Power Grid Research at Pacific Northwest National Laboratory
Moe KhaleelLaboratory Fellow and Director
Computational Sciences and Mathematics DivisionSeptember 10, 2009
HPC User Forum
1
![Page 2: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/2.jpg)
Overview
IntroductionProblems on the electrical gridNeed for HPC on the electrical grid
• Operations• Integration of renewables• Cyber security
• Need for HPC at vision level– State estimation– Multithreaded platforms for contingency analysis
• Looking forward
![Page 3: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/3.jpg)
Transform the way the U.S. generates, transmits, distributes and uses electricity
• Current U.S. electricity infrastructure is inadequate for national energy priorities in the 21st century. Three main areas need to be addressed:
– Capacity– Grid management (wide area, real-time)– Vulnerability, resiliency, reliability
• The future state of the grid must be able to:– Substantially increase the integration of renewables – Reduce carbon emissions– Provide flexibility to enable electrification of transportation and reduce dependence on
oil imports (substitute electricity for oil)– Respond to increased demand
• Reality: The current grid infrastructure/operation is limited– Currently manage/engage grid at sub-optimal (service territory) level; can’t efficiently
move electrons across large enough spaces– No ability to see performance across grid (lacks transparency)– Inability to integrate renewables; need storage, ability to offset, transmission across
service territories where generated, load/dispatch renewables– System communication has been one-directional: supply to demand– Fragmented authority, control, market, function, regulation
• Need to build new functionality and infrastructure into the grid• Future grid must be transformed while maintaining reliability
and affordability (serving public good)3
![Page 4: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/4.jpg)
Transform the way the U.S. generates, transmits, distributes and uses electricity
• Capacity: Transmission infrastructure cannot meet future load growth and large-scale renewable connectivity to grid
– Utilities not incentivized to build physical infrastructure– Difficult to site & permit new transmission infrastructure – Renewable resource physically isolated from high grid transmission infrastructure
• Grid Management: Unable to manage grid at national, interconnect scale
– Large scale models that allow examination and optimization of future national grid do not exist
– Integrated wide area models (variable renewable generation, energy storage, distributed generation, demand management) that describe real-time power flow and predict reliability do not exist
– Ability to see and understand the grid at interconnections scale are limited; wide area grid performance is not accessible, transparent so can’t optimize supply and demand across limited service areas
– Transparent real-time monitoring and operation currently not in place– Large-scale wind generation introduces significant variability– Large scale electric energy storage capability is limited – pumped hydro, flywheels,
electro-chemical systems connected to and supporting the power grid
• Vulnerability and Resiliency– Susceptible to cyber, other threats – can we prevent, respond to threats?
Resilient to catastrophic events – can we rapidly recover?
4
![Page 5: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/5.jpg)
Power System Elements
![Page 6: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/6.jpg)
Problems on the electrical grid
• Inadequacy of current control center functions– Slow, not able to keep up with the change of the grid– Static, no dynamic information for real-time operations
• Computational Issues with today’s grid operations– Real-time grid view: static– Not able to capture grid dynamics – Low computational efficiency: not keep up with system
changing – No use of high-performance computing architectures
![Page 7: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/7.jpg)
Problems on the electrical grid
![Page 8: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/8.jpg)
The need for HPC on the electrical grid
• Major HPC Architectures – Shared-memory architecture for extensive data sharing and
un-uniform data access– Distributed-memory architecture for less data sharing and
uniform data access– Hybrid architecture - re-configurable architecture: e.g. FPGA
+ shared-memory
• Performance of Parallel Algorithms/Programs– Speedup/Scalability– Reliability
![Page 9: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/9.jpg)
The need for HPC on the electrical grid
• Parallel Computing is essential – Only explicitly parallelized algorithms can take advantage of
multi-core parallel computers
• Parallel Computing is “an art”– Parallelization approaches are problem-dependent – Computing implementation needs to consider “good match”
of computing architecture and the problems
![Page 10: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/10.jpg)
Today’s Electrical Grid Operations Paradigm
SCADA
State Estimation
Contingency Analysis
Operator
Market Operation
~ minutes ~ minutes
Violations
Constrained solutions
~ seconds
Normal operations• Asset underutilization • Limited market opportunities • Lead to emergency operations
Emergency operations• Blackouts and cascading failures
slow static
~ hours
Off-line Transient/VoltageStability Analysis
Ratings & Limitsseasonal
![Page 11: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/11.jpg)
Trends Impacting Control System Security
• Open Protocols– Open industry standard protocols are replacing vendor-
specific proprietary communication protocols• General Purpose Computing Equipment and Software
– Standardized computational platforms increasingly used to support control system applications
• Interconnected to Other Systems– Connections with enterprise networks
to obtain productivity improvementsand information sharing
• Reliance on External Communications– Increasing use of public telecommunication
systems, the Internet, and wireless for controlsystem communications
• Increased Capability of Field Equipment– “Smart” sensors and controls with enhanced
capability and functionality
![Page 12: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/12.jpg)
The Emerging Cyber Threat
• Industry has long history of planning for and coping with natural disasters and other reliability events
– Through industry standard operating procedures, there is much effort expended to reduce likelihood of cascading outages leading to widespread blackouts
• Historically, cyber security focused on countering unstructured adversaries
– e.g., individuals, untargeted malicious software, human error
• Very little protection against structured adversaries intent on exploiting vulnerabilities to maximize consequences
– e.g., terrorist groups, organized crime, nation states– Insider threat remains very challenging, can be used as part of structured
threat vector
• New possibilities for widespread sustained outages resulting from cyber attack are now being contemplated
– But industry still not ready to cope with this threat
![Page 13: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/13.jpg)
The need for HPC: State Estimation
• Power system State Estimation (PSE)– Given: power grid topological information, telemetry on line
flows, bus injections or bus voltages– Compute: a reliable estimate of the system state (bus
voltages), validate model structure and parameter values– Calculated using Weighted Least-Squares (WLS) method– WLS: minimize– Where r = z - h(x), and r is the residual vector, x is the
system state, z is a vector of measured quantities, h is a vector function, wi is the weight for residual ri and W is as diagonal matrix.
– This is a non-linear problem, which is solved using the Newton-Raphson iterative procedure
![Page 14: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/14.jpg)
The need for HPC: State Estimation
• PSE– Every iteration of the method requires solving a large set of
sparse linear equations– Sparse matrices are derived from the topology of the power grid
being analyzed– The number of non-zeros per row varies greatly and the matrix is
badly conditioned– The set of linear equations can be solved using direct solvers
such as sparse LU factorization or iterative solvers such as sparse Conjugate Gradient (CG)
• PSE is a critical element of the software used by power grid control centers
– Under real-time constraints (< 10 seconds)– Commercial PSE solvers are not commonly parallel
![Page 15: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/15.jpg)
Power System State Estimation
August 13, 2003Normal
August 14, 2003Blackout
Situational Awareness?
Source: NOAA/DMSP
Do we know what really happened?Could it be prevented?
![Page 16: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/16.jpg)
Model Validation Need and Challenges
Reality
Model
Recorded system dynamics vs. simulation results: California and Oregon Intertie (COI) real power flow during the August 10, 1996 event
![Page 17: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/17.jpg)
The need for HPC: Multithreaded Platforms for Contingency Analysis
• Growing class of scientific applications is becoming memory-bound
• Many scientific applications exhibit irregular memory access patterns
• CPU and memory technology trends indicate that the situation will not improve anytime soon
• Multithreaded architectures offer an appealing alternative for irregular applications
– Processors tolerate memory access latencies by switching execution context between multiple hardware threads
– Examples of such architectures are the Cray MTA-2 and XMT systems and the Sun Niagara
– Latency tolerance mechanisms should improve the performance of irregular, data-intensive applications with abundant fine-grained parallelism
![Page 18: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/18.jpg)
Role of Contingency Analysis
• From “N-1” to “N-x”– To improve situational awareness
• From Balancing Authorities to a Wide Area
– Example: 35 BAs in west– Further require “N-x” CA– To better understand cascading
failures
• N-x Contingency AnalysisResult in a large number of cases. “N-5” 1020 cases for the west =~ 1020 seconds + lots of data
– Needs: better contingency selection and post-processing
![Page 19: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/19.jpg)
Looking forward: PNNL’s vision of advanced contingency analysis
Industry Need:
Issue:
Need:
Graph Theory
Contingency Index Sorting
10Z cases 10Y cases 10X casesContingency
AnalysisData
Time
past now future
Pre
dic
tio
n
Trending
Visual Analytics& Graph Trending
Interactive Graphing
Multi-failure (N-x) massive contingency analysis
Massive number of cases
Smart case selection
Massive amount of data
Operator-oriented data processing
Our Solution:
Major Tasks:
ExpectedOutcomes:
• An advanced tool for contingency analysis to support the operation of the nation’s critical infrastructures, e.g. power grids
• Analysis capabilities through generic implementation of algorithms on Cray XMT ThreadStorm processors, applicable to other problems
![Page 20: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/20.jpg)
Tool Suites for Advanced Power System Simulation
Parallel contingency analysis
Dynamic state estimation
Look-ahead dynamic simulation
Market Monitoring
Parallel state estimation
On-line voltage stability
SCADA Measurements
Phasor Measurements
Dyn. contingency analysis
Applicable to current grid operations Next-generation grid operation tools
Visualization
National Level: monitoring, planning, design Utility Level
![Page 21: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/21.jpg)
Looking forward: PNNL’s long-term vision for electrical grid operations
SCADA & Phasor Dynamic
State Estimation
Dynamic CA,On-line TSA/VSA
Operator
Real-TimeOptimized Market
Operation
~ (sub)seconds~ (sub)seconds
< 1 hour
Violations
Constrained solutions
~ (sub)seconds
DynamicRatings & Limits
Normal operations• Optimized asset utilization • Enabled regular & ancillary markets• Predict emergencies
Emergency operations• Prevent/mitigate failures
fastdynamic
![Page 22: Power Grid Research at Pacific Northwest National Laboratory](https://reader035.fdocuments.in/reader035/viewer/2022070400/568134d5550346895d9bffac/html5/thumbnails/22.jpg)
22
Use HPC to analyze sensor data for real-time grid monitoring, prediction, and operation: data-driven models, stochastic simulations, visual analytic tools, secure sensor network infrastructure, data provenance
Electricity Infrastructure Operational Center at PNNL