Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical...

27
Power Lunch Webinar DLC QPL Search and Lighting Yoelit Hiebert, PE, CEM, LC Senior Engineer, Leidos, Inc. April 5, 2017

Transcript of Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical...

Page 1: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Power Lunch Webinar

DLC QPL Search and Lighting

Yoelit Hiebert, PE, CEM, LC

Senior Engineer, Leidos, Inc.

April 5, 2017

Page 2: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Agenda

• What is a Qualified Products List?

• Eligibility requirements for lighting products

• How to search the DLC Qualified Products List

• Exceptions

• On-line lighting application

• Resources

Page 3: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

What is a lighting Qualified Products List?

• A lighting QPL is a list of products that have been evaluated for performance and efficiency specifications.

• The list is designed to promote the widespread adoption of the energy-efficient lighting by providing utilities with an independent evaluation resource.

• The QPL is also a tool for architects, specifiers, engineers and contractors to evaluate and compare lighting products for their projects and programs.

• Both Energy Star and Design Light Consortium (DLC) maintain QPLs that are recognized by the Ameren Illinois Energy Efficiency program.

Page 4: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Eligibility requirements for retrofit lighting projects

• LED products must be either Energy Star or DLC listed.

***Logo on spec sheet is not sufficient to confirm listing***

• Energy Star lists lamps and products that look like lamps.

These products are typically available through Instant Incentive

for which eligibility requirements have already been confirmed.

• DLC lists most other types of LED lighting and are typically

incentivized through the Standard Lighting or Custom program.

Eligibility will be confirmed as part of the pre-approval

and/or final approval project evaluation process.

• LED lighting products must be either Energy Star or DLC listed.

Eligibility requirements for new construction lighting

Page 5: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Pre-approval vs. Final Approval

Retrofit Lighting

Standard Lighting

• Projects with an anticipated incentive of >$10K require pre-approval.

o DLC listing will be confirmed and documented.

o The customer and/or ally will be notified of any unlisted products to provide an opportunity to select an alternate.

o Listing at pre-approval will be honored regardless of status at final approval.

• Projects with incentive of <$10k can apply for incentives upon project completion.

o DLC listing with be confirmed as part of the incentive application review. Products that are not listed will not receive incentives.

o Customer/ally should confirm and document that the product was listed at time of purchase.

Pre-approval

Final Application

Page 6: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Pre-approval vs. Final Approval

Retrofit Lighting

Custom Lighting

o All custom lighting projects require pre-approval.

o DLC listing will be confirmed and documented.

o The customer and/or ally will be notified of any unlisted products to provide an opportunity to select an alternate.

o Listing at pre-approval will be honored regardless of status at final approval.

o Eligibility of lighting products not documented at pre-approval will be confirmed as part of the final project evaluation process. Products that are not listed will not receive incentives.

o Customer/ally should confirm and document that the product was listed at time of purchase.

Pre-approval

Final Approval

Page 7: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Pre-approval vs. Final Approval

New Construction Lighting

o All new construction lighting projects require pre-approval.

o DLC listing will be confirmed and documented.

o The customer and/or ally will be notified of any unlisted products to provide an opportunity to select an alternate.

o Listing at pre-approval will be honored regardless of status at final approval.

o Eligibility of lighting products not documented at pre-approval will be confirmed as part of the final project evaluation process. Products that are not listed will not receive incentives.

o Customer/ally should confirm and document that the product was listed at time of purchase.

Pre-approval

Final Approval

Page 8: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

DLC V4.0/V4.1 Delisting

• The DLC Technical Requirements V4.0/V4.1 went into full

effect Monday, April 3.

• The DLC has delisted any products that do not meet

Technical Requirements V4.0/V4.1 on Monday, April 3.

These products have been moved to the de-listed QPL.

• Approx. 40% of DLC products delisted.

Page 9: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Demonstration - “How to confirm a DLC listing”

Page 10: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Exceptions

An exception to the listing requirement with be considered for the following cases:

• No DLC category for the product

o Must apply under Custom program

• The product is essentially the identical to a listed product except for one or two parameters which do not

impact overall performance, e.g., lensing material, CCT

o May apply under Standard Lighting or Custom program (depending on other project parameters)

• A very limited selection of products (i.e., just a few) are listed

o Must apply under Custom program

• Energy Advisors can help with determining which of the above may apply

Test data will be requested for an internal evaluation of product performance

Not all exception requests may be considered or approved

Page 11: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Applying for lighting incentives on-line

• Program allies are able to submit for incentives for retrofit

lighting projects using an on-line application.

• Equipment eligibility is confirmed as part of the on-line

application process, ineligible equipment is identified.

• No need to separately confirm Energy Star or DLC

listing.

• Available for standard and custom lighting projects only.

• Pre-approval and final approval guidelines are the same

as for paper-based applications.

Page 13: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Ameren Illinois Energy Efficiency

Program Energy Advisors

Call 1.866.800.0747

to request a consultation with an

Energy Advisor

1. Chad Whitehead [email protected] 309.620.6333 2. Steven Smith [email protected] 309.212.5831 3. Rod Rhoads [email protected] 217.649.8897 4. Mark Steinmetz [email protected] 217.670.9606 5. John Strode [email protected] 309.370.0062 6. Fred Joshu [email protected] 309.433.4316 7. Larry Erwin [email protected] 309.838.2340

Page 14: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Questions?

14

Yoelit Hiebert, PE,CEM,LC

Senior Engineer, Leidos Engineering, Inc

[email protected]

314-770-3066

Page 15: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted
Page 16: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted
Page 17: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 18: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 19: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 20: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 21: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 22: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted
Page 23: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 24: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 25: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted
Page 26: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted

Page 27: Power Lunch Webinar DLC QPL Search and Lighting...DLC V4.0/V4.1 Delisting • The DLC Technical Requirements V4.0/V4.1 went into full effect Monday, April 3. • The DLC has delisted