce.
stampdutyvaluationat$750
landatbulgasingleton 1 555234 auctionsale
23.09.08 soldtolindsayGordonHarrisandGillianMayferguson
expatrolhutsitesoldatauctionfor$32,000
TransGridiscommittedtoprovidingavarietyofcommunicationvehiclestoinformthepublic,customers,stakeholders,employeesandsuppliers.
leFt(clockwise from top left)
Garrie Smith, former Manager/Southern Region
David Thretheway, Manager/Stakeholders and Strategic Projects
Neil Mitchell, Project Engineer
James Bradley, Apprentice
TransGridannualreporT2009>FinAnCiAls 71
2008/09financialsContents73 inComestAtement
74 bAlAnCesHeet
75 CAsHFlowstAtement
76 stAtementoFreCoGnisedinComeAndexPense
77 notestotHeFinAnCiAlstAtements
101stAtementbymembersoFtHeboArd
102indePendentAuditor’srePort
72 CommerCiAlrePort>TransGridannualreporT2009
Thefinancialyearwasmadeupoftwoverydifferenthalves.duringthesecondhalfof2008,TransGridexperiencedsignificantcostpressuresasareflectionofthebuoyantaustralianeconomy.TherecordlevelofprofitsisanindicatorthatTransGridhashadastrongfocusoncontrollingoperatingexpenditure.bythesecondhalfofthefinancialyearTransGridwasbeingimpactedbytheuncertainfinancialconditionscreatedbytheglobalfinancialcrisis.TransGridhasactedtomitigatetherisksfacedfromtheglobalfinancialcrisiswithareviewofitsdebtmanagementpoliciesandcloselymonitoringthefinancialstatusofkeysuppliers.
duringtheyearTransGriddeliveredarecordcapitalworksprogram,withatotalexpenditureof$619.9million.inordertofundthiscapitalexpenditure,TransGridborrowed$457.3millionwithitstotaldebtincreasingto$1,988.9million.Theyearwasalsooneinwhichtheaerapprovedaregulatedcapitalworksprogramof$2.4billionforthe2009to2014regulatoryperiod,withdetailedplanningforthefinancingofthislargecapitalworksprogramcommencingduringtheyear.
TheprofitsgeneratedintheyearhaveresultedinTransGriddeclaringdividendpaymentstoitsshareholdersof$120.2million.
arestructureoftheorganisationinseptember2008resultedintheestablishmentofthepositionofchieffinancialofficer.TonyMeehanwasappointedtothispositioninoctober2008andhasenabledthestaffofthecommercialbusinessunittoundertakesomesignificantreviewsoftheorganisation’sfinancialmethodsandcommercialpractices.Thiscoupledwithanincreasedfocusonoperationsisexpectedtoenhancethestrongfinancialperformanceoftheorganisation.
afteradetailedreview,anewdebtandinvestmentriskManagementpolicywasapprovedbytheboardinapril2009.Thestrategiesadoptedinthenewpolicywillresultinchangestotheongoingdebtportfoliotomanagethekeyobjectivesofminimisinginterestexpenseandprofitvolatilitywhilemitigatingpotentialrefinancingrisks.changestoworkingcapitalstrategieswillresultinreductionsinfinancingchargesbeingrealisedinthe2009/10financialyear.
TheglobalfinancialcrisishasimpactedthedefinedbenefitsuperannuationschemescontributedtobyTransGrid.Thereductioninthefairvalueoftheplan’sassetsandincreasesinthepresentvalueofthedefinedbenefitobligations,resultedinTransGridrecordingactuariallossesof$133.2million.Theselosseshavebeenrecognisedthroughanadjustmenttoretainedearnings.
adetailedrevaluationofTransGrid’sfixedassetswascarriedoutduringtheyear.asrequiredbyaccountingstandards,animpairmenttesthasbeenappliedtotheresultingvaluesandanimpairmentlossof$919millionwasbroughttoaccountasareductiontotheassetrevaluationreserve.
CommerCiAlrePort
despiteachallengingfinancialenvironmentduring2008/09TransGridhasbeenabletoachievearecordprofitbeforetaxof$217.4million.Theprofitreflectsastrongfocusoncontrollingroutineoperatingexpenditure,managingfinancingcostsandanincreaseinnon-prescribedrevenue.
TransGridannualreporT2009>Income Statement 73
Income StatementForTheyearended30ThJune2009
2009 2008 note $’000 $’000
income 3 652,797 572,987
expensesexcludingFinanceCosts 4 (330,304) (280,553)
FinanceCosts 4 (105,072) (101,882)
Profit/(Loss) Before Income Tax Expense 217,421 190,552
incomeTaxBenefit/(expense) 6(a)(i) (67,130) (58,165)
Profit/(Loss) For The Year 150,291 132,387
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
BegInnIng of audIted fInancIal RepoRt
74 Balance Sheet>TransGridannualreporT2009
Balance Sheet asaT30ThJune2009
2009 2008 note $’000 $’000
cuRRent aSSetS Cashandcashequivalents 7 20,861 30,571
Tradeandotherreceivables 8 110,096 69,857
inventories 9 27,634 25,699
derivatives 10 3,018 61
other 11 2,295 1,331
Total Current Assets 163,904 127,519
non-cuRRent aSSetS deferredtaxassets 6(b) 73,658 34,504
derivatives 10 1,521 5
property,plantandequipment 12 4,390,275 3,531,916
intangibles 13 537,535 523,067
other 14 4,008 3,603
Total Non-Current Assets 5,006,997 4,093,095
Total Assets 5,170,901 4,220,614
cuRRent lIaBIlItIeS Borrowings 375,738 143,485
Tradeandotherpayables 16 130,894 144,318
provisions 17 189,616 169,541
Currenttaxpayable 17,877 23,564
derivatives 18 1,020 8,714
other 19 175,080 67,494
Total Current Liabilities 890,225 557,116
non-cuRRent lIaBIlItIeS Borrowings 1,613,190 1,388,107
deferredtaxliabilities 6(b) 664,768 506,812
Tradeandotherpayables 16 2,973 5,413
provisions 17 11,929 10,440
derivatives 18 279 2,508
Total Non-Current Liabilities 2,293,139 1,913,280
Total Liabilities 3,183,364 2,470,396
Net Assets 1,987,537 1,750,218
equIty Capital 20 651,967 651,967
reserves 21 1,286,367 986,779
retainedearnings 22 49,203 111,472
Total Equity 1,987,537 1,750,218
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
TransGridannualreporT2009>caSh flow Statement 75
2009 2008 note $’000 $’000
caSh flowS fRom opeRatIng actIvItIeSCashreceiptsfromCustomers 664,245 579,981
Cashpaidtosuppliersandemployees (269,018) (164,290)
FinanceCostspaid (111,057) (101,279)
interestreceived 2,028 1,909
incomeTaxpaid (42,424) (18,905)
netCashFlowsfromoperatingactivities 30(e) 243,774 297,416
caSh flowS fRom InveStIng actIvItIeSpurchaseofproperty,plantandequipment,andintangibles (607,327) (289,854)
proceedsfromthesaleofproperty,plantandequipment 2,268 4,453
netCashFlowsfrominvestingactivities (605,059) (285,401)
caSh flowS fRom fInancIng actIvItIeS proceedsfromBorrowings 1,245,985 361,835
repaymentsofBorrowings (788,500) (282,200)
dividendspaid 17(a) (105,910) (71,482)
netCashFlowsfromFinancingactivities 351,575 8,153
netincrease/(decrease)inCashandcashequivalents (9,710) 20,168
CashandcashequivalentsatBeginningoftheFinancialyear 30,571 10,403
Cash and cash equivalents at the End of the Financial Year 30(a) 20,861 30,571
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
caSh flow StatementForTheyearended30ThJune2009
76 Statement of RecognISed Income and expenSe > TransGridannualreporT2009
Statement of RecognISed Income and expenSeForTheyearended30ThJune2009
2009 2008 note $’000 $’000
assetrevaluationreserve:netincrease/(decrease)inrevaluations, 21 414,560 75,958includingimpairments
netunrealisedGains/(losses)reserve:netgains/(losses)takento 21 – (426)equityonavailable-for-salefinancialassets
CashFlowhedgereserve:netmovementinequity 21 14,397 (2,895)
superannuationactuarialGains/(losses) 5(b) (133,287) (39,499)
incometaxonitemstakendirectlytoequity 6(a)(ii) (88,409) (10,916)
Net income recognised directly in equity 207,261 22,222
profitfortheyear 150,291 132,387
Total recognised income and expense for the year attributable to members of TransGrid 357,552 154,609
effect of change In accountIng polIcy profitfortheperiodasreportedin2008 104,738
Changeofpolicy–actuariallosses 27,649
restatedprofitfortheperiod 132,387
Theaccompanyingnotesformanintegralpartofthesefinancialstatements.
TransGridannualreporT2009>noteS to the fInancIal StatementS 77
noteS to the fInancIal StatementSForTheyearended30ThJune2009
1. coRpoRate InfoRmatIonThefinancialreportofTransGridfortheyearended30June2009wasauthorisedforissueinaccordancewitharesolutionofthedirectorson10september2009.
TransGridisastatutorystateownedCorporationunderthestateownedCorporationsact,1989andwascorporatisedundertheenergyservicesCorporationsamendment(TransGridCorporatisation)act,1998.
2. SummaRy of SIgnIfIcant accountIng polIcIeS(a) Basis of preparation Thefinancialreportisageneral-purposefinancialreport,andhasbeenpreparedinaccordancewithaustralianaccountingstandardsincludingaccountinginterpretations;therequirementsofthepublicFinanceandauditact,andregulation;thestateownedCorporationsact,1989;andrelevantTreasuryCirculars.
property,plantandequipment,assetsclassifiedasheldforsale,derivativefinancialinstruments,andavailable-for-salefinancialassetsaremeasuredatfairvalue.otherfinancialstatementitemsarepreparedinaccordancewiththehistoricalcostconvention,exceptasotherwisestatedinthefinancialreport.
Wherenecessary,comparativeinformationhasbeenreclassifiedtoconformtothecurrentyear’spresentation.
allamountsareroundedtothenearestthousanddollars($’000)andareexpressedinaustraliancurrency.
(b) Statement of complianceThefinancialreportcomplieswithaustralianaccountingstandards,whichincludetheaustralianequivalentstointernationalFinancialreportingstandards(aeiFrs).ThefinancialreportalsocomplieswiththeinternationalFinancialreportingstandards(iFrs).
(c) new australian accounting Standards and Interpretations not yet adoptedaustralianaccountingstandardsandinterpretationsthathaverecentlybeenissuedoramendedbutarenotyeteffectivehavenotbeenadoptedbyTransGridinpreparingthisfinancialreport.
Thefollowingstandards,amendmentstostandardsandinterpretationshavebeenidentifiedasthosewhichmayimpactTransGridintheperiodofinitialapplication:
> aasB101(issuedseptember2007),aasB2007-8(issuedseptember2007)andaasB2007-10(issueddecember2007)relatetopresentationoffinancialstatements.
> aasB2008-9(issuedseptember2008)relatestoamendmentstoaasB1049forconsistencywithaasB101.
> aasB123andaasB2007-6(bothissuedJune2007)relatetoborrowingcosts.
> aasB2008-5andaasB2008-6(bothissuedJuly2008)relatetoamendmentstoaustralianaccountingstandardsarisingfromtheannualimprovementsproject.
> aasB2008-8(issuedaugust2008)relatestoeligiblehedgeditems.
> aasB8(issuedFebruary2007)replacesthepresentationrequirementsofsegmentreportinginaasB114.
> aasB2007-3(issuedFebruary2007)relatestoamendmentstoexistingaccountingstandardsasaresultofthenewaasB8.
> aasB2009-2(issuedapril2009)relatestofinancialinstrumentdisclosures.
> aasB2009-7(issuedJune2009)relatestoamendmentstoaustralianaccountingstandards.
> interpretation18(issuedMarch2009)relatestothetransferofassetsfromcustomers.
allofthesepronouncementsareapplicablefortheyearcommencing1July2009.ThenewstandardsareconcernedwithdisclosuresandwillhavenodirectimpactonTransGrid’sfinancialresults.
(d) Significant accounting Judgements, estimates and assumptions made by managementinapplyingTransGrid’saccountingpolicies,managementcontinuallyevaluatesjudgements,estimatesandassumptionsbasedonexperienceandotherfactors,includingexpectationsoffutureeventsthatmayhaveanimpactonTransGrid.alljudgements,estimatesandassumptionsmadearebelievedtobereasonable,basedonthemostcurrentsetofcircumstancesavailabletomanagement.actualresultsmaydifferfromthejudgements,estimatesandassumptions.significantjudgements,estimatesandassumptionsmadebymanagementinthepreparationofthesefinancialstatementsareoutlinedbelow:
(i) Significantaccountingjudgements
ImpairmentTransGridassessesimpairmentofallassetsateachreportingdatebyevaluatingconditionsspecifictoTransGrid’sbusinessasawhole,whichmayleadtoimpairment.ifanimpairmenttriggerexists,therecoverableamountofthevalueinuseforthebusinessisdetermined.Furtherdetailsonthevalueinusecalculationsandadjustmentforimpairmentaredisclosedinnote2(h).
Recovery of Deferred Tax Assetsdeferredtaxassetsarerecognisedfordeductibletemporarydifferencesasmanagementconsidersthatitisprobablethatfuturetaxableprofitswillbeavailabletoutilisethosetemporarydifferences.
Long Service Leave ProvisionTransGrid’sliabilityforemployeebenefitsrelatingtolongserviceleaveismeasuredusingthecurrentcostapproach,whichapproximatesthepresentvaluebasis.periodiccomparisonisundertakenofthetwomeasurementbases,inconjunctionwithanindependentactuarialreview.Management’sjudgement,basedonhistoricalexperience,isappliedindeterminingwhethertheresultingdifferencemateriallyimpactsontheliabilityvaluationrecognisedinthefinancialreportandrequiresanadjustmenttoaligntopresentvaluemeasurement.
Workers’ Compensation ProvisionTheliabilityforworkers’compensationisbasedonanannualindependentactuarialassessment,supplementedbymanagementconsiderations,toarriveatabestestimateoftheexpenditurerequiredtosettlepresentconsiderationsatthereportingdate.Theestimatecontainsuncertaintybecausevariablesusedincalculationscannotbeeasilyquantifiedormeasuredinadvanceofapossibleoccurrence.
(ii)Significantaccountingestimatesandassumptions
Allowance for impairment loss on receivables from trade and other debtors Wherereceivablesareoutstandingbeyondthenormaltradingterms,thelikelihoodofrecoveryofthesereceivablesisassessedbymanagement.Thisassessmentisbasedonsupportablepastcollectionhistoryandhistoricalwrite-offsofbaddebts.
Estimation of useful lives of assetsTheestimationoftheusefullivesofassetsisbasedonhistoricalexperience,industrycomparisons,aswellasexpectedusage,physicalwearandtear,andtherateoftechnicalandcommercialobsolescence.Furtherinformationontheestimationofusefullivesisdisclosedinnote2(f)(iv).
78 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
(e) changes in accounting policies(i) SuperannuationActuarialGainsandLossesinaccordancewithnsWTreasurypolicy,theentityhaschangeditspolicyontherecognitionofsuperannuationactuarialgainsandlosses.suchactuarialgainsandlossesarenowrecognisedoutsideofprofitorlossinthe‘statementofrecognisedincomeandexpense’.previously,actuarialgainsandlosseswererecognisedthroughtheincomestatement.BothoptionsarepermissibleunderaasB119Employee Benefits.
Thechangeinpolicyhasbeenadoptedonthebasisthatrecognitionoutsideoftheincomestatementprovidesreliableandmorerelevantinformationasitbetterreflectsthenatureofactuarialgainsandlosses.Thisisbecauseactuarialgainsandlossesarere-measurements,basedonassumptionsthatdonotnecessarilyreflecttheultimatecostofprovidingsuperannuation.
recognitionoutsideoftheincomestatementalsoharmonisesbetterwiththeGovernmentFinancestatistics/Gaapcomprehensiveincomepresentationforthewholeofgovernmentandgeneralgovernmentsector,requiredunderaasB1049Whole of Government and General Government Sector Financial Reporting.acomprehensiveincomepresentationwillalsobeavailableattheentitylevelfrom2009/10underaasB101Presentation of Financial Statements.
Thechangeinaccountingpolicyincreases2009“profit/(loss)fortheyear”from$57.0mto$150.3m(2008:from$104.7mto$132.4m),byexcludingfromprofitthesuperannuationactuariallosslineitem(2009:$133.3m,2008:$39.5m),alongwiththeassociatedandoffsettingincometaxrevenue(2009:$40.0m,2008:$11.9m).Boththeseitemsarenowrecognisedinthestatementofrecognisedincomeandexpenseratherthantheincomestatement.
(ii)Otherallotheraccountingpoliciesareconsistentwiththoseappliedinthepreviousyear.
(f) property, plant and equipment(i) AcquisitionofAssetsThecostmethodofaccountingisusedfortheinitialrecordingofallacquisitionsofassetscontrolledbyTransGrid.Costistheamountofcashorcashequivalentspaidorthefairvalueoftheotherconsiderationgiventoacquiretheassetatthetimeofitsacquisitionorconstruction.CostincludesinterestonborrowingsrelatedtoQualifyingassetsasdetailedinnote2(f)(iii).
assetsacquiredatnocost,orfornominalconsideration,areinitiallyrecognisedattheirfairvalueatthedateofacquisition.
(ii)Revaluationsproperty,plantandequipmentarevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.
Fairvalueofproperty,plantandequipmentisdeterminedbasedonthebestavailablemarketevidence,includingcurrentmarketsellingpricesforthesameorsimilarassets.Wherethereisnoavailablemarketevidence,theasset’sfairvalueismeasuredatitsmarketbuyingprice,thebestindicatorofwhichisdepreciatedreplacementcost.
TransGridrevaluesdepreciableproperty,plantandequipmentbyreferencetocurrentpricesforassetsnewerthanthosebeingrevalued,andadjuststhoseamountstoreflectthepresentconditionoftheasset.Theaccumulateddepreciationfortherevaluedassetisrestatedproportionatelywiththechangeinthegrosscarryingamountoftheasset,sothatthecarryingamountoftheassetafterrevaluationequalsitsrevaluedamount,inlinewithnsWTreasurypolicy.
anyrevaluationsurplusiscreditedtotheassetrevaluationreserveincludedintheequitysectionoftheBalancesheet,unlessitreversesarevaluationdecreaseofthesameassetpreviouslyrecognisedintheincomestatement.
anyrevaluationdeficitisrecognisedintheincomestatementunlessitdirectlyoffsetsaprevioussurplusofthesameassetintheassetrevaluationreserve.
upondisposal,anyrevaluationreserverelatingtotheparticularassetorpartsofassetbeingsoldistransferredtoretainedearnings.
property,plantandequipmentcomprisethefollowingtypesofassets:
Regulated Assets regulatedassetscompriseproperty,plantandequipmentusedbyTransGridtoprovideelectricitytransmissionservicesthatareregulatedbytheaustralianenergyregulator(aer).regulatedassetsasdisclosedinnotes12(a)and(b)are:
> networkasset> otherassets
networkassetisacomplexinfrastructureassetthatworkstogetherasanintegratedwholetoprovideregulatedelectricitytransmissionservices.itincludesthefollowingmajorparts:
> land> Buildings> systemplantandequipment> Communicationequipment
TransGridassessesateachreportingdatewhetherthereisanyindicationthatanasset’scarryingamountdiffersmateriallyfromfairvalue.ifanyindicationexists,theassetisrevalued.
subjecttotheabove,TransGrid’svaluationpolicyprovidesforafullanddetailedvaluationoftheseassetstobeundertakenatfive-yearintervals,inconjunctionwithnsWTreasurypolicy.intheinterveningyears,arevaluationbasedonpriceindexmovementsisundertaken.
detailedvaluationsofsystemplantandequipment,land,buildingsandcommunicationequipmentassociatedwithopticalfibreswereundertakenasat30June2009.
Non-regulated Assetsnon-regulatedassetscompriseproperty,plantandequipmentusedbyTransGridtoprovideservicesotherthanregulatedelectricitytransmissionservices.non-regulatedassetsasdisclosedinnotes12(a)and(b)are:
> systemplantandequipment> Communicationequipment> otherassets
Valuationofnon-regulatedassetsisbasedonrelevantcommercialagreements,whichdefinetheirearningcapacity.
(iii)CapitalisationCapitalexpenditureisdefinedasexpenditureinrelationto:
> acquisitionofanewunitofplant;> installationofanewunitofplant;> workperformedonaunitofplant,wheretheneedforthework
existedatthetimetheunitwasacquiredandtheworkwascarriedoutpriortoitbeingputintooperation;
> replacementofaunitofplant,orofasubstantialpartofaunitofplant;
> anadditionoralterationtoaunitofplant,whichresultsinanincreaseineconomicbenefits.
TransGridannualreporT2009>noteS to the fInancIal StatementS 79
interestonborrowingsiscapitalisedagainstQualifyingassetsinaccordancewithaasB123Borrowing Costs.Qualifyingassetsareassetswhichtakemorethan12monthstobereadyfortheirintendeduse.
expenditureisnotcapitalisedbelowaminimumthresholdof$1,000.
(iv)Depreciationproperty,plantandequipment,excludingland,aredepreciatedovertheirestimatedusefullives.Thestraight-linedepreciationmethodisused.assetsaredepreciatedfromthemonthofacquisitionorinrespectofconstructedassets,fromthetimetheassetreachespracticalcompletionandisreadyforuse.
assetlivesarereviewedannuallyinaccordancewithaasB116Property, Plant and Equipment,andwhererequired,adjustmentshavebeenmadetotheremainingusefullivesofseparatelyidentifiablepartsofassetshavingregardtofactorssuchasassetusageandtherateoftechnicalandcommercialobsolescence.
TheusefullivespresentlyassignedtoTransGrid’sassetsareshowninthetablebelow:
Regulated Assets
networkasset Buildings 30years
systemplantandequipment
40–50years
Communicationequipment
10–35years
otherassets 2–10years
Non-regulated Assets
systemplantandequipment
20–50years
Communicationequipment
35years
otherassets 2–10years
(g) Intangible assets intangibleassetscomprisethefollowingassetsasdisclosedinnotes13(a)and(b):
> easements> Computersoftware> airspacerights
intangibleassetsaremeasuredatcost.
Capitalexpenditureonintangibleassetsisdefinedasexpenditureinrelationto:
> acquisitionofcomputersoftwareoreasements> installationofcomputersoftware> anadditionoralterationtocomputersoftware,whichresultsin
anincreaseineconomicbenefits.
easementsareacomponentofTransGrid’sinfrastructureassetsthatprovideelectricitytransmissionservicesthatareregulatedbytheaer.easementsarenotamortised.
Computersoftwareisamortisedoveraperiodof5yearsusingthestraight-lineamortisationmethod.Theusefullifeforsoftwareisreviewedannually,andadjustmentswhereapplicable,aremadeonaprospectivebasis.
airspacerightshavebeenrecognisedwhenthecostoftheassetcanbemeasuredreliablyanditisprobablethattheassetwillgenerateexpectedfutureeconomicbenefitsforTransGrid.airspacerightsarenotamortised.
expenditureisnotcapitalisedbelowaminimumthresholdof$1,000.
(h) ImpairmentTransGrid’sbusinessasawholerepresentsacash-generatingunit.ateachreportingdate,TransGrid’sspecialisedplantandinfrastructureassets,landandbuildings,andeasementsaretestedforimpairmentaspartofthecash-generatingunit.ifthereisanyindicationthatthecash-generatingunitmaybeimpaired,TransGridmakesanestimateoftherecoverableamountoftheunit.
asTransGrid’srevenuefromelectricitytransmissionservicesisdeterminedbytheaer,therisksofimpairmentforthebusinessasawholeduringtheregulatoryperiodareconsideredtobeextremelylow.
Therecoverableamountofthecash-generatingunitisbasedonthevalueinuseforthebusinessasawhole.inassessingvalueinuse,theestimatedfuturecashflowsforthebusinessarediscountedtotheirpresentvalueusingadiscountratethatreflectstherisksspecifictothebusinessandrelevantmarketassessments.on28april2009,theaerissuedtheirfinalrevenuedeterminationfortheperiod2009-2014.Theoutcomeofthisdeterminationprocesshasbeenusedinthecalculationoftherecoverableamount.
ifthecarryingamountsoftheassetsexceedtherecoverableamountofthebusiness,theassetscomprisingthebusinessasawholeareconsideredtobeimpaired.Theassetsarewrittendownproportionatelytoensuretheircarryingamountsreflecttherecoverableamount.
(i) InventoriesinventoriesofstoresandMaterialsarevaluedattheaveragecostofitemsinstoreautomaticallyadjustedattimeofdeliveryofnewitems,separatelydeterminedforeachlocation.
(j) cash and cash equivalentsCashandcashequivalentsintheBalancesheetandforpurposesoftheCashFlowstatementcomprisecashonhand,cashatbankanddepositswithfinancialinstitutions.
(k) Borrowings allborrowingsaremeasuredatamortisedcostusingtheeffectiveinterestmethod.
interestonborrowingsisrecognisedasexpenseintheperiodinwhichitisincurredunlessitrelatestoqualifyingassets.Qualifyingassetsareassets,whichtakemorethan12monthstogetreadyfortheirintendeduse.Wherefundsareborrowedgenerally,interestontheborrowingsiscapitalisedtoqualifyingassetsinaccordancewithaasB123Borrowing Costs.
Theamountofinterestattributedtoqualifyingassetsduringtheyearwas$19.4m(2008–$2.7m)ataweightedaveragerateof7.2%(2008–6.8%).Thetotalinterestexpenseforthefinancialyearisreportedat$107.8m(2008–$92.2m).
loansareclassifiedascurrentwhentheyhaveamaturityoflessthanoneyearfromthereportingdate.
(l) dividendsprovisionismadefortheamountofdividendpayableinrelationtothecurrentfinancialyear,inaccordancewiththedividendrecognitionpolicysetoutinTreasuryCircularNSW TC 05-11 Accounting for Dividends.accordingly,adividendinrelationtothefinancialyearistakentobedeterminedbeforereportingdate,consistentwiththerequirementsofaasB137Provisions, Contingent Liabilities and Contingent Assets.
80 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
ThedividendiscalculatedaccordingwithTpp02-3Financial Distribution Policy for Government Businesses.Thedividendpayableof$120.2m(2008:$105.9m)iscalculatedbasedonprofitfortheyear.intheincomestatement,thisisbasedonapercentageofthelineitem“profit/(loss)fortheyear”of$150.3m(2008:$132.4m).asaresultofthechangedtreatmentofsuperannuationactuarialgainsandlosses(refernote2(e)(i)),inthedividendcalculation,thereisnolongeraneedtoadjustprofittoexcludethesegains/losses,astheyarenowrecognisedoutsideprofit/loss.
(m) employee BenefitsacalculationinaccordancewithaasB119Employee BenefitsismadeeachyearinrespectofTransGrid’sliabilityatreportingdateforemployeebenefitsrelatingtolongserviceleaveandannualleave,andanannualcontributionismadetoadjusttheprovisiontoanamountwhichisconsideredadequatetomeetthatliability.
(i) AnnualLeaveTheprovisionforemployeebenefitsrelatingtoannualleaverepresentstheamountwhichTransGridhasapresentobligationtopayresultingfromemployees’servicesprovideduptoreportingdate.
Theprovisionhasbeencalculatedatnominalamountsbasedontheremunerationratesthatareexpectedtobepaidwhentheleaveistaken.
(ii)LongServiceLeaveTheliabilityforemployeebenefitsrelatingtolongserviceleavehasbeencalculatedonthebasisofcurrentsalaryratestobepaidbyTransGridresultingfromemployees’servicesprovideduptoreportingdateandincludesrelatedon-costs,inaccordancewiththeguidelinesofTreasuryCircularnsWTC09/04Accounting for Long Service Leave and Annual Leave.
(n) SuperannuationTransGridcontributestofourdefinedBenefitsuperannuationschemesforwhichliabilitiesaccrue.
ThedefinedBenefitschemescomprise:
> energyindustriessuperannuationschemepoolB(eiss)> stateauthoritiessuperannuationscheme(sass)> stateauthoritiesnon-Contributorysuperannuationscheme
(sanCs)> statesuperannuationscheme(sss).
TransGridcontributestoanumberofaccumulationsuperannuationschemesforwhichnolong-termliabilityaccrues.
WiththedefinedBenefitschemes,acomponentofthefinalbenefitisderivedfromamultipleofmembersalaryandyearsofmembership.allthedefinedBenefitschemesareclosedtonewmembers.
ThesuperannuationschemesadvisethelevelofliabilityinrespectofTransGrid’ssuperannuationcommitmentstoitsemployeeswhoaremembersofthevariousdivisionsoftheschemes.ThecalculationofthesuperannuationpositionisbaseduponactuarialreviewsindependentofTransGrid’songoingactivitiesandinvolvement.VariousactuarialassumptionsunderpinthedeterminationofTransGrid’sdefinedbenefitobligations.Theseassumptionsandtherelatedcarryingamountsforeissaredisclosedinnote5.
TransGridrecognisesthenettotalofthefollowingasanassetoraliabilityinitsBalancesheet:
> presentvalueofthedefinedbenefitobligationatreportingdate> Fairvalueofplanassetsinthedefinedbenefitschemesat
reportingdate.
Thetotalofthenetsuperannuationexpense(orrevenue)fortheyear,includingamountsrecognisedbothinandoutsideprofitorloss,isthedifferencebetweentheopeningandclosingbalancesofthenetdefinedsuperannuationliability(orprepaidsuperannuationcontributions)plusthecontributionspaidbyTransGridtotheeiss,sass,sanCsandsss.
TransGridhasdeterminedthatdetaileddisclosureofthedefinedBenefitschemesofsass,sanCsandssswillnotmateriallyinfluencetheusersofthefinancialreportandthereforehasnotbeendisclosed.
(o) InsuranceTransGridmaintainsamixofexternalinsurancepoliciesandinternalprovisioninginaccordancewithaasB137Provisions, Contingent Liabilities and Contingent Assets.Thetreatmentofrisksandassociatedliabilitiesaredeterminedinconjunctionwithindependentinsuranceadvisersandlossadjusters.Themainareaofself-insuranceisTowersandWireswhereitisconsideredcost-effectivetocarrytheriskinternally.
TransGridisaself-insurerforWorkers’Compensation.Theliabilityforclaimsmade,ortobemade,againsttheinsuranceprovisionisdeterminedbyreferencetotheWorkers’Compensationact,1987andtheWorkCoverauthority’sguidelinestoself-insurers.
(p) trade and other Receivables receivablesfromtradeandotherdebtors,whichgenerallyhave20to30dayterms,arerecognisedatamountsduelessanallowanceforanyuncollectibleamounts.Collectibilityofthesereceivablesisreviewedonanongoingbasis.debtsthatareknowntobeuncollectiblearewrittenoffwhenidentified.anallowancefordoubtfuldebtsisraisedwhenthereisobjectiveevidencethatTransGridwillnotbeabletocollectthedebt.
Prescribed Customer Receivablesasat30June2009,TransGrid’stotalrevenuereceivedforprescribedtransmissionservices,includingintra-regionalsettlementresiduesandinter-regionalsettlementresidueauctionproceedsfromthenationalelectricityMarketsettlementresidueprocess,waslessthantherevenueentitlementforthefinancialyearasdeterminedbytheaer.inaccordancewiththenationalelectricityrules(ner),theunder-recoveredamountandassociatedinterestisheldinprescribedCustomerreceivablesandisentitledtoberecoveredwhensettingthenextperiod’stransmissionserviceprices,resultinginthosetransmissionpricesbeinghigherthantheywouldhavebeenotherwise.
prescribedCustomerreceivablesincludesaninterestchargebasedontheannualaverageofthe11a.m.dailypublishedcashrateforthefinancialyear.inaccordancewiththerequirementsofthener,thebasisfortheinterestratewasapprovedbytheaer.
(q) payablesaccountspayable,includingaccrualsnotyetbilled,arerecognisedwhenTransGridhasanobligationtopayasaresultofthecompletionofaworkorservice.Tradeaccountsareusuallysettledwithin60days.
(r) RevenuerevenueisrecognisedtotheextentthatitisprobablethattheeconomicbenefitswillflowtoTransGridandtherevenuecanbereliablymeasured.Thefollowingspecificrecognitioncriteriamustalsobemetbeforerevenueisrecognised:
(i) Saleofgoodsrevenueisrecognisedwhenthesignificantrisksandrewardsofownershipofthegoodshavepassedtothebuyerandcanbemeasuredreliably.risksandrewardsareconsideredpassedtothebuyeratthetimeofdeliveryofthegoodstothecustomer.
TransGridannualreporT2009>noteS to the fInancIal StatementS 81
(ii)Renderingofservicesrevenuefromelectricitytransmissionservicesissubjecttotheapplicationofanaerdeterminedrevenuecapforthefinancialyear.Therevenuecapsaredeterminedbytheaeratfive-yearintervals.TransGridisinthefinalyearofthecurrentregulatorydeterminationwhichoperatesfromJuly2004toJune2009.Thetransmissionservicepricesaresetatthebeginningofthefinancialyeartoachievetherevenuecapapplicableforthatyear.
revenuefromtherenderingofotherservicesisrecognisedwhentheserviceisprovidedorbyreferencetothestageofcompletion.Wherethecontractoutcomecannotbemeasuredreliably,revenueisrecognisedonlytotheextentoftheexpensesrecognisedthatarerecoverable.
(iii)Interestinterestrevenueisrecognisedasitisearned,usingtheeffectiveinterestmethod.
(iv)ContributionsforCapitalWorksCashandnon-cashcapitalcontributionshavebeenrecognisedinaccordancewithaccountinginterpretation1017Developer and Customer Contributions for Connection to a Price-Regulated Network.
Contributionsofnon-currentassetsarerecognisedasrevenueandanassetwhenTransGridgainscontroloftheasset.Theamountrecognisedisthefairvalueofthecontributedassetatthedateonwhichcontrolisgained.
Cashcapitalcontributionsarerecognisedasrevenuewhenthenetworkisextendedormodified,consistentwiththetermsofthecontribution.
(s) Income taxTransGridissubjecttothenationalTaxequivalentregime(nTer)administeredbytheaustralianTaxationoffice.ThenTerisbasedonapplicationoffederalincometaxlawsunderwhichTransGridpaysincometaxequivalentstonsWTreasury.
deferredincometaxisprovidedonalltemporarydifferencesatreportingdatebetweenthetaxbasesofassetsandliabilitiesandtheircarryingamountsforfinancialreportingpurposes.
deferredincometaxliabilitiesarerecognisedforalltaxabletemporarydifferencesexceptwherethedeferredincometaxliabilityarisesfromtheinitialrecognitionofanassetorliability,andatthetimeofthetransaction,affectsneithertheaccountingprofitnortaxableprofitorloss.
deferredincometaxassetsarerecognisedforalldeductibletemporarydifferences,carry-forwardofunusedtaxassetsandunusedtaxlosses,totheextentthatitisprobablethattaxableprofitwillbeavailableagainstwhichthedeductibletemporarydifferences,andthecarry-forwardofunusedtaxassetsandunusedtaxlossescanbeutilised,exceptwherethedeferredincometaxassetarisesfromtheinitialrecognitionofanassetorliability,andatthetimeofthetransaction,affectsneithertheaccountingprofitnortaxableprofitorloss.
Thecarryingamountofdeferredincometaxassetsisreviewedateachreportingdateandreducedtotheextentthatitisnolongerprobablethatsufficienttaxableprofitwillbeavailabletoallowallorpartofthedeferredincometaxassettobeutilised.
deferredincometaxassetsandliabilitiesaremeasuredatthetaxratethatisexpectedtoapplytotheyearwhentheassetisrealisedortheliabilityissettled,basedontaxrate(andtaxlaws)thathavebeenenactedorsubstantivelyenactedatreportingdate.
incometaxesrelatingtoitemsrecogniseddirectlyinequity(suchasassetrevaluation,cashflowhedgesandsuperannuationactuarialgainsandlosses)arerecognisedinequityandnotintheincomestatement.
(t) financial Risk managementOverviewTransGridhasexposuretothefollowingrisksfromitsuseoffinancialinstruments:
> Creditrisk> liquidityandfundingrisk> interestraterisk> Foreignexchangerisk> Commodityrisk> operationalrisk.
CreditRiskCreditriskistheriskthatarisesifafinanciallossissufferedduetotheinabilityofthecounterpartybeingabletomeetitsfinancialobligationstoTransGrid.
Theriskismanagedbyonlyundertakingtransactionswithgovernmentownedfinancialinstitutionsandcommercialbankswithaminimumcreditratingthreshold.Monetarylimitsapplytocontaintheexposurewithinreasonablelevels.
Trade and other receivablesTransGrid’sexposuretocreditriskisinfluencedmainlybytheindividualcharacteristicsofeachcustomer.ThedemographicsofTransGrid’scustomerbase,includingthedefaultriskoftheindustryandcountryinwhichcustomersoperate,haslessofaninfluenceoncreditrisk.
TransGridconsidersaconcentrationofcreditrisktoexistwhenanindividualcustomer’soutstandingtradereceivablebalanceexceeds10%ofthetotaltradereceivablesbalance.approximately88%(2008-66%)ofTransGrid’stradereceivablesbalanceisattributabletothreedistributioncustomerswhohaveindividualtradereceivablebalancesinexcessof10%ofthetotalbalance.
TransGrid’stradeandotherreceivablesbalancerelatesmainlytoTransGrid’sdistributioncustomers.allofTransGrid’sdistributioncustomershavebeentransactingwiththeorganisationsinceitsinception,withnocreditlossesoccurringinthatperiodoftime.
intheeventthatthereisobjectiveevidencethatTransGridwillnotbeabletocollectadebt,TransGridestablishesanallowancefordoubtfuldebtsthatrepresentstheorganisation’sestimateofincurredlossesinrespectoftradeandotherreceivables.Wherereceivablesareoutstandingbeyondthenormaltradingterms,thelikelihoodofrecoveryofthesereceivablesisassessedbymanagement.Thisassessmentisbasedonasupportablepastcollectionhistoryandhistoricalwrite-offsofbaddebts.
LiquidityandFundingRiskThemainobjectiveofliquidityriskmanagementistoensurethatTransGridhassufficientfundsavailabletomeetitsfinancialobligationsandinatimelymanner.
TransGridmaintainsdetailedcashflowforecastsanduseapprovedinstrumentswithliquiditylimitstomaintainadequatecashflow.Borrowinglimitsaremonitoredtoensurefundingcommitmentformajorcapitalworksareinplace.Thedebtportfolioismanagedinsuchawaythatnomorethan20%oftheportfoliowillmatureinany12monthperiod.
InterestRateRiskinterestrateriskistheriskofamaterialchangeinearningsasaconsequenceofadversemovementsininterestrates.
82 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
Theobjectiveinmanaginginterestrateriskistominimiseinterestexpensevolatilitywhilstensuringthatanappropriatelevelofflexibilityexiststoaccommodatepotentialchangesinfundingrequirementsandmovementinmarketinterestrates.Toachievethis,TransGrid’soveralldebtportfoliowillcompriseamixofnominalfixedrateandlongdatedCpilinkeddebtwithsomefloatingratedebt.
ForeignExchangeRiskForeignexchangeriskistheriskthatTransGridsuffersfinanciallossduetoachangeinforeignexchangerates.
TransGrid’spolicyistohedgeallforeigncurrencyexposuresinexcessofaud0.5millionequivalent.
CommodityRiskTransGridmaybeexposedtocommoditypricerisktypicallyinrelationtoadverseandunexpectedincreasesincostsforinfrastructurerelatedcapitalexpenditure.TransGrid’spreferredpositioninrelationtocommodityriskistonegotiatefixedpricecontractswithitssuppliers.inaddition,appropriatepoliciesareinplacetomonitormovementsincommoditypriceswhilsthedgingstrategiesmitigaterisk.
OperationalRiskoperationalriskistheriskthatTransGridsuffersfinanciallossduetomismanagement,error,fraudorunauthoriseduseoftechniquesand/orfinancialproducts.
ThepolicyobjectiveistominimisetheriskthatTransGridsuffersanyfinanciallossarisingfromoperationalrisk.
appropriatesegregationofdutiesandmaintenanceofcontrolsystemsareinplacetomitigateoperationalrisk.
CapitalManagementTransGridhasbeensubjecttothensWGovernment’sFinancialdistributionpolicysinceitsinceptionandisfullycommittedtoprovidinganadequatereturntotheshareholder.Thisobjectivemustbemanagedwithintheregulatoryframeworkprovidedbythener,giventhatthevastmajorityofTransGrid’srevenueissubjecttoregulation.
TransGrid’sreturnoncapitalisbasedonaWeightedaverageCostofCapitalsetbytheaer,aspartoftherevenuecapdeterminationprocessatfive-yearintervals.TheregulatoryrateofreturnissetataleveldeemedsufficienttoensurethecontinuingviabilityofTransGrid’sbusinessandtoencouragenecessaryinvestmentinnewandreplacementassets.TheWeightedaverageCostofCapitalapplicabletoTransGridforthecurrentfive-yearregulatoryperiodending30June2009is9.08%.
TherewerenochangesinTransGrid’sapproachtocapitalmanagementduringtheyear.
TransGridisnotsubjecttoexternallyimposedcapitalrequirements.
Theaerissueditsrevenuedeterminationforthefive-yearperiodending30June2014on28april2009.
(u) goods and Services taxrevenues,expensesandassetsarerecognisednetoftheamountofGoodsandservicesTax(GsT),withthefollowingexceptions:
> WheretheamountofGsTincurredisnotrecoverablefromtheaustralianTaxationoffice.inthesecircumstances,theGsTisrecognisedaspartofthecostofacquisitionoftheassetoraspartofanitemoftheexpense.
> receivablesandpayablesarestatedwiththeamountofGsTincluded.
ThenetamountofGsTrecoverablefrom,orpayableto,theaustralianTaxationofficeisincludedasacurrentassetorcurrentliabilityintheBalancesheet.
CashflowsareincludedintheCashFlowstatementonagrossbasis.TheGsTcomponentofcashflowsarisingfrominvestingandfinancingactivitieswhicharerecoverablefrom,orpayableto,theaustralianTaxationofficeareclassifiedasoperatingcashflows.
(v) derivative financial InstrumentsTransGridusesderivativefinancialinstrumentssuchasforwardforeigncurrencycontractstohedgeitsrisksassociatedwithforeigncurrencyfluctuations.
Forthepurposesofhedgeaccounting,TransGridclassifiesitshedgesascashflowhedges.Thehedgesareundertakentoaddressexposuretovariabilityincashflowsthatiseitherattributabletoaparticularriskassociatedwitharecognisedassetorliabilityoraforecastedtransaction.
inrelationtocashflowhedgestohedgefirmcommitmentswhichmeetthespecificconditionsforhedgeaccounting,theportionofthegainorlossonthehedginginstrumentthatisdeterminedtobeaneffectivehedgeisrecogniseddirectlyinequityandtheineffectiveportionisrecognisedintheincomestatement.
Whenthehedgedfirmcommitmentresultsintherecognitionofanassetorliability,then,atthetimetheassetorliabilityisrecognised,theassociatedgainsorlossesthathadpreviouslybeenrecognisedinequityareincludedintheinitialmeasurementoftheacquisitioncostorothercarryingamountoftheassetorliability.
(w) Segment ReportingTransGridoperatesinoneindustrybeingthetransmissionofelectricityinnsW.assuch,TransGridhasonlyonebusinesssegmentaswellasonegeographicalsegmentinaccordancewithaasB114Segment Reporting,andthisisreportedinthefinancialstatements.
TransGridannualreporT2009>noteS to the fInancIal StatementS 83
3. Income
2009 2008 $’000 $’000
Revenue Transmissionofelectricity 602,789 526,620
non-regulatedWork 22,716 11,599
CapitalContributions 18,546 29,215
interest 2,028 1,909
sundry 5,721 3,644
Total Revenue 651,800 572,987
Net Gain on Cash Flow Hedges 997 –
Total Income 652,797 572,987
CapitalContributionspredominantlyrelatestothetransferoftransmissionassetsformingpartoftheCapitalWindFarmsubstationproject.
4. expenSeS
2009 2008 $’000 $’000
expenses excluding losses & finance costs Transmissionofelectricity 309,730 270,306
otherservices 14,109 8,811
Total Expenses excluding Losses & Finance Costs 323,839 279,117
netlossondisposalofproperty,plantandequipment 2,150 1,213
netlossonCashFlowhedges – 223
impairmentadjustmentonintangibles 4,315 –
Total Expenses excluding Finance Costs 330,304 280,553
FinanceCosts 105,072 101,882
Total Expenses 435,376 382,435
total expenses above include:
2009 2008 $’000 $’000
depreciationofproperty,plantandequipment(refertonote12(b)) 148,272 138,112
amortisationofintangibles(refertonote13(b)) 4,612 3,884
doubtfuldebts 45 –
inventoryexpense 2,736 3,610
EmployeeBenefitsExpense: netsuperannuationexpense,excludingactuariallosses* 5,348 9,178
otheremployeeBenefitsexpense 85,278 80,304
Total Employee Benefits Expense 90,626 89,482
Maintenanceexpensesareasubsetoftheabovetotalexpenses:
MaintenanceExpense: Transmissionofelectricity
employee-relatedmaintenanceexpense 24,149 23,601
othermaintenanceexpense 40,248 37,855
Transmissionofelectricity–Maintenanceexpense 64,397 61,456
otherservices–Maintenanceexpense 251 251
Total Maintenance Expense 64,648 61,707
* refernote5.superannuationactuariallossesof$133.3m(2008:$39.5m)arerecognisedinthestatementofrecognisedincomeandexpense.Totalsuperannuationexpense,includingactuariallossesrecognisedinthestatementofrecognisedincomeandexpenseis$138.6m(2008:$48.7m).
84 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
5. SupeRannuatIon defIned BenefIt planSThefollowingtablessummarisethecomponentsofmovementinemployer’ssuperannuationreserverecognisedintheincomestatementandstatementofrecognisedincomeandexpense,andthefundedstatusandamountsrecognisedintheBalancesheetforthedefinedBenefitsuperannuationplans.
TheassetsandliabilitiesofTransGrid’seissdefinedBenefitplansareprovidedbythescheme’sactuary,Mercer(australia)ptyltd.
(a) movements in Superannuation Reserves recognised in Income Statement
2009 2008 $’000 $’000
eISS Currentservicecost (8,375) (15,700)
interestcostonbenefitobligation (26,299) (25,443)
expectedreturnonplanassets 29,320 31,919
EISS net gains/(expense) (5,354) (9,224)
SSS, SASS and SANCS net gains/(expense) 6 46
Total net gains/(expense) (5,348) (9,178)
(b) movements in Superannuation Reserves recognised in Statement of Recognised Income and expense
2009 2008 $’000 $’000
EISS Actuarial gains/(losses) (133,170) (39,429)
SSS, SASS and SANCS Actuarial gains/(losses) (117) (70)
Total Actuarial gains/(losses) (133,287) (39,499)
(c) eISS Superannuation Surplus/(liability)
2009 2008 $’000 $’000
FairValueofplanassetsatendofyear 307,166 385,164
presentValueofdefinedBenefitobligationatendofyear (468,958) (412,716)
Net Asset/(Liability) Recognised in Balance Sheet at End of Year (161,792) (27,552)
(d) Reconciliation of the present value of the eISS defined benefit obligations
2009 2008 $’000 $’000
Present value of defined benefit obligations at beginning of the year (412,716) (409,747)
Currentservicecost (8,375) (15,700)
interestcost (26,299) (25,443)
Contributionsbyschemeparticipants (4,238) (3,787)
actuarialgains/(losses) (34,330) 32,850
Benefitspaid 17,000 9,111
Present value of defined benefit obligations at the end of the year (468,958) (412,716)
(e) Reconciliation of the eISS fair value of plan assets
2009 2008 $’000 $’000
Fair value of plan assets at beginning of the year 385,164 430,848
expectedreturnonplanassets 29,320 31,919
actuarialgains/(losses) (98,840) (72,279)
employerContributions 4,284 –
Contributionsbyplanparticipants 4,238 3,787
Benefitspaid (17,000) (9,111)
Fair value of plan assets at the end of the year 307,166 385,164
TransGridannualreporT2009>noteS to the fInancIal StatementS 85
(f) percentage invested in each asset class at reporting date:
2009 2008
australianequities 34.3% 37.6%
overseasequities 33.1% 34.0%
australianfixedinterestsecurities 9.0% 10.7%
overseasfixedinterestsecurities 6.9% 6.3%
property 6.1% 3.2%
Cash 6.1% 6.0%
other 4.5% 2.2%
(g) fair value of eISS scheme assetsallschemeassetsareinvestedbytheTrusteesatarm’slengththroughindependentmanagers.
(h) expected rate of return on assetsTheexpectedreturnonassetsassumptionisdeterminedbyweightingtheexpectedlong-termreturnforeachassetclassbythetargetallocationofassetstoeachclass.Thereturnsusedforeachclassarenetofinvestmenttaxandinvestmentfees.
(i) actual return on eISS plan assets
2009 2008 $’000 $’000
actualreturnonplanassets (67,367) (40,085)
(j) valuation methodTheprojectedunitCredit(puC)valuationmethodwasusedtodeterminethepresentvalueofthedefinedbenefitobligationsandtherelatedcurrentservicecosts.Thismethodseeseachperiodofserviceasgivingrisetoanadditionalunitofbenefitentitlementandmeasureseachunitseparatelytobuildupthefinalobligation.
(k) economic assumptions
30 June 2009
salaryincreaserate(excludingpromotionalincrease) 4.0%p.a.
rateofCpiincrease 2.5%p.a.
expectedrateofreturnonassets 7.78%p.a.
discountrate 5.35%p.a.
(l) demographic assumptionsThedemographicassumptionsat30June2009arethoseusedinthe2006triennialactuarialvaluation.
(m) historical Information
2009 2008 2007 2006 2005 $’000 $’000 $’000 $’000 $’000
presentvalueofdefinedbenefitobligation (468,958) (412,716) (409,747) (405,668) (411,403)
Fairvalueofschemeassets 307,166 385,164 430,848 387,067 335,671
surplus/(deficit)inscheme (161,792) (27,552) 21,101 (18,601) (75,732)
experienceadjustments–schemeliabilities (34,330) 32,850 5,103 15,036 (36,908)
experienceadjustments–schemeassets (98,840) (72,279) 24,780 32,968 15,216
(n) expected contributions
2009 $’000
expectedemployercontributionstobepaidinthenextreportingperiod 23,591
86 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
(o) funding arrangements for employer contributions(i) NetSurplus/(Liability)Thefollowingisasummaryofthefinancialpositionoftheschemeatreportingdatecalculatedinaccordancewithaas25Financial Reporting by Superannuation Plans.
2009 2008 $’000 $’000
netMarketValueofschemeassets 307,166 385,164
accruedBenefits (368,099) (379,148)
Net Surplus/(Liability) (60,933) 6,016
(ii)FundingMethodThemethodusedtodeterminetheemployercontributionrecommendationswastheAggregate Fundingmethod.Themethodadoptedaffectsthetimingofthecosttotheemployer.
undertheAggregate Fundingmethod,theemployercontributionrateisdeterminedsothatsufficientassetswillbeavailabletomeetbenefitpaymentstoexistingmembers,takingintoaccountthecurrentvalueofassetsandfuturecontributions.
(iii)EconomicAssumptionsTheeconomicassumptionsadoptedforthe2006actuarialreviewoftheschemewere:
Weighted Average Assumptions expectedrateofreturnonschemeassets 7.0%p.a.
expectedsalaryincreaserate 6.0%p.a.untilJune2009;4.0%p.a.thereafter
expectedrateofCpiincrease 2.5%p.a.
(iv)NatureofAsset/LiabilityasaliabilityisrecognisedintheBalancesheetasat30June2009,TransGridisresponsibleforthedifferencebetweentheorganisation’sshareofschemeassetsandthedefinedbenefitobligation.
(p) otherThesuperannuationexpenserecognisedintheincomestatementisincludedinthelineitem“expensesexcludingFinanceCosts”.superannuationactuariallossesinrespectofeiss,sss,sassandsanCsof$133.3m(2008:$39.5m)areseparatelyidentifiedinthestatementofrecognisedincomeandexpense.
Thecumulativeamountofactuariallossesinrespectofeiss,sss,sassandsanCsrecognisedinthestatementofrecognisedincomeandexpensesince1July2004is$116.6m.
6. Income tax (a) Income tax expense Majorcomponentsofincometaxexpensefortheyearsended30June2009and2008are:
(i) IncomeStatement
2009 2008 $’000 $’000
Current Income Tax Currentincometaxcharge 37,487 36,681
adjustmentsinrespectofcurrentincometaxofpreviousyears (750) (317)
Deferred Income Tax relatingtooriginationandreversaloftemporarydifferences 30,393 21,801
Income tax expense 67,130 58,165
(ii)StatementofRecognisedIncomeandExpense
2009 2008 $’000 $’000
Deferred Income Tax nettax(gain)/lossonrevaluationofproperty,plantandequipment 124,076 23,763
nettax(gain)/lossonavailable-for-salefinancialassets – (128)
nettax(gain)/lossonsuperannuationreserve–actuariallosses (39,986) (11,850)
nettax(gain)/lossoncashflowhedges 4,319 (869)
Income tax on items taken directly to equity during the year 88,409 10,916
TransGridannualreporT2009>noteS to the fInancIal StatementS 87
(iii)Reconciliationofincometaxexpenseonpre-taxaccountingprofittoincometaxexpensereportedintheIncomeStatementTheprimafacieincometaxexpenseonpre-taxaccountingprofitfromoperationsreconcilestotheincometaxexpenseintheincomestatementasfollows:
2009 2009 2008 2008 $’000 $’000 $’000 $’000
profit/(loss)BeforeincomeTaxexpense 217,421 190,552
incometaxexpense/(benefit)calculatedatstatutoryincometaxrateof30% 65,226 57,166
Capitalallowances (131) 20
expenditurenotallowedforincometaxpurposes 16 38
reversaloftemporarydifferencesrecognisedinpreviousyears 2,769 1,258
adjustmentsinrespectofcurrentincometaxofpreviousyears (750) (317)
Income tax expense reported in Income Statement 67,130 58,165
(b) deferred Income taxDeferred Income Tax at 30 June relates to the following:
Balance Sheet Income Statement
2009 2008 2009 2008 $’000 $’000 $’000 $’000
DeferredTaxAssetsprovisions 21,839 21,154 (685) (1,614)
superannuationliability 48,538 8,266 (321) (2,739)
property,plantandequipment 2,018 912 (1,106) (65)
other 1,263 4,172 (68) (516)
Gross Deferred Tax Assets 73,658 34,504
DeferredTaxLiabilities property,plantandequipmentandintangibles (661,617) (505,293) 32,248 25,576
superannuationsurplus – (30) 5 (9)
other (3,151) (1,489) 320 1,168
Gross Deferred Tax Liabilities (664,768) (506,812)
Deferred Tax Charge 30,393 21,801
7. caSh and caSh equIvalentS
2009 2008 $’000 $’000
Cashonhand 13 13
deposits 20,848 30,558
Total 20,861 30,571
8. tRade and otheR ReceIvaBleS
2009 2008 $’000 $’000
currentDebtors Tradedebtors 67,481 60,777
debtorsotherThanTrade 7,742 6,640
75,223 67,417
allowanceFordoubtfuldebts (50) –
Totaldebtors 75,173 67,417
Other prescribedCustomerreceivables 34,822 –
other 101 2,440
34,923 2,440
Total 110,096 69,857
88 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
9. InventoRIeS
2009 2008 $’000 $’000
Transmissionplantspares 27,451 25,531
other 183 168
Total 27,634 25,699
10. deRIvatIveS (aSSetS)
2009 2008 $’000 $’000
current ForwardContract 3,018 61
non-current ForwardContract 1,521 5
Total 4,539 66
11. otheR cuRRent aSSetS
2009 2008 $’000 $’000
superannuationsurplus – 103
prepayments 1,774 829
insurancerecoveryasset 521 399
Total 2,295 1,331
12. pRopeRty, plant and equIpment (a) valuation and accumulated depreciation for each class of property, plant and equipment
2009 2008 $’000 $’000
RegulatedAssetsnetworkasset 8,039,205 6,592,366
accumulateddepreciation (4,317,538) (3,469,037)
Workinprogress 537,737 318,546
4,259,404 3,441,875
otherassets 91,953 78,030
accumulateddepreciation (50,906) (44,481)
Workinprogress 17,813 16,439
58,860 49,988
Total Regulated Assets 4,318,264 3,491,863
Non-regulatedAssetssystemplantandequipment 42,944 41,035
accumulateddepreciation (5,277) (4,012)
Workinprogress 33,179 1,908
70,846 38,931
Communicationequipment 198 198
accumulateddepreciation (67) (58)
Workinprogress 19 –
150 140
otherassets 1,260 1,265
accumulateddepreciation (245) (325)
Workinprogress – 42
1,015 982
Total Non-regulated Assets 72,011 40,053
Total Property, Plant and Equipment 4,390,275 3,531,916
TransGridannualreporT2009>noteS to the fInancIal StatementS 89
(b) Reconciliations of the carrying amounts of each class of property, plant and equipment at the beginning and end of the financial yearproperty,plantandequipmentistreatedinaccordancewiththevariousexplanationssetoutinnote2.property,plantandequipmentarevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.
Revaluation carrying Increments/ amount at non-current (decrements) carrying Beginning assets held excluding amount at of year additions disposals for Sale depreciation Impairments Impairments* end of year 2009 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
RegulatedAssets:networkasset 3,441,875 542,222 (1,427) – (137,826) 1,333,560 (919,000) 4,259,404
otherassets 49,988 20,411 (2,576) – (8,963) – – 58,860
Total Regulated 3,491,863 562,633 (4,003) – (146,789) 1,333,560 (919,000) 4,318,264 Assets
Non-regulatedAssets:systemplant 38,931 33,180 – – (1,265) – – 70,846andequipment
Communication 140 19 – – (9) – – 150equipment
otherassets 982 651 (409) – (209) – – 1,015
Total Non-regulated 40,053 33,850 (409) – (1,483) – – 72,011 Assets
Total 3,531,916 596,483 (4,412) – (148,272) 1,333,560 (919,000) 4,390,275
Impairments*impairmentsofnetworkassetswerebroughttoaccountasareductiontotheassetrevaluationreserve.inrespectofproperty,plantandequipment,noimpairmentswerebroughttoaccountwithintheincomestatement.
Revaluation carrying Increments/ amount at non-current (decrements) carrying Beginning assets held excluding amount at of year additions disposals for Sale depreciation Impairments Impairments end of year 2008 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
RegulatedAssets:networkasset 3,210,770 282,992 (597) 1,685 (128,933) 75,958 – 3,441,875
otherassets 43,809 17,902 (3,665) – (8,058) – – 49,988
Total Regulated 3,254,579 300,894 (4,262) 1,685 (136,991) 75,958 – 3,491,863 Assets
Non-regulatedAssets:systemplant 10,377 29,419 – – (865) – – 38,931andequipment
Communication 148 – – – (8) – – 140equipment
otherassets 1,166 713 (649) – (248) – – 982
Total Non-regulated 11,691 30,132 (649) – (1,121) – – 40,053 Assets
Total 3,266,270 331,026 (4,911) 1,685 (138,112) 75,958 – 3,531,916
90 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
(c) property, plant and equipment Impairment lossesTransGrid’svaluationpolicyprovidesforafullanddetailedvaluationofassetstobeundertakenatfiveyearintervalsinconjunctionwithnsWTreasurypolicyTpp07-01Valuation of Physical Non-Current Assets at Fair Value.
duringtheyearended30June2009,anextensiverevaluationwasundertakeninaccordancewiththiscyclicalreviewrequirementtodeterminethecarryingamount.
TherecoverableamountofthecashgeneratingunitwasdeterminedwiththeassistanceofindependentvaluersusingtheValueinusemethodologyandcomparedtothecarryingamount.TheestimateofValueinusewasdeterminedusingadiscountrateof7.75%.
Thecarryingamountwasdeterminedtobehigherthanitsrecoverableamountandanimpairmentlossof$919.0mwasrecognisedwithrespecttothefollowingclassesofassets:
2009 $’000
asset classsubstationequipment 367,416
Transmissionlines 551,584
Total Impairment Losses 919,000
Theimpairmentlosshasbeenrecognisedasareductiontotheassetrevaluationreserve.
(d) cost model
accumulated cost depreciation net Book value as at 30 June 2009 $’000 $’000 $’000
RegulatedAssets:networkasset 3,249,398 (829,639) 2,419,759
accumulated cost depreciation net Book value as at 30 June 2008 $’000 $’000 $’000
RegulatedAssets:networkasset 2,887,418 (702,741) 2,184,677
13. IntangIBleS(a) valuation and accumulated amortisation of Intangibles
2009 2008 $’000 $’000
easements 497,748 487,139
Workinprogress 6,572 6,836
504,320 493,975
Computersoftware 45,494 40,240
accumulatedamortisation (33,794) (29,353)
Workinprogress 18,615 10,990
30,315 21,877
airspacerights 2,900 7,215
Total Intangibles 537,535 523,067
TransGridannualreporT2009>noteS to the fInancIal StatementS 91
(b) Reconciliations of the carrying amounts of intangibles at the beginning and end of the financial year
carrying amount at carrying Beginning amount at of year additions disposals amortisation Impairments* adjustments end of year 2009 $’000 $’000 $’000 $’000 $’000 $’000 $’000
IntangibleAssetseasements 493,975 10,351 (6) – – – 504,320
Computersoftware 21,877 13,050 – (4,612) – – 30,315
airspacerights 7,215 – – – (4,315) – 2,900
Total 523,067 23,401 (6) (4,612) (4,315) – 537,535
Impairments*animpairmentofairspacerightswasbroughttoaccountwithintheincomestatement.
carrying amount at carrying Beginning amount at of year additions disposals amortisation Impairments adjustments end of year 2008 $’000 $’000 $’000 $’000 $’000 $’000 $’000
IntangibleAssetseasements 481,348 12,634 (7) – – – 493,975
Computersoftware 14,454 11,335 (28) (3,884) – – 21,877
airspacerights 7,215 – – – – – 7,215
Total 503,017 23,969 (35) (3,884) – – 523,067
(c) Intangible assets Impairment losses aasB136Impairment of Assetsrequiresconsiderationifanyimpairmentexistsforintangibleassets.
Withtheassistanceofindependentvaluers,impairmenttestingdeterminedthattherecordedvalueoftheairspacerightswerenolongeratfairvalueandawritedownwasrequired.
asaresult,airspacerightswereimpairedby$4.3mandadjustedthroughtheincomestatement.
14. otheR non-cuRRent aSSetS
2009 2008 $’000 $’000
insurancerecoveryasset 4,008 3,603
Total 4,008 3,603
15. expendItuRe commItmentS (a) capital expenditure commitments Commitmentsarisingfromcontractsforexpenditureinrespectofproperty,plantandequipmentandintangibles,totheextentnotprovidedforintheaccounts:
2009 2008 $’000 $’000
payableWithinoneyear 255,694 426,407
payableonetoFiveyears 18,222 106,418
payablelaterthanFiveyears 2,022 –
Total (including GST) 275,938 532,825
TotalexpenditureCommitmentsaboveincludeinputtaxcreditsof$25.1m(2008-$48.4m)thatareexpectedtoberecoverablefromtheaustralianTaxationoffice.
92 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
(b) operating expenditure commitments Majorcommitmentsarisingfromcontractsforexpenditureassociatedwithnetworksupport,totheextentnotprovidedforintheaccounts:
2009 2008 $’000 $’000
payableWithinoneyear 20,900 39,663
payableonetoFiveyears – 20,900
payablelaterthanFiveyears – –
Total (including GST) 20,900 60,563
TotalexpenditureCommitmentsaboveincludeinputtaxcreditsof$1.9m(2008-$5.5m)thatareexpectedtoberecoverablefromtheaustralianTaxationoffice.
16. tRade and otheR payaBleS
2009 2008 $’000 $’000
CurrentCreditors 75,503 102,826
accruedFinanceCosts 54,358 41,492
other 1,033 –
130,894 144,318
Non-CurrentCreditors 2,973 5,413
Total 133,867 149,731
17. pRovISIonS
2009 2008 $’000 $’000
Currentdividend 120,233 105,910
employees’accruedBenefits 68,036 62,274
insurance 1,347 1,357
189,616 169,541
Non-Currentemployees’accruedBenefits 4,027 2,847
insurance 7,902 7,593
11,929 10,440
Total 201,545 179,981
(a) dividends
2009 2008 $’000 $’000
openingBalance 105,910 71,482
dividendpayments (105,910) (71,482)
dividendfortheyear 120,233 105,910
Closing Balance 120,233 105,910
(b) employees’ accrued Benefits Thefollowingtabledetailsthemovementsintheemployees’accruedBenefitsprovisionduringtheyear:
2009 2008 $’000 $’000
openingBalance 65,121 64,373
Contributions 18,302 11,411
payments (11,360) (10,663)
Closing Balance 72,063 65,121
TransGridannualreporT2009>noteS to the fInancIal StatementS 93
Thefollowingtableshowsabreakdownoftheemployees’accruedBenefitsprovisionatreportingdate:
2009 2008 $’000 $’000
annualleave 16,998 16,985
longserviceleave 55,065 48,136
Total 72,063 65,121
ThefollowingtableshowsabreakdownoftheCurrentportionoftheemployees’accruedBenefitsprovisionatreportingdate,splitintotheperiodoftimethebenefitsareexpectedtobesettled:
2009 2008 $’000 $’000
Withinoneyear 15,581 13,589
laterthanoneyear 52,455 48,685
Total 68,036 62,274
(c) Insurance inaccordancewithCondition6(a)(iii)ofthelicensegrantedundersection211oftheWorker’sCompensationact,1987,theprovisionfortotaloutstandingworkers’compensationclaimsliabilityincludingincurredbutnotreportedclaimsandadministrationis$9.2m(2008–$9.0m).duringthefinancialyear,$1.3m(2008-$5.9m)wascontributedtotheprovisionforWorkers’Compensation.
Theprovisionincludes$4.5mforaworkers’compensationclaimthathasbeenactivatedunderTransGrid’sreinsurancepolicy.reinsurancerecoverieshavecommencedandfuturerecoveriesforthisclaimareconsideredtobevirtuallycertain.TransGridhasrecognisedaninsurancerecoveryassetof$4.5mbasedonindependentactuarialadvice(refertonotes11and14).
Thefollowingtabledetailsthemovementsintheinsuranceprovisionduringtheyear:
opening Balance contributions payments closing Balance class $’000 $’000 $’000 $’000
Workers’Compensation 8,950 1,255 (956) 9,249
Total 8,950 1,255 (956) 9,249
18. deRIvatIveS (lIaBIlItIeS)
2009 2008 $’000 $’000
CurrentForwardContract 1,020 8,714
Non-Current ForwardContract 279 2,508
Total 1,299 11,222
19. otheR cuRRent lIaBIlItIeS
2009 2008 $’000 $’000
superannuationliability 161,792 27,552
Other electricityCreditors 10,391 37,414
other 2,897 2,528
13,288 39,942
Total 175,080 67,494
94 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
20. capItal TransGridcommencedoperationson1February1995onseparationfrompacificpowerundertheelectricityTransmissionauthorityact,1994atwhichtimeaseriesofassetsandliabilitiesweretransferred.
TransGridwascorporatisedasastatutorystateownedCorporationon14december1998,withsharecapitaloftwo$1.00shares.TheseshareswereissuedtotheTreasurerandtheMinisterforFinance,asVotingshareholdersonbehalfofthensWGovernment,asat30June2009.The$2.00isreportedaspartofCapital.
2009 2008 $’000 $’000
CapitalopeningBalance 651,967 651,967
Movements – –
Closing Balance 651,967 651,967
21. ReSeRveS
net unrealised asset gains/ cash flow Revaluation (losses) hedge Reserve Reserve Reserve total Reserves $’000 $’000 $’000 $’000
At 1 July 2007 939,144 298 (5,784) 933,658
revaluationofproperty,plantandequipment(note12(b)) 75,958 75,958
Transfertoretainedearnings–revaluationreserve 3,250 3,250forassetsdisposed(note22)
Taxeffectofproperty,plantandequipmentrevaluation (23,763) (23,763)andTransferstoretainedearnings(note6(a)(ii))
netGains/(losses)onavailable-for-saleFinancialassets (426) (426)transferredtoprofitorlossuponsaleofTransGrid’ssharesinGeodynamicslimited
Taxeffect:netGains/(losses)onavailable-for-sale 128 128Financialassetstransferredtoprofitorloss(note6(a)(ii))
revaluationofCashFlowhedges (4,089) (4,089)
realisedGains/(losses)onCashFlowhedgesremoved 1,194 1,194fromequityandincludedinassets
TaxeffectofCashFlowhedgeequityMovements(note6(a)(ii)) 869 869
At 30 June 2008 994,589 – (7,810) 986,779
revaluationofproperty,plantandequipment, 1,333,560 1,333,560excludingimpairments(note12(b))
impairments(note12(b)) (919,000) (919,000)
Transfertoretainedearnings– (974) (974)revaluationreserveforassetsdisposed(note22)
Taxeffectofproperty,plantandequipmentrevaluation, (124,076) (124,076)impairmentsandTransferstoretainedearnings(note6(a)(ii))
revaluationofCashFlowhedges 24,282 24,282
realisedGains/(losses)onCashFlowhedges (9,885) (9,885)removedfromequityandincludedinassets
TaxeffectofCashFlowhedgeequityMovements(note6(a)(ii)) (4,319) (4,319)
At 30 June 2009 1,284,099 – 2,268 1,286,367
AssetRevaluationReserveThisreserveisusedtorecordincreasesinthefairvalueofproperty,plantandequipment,anddecreasestotheextentthatsuchdecreasesrelatetoanincreaseonthesameassetpreviouslyrecognisedinequity.assetsarerevaluedinaccordancewithnsWTreasurypolicyTpp07-1Valuation of Physical Non-Current Assets at Fair Value.
NetUnrealisedGains/(Losses)ReserveThisreserverecordsfairvaluechangesonavailable-for-saleinvestments.
CashFlowHedgeReserveThisreserverecordstheportionofthegainorlossonahedginginstrumentinacashflowhedgethatisdeterminedtobeeffective.
TransGridannualreporT2009>noteS to the fInancIal StatementS 95
22. RetaIned eaRnIngS
2009 2008 $’000 $’000
openingBalance 111,472 115,894
netprofit/(loss)Beforedividend 150,291 132,387
superannuationactuarialGains/(losses) (133,287) (39,499)
incomeTaxBenefit/(expense)onsuperannuationactuarialGains/(losses) 39,986 11,850
dividend (120,233) (105,910)
Transferfromassetrevaluationreserve 974 (3,250)
Closing Balance 49,203 111,472
23. dIvIdend and contRIButIonS to ShaReholdeRadividendof$120.2m(2008-$105.9m)hasbeenrecognisedfordistributiontotheshareholder.Thedividendwillbepaidduringthecourseofthe2009/10financialyearandisrepresentedbythedividendprovision.
24. SecuRed lIaBIlItIeSatreportingdate,therewasnoloanliabilityofTransGridsecuredbyachargeoverTransGrid’sassets.
25. audIt feeSamountsreceived,ordueandreceivable,bytheauditorsfor:
2009 2008 $’000 $’000
auditingthefinancialreport 168 188
26. compenSatIon of Key management peRSonnel
2009 2008 $’000 $’000
short-termemployeebenefits 2,387 2,032
post-employmentbenefits 845 839
otherlong-termbenefits 238 226
Total 3,470 3,097
fees paid to directorsFees,includingsuperannuationbenefitspaidtodirectors,otherthansalariespaidtofull-timedirectors,were$0.5m(2008-$0.3m).
27. contIngent lIaBIlItIeS and contIngent aSSetS(a) contingent liabilities
2009 2008 $’000 $’000
Contractliability 247 40
ClaimsforcompensationassociatedwithdelayedcontractualmilestonesarebeingpursuedagainstTransGridbyacontractor.TheamountdisclosedrepresentsTransGridmanagement’sbestestimateatbalancedate.atthisstage,itisnotpossibleformanagementtoformanopiniononthelikelyoutcomeoftheclaims.
aclaimforcompensationisbeingsoughtagainstTransGridviaadebtCertificateundertheContractor’sdebtsact1997.Thisinstrumentallowsasub-contractorofacontractortorecoveroutstandingmoniesdirectlyfromtheprincipaltowhichthesamecontractapplies.TheamountdisclosedrepresentsTransGridmanagement’sbestestimateatbalancedate.atthisstage,itisnotpossibleformanagementtoformanopinionaboutthelikelyoutcomeoftheclaim.
aclaimforcompensationisbeingpursuedviaarbitrationagainstTransGrid,forallegedreductioninthevalueofacoalmineduetotheconstructionofatransmissiontower.atthisstage,itisnotpossibleformanagementtoformanopinionaboutthelikelyoutcomeofthearbitration.
aclaimforcompensationisbeingpursuedagainstTransGridarisingfromacontractualdispute.atthisstage,itislikelythattheclaimwillbesettledalthoughitisnotpossibleformanagementtoreliablyestimateasettlementamount.
(b) contingent assetsTransGridhasinitiatedlegalproceedingstorecoverdamagesof$16.1massociatedwithitscontractor.atthisstage,itisnotpossibleformanagementtoformanopiniononthelikelyoutcomeoftheproceedings.
TheaustralianCompetitionTribunalishearingaMeritsreviewoftheaer’sTransGridFinalrevenuedeterminationof28april2009,whichestablishedTransGrid’srevenuecapsforprescribedtransmissionservicesforthe2009/10to2013/14period.atthisstageitisnotpossibleformanagementtobecertainoftheoutcomeofthisreview.however,thedecisiontoseekaMeritsreviewwasbasedon‘prospectsadvice’fromseniorCounselwithinputfromexpertregulatoryeconomists.
96 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
28. faIR compenSatIon tRuSt fundinaccordancewiththelandacquisition(JustTermsCompensation)act,TransGridmaintainsaTrustaccount.Theaccountbalanceatreportingdatewas$1.9m(2008–$0.3m).
29. leaSeS TransGridhasnofinanceleasecommitments.Thefollowingleasecommitmentsdisclosedareinthenatureofoperatingleases.
lesseeTransGridhasoneoperatingleasecommitmentunderacommercialleasewhichcommencedon9May2007.Theleasetermis6yearswithanoptiontoextendforanother4years.leasepaymentsareincreasedannuallyby4%.Theleaseexpenditureforthefinancialyear,GsT-exclusive,was$1.9m(2008–$2.2m).
MinimumrentalspayableGsT-inclusive,asat30Juneareasfollows:
2009 2008 $’000 $’000
Withinoneyear 2,044 2,110
laterthanoneyearbutnotlaterthan5years 6,244 8,287
laterthan5years – –
Total (including GST) 8,288 10,397
30. noteS to caSh flow Statement(a) Reconciliation of cash CashasattheendofthefinancialyearasshownintheCashFlowstatementisreconciledtotherelateditemsintheBalancesheetasfollows:
2009 2008 $’000 $’000
CashandCashequivalents 20,861 30,571
(b) dividends and taxesnodividendswerereceived.dividendsandtaxequivalentspaidduringtheyearamountedto$148.3m(2008–$90.4m).
(c) acquisitions and disposals of entitiesnoentitieswereacquiredordisposedofduringtheyear.
(d) financing arrangementsTransGridhasanoverdraftfacilityof$6,000,000withtheWestpacBankandthisfacilitywasundrawnatreportingdate.TransGridalsohasapprovalforanindemnityguaranteefacilityfor$16,000,000ofwhich$5,873,000hasbeendrawn.
TransGridannualreporT2009>noteS to the fInancIal StatementS 97
(e) Reconciliation of profit after Income tax equivalent expense to net cash provided by operating activities
2009 2008 $’000 $’000
Profit/(Loss) after Income Tax Equivalent Expense 150,291 104,738
Add/(Less): Items Classified as Financing/Investing Activities
loss/(Gain)ondisposalofproperty,plantandequipment 2,150 1,213
Add/(Less) Non-Cash Items
depreciationandamortisation 152,884 141,996
amortisationof(premium)/discountonloans (149) (1,556)
impairmentadjustment 4,315 –
Capitalisedinterest (19,370) (2,741)
CapitalContributions (18,546) (29,215)
accrualsrelatingtootherthanoperatingactivities – (670)
Net Cash Provided by Operating Activities Before Change in Assets and Liabilities 271,575 213,765
Net Changes in Assets and Liabilities During the Financial Year
(increase)/decreaseinTradedebtors&otherreceivables (39,206) 6,668
(increase)/decreaseininventories (1,935) (845)
(increase)/decreaseinotherCurrentassets (1,066) 21,005
(increase)/decreaseinothernon-Currentassets (405) (3,603)
increase/(decrease)inTradeCreditors&otherpayables 8,462 21,765
increase/(decrease)inprovisions 7,241 5,321
increase/(decrease)inincomeTax&deferredTaxes 24,706 27,410
increase/(decrease)inotherCurrentliabilities (25,598) 5,930
Net Cash Provided by Operating Activities 243,774 297,416
31. fInancIal InStRumentS dIScloSuRe(a) credit Risk ExposuretocreditriskThecarryingamountofTransGrid’sfinancialassetsrepresentsthemaximumcreditexposure.TransGrid’smaximumexposuretocreditriskatthereportingdatewas:
2009 2008 carrying amount note $’000 $’000
Tradeandotherreceivables 110,146 69,857
Cashandcashequivalents 7 20,861 30,571
Forwardexchangecontractsusedforhedging(assets) 10 4,539 66
135,546 100,494
ImpairmentlossesBasedonhistoricdefaultrates,TransGridbelievesthatnoimpairmentallowanceisnecessaryinrespectoftradereceivableseithernotpastdueorpastdue.Thetradereceivablesbalance,whichincludestheamountsowedbyTransGrid’sthreemostsignificantcustomers,relatestocustomersthathaveagoodcredithistorywithTransGrid.
TheagingofTransGrid’stradeandotherreceivablesatthereportingdatewas:
gross Impairment gross Impairment Receivables losses Receivables losses 2009 2009 2008 2008 $’000 $’000 $’000 $’000
notpastdue 107,135 – 68,301 –
pastdue1-30days 596 – 1,556 –
pastdue31-60days 38 – – –
Morethan61days 2,377 50 – –
110,146 50 69,857 –
TheabovetabledefinestheGrossreceivablesexpectedtobereceivedbyTransGrid.
asat30June2009,allreceivabletransactionswereassessedtodeterminetheirfairvalueandthatcollectabilitywashighlyprobable.onereceivableof$49,500wasconsideredunlikelytobecollectedinfullandthusthetotalamountwasconsideredimpaired.Therewasnoimpairmentfor2008.
98 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
Themovementintheallowancefordoubtfuldebtsaccountinrespectoftradereceivablesduringtheyearwasasfollows:
2009 2008 $’000 $’000
Balanceat1July2008 – –
impairmentlossrecognised 50 –
Balance at 30 June 2009 50 –
(b) liquidity and funding Risk Thefollowingarethecontractualmaturitiesoffinancialliabilities,includingestimatedinterestpayments:
carrying contractual less than 1 year to more than amount cash flows 1 year 5 years 5 years 30 June 2009 $’000 $’000 $’000 $’000 $’000
Non-derivativefinancialliabilitiesBorrowings 1,988,928 2,616,580 485,892 1,064,758 1,065,930
Tradeandotherpayables 133,867 133,867 130,894 2,973 –
otherfinancialliabilities 10,391 10,391 10,391 – –
DerivativefinancialliabilitiesForwardexchangecontractsusedforhedging:Grossoutflow 1,299 9,695 7,479 2,216 –
Total 2,134,485 2,770,533 634,656 1,069,947 1,065,930
carrying contractual less than 1 year to more than amount cash flows 1 year 5 years 5 years 30 June 2008 $’000 $’000 $’000 $’000 $’000
Non-derivativefinancialliabilitiesBorrowings 1,531,592 2,089,759 237,153 922,213 930,393
Tradeandotherpayables 149,731 149,731 144,318 5,413 –
otherfinancialliabilities 37,414 37,414 37,414 – –
DerivativefinancialliabilitiesForwardexchangecontractsusedforhedging:Grossoutflow 11,222 103,100 65,801 37,299 –
Total 1,729,959 2,380,004 484,686 964,925 930,393
(c) foreign exchange RiskCashFlowHedgesThecashflowsarisingfromcashflowhedgesarenotexpectedtoaffectprofitorloss.
Cash Flow Hedge Equity Movements
amount carrying removed amount carrying amount at amount from equity removed amount at beginning recognised in and included from equity end of of period equity during in Income and included period (1/7/08) the period Statement in assets (30/6/09) 2009 $’000 $’000 $’000 $’000 $’000
Equity (11,156) 24,282 – (9,886) 3,240
amount carrying removed amount carrying amount at amount from equity removed amount at beginning recognised in and included from equity end of of period equity during in Income and included period (1/7/07) the period Statement in assets (30/6/08) 2008 $’000 $’000 $’000 $’000 $’000
Equity (8,262) (4,089) – 1,195 (11,156)
TransGridannualreporT2009>noteS to the fInancIal StatementS 99
SensitivityanalysisTransGridemployscashflowhedgestoremovecurrencyriskassociatedwithpurchaseofoverseasequipment.
a10percentstrengtheningandweakeningoftheaustraliandollaragainstthefollowingcurrencieswouldhaveincreased(decreased)equitybytheamountsshownbelow.Thisanalysisassumesthatallothervariables,inparticularinterestrates,remainconstant.Theanalysisisperformedonthesamebasisfor2008.
asthesearealleffectivecashflowhedges,therearenoprofitorlossimpacts.
+10% -10% effect on equity in thousands of aud $’000 $’000
30June2009usd (288) 352
Cad (6) 7
eur (513) 627
Jpy (3,943) 4,819
seK (144) 175
30June2008usd (143) 175
Cad (655) 800
eur (2,121) 2,592
Jpy (7,771) 9,498
(d) Interest Rate Risk interestrateriskistheriskofamaterialchangeinearningsandultimatelydividendpaymentsasaconsequenceofadversemovementsininterestrates.ThepolicyobjectiveistoensurethatTransGridisnotexposedtointerestratemovementswhichcouldadverselyimpactonitsabilitytomeetitsfinancialobligationsastheyfalldue.
Cashflowsensitivityanalysisforvariablerateinstrumentsachangeof100basispointsininterestratesatthereportingdatewouldhaveincreased(decreased)profitorlossbytheamountsshownbelow.Thisanalysisassumesthatallothervariables,inparticularforeigncurrencyrates,remainconstant.Theanalysisisperformedonthesamebasisfor2008.
Profit or Loss
100bp 100bp increase decrease $’000 $’000
30June2009 prescribedCustomerreceivables (13) 13
Cashflowsensitivity(net) (13) 13
electricityCreditors (65) 65
Cashflowsensitivity(net) (65) 65
30June2008 electricityCreditors (478) 478
Cashflowsensitivity(net) (478) 478
100 noteS to the fInancIal StatementS > TransGridannualreporT2009
noteS to the fInancIal StatementSForTheyearended30ThJune2009
(e) net fair value of financial assets and liabilities Thenetfairvalueoffinancialassetsandliabilities,withtheexceptionofborrowings,isreflectedbytheircarryingamountsintheBalancesheet,inaccordancewithaasB132andaasB7.
ThenetfairvalueofborrowingsisbasedonmarketvaluederivedbyBarringtonTreasuryservicesusingmarketinterestratescurrentatreportingdate.
Thecarryingamountsandnetfairvaluesoffinancialassetsandliabilitiesatreportingdateare:
2009 2008
carrying net fair carrying net fair amount value amount value $’000 $’000 $’000 $’000
FinancialAssetsCashandcashequivalents 20,861 20,861 30,571 30,571
Tradeandotherreceivables 110,096 110,096 69,857 69,857
derivatives 4,539 4,539 66 66
Total Financial Assets 135,496 135,496 100,494 100,494
FinancialLiabilitiesTradeandotherpayables 133,867 133,867 149,731 149,731
Borrowings 1,988,928 2,000,231 1,531,592 1,484,958
otherfinancialliabilities 10,391 10,391 37,414 37,414
derivatives 1,299 1,299 11,222 11,222
Total Financial Liabilities 2,134,485 2,145,788 1,729,959 1,683,325
end of audIted fInancIal RepoRt
104 Index > TransGridannualreporT2009
aaboriginalemploymentanddevelopmentstrategy 50
aboutTransGrid 2
apprentices 45
assetManagement 24
BBalancesheet 74
Boardofdirectors 54
cCapitalexpenditure($Million) 10
CapitalWorksprojects 23
CashFlowstatement 75
ChairmanandManagingdirector’sreview 16
Challenges2009/10 15
Charter 58
ClimateChangestrategy 34
Codeofethicsprogram 65
Commercialreport 72
CommunityConsultation 37
ConsultantFees 64
Consumerresponse 64
Contents 1
CorporateGovernance 53
Costofannualreport 70
CreditCardusage 69
CustomerConnections 21
ddemandGraphs 20
demandManagementinitiatives 21
disabilityactionplan 50
eeeoachievements(2008-2009) 50
eeodisclosures 49
eeoplannedachievements(2008-2009) 50
electronicservicedelivery 70
employeeservices 47
environmentalaward 34
environmentalincidentnotification 14
environmentalproductionnotes 108
environmentalstrategies 34
ethnicaffairsprioritystatement(eaps) 50
executiveleadershipTeam 56
fFinancialreport 71
Fraudprevention 65
Freedomofinformation 65
Futurepeoplestrategies 47
gGlossary 106
Graduateprogram 45
Guaranteeofservice 64
hheritageManagement 70
highlights2008/09 8
Iincome($Million) 10
incomestatement 73
independentauditor’sreport 102
index 104
industrialrelationspoliciesandpractices 70
informationTechnology 32
innovation 30
internetContactdetails Backpage
Index
TransGridannualreporT2009>Index 105
JJudicialdecisions 64
KKeyCommercialperformanceindicators 10
llanddisposal 70
leadershipdevelopmentprograms 44
legislativeChange 64
lettertoshareholders insideFrontCover
mManagingdirectorsscholarship 48
MeetingsoftheBoard 60
Minister 58
nnationalelectricityMarketdevelopment 21
networkavailability(%) 12
networkreliability(systemMinuteslost) 12
notestotheFinancialstatements 77
ooccupationalhealthandsafetyperformance 41
ourdirection 7
ournetwork 4
overseasVisits 68
pperformanceManagement 46
performancesummary:executive 62
planning 18
pricing 21
privacy 66
promotion 70
qQualifications:executive 63
Rremuneration:Boardofdirectors 61
remuneration:executive 63
reportingexemptions 69
returnonassets(%) 11
returnonequity(%) 11
revenueresetdetermination(2004/09) 22
riskManagementandinsurance 64
revenuedetermination(2009–2014) 22
reviewsofthenationalelectricityMarket 16
Ssafety(lTi’s) 13
safetyaward 43
shareholders 58
significantCommittees 66
sponsorships 37
staffnumbers:Comparisonofstaffnumbers 14
staffnumbers:staffbyCategory 13
staffnumbers:numbersofexecutiveofficers 14
staffnumbers:numbersbyGender 14
statementofrecognisedincomeandexpense 76
statementbyMembersoftheBoard 101
statementofaffairs 66
tTraineeengineeringofficer 45
TransGridContactdetails BackCover
wWastereductionandpurchasingpoliCy(Wrapp) 34
Womenprograms 51
Workforcediversitystrategy 49
Index continued
106 gloSSaRy > TransGridannualreporT2009
Term Explanation/Comments
aer(“theregulator”) Theaustralianenergyregulator
aeMC TheaustralianenergyMarketCommission
aeMo TheaustralianenergyMarketoperator
annualplanningreport(apr200X) adocumentthatsetsoutissuesandprovidesinformationtothemarketthatisrelevanttotransmissionplanninginnewsouthWales.Thisdocumentistheapr2009.
annualplanningreview TheannualplanningprocesscoveringelectricitytransmissionnetworksinnewsouthWales.
“assets” TransGrid’s‘polesandwires’,allthesubstationsandelectricitytransmissionlinesthatformournetwork.
CBd CentralBusinessdistrict
Constraint aninabilityofanelectricitytransmissionordistributionsystemtosupplyarequiredamountofelectricitytoarequiredstandard.
Customers TransGrid’scustomersarethosedirectlyconnectedtoournetwork.Theyareeitherdistributionnetworkserviceproviders,directlyconnectedgenerators,largeindustrialcustomers,customersconnectedthroughinter-regionalconnectionsorpotentialnewcustomers.
dM demandmanagement.asetofinitiativesthatisputinplaceatthepointofend-usetoreducethetotaland/orpeakconsumptionofelectricity.
dnsp(distributor) distributionnetworkserviceprovider.abodythatowns,controlsoroperatesadistributionsystemintheneM.
dWe nsWdepartmentofWaterandenergy
easement aneasementoverapropertygivesTransGridtherighttoconstructandmaintainourassets,whileownershipofthepropertyremainswiththeoriginallandowner.
GWh aunitofenergyconsumptionequalto1,000MWh.
interconnection Thepointsonanelectricitytransmissionnetworkthatcrossjurisdictional/stateboundaries.
iparT independentpricingandregulatoryTribunalofnsW
kV operatingvoltageofelectricitytransmissionequipment.onekilovoltisequaltoonethousandvolts.
load Theamountofelectricalpowerthatisdrawnfromthenetwork.
localGeneration agenerationorcogenerationfacilitythatislocatedontheloadsideofatransmissionconstraint.
gloSSaRy
TransGridannualreporT2009>gloSSaRy 107
lTi losttimeinjury
MCe MinisterialCouncilonenergy
MVar aunitofreactivepower.one“Mega-Var”isequalto1,000,000Var.
MWh aunitofenergyconsumption.oneMegawatthouristheamountofenergyconsumedinonehouratarateofoneMegawatt.
nationalelectricitylaw CommonlawsacrossthestateswhichcomprisetheneM,whichmakethenerenforceable.
nationalelectricityrules(neror“therules”) TherulesthatgoverntheoperationoftheneM.
neM ThenationalelectricityMarket
nTFp nationalTransmissionFlowpath
nTp nationalTransmissionplanner
networkaugmentation anexpansionoftheexistingelectricitytransmissionnetwork.
non-networksolutions alternativestonetworkaugmentationwhichaddressapotentialshortageinelectricitysupplyinaregion.
outage anoutageiswhenpartofthenetworklosespower.Thiscanbeeitherplanned(i.e.whenworkneedstobedoneontheline)orunplanned.
regulatoryTest atestpromulgatedbytheaerthatisrequiredbythenertobeappliedwhendeterminingtherelativeeconomicmeritsofoptionsforthereliefoftransmissionconstraints.
rFp requestforproposal
riT-T regulatoryinvestmentTest–Transmission
sndp strategicnetworkdevelopmentplan
sVC staticVarCompensator.adevicethatprovidesforcontrolofreactivepower.
switchbay asitecontaininghighvoltageswitchgear,usedtoconnectordisconnectasectionofthenetwork.
theMinister ThenewsouthWalesMinisterforenergy.
Tnsp Transmissionnetworkserviceprovider.abodythatowns,controlsandoperatesanelectricitytransmissionsystemintheneM.
Transmissionline ahigh-voltagepowerlinerunningat500kV,330kVor132kV.
WaCC WeightedaverageCostofCapital
gloSSaRy continued
108 envIRonmental pRoductIon noteS > TransGridannualreporT2009
pRIntIngTheprinteroftheannualreportholdsanFsCChainofCustody(CoC)Certificationensuringthehigheststandardsofsustainablepracticehavebeenusedthroughouttheprintingprocess.
environmentallyfriendlysoy-basedinksandlow-alcoholproductionmethodshavebeenused.
coveR and edItoRIal pageSThecoverandeditorialsectionpagesareprintedonMonzarecycled,whichcontains55%recycledfibre(25%postconsumerand30%preconsumer)andFsCcertifiedpulp,ensuringallvirginpulpisderivedfromwell-managedforests,andismanufacturedbyaniso14001certifiedmill.
ThepaperisFsCMixedsourceCertified.
fInancIal pageSThefinancialpagesareprintedonTudorrp,whichisFsCrecycledCertifiedandaustralianMade.itcontains100%recycledfibreandnochlorinebleachingoccursintherecyclingprocess.Themilllisiso14001certified.salesofTudiorrpsupportlandcareaustralia.
envIRonmental pRoductIon noteS
TransGrid’scommitmenttotheenvironmentisreflectedinthesustainableprintingpracticesandpaperusedintheproductionofthisannualreport.
transgrid contact detailsSydney201 elizabeth street po Box a1000 sydney south nsW 1235
Telephone 02 9284 3000 Telephone 61 2 9284 3000 Facsimile 02 9248 3456 Facsimile 61 2 9284 3456
Business Hours 8:00am – 6:00pm
Metropolitan Telephone 02 9620 0777
OrangeTelephone 02 6360 8711
NewcastleTelephone 02 4967 8678
TamworthTelephone 02 6765 1666
WaggaTelephone 02 6922 0222
YassTelephone 02 6226 9666
TransGrid aBn: 19 622 755 774
This report is available on Cd and on TransGrid’s website.
www.transgrid.com.au
acknoWledgements Published by TransGrid Corporate Business unit
Designed and produced by equation Corporate design pty ltd
Photographs by:Jon novakovicKarl Hofmanneil Billingtonron sonterJohn Marmaras