Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and...

31
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Power Electronics Thermal Management R&D P.I.: Gilbert Moreno National Renewable Energy Laboratory (NREL) 2016 Annual Merit Review June 8, 2016 EDT069 This presentation does not contain any proprietary, confidential, or otherwise restricted information.

Transcript of Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and...

Page 1: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

Power Electronics Thermal Management R&D

P.I.: Gilbert MorenoNational Renewable Energy Laboratory (NREL)2016 Annual Merit ReviewJune 8, 2016

EDT069

This presentation does not contain any proprietary, confidential, or otherwise restricted information.

Page 2: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

2

Overview

• Project start date: FY15• Project end date: FY17• Percent complete: 30%

• Weight• Performance and Lifetime• Cost

• Total project fundingo DOE share: $1,225 K

• Funding received in FY 2015: $625K

• Funding for FY 2016: $600K

Timeline

Budget

Barriers

• John Deere• Kyocera• Oak Ridge National Laboratory

(ORNL)• National Renewable Energy

Laboratory (NREL) – Project Lead

Partners

Page 3: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

3

RelevanceWhy is thermal management essential?• Manage and dissipate heat• Limit failure, increase reliability• Increase power density

Transition to wide-bandgap (WBG) devices changes, but does not reduce, need for thermal management

• More efficient Less heat• Reduced area Increased heat flux• Higher junction temperature Larger temperature gradients,

impacts other components that may not tolerate higher temperatures:o At the module level: bonded interface materials, thermal greaseso At the inverter level: DC-link capacitors, electrical boards

WBG

Page 4: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

4

Relevance

Objective: Develop thermal management techniques to enable high-temperature, WBG devices in power electronics

• Estimate component temperatures (e.g., capacitor, electrical board, solders) under elevated device temperature conditions

• Evaluate the effect of different under-hood (all-electric, hybrid-electric) temperature environments on component temperatures

Page 5: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

5

Approach/Milestones

Month / Year Description of Milestone or Go/No-Go Decision

Status

December 2015 Milestone: Complete inverter-scale thermal simulations. Complete

March 2016Milestone: Complete identification and assessment of thermal bottlenecks in the inverter and converter systems.

Complete

June 2016 Go/No-Go: Determine strategy to overcome the thermal bottlenecks and limitations. In progress

September 2016

Milestone: Complete modeling of the performance of the improved inverter-scale thermal management concepts and prepare a report to summarize the project results.

Upcoming

Page 6: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

6

Power Electronics Thermal Management R&D

Application Thermal Research Thermal and Fluid Measurement Research

WBG Power Electronics Thermal Management

Advanced Cooling Technologies for John Deere Inverter(cooperative research and development agreement [CRADA])

Fluids/coolants

Advanced Materials

Approach/Strategy

Interactions with other DOE projects: Thermal Performance Benchmarking (NREL), Motor Thermal Management R&D (NREL), Performance and Reliability of Bonded Interfaces for High-Temperature Packaging (NREL), EDT System Benchmarking (ORNL)

Particle image velocimetry to understand heat transfer mechanisms of jets impinging on micro-structure surfaces

Phase-sensitive transient thermoreflectance to measure thermal properties of new interface materialsPhoto Credit: Gilbert Moreno (NREL) Photo Credit: Xuhui Feng (NREL)

Page 7: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

7

Approach/Strategy

Create thermal models of an automotive inverter

Simulate WBG operation using the inverter model

Explore advanced cooling strategies

Quantify the inverter component temperatures

under elevated device temperatures

Validate the thermal models

Evaluate different module topologies

Experimentally validate some key thermal management

concepts

cold plate

coppercopper-molybdenum DBC

cold plate

Develop thermal management concepts to

enable WBG power electronics

WBG Power Electronics Thermal Management

Identify the primary thermal paths through which heat is

conducted from the devices to the other components

0

10

20

30

40

50

60

70

80

90

100

0 2 4 6 8 10 12 14 16

Spec

ific

ther

mal

resi

stan

ce: R

" th

,j-l (m

m2 -

K/W

)

Flow rate (liters per minute)

Experiment

Model: maximum

Model: average

DBC: direct-bond copper

Photo Credit: Scot Waye (NREL)

Page 8: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

8

2012 LEAF

Accomplishments: Automotive Inverter Thermal Model

• Created thermal models of the 2012 Nissan LEAF (80 kW) and used them to simulate WBG conditions

• Will create several inverter models to evaluate different inverter designs

• Working to develop thermal solutions that can be applied across a wide range of inverter designs

Model

Photo Credit (all images): Scot Waye (NREL)

Page 9: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

9

IGBT / MOSFETdiode copper-molycopper plate

TIM - dielectric pad -TIM

aluminum cold plate

device soldercopper-moly solder

silicone

Accomplishments: Model Description

DBC-based configuration WBG module

Other module configurations to be evaluated (future work)

Copper plate /electrical conductor is adjacent to the cold plate

LEAF Module

Used SiC thermal properties for devices to simulate WBG

IGBT: insulated gate bipolar transistor, MOSFET: metal-oxide-semiconductor field-effect transistor, SiC: silicon carbide, TIM: thermal interface material

Page 10: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

10

Accomplishments: Model Description

Capacitors: Metalized film

Power modules and gate driver board

zr

φ

Capacitor winding thermal conductivity (k)

kz = kφ = 0.46 W/m-Kkr = 0.16 W/m-K

Electrical board thermal conductivity (k)

kx = ky = 0.81 W/m-Kkz = 0.29 W/m-K

z

x

y Electrical pins included to account for the thermal path from the devices to the gate driver board

Page 11: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

11

Accomplishments: Model versus Experiment

• Validated the junction-to-coolant thermal resistance in the Thermal Benchmarking project

o Model within 6% of experimental results

Source: Burress, T. 2012 “Benchmarking of Competitive Technologies,” 2012 DOE VTO Annual Report

• Used ORNL’s test data to validate the capacitor’s thermal performance

o Water-ethylene glycol (WEG) inlet temperature = 65°C, DC voltage = 375 V

o Used the 50-kW transient and 80-kW steady-state test data for comparison

Page 12: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

12

Accomplishments: Model versus ExperimentEstimated component heat dissipation Heat on all components imposed as a volumetric heat generation value

Mechanical power

Mechanical power/ ηmotor

Mechanical power/ (ηinverter × ηmotor)

Bus bar heat𝑰𝑰𝑫𝑫𝑫𝑫, 𝑨𝑨𝑫𝑫𝟐𝟐 × 𝜴𝜴𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄𝒄

Capacitor heat𝑰𝑰𝒄𝒄𝒓𝒓𝒄𝒄𝒄𝒄𝒓𝒓𝒄𝒄𝟐𝟐 × ESR

Total Heat

Power module heat• Equal to the total heat minus the

bus bar and capacitor heat• Assumed a 3-to-1 IGBT-to-diode

heat loss ratio

Photo Credit: Scot Waye (NREL)

η: efficiency, I: current , Ω: electrical resistance, ESR: equivalent series resistance

Photo Credit: Scot Waye (NREL)

Page 13: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

13

0

10

20

30

40

50

60

70

0 10 20 30 40 50 60Te

mpe

ratu

re (°

C)

Time (minutes)

ORNL experimental data

Model (capacitor thermistor location)

Accomplishments: Model versus Experiment

80 kW, steady-state condition

Model-predicted capacitor temperature compares well with measured value of ~75°C

50 kW, transient condition

Model-predicted capacitor temperature versus time response compares well with test results

85.2

75.2

78.3

70

80

90

100

IGBT Capacitor (thermistorlocation)

Gate driver

Max

imum

Tem

pera

ture

(°C

)

CFD

CFD: computational fluid dynamics, FEA: finite element analysis

Transient FEA

Page 14: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

14

Accomplishments: Simulating WBG Conditions

• Simulated WBG conditions by increasing the device (MOSFET) temperatures to 175°C, 200°C, and 250°C

• Quantified component (capacitors, boards) temperatures under elevated device temperatures

• Varied the under-hood temperature to simulate all-electric and hybrid-electric vehicle environments

Under-hood temperatures evaluated:

• 75°C all-electric• 125°C hybrid-electric• 140°C hybrid-electric (near engine)

Page 15: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

15

Accomplishments: Simulating WBG Conditions

• Increasing the device temperatures requires increasing the device heat (assuming device size and count remains the same)

• Increasing inverter power beyond 80 kW would require re-designing the inverter (larger bus bars, more capacitors)

• Challenging to compute heat loads for the bus bars and capacitors at power levels greater than 80 kW

0

1

2

3

4

5

6

7

8

9

10

100 125 150 175 200 225 250 275

Inve

rter

Hea

t (kW

)

Maximum Junction Temperature (°C)

Page 16: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

16

Accomplishments: Simulating WBG ConditionsModeled three cases to compute component temperatures

• Case 1: Only the modules generated heat

• Case 2: Module heat plus the bus bar and capacitor heat values computed at 125°C junction temperature condition

o Assuming that the bus bar size and number of capacitors would increase to accommodate the increased power, but the heat dissipated per component remains the same

• Case 3: Module heat plus the bus bar and capacitor heat computed as a percentage of the module heat. Percentage taken at the 125°C junction temperature condition

Case Capacitors (total) Bus bars (total)

3 0.06% of module heat 0.72% of module heat

Case Capacitors (total) Bus bars (total)

2 1.6 W 21.2 W

Case Capacitors (total) Bus bars (total)

1 0 0

Page 17: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

17

Accomplishments: CFD-Estimated Capacitor Temperatures

• For all cases, capacitors exceed 85°C (typical limit of polypropylene film capacitors)

• Capacitor temperature target of 140°C seems appropriate for junction temperatures up to 250°C

• Increasing under-hood temperature does not have a significant effect on capacitor temperatures

108

115

130

113

120

135

114

122

137

70

80

90

100

110

120

130

140

150

174.1 198.6 248.3

Max

imum

Tem

pera

ture

(°C

)

Maximum Junction Temperature (°C)

Capacitor Temperatures75°C

125°C

140°C

Legend shows under-hood temperatures

case 3

case 1

case 2

Error bars on figure represent

Page 18: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

18

Accomplishments: CFD-Estimated Capacitor Temperatures

• High capacitor temperatures not a result of capacitor self heating, but associated with heat conducted from the power modules via the bus bars

• Developing methods to cool the bus bars will be a focus of the project

175°C junction temperature, 75°C under-hood temperature

Page 19: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

19

136

151

183

136

152

183

136

152

183

70

80

90

100

110

120

130

140

150

160

170

180

190

200

174.1 198.6 248.3

Max

imum

Tem

pera

ture

(°C

)

Maximum Junction Temperature (°C)

Gate Driver Board Temperatures75°C125°C140°C

Accomplishments: CFD-Estimated Gate Driver Temperatures

• Increasing the under-hood temperature has minimal effect on board temperatures

• For all cases, gate driver board exceeds 125°C (typical temperature limit for electrical boards)

Legend shows under-hood temperatures

Page 20: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

20

Accomplishments: CFD-Estimated Gate Driver Temperatures

• Proximity of the gate driver board to the modules exposes them to high temperatures

• Hottest location is where the electrical pins contact the board heat is conducted from the devices to the board via the electrical pins

175°C junction temperature, 75°C under-hood temperature

Page 21: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

21

173

198

247

163

185

229

159

180

223

100

125

150

175

200

225

250

275

174.1 198.6 248.3

Max

imum

Tem

pera

ture

( °C

)

Maximum Junction Temperature (°C)

Device solder Substrate solder TIM

Accomplishments: CFD-Estimated Solder and TIM Temperatures

• Device solder essentially at the junction temperature

• High-temperature bonding materials are required for die and substrate attach layers

• High-temperature TIMs are required (~165°C – 200°C typical maximum operating temperature for TIMs)

• Power module temperatures not affected by under-hood temperatures

75°C under-hood temperature

Page 22: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

22

0

50

100

150

200

250

300

0 20 40 60 80 100 120

Max

imum

Tem

pera

ture

(°C

)

Time (minutes)

MOSFETs

Gate driver board

Capacitor windings

Accomplishments: Transient FEA

• MOSFETs achieve maximum temperature within a few seconds

• Capacitors take minutes to achieve maximum temperatures

• Opportunities to operate at full power for short periods of time without exceeding board or capacitor temperature limits

75°C under-hood temperature

250°C Junction Condition

Page 23: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

23

Accomplishments: Advanced Cooling Concepts

• Conducted analyses to compare the thermal performance of baseplate-cooled and DBC-cooled configurations

• Identified the convective cooling performance required to enable DBC-cooled configurations to outperform baseplate-cooled configurations

Low Convective Resistance: Less heat spreading, removing layers (e.g., baseplate) is beneficial

High Convective Resistance: Increased area from the baseplate is beneficial

Baseplate Cooled DBC Cooled

Page 24: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

24

10

100

1 10 100 1,000

Spec

ific

ther

mal

resi

stan

ce: R

" th,

j-f (

mm

2 -K

/W)

Convective thermal resistance: R"th, convective (mm2-K/W)

Accomplishments: DBC versus Baseplate-Cooled FEA Results

Die area: 5 mm × 5 mm

Direct-cooled DBC

Direct-cooled baseplate

LayersSiC

SolderCu

SiN (substrate)Cu

SolderAlSiC

(baseplate)

• Heat spreading is more effective at higher convective resistance values• Direct cooling of the DBC is superior when convective resistance is less than ~20 mm2-K/W

(heat transfer coefficient of >~50,000 W/m2-K)

a

DBC

Die

Cooled surface

a

b

DBC

Baseplate

Die

Cooled surface

a = 3.5 mm

a = 7.5 mm

a = 7.5 mm b = 7 mm

a = 3.5 mm b = 7 mm

AlSiC: aluminum silicon-carbideCu: copperSiN: silicon nitride

Page 25: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

25

Accomplishments: WEG Jet Impingement CFD Results

L=20 mm

L=20

mm

2 mm diameter (d) orifice

Round orifice jet

L=20 mm

L=20

mm

2 mm (w) slot

Slot jet

• WEG submerged jet impingement cases evaluated cannot achieve the 50,000 W/m2-K target• Continue to evaluate other cooling options

0 0.5 1 1.5 2

0

10,000

20,000

30,000

40,000

50,000

0 2 4 6 8 10 12

Flow Rate (lpm)

Hea

t Tra

nsfe

r Coe

ffici

ent (

W/m

2 -K

)

Jet Velocity (m/s)

L/d=10 L/w=10

0 5 10 15 20 25

0

10,000

20,000

30,000

40,000

50,000

0 2 4 6 8 10 12

Flow Rate (lpm)

Hea

t Tra

nsfe

r Coe

ffici

ent (

W/m

2 -K

)

Jet Velocity (m/s)

Page 26: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

26

Response to Previous Year Reviewers’ Comments

• Reviewer Comment: “This reviewer found a nice simple introduction of the heat transfer challenges and the relevance of the project, but thought it would be nice to include the management of heat flows through other components of the complete system (not just the inverter module) and heat generation in other components. Complex and quite geometry, materials, and design specific – should span a range of technology and design options.”

We agree with the reviewer and have included the majority of the inverter components in the thermal models including the capacitors, bus bars, electrical boards. We have also included heat dissipation for the power modules, capacitors, and bus bars.

• Reviewer Comment: “The reviewer expects that next year the team should be able to demonstrate how they actually worked together rather than just talking about getting CRADAs and non-disclosure agreements (NDAs) in place.”

We have established a CRADA project with John Deere and are working with them to develop a power-dense, two-phase-cooled inverter.

Page 27: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

27

Collaboration and Coordination with Other Institutions

• John Deere (industry): CRADA project to develop a power-dense, two-phase-cooled inverter

• Kyocera (industry): Evaluating substrate cooling configurations

• ORNL (national laboratory): Interactions related to ORNL’s benchmarking work

• Interactions with other industry contacts

Page 28: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

28

Remaining Challenges and Barriers

• Every inverter is unique, which makes it difficult to develop cooling strategies that are applicable to all inverters

• We are working to develop thermal management concepts that are applicable to a wide range of inverter designs

Page 29: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

29

Proposed Future Work

FY 2016

• Evaluate different power module designs to see effect on component temperatures

• Develop methods to prevent heat from spreading to the capacitors and electrical boards

FY 2017

• Evaluate motor-related heating effects

• Estimate the effect of degrading thermal properties on component temperatures

• Conduct experimental validation of key thermal concepts developed

Page 30: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

30

SummaryRelevance• Develop thermal management techniques to enable increased efficiency and power density via

WBG power electronics

Approach/Strategy• Model the effects of high-temperature WBG devices in an automotive inverter• Compute inverter component (e.g., capacitors, boards, bonded interfaces) temperatures under

elevated device temperatures• Develop thermal strategies to enable WBG power electronics

Technical Accomplishments• Created thermal models of an automotive inverter and used them to simulate WBG conditions• Estimated the inverter components (e.g., capacitors, boards, bonded interfaces) temperatures at

WBG device temperatures of 175°C, 200°C, and 250°C• Identified the electrical interconnections as the primary paths that conduct heat from the devices to

the other passive components• Working with John Deere to use advanced cooling technologies and develop a power-dense inverter

Collaborations• John Deere• Kyocera• ORNL

Page 31: Power Electronics Thermal Management R&D improved inverter-scale thermal management concepts and prepare a report to summarize the project results. Upcoming. 6 Power Electronics Thermal

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

For more information contact:

Principal InvestigatorGilbert [email protected]: (303) 275-4450

EDT Task LeaderSreekant [email protected]: (303) 275-4062

Acknowledgment:

Susan Rogers and Steven Boyd, U.S. Department of Energy

Team Members:

Kevin BennionCharlie King