POWER GRID CORPORATION OF INDIA LTD
-
Upload
graiden-poole -
Category
Documents
-
view
94 -
download
4
description
Transcript of POWER GRID CORPORATION OF INDIA LTD
POWER GRID CORPORATION OF INDIA LTD
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
WELCOMES YOU
SOUTHERN REGION GRID HIGHLIGHTS
ANDHRA PRADESH GRID HIGHLIGHTS
KARNATAKAGRID HIGHLIGHTS
KERALA GRID HIGHLIGHTS
TAMIL NADU GRID HIGHLIGHTS
ANDHRA PRADESH INSTALLED CAPACITY
KARNATAKAINSTALLED CAPACITY
KERALA INSTALLED CAPACITY
TAMIL NADUINSTALLED CAPACITY
FREQUENCY PIE-CHARTLAST FOUR YEARS
MORE LINKS
LINKS
SOUTHERN REGION INSTALLED CAPACITY
FREQUENCY PIE-CHARTAPRIL 2002
INTER REGIONAL EXCHANGES
IMPORT THROUGH HVDC
SIGNIFICANTMILESTONES
PROBLEMS
SOLUTIONS
INSTALLATION OF SHUNT CAPACITOR
EXPECTED TRANSMISSION
EXPECTED GENERATION
LINKS - 2
BANGALORE VOLTAGE VS MVAR
KARNATAKA - ISSUESGRID DISTURBANCES
DURING 2002
ALLOCATION OFSHARES
GRID MAPS3D DEMAND CURVE
APRIL 2002
3D FREQUENCY CURVEAPRIL 2002
SRLDCMAN POWER
CERC PETITIONS SRLDC EXPENDITURE
VOLTAGE PROFILE
SOUTHERN REGION GRID HIGHLIGHTS 1997-98 1998-99 1999-00 2000-01 2001-02
Installed Capacity(MW) 21297 22133 22983 24173 26163
Average Daily Consumption (MU)
293 309 337 349 358
Average Frequency (HZ) 48.2 48.36 48.7 48.67 48.52
Average FVI 36 31 22 23 28
Inter Regional Assistance through HVDC (MU)
403 1571 2264 3040 4454
Generation Addition (MW) 638 836 850 1190 1990
Peak Demand Met (MW) 15682 17180 18535 19428 20063
Peak Demand Requirement (MW)
18018 18840 20014 23172 24110
% Demand Deficit 13 9 7 16 17
Total Energy Consumed (MU) 106897 111356 123073 127524 130822
Energy Requirement (MU) 115099 121869 128141 142340 146473
% Energy Deficit 7 9 4 10 11
ANDHRA PRADESH GRID HIGHLIGHTS
2000-01 2001-02
Installed Capacity (MW) 6846 7860
Peak Demand Met(MW) 7143 7029
Peak Demand Requirement(MW)
8108 8391
% Demand Deficit 12% 16%
Total Energy Consumed(MU)
46533 46410
Energy Requirement(MU) 51865 52009
% Energy Deficit 10% 11%
Average Daily Consumption127 127
KARNATAKA GRID HIGHLIGHTS
2000-01 2001-02
Installed Capacity(MW) 4302 4813
Peak Demand Met(MW) 4510 4656
Peak Demand Requirement(MW)
5027 5814
% Demand Deficit 10% 20%
Total Energy Consumed(MU)
27447 28596
Energy Requirement(MU) 30950 32254
% Energy Deficit 11% 11%
Average Daily Consumption75 78
KERALA GRID HIGHLIGHTS
2000-01 2001-02
Installed Capacity(MW) 2525 2553
Peak Demand Met(MW) 2340 2348
Peak Demand Requirement(MW)
2539 2571
% Demand Deficit 8% 9%
Total Energy Consumed(MU)
12500 12640
Energy Requirement(MU) 14094 14165
% Energy Deficit 11% 11%
Average Daily Consumption34 35
TAMIL NADU GRID HIGHLIGHTS
2000-01 2001-02
Installed Capacity(MW) 6151 6587
Peak Demand Met(MW) 6290 6686
Peak Demand Requirement(MW)
6839 7758
% Demand Deficit 8% 14%
Total Energy Consumed(MU)
41044 43180
Energy Requirement(MU) 45430 48044
% Energy Deficit 10% 10%
Average Daily Consumption112 118
IMPORT THROUGH HVDC
1997-98 1998-99 1999-00 2000-01 2001-02
S1
403
15712264
4454
3040
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
YEARS ---->
IN MUS
INTER-REGIONAL EXCHANGES:
2000-01 2001-02
FROM ER 2513 3666
FROM WR 527 788
FROM MSEB 108 0
FROM GRIDCO (Orissa) 750 634
FROM CSEB 0 16
TOTAL 3898 5104
IN MUs
INSTALLED CAPACITY OF SOUTHERN REGION AS ON 31.03.2002
IN MW
26163MW12206 (46%)
9912 (38%)780 (3%)2487 (10%)
25 (0.1%)
753 (3%)
HYDRO THERMAL GAS WIND IPP NUCLEAR
STATE/CGS HYDRO THERMAL GAS WIND IPP NUCLEAR TOTAL
ANDHRA PRADESH 3042 3443 273 2 1100 7860
KARNATAKA 3082 1388 2 341 4813
KERALA 1795 235 350 2 171 2553
TAMIL NADU 1993 3570 130 19 875 6587
NTPC 2100 2100
NLC TS II 1470 1470
MAPS 340 340
KAIGA 440 440
TOTAL 9912 12206 753 25 2487 780 26163
IN % 38% 47% 3% 0.10% 9% 3%
INSTALLED CAPACITY OF SR IN MWINSTALLED CAPACITY OF SR IN MWAS ON 31st March 02
INSTALLED CAPACITY OF ANDHRA PRADESH AS ON 31.03.2002
IN MW
7860MW3443 (44%)
3042 (39%)1100 (14%)
2 (0.03%)
273 (3%)
HYDRO THERMAL GAS WIND IPP
INSTALLED CAPACITY OF ANDHRA PRADESH:
IN MW IN PERCENTAGE
HYDRO 3042 39%
THERMAL 3443 44%
GAS 273 3%
WIND 2 0.03%
IPP 1100 14%
TOTAL 7860
AS ON 31st March 02
INSTALLED CAPACITY OF KARNATAKA AS ON 31.03.2002
IN MW
4813MW
1388 (29%)
3082 (64%)
341 (7%)2 (0.04%)
HYDRO THERMAL WIND IPP
INSTALLED CAPACITY OF KARNATAKA:
IN MW IN PERCENTAGE
HYDRO 3082 64%
THERMAL 1388 29%
WIND 2 0.04%
IPP 341 7%
TOTAL 4813
AS ON 31st March 02
INSTALLED CAPACITY OF KERALA AS ON 31.03.2002
IN MW
2553MW
235 (9%)1795 (70%)
171 (7%)2 (0.1%)
350 (14%)
HYDRO THERMAL GAS WIND IPP
INSTALLED CAPACITY OF KERALA:
IN MW IN PERCENTAGE
HYDRO 1795 70%
THERMAL 235 9%
GAS 350 14%
WIND 2 0.08%
IPP 171 7%
TOTAL 2553
AS ON 31st March 02
INSTALLED CAPACITY OF TAMIL NADU AS ON 31.03.2002
IN MW
6587MW3570 (54%)
1993 (30%)875 (13%)
19 (0.3%)
130 (2%)
HYDRO THERMAL GAS WIND IPP
INSTALLED CAPACITY OF TAMIL NADU:
IN MW IN PERCENTAGE
HYDRO 1993 30%
THERMAL 3570 55%
GAS 130 2%
WIND 19 0.29%
IPP 875 13%
TOTAL 6587
AS ON 31st March 02
S.No APTRANSCO KPTCL KSEB TNEBTOTAL
REGION
1 Installed as on 31.03.2002 5573 2841 514 2930 11858
2Programme of SEB's for
2001-2002 *427 625 550 888 2490
3Capacitors installed during
2001-200264 362 40 482.4 948.4
4 Backlog for 2001-2002 363 263 510 405.6 1541.6
5Total Cummulative
Installed as on 31.03.20025637 3203 554 3412.4 12806.4
6Capacitor installed during
April 200210 0 0 24 34
PROGRESS OF SHUNT CAPACITORS
* As furnished in 127th SREB meeting held on 6th June 2001.
EXPECTED GENERATION EXPECTED GENERATION ADDITIONSADDITIONS
STATE 02-03 03-04 04-05 05-06 06-07
ANDHRA PRADESH 2642 2288 2020 500 0
KARNATAKA 210 0 500 0 0
KERALA 262 294 549 310 0
TAMIL NADU 635 30 1050 0 2920
CENTRAL SECTOR 420 0 0 500 0
TOTAL (IN MW) 4169 2611 4118 1310 2920
EXCEL FILE
EXPECTED TRANSMISSION LINESEXPECTED TRANSMISSION LINES
STATE/CENTRAL SECTOR LEVEL 2002-03 2003-04
ANDHRA PRADESH400 KV 742 400
220 KV 472
KARNATAKA400 KV 265 482
220 KV 380
TAMILNADU400 KV 190
220 KV 604
POWERGRID500 KV400 KV
14371766 346
TOTAL500 KV400 KV
14372963 1228
220 KV 1456
IN CKT KMS
EXCEL FILE
Frequency Profile: Last 4 yearsFrequency Profile: Last 4 years
2001-0249.5-50.5 HZ
13%49-49.5 HZ7%
48.5-49 HZ11%
48-48.5 HZ
41%
<48.0HZ
23%
>50.5HZ5%
2000-01>50.5
HZ2%
<48.0HZ
12%
48-48.5 HZ
45%
48.5-49 HZ19%
49-49.5 HZ
11%
49.5-50.5 HZ
11%
1999-00>50.5
HZ4%
<48.0HZ
11%
48-48.5 HZ
45%
48.5-49 HZ18%
49-49.5 HZ9%
49.5-50.5 HZ
13%
1998-99>50.5
HZ2%
<48.0HZ
28%
48-48.5 HZ
48%
48.5-49 HZ10%
49-49.5 HZ5%
49.5-50.5 HZ7%
PIE CHART FOR FREQUENCY SPECTRUM FOR APRIL 2002
48 & < 48.513.23%
50.5 & More0.06%
49.5 & < 50.50.18%
49.0 & < 49.50.33%48.5 & < 49
0.98%
< 4885.22%
FREQUENCY SPECTRUM FOR APRIL 2002
SIGNIFICANT MILESTONESSIGNIFICANT MILESTONES1.1. 1000MW IMPORT FROM WR ON 16/07/2001. HVDC CAPACITY FULLY 1000MW IMPORT FROM WR ON 16/07/2001. HVDC CAPACITY FULLY
UTILIZED.UTILIZED.
2.2. 500MW BEING AVAILED FROM ER FROM MARCH 2002. HVDC 500MW BEING AVAILED FROM ER FROM MARCH 2002. HVDC CAPACITY FULLY UTILIZED. CAPACITY FULLY UTILIZED.
3.3. IMPORT FROM NEIGHBOURING REGIONS - 5105MU DURING 2001-02 - IMPORT FROM NEIGHBOURING REGIONS - 5105MU DURING 2001-02 - COMPARED TO 3898MU DURING 2000-01 (ie. A RISE OF 31%).COMPARED TO 3898MU DURING 2000-01 (ie. A RISE OF 31%).
4.4. AC BYPASS ARRANGMENT AT HVDC STATION, BHADRAVATI UTILISED AC BYPASS ARRANGMENT AT HVDC STATION, BHADRAVATI UTILISED FOR FAST RESTORATION DURING DISTURBANCE.FOR FAST RESTORATION DURING DISTURBANCE.
5.5. PEAK DEMAND MET 20063 MW DURING MARCH 2002 - COMPARED TO PEAK DEMAND MET 20063 MW DURING MARCH 2002 - COMPARED TO 19428 MW IN MARCH 2001.(ie. A RISE OF 3%).THE TOTAL 19428 MW IN MARCH 2001.(ie. A RISE OF 3%).THE TOTAL CONSUMPTION DURING 2001-02 - 130821 MU - COMPARED TO CONSUMPTION DURING 2001-02 - 130821 MU - COMPARED TO 127524 MU DURING 2000-01(ie A RISE OF 3%).127524 MU DURING 2000-01(ie A RISE OF 3%).
6.6. DORMANT INTER STATE LINES BETWEEN ANDHRA PRADESH AND DORMANT INTER STATE LINES BETWEEN ANDHRA PRADESH AND KARNATAKA i.e. 220KV GOOTY-BELLARY & SADEM-TANDUR MADE KARNATAKA i.e. 220KV GOOTY-BELLARY & SADEM-TANDUR MADE USE FROM 1USE FROM 1stst & 2 & 2ndnd MAY 2002 RESPECTIVELY MAY 2002 RESPECTIVELY..
7.7. ULDC CONTROL ROOM AT SRLDC FULLY FUNCTIONAL FROM 1st ULDC CONTROL ROOM AT SRLDC FULLY FUNCTIONAL FROM 1st MARCH 2002.MARCH 2002.
8.8. SLDC’s OF KARNATAKA, KERALA & TAMIL NADU EXTENSIVELY USING SLDC’s OF KARNATAKA, KERALA & TAMIL NADU EXTENSIVELY USING ULDC SCHEME. TRIAL OPERATION IN PROGRESS IN ANDHRA ULDC SCHEME. TRIAL OPERATION IN PROGRESS IN ANDHRA PRADESH.PRADESH.
PROBLEMSPROBLEMS LOW GRID FREQUENCYLOW GRID FREQUENCY LOW VOLTAGESLOW VOLTAGES HEAVY MVAR DRAWALSHEAVY MVAR DRAWALS CAPACITOR INSTALLATION-BACKLOGCAPACITOR INSTALLATION-BACKLOG MEAGRE RELIEF FROM AUFR’SMEAGRE RELIEF FROM AUFR’S RELUCTANCE - MANUAL LOAD RELUCTANCE - MANUAL LOAD
SHEDDINGSHEDDING TRANSMISSION CONSTRAINTSTRANSMISSION CONSTRAINTS PROTECTION CO-ORDINATIONPROTECTION CO-ORDINATION GRID GRID
DEFENCELESS DEFENCELESS VULNERABLEVULNERABLE
SOLUTIONSOLUTION
MAINTAIN FREQ BETWEEN 49-50.5 HZMAINTAIN FREQ BETWEEN 49-50.5 HZ ACCELERATE SHUNT CAPACITOR ACCELERATE SHUNT CAPACITOR
INSTALLATIONINSTALLATION REINSTATE 2 STAGE UFR’SREINSTATE 2 STAGE UFR’S PROTECTION CO-ORDINATIONPROTECTION CO-ORDINATION AUGMENTATION OF TRANSMISSIONAUGMENTATION OF TRANSMISSION SCIENTIFIC SETTLEMENT SYSTEM-ABTSCIENTIFIC SETTLEMENT SYSTEM-ABT FREE GOVERNOR MODEFREE GOVERNOR MODE
SELF HEALING MECHANISMSELF HEALING MECHANISM CONJUNCTIONCONJUNCTION
KARNATAKA ISSUESKARNATAKA ISSUES11 400/220 KV 500MVA TRANSFORMER AT HOODY 400/220 KV 500MVA TRANSFORMER AT HOODY
CONTINUOUSLY OVER LOADED CONTINUOUSLY OVER LOADED - FREQUENT TRIPPING.- FREQUENT TRIPPING.- GRID DISTURBANCES/SEPARATIONS- GRID DISTURBANCES/SEPARATIONS
22 INADEQUATE SHUNT COMPENSATIONINADEQUATE SHUNT COMPENSATION- EXTREME LOW VOLTAGE (300KV) AT - EXTREME LOW VOLTAGE (300KV) AT
BANGALOREBANGALORE- FREQUENT POWER SWINGS- FREQUENT POWER SWINGS- RESTRICTION IN INTER REGIONAL - RESTRICTION IN INTER REGIONAL
ASSISTANCEASSISTANCE
33 NO REDUNDANCY IN 220KV NETWORK – LINES FULLY LOADED.NO REDUNDANCY IN 220KV NETWORK – LINES FULLY LOADED.
44 OBSOLETE PROTECTIVE RELAYS – FREQUENT MALOPERATION.OBSOLETE PROTECTIVE RELAYS – FREQUENT MALOPERATION.
55 MAJORITY EXISTING 220KV SUB-STATIONS WITHOUT BUS-BAR MAJORITY EXISTING 220KV SUB-STATIONS WITHOUT BUS-BAR PROTECTION.PROTECTION.
66 POOR MONSOON POOR MONSOON - DEPLETED HYDEL RESERVOIR.- DEPLETED HYDEL RESERVOIR.- PERPETUAL OVER DRAWAL AT LOW - PERPETUAL OVER DRAWAL AT LOW
FREQUENCY.FREQUENCY.
DISTURBANCES IN SOUTHERN REGION DURING 2002
No
Date of Event
Time when the event occurred
Description of the Event and area affected Remarks
1 23-Jan-02 12:49
VTS-BOMMUR feeder jumper got cut at VTS. Due to delay in tripping of the line LBB operated at VTS. Most
part of Andhra Pradesh & Karnataka system were effected.
Due to delay in tripping clearance of fault in VTS-BOMMUR feeder, LBB
operated at VTS. Further during restoration of loads after change
over at 12:00Hrs the voltages dipped and caused the power swing.
2 1-Mar-02 14:26Hoody transformer tripped on over load .South
Karnataka load was effected Hoody transformer tripped on over
load.
3 1-Mar-02 17:07Guttur transformer tripped on over load. Parts of south
Karnataka were effectedGuttur transformer tripped on over
load.
4 6-Mar-02 13:38Hoody transformer tripped on over load .South
Karnataka load was effected Hoody transformer tripped on over
load.
5 7-Mar-02 8:45Hoody transformer tripped on over load .South
Karnataka load was effected Hoody transformer tripped on over
load.
6 7-Mar-02 12:45Hoody transformer was Hand tripped on load due to isolator contact melting.South Karnataka load was
effected
Hoody transformer was Hand tripped on load due to isolator
contact melting.This caused a power swing and south Karnataka got
separated from rest of the system
7 19-Mar-02 10:35Hoody Transformer tripped on over load. Southern
Karnataka load was affected.
Tripping of Hoody Transformer caused power swing separating AP-
KARNATAKA from rest of the system.
8 22-Apr-02 16:45NEELAMANGALA-HOODY Tripped on fault.Total South
karnataka Load was effected.NEELAMANGALA-HOODY Tripped
on fault.
9 3-May-02 9:08HOODY AND GUTTUR transformers tripped on over
load . Parts of Karnataka(1050 MW) effected Hoody transformer tripped on over
load.
ALLOCATION OF SHARES
STATE NTPC PEAK
NTPC OFFPEA
K
NLY-II/I
NLY-II/II MAPS KAPS ERTOTAL PEAK
TOTAL OFFPEAK
Andhra Pradesh 698 711 106 192 32 18 160 1206 1218
Karnataka 439 428 153 206 26 132 156 1113 1102
Kerala 254 260 64 92 19 40 74 543 548
Tamil Nadu 536 528 184 276 259 237 100 1591 1584
PONDY 73 73 72 24 5 13 10 197 197
GOA 100 100
TOTAL 2100 2100 580 790 340 440 500 4750 4750
IN MW
PETITIONSPETITIONS
SRLDC FILED 10 PETITIONS AND 3 AFFIDAVITS WITH SRLDC FILED 10 PETITIONS AND 3 AFFIDAVITS WITH CERC ON MAINTENANCE OF GRID FREQUENCY.CERC ON MAINTENANCE OF GRID FREQUENCY.
KPTCL FILED WRIT PETITION IN THE HIGH COURT OF KPTCL FILED WRIT PETITION IN THE HIGH COURT OF KARNATAKA AGAINST CERC ORDER DATED 14-02-KARNATAKA AGAINST CERC ORDER DATED 14-02-2002.2002.
HIGH COURT OF KARNATAKA IN ITS INTERIM ORDER HIGH COURT OF KARNATAKA IN ITS INTERIM ORDER DATED 22-03-2002 STAYED CERC ODRER DATED 22-03-2002 STAYED CERC ODRER 14.02.2002.14.02.2002.
SRLDC FILED LATEST PETITION WITH CERC ON 03-SRLDC FILED LATEST PETITION WITH CERC ON 03-05-2002 ON MAINTENANCE OF GRID FREQUENCY.05-2002 ON MAINTENANCE OF GRID FREQUENCY.
O & M EXPENDITURE OF SRLDCO & M EXPENDITURE OF SRLDC
YEARSYEARS TOTAL TOTAL EXPENDITUREEXPENDITURE
1993-941993-94 24047362404736
1994-951994-95 1672605116726051
1995-961995-96 1957118019571180
1996-971996-97 2420510624205106
1997-981997-98 2849260428492604
1998-991998-99 3371177433711774
1999-001999-00 3689234536892345
2000-012000-01 4978407349784073
2001-022001-02 DETAILS
EXPENDITURE OF SRLDCEXPENDITURE OF SRLDCO&M EXPENDITURE OF SRLDC, BANGALORE (Amt. in Rs.)
A/ c.Code DETAILS 1993-94 1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01
120199 WORKMAN COST 369973 1964688 2508387 2537207 3379428 3259618 4813385 9190041
120299 SUPERVISORS COST 115032 804099 957270 1281692 1096956 1052676 1458321 2830750
120399 EXECUTIVE COST 580214 3699440 4286551 7210391 8680016 11284438 14443595 15966305
120599 PF & OTHER FUNDS 83717 459873 543037 861302 890497 1705406 1648175 2541272
120699 EMPLOYEE WELFARE EXPS 112204 1172341 1425397 1962717 2157073 2850188 3165086 3917311
130199 R&M - BUILDINGS 17313 213099 122841 16636 66993 63035 75933 171067
130299 R&M -PLANT & MACHINERY 0 0 0 0 8108 0 0 0
130599 R&M -OTHERS 0 66826 170130 242584 431240 290510 315290 256069
130799 ELECTRIC ITY CHARGES 0 335053 297788 374158 618938 637079 526081 784879
130999 WATER CHARGES 5642 65018 80728 115374 126306 148622 284604 375033
140299 TRAINING COST 0 57282 12675 31997 59352 75605 109638 61363
140499 AUDIT & PROF. CHARGES 1700 8348 29370 5000 34251 89128 43295 31939
140599 COMMUNICATION EXPS 809844 4564917 5691903 5992460 6237675 7117298 4218331 4362830
140699 TRAVEL EXPS 86041 1076026 1947057 1901572 2125111 2228224 2493569 2617842
140899 STATUTORY AUDIT EXPS 0 7162 0 2555 1226 4793 0 20136
140901 PUBLIC ITY EXPS 3864 80955 21697 1645 0 6200 26682 0
141099 PRINTING & STATIONERY 76737 783681 336057 229007 264570 200341 199138 305796
141199 EDP CONSUMABLES 12418 163878 27481 51084 23406 110697 114511 79045
141399 ENTERTAINMENT EXPS 24063 192467 178599 149118 49317 18051 40700 8278
141202 TRANSIT HOSTEL EXPS 0 43860 0 0 0 0 0 0
141599 0 154436 0 0 0 0 226389 201158
141699 BOOKS & PERIODICALS 896 20566 8819 12575 12507 15937 23258 289974
141999 BROCKERAGE & COMMISSION 2166 12368 9342 2875 3090 12225 12675 6890
142499 VEHICLE HIRE, RUNN.& OTHER MISC EXPS 102912 762635 368245 388120 446525 513281 492382 583944
142599 INSURANCE 0 2909 440 6996 6552 6782 22999 21221
142899 RATES & TAXES 0 0 8196 7980 15838 7868 5775 0
150999 REBATE TO CUSTOMERS 0 0 0 0 0 0 141898 571512
151099 BANK CHARGES 0 427 0 10 35 115 141 350
163299 DEPRECIATION 0 13697 539170 820051 1757594 2013657 1990494 4589068
TOTAL EXPENDITURE 2404736 16726051 19571180 24205106 28492604 33711774 36892345 49784073
MAN POWER OF SRLDC
EXECUTIVESEXECUTIVES 3737
SUPERVISORSSUPERVISORS 66
WORKMENWORKMEN 3434
TOTALTOTAL 7777