The new point-of-reference tool for Electricity Transmission Asset and Operation Management

Transcript of Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

Page 1: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

The new point-of-reference tool for Electricity Transmission Asset and Operation Management

Page 2: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Marcus StenstrandProgram Manager for Fingrid 's Elvis project

Jens DalsgaardPrincipal Business process Consultant & SME in Electric Utility and GIS

Presenting the Presenters

Marcus has a vast experience that is based on various responsibilities from manager positions in maintenance and asset management, in addition with business and strategy development at Fingrid. Been active in bringing in new methods of working and operating such us knowledge and performance management with service providers. Worked with international benchmarking for several years and worked on the PAS55 adaption team at Fingrid and the Finnish ISO55000 review committee. http://fi.linkedin.com/in/stenstrand/en

In the ELVIS project Jens Dalsgaard has been responsible for planning, leading and documenting clarification workshops, data modelling and data migration, and the close cooperation with Fingrid and IBM gave invaluable insight into business processes throughout the life cycle of grid operation and asset management. https://www.linkedin.com/in/jensdalsgaard

Page 3: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Power Transmission Network

The main electricity

transmission network, to which major power plants,

factories and regional distribution networks are mainly

linked.

Also connects Finland to international electricity

markets.

Page 4: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

The main grid in numbers

113 substations

14 400 km of power lines 300 km of submarine cable

48 000 towers

10 reserve power plants > 935 MW reserve

Page 5: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Fingrid 's tariff is among the lowest in Europe

Norway Finland Belgium Denmark Czech

Republic Ireland Slovakia

€/MWh

Source: Entso-E

The comparison includes European main grid companies with responsibility for110 kV and 400 kV electricity grids.

Great Britain

Page 6: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

We make sure that Finland obtains electricity without disturbances

There are

525,600 minutes

in a year. *The average duration of transmission disturbances for

Fingrid main grid customers is 3 minutes per year.

3 min*

Page 7: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Fingrid

According to international benchmarks, cost effectiveness and grid reliability are

among the best in the industry.

One of the world's best electricity companies since 1995.

Page 8: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

88 89 90 91 92 93 94 95 96 97 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16

1988 First Computerized maintenance management system (CMMS) application (in-house, called KUNTO) into use, data collected by paper form in-hand

1992 First Enterprise Asset Mgmt system (EAM) into use (fully integrated between applications. In-house, called ELNET), UNIX based○ Asset register○ CMMS with Condition

prediction models and work package mgmt

○ Mobile handhelds for inspection results

○ GIS○ Relay settings, out-

age mgmt, grid calc.

1997-1999 ELNET user interface updated from UNIX to Windows

2002 FgPartners Extranet for Service Providers where all asset related data available (Citrix), same tools and data for Fingrid and service providers

2001 Project Portfolio and project mgmt tool introduced (Artemis CmPro)

2003 Paperless office reached 100 %, last drawings and technical documents scanned into DMS (Bentley ProjectWise)

2006 Work order follow -up and cost supervision tool introduced (in-house, called TOSU)

2005 Buisness Intelligence (BI) tools introduced for combining financial data with asset data (IBM Cognos). Performance mgmt dashboards introduced for all roles

2005 Time series database for history data from SCADA (OSIsoft PI)

2012 Condition history and on-line monitoring plus asset health indices (OSIsoft ProcessBook)

2013 ELVIS part 1: Substation asset register and maintenencae (Maximo) plus ProjectPortfolio update (Primavera)

ELVIS part 2 & 3.

The next step

2007 First on-line condition monitoring meters in to use (in-house)

History lane for Asset mgmt support tools at Fingrid

Knowledge Management has been of high importance in strategy for decades

Page 9: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Fingrid's next generation Asset Management solution

ELectricity

Verkko (Finnish word for Grid)

Information

System• Solution planning started in 2008• Project kick-off in 2012• Final parts in to be deployed in 2015• Solution provider IBM, ESRI, Informi GIS, Siemens, IPS, Electrocon,

Project Institute Finland,

Page 10: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

ELVIS main goalsIncreasing operative efficiency, lowering risk and improving decision making

Process Digitization

Big Data

Master Data

• Next generation streamlining of asset management processes

• 2nd generation performance dashboards

• Integrating all business data• Combining asset mgmt data with IoT

generated data• Enabling industry wide data analytics

• Single source for power system information → One version of the truth

• Data entered only ONCE into ONE system, other systems uses this data

ELVIS is part of Asset Mgmt strategy, not part of IT

Page 11: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Asset Management and Grid Optimization

A high data quality is the foundation for any qualified decision making.

Fingrid has established a coherent setup establishing / guaranteeing the data needed in asset management, in grid optimization, as well as in many other business processes.

Page 12: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Two Fundamental Architectural Strategies

Data should be entered once and distributed as needed

Standard software products should be used with a minimum of customization required.

Page 13: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

An Overview of the ELVIS Solution

GIS

Maximo

PSS®ODMS PSS®E

IPS CAPEPrimavera

1. Complete grid documentation in one place

2. Integrated with asset and work management

3. Integrated project planning

4. CIM based electrical grid model generated from GIS model

5. Electrical calculations and analysis

6. Relay management and calculations

Standard Software Packages

Page 14: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

GIS

Maximo

PSS®ODMS

1. Complete grid documentation in one place

2. Integrated with asset and work management

3.

4. CIM based electrical grid model generated from GIS model

Let’s Focus on Central Parts of Elvis

GIS holds the crucial grid documentation

Page 15: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

The PowerGrid Data Model in GIS

The objectives / requirements behind the PowerGrid data model are:

Holds complete and topologically correct documentation of the grid

Supports asset management in cooperation with 3rd party EAM solution

Supports extract to CIM for subsequent complex analyses

Supports life cycles from planning till decommissioning

Requires a minimum of customization

GIS

Page 16: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

The Grid is Documented in GIS

Page 17: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

GIS data supporting business processes

Through integrations GIS data is made available to:

• The Maximo asset management solution

• The PSS®ODMS / PSS®E power system planning and analysis solution

Reversely relevant data from Maximo and the PSS solutions is made available in GIS.

Data is entered once and distributed as needed

Page 18: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Integrated with the Asset Management System

In Maximo assets are related to locations originating from GIS.

This allows not only benefitting from the ‘hierarchical’ / relational information from GIS.

As locations are geometric the asset manager may also search and visualize intuitively /

efficiently using maps.

Page 19: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

The Asset Management System

The Maximo solution handles tasks related to:

Asset life cycle tracking

Maintenance planning and documenting

Work management

Inventory management

Procurement management

Page 20: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Business value as of now – asset management-wise

• Previous Elnet Grid Information System, which has been in use for more than 20 years, has been replaced by ELVIS

• With better business process support and lots of flexibility it is now• Easier to calculate the value of the grid• Possible to make more accurate calculating and assessment of life-cycle costs.• Easier and quicker to access relevant and updated information for Fingrid personnel –

centrally as well as in the field using mobile devices.

• The consolidated data strategy ensures the high data quality that is the foundation for any qualified decision making.

Page 21: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Right of Way Management – work order management

Another great example of GIS and Maximo co-existence is with respect to the

Right of Way management.

• Right of Way aims at protecting property (overhead lines)

• Tree trimming has been out-sourced

• The solution eases

– Tendering

– Contract management

– Access to data for external parties

– Tracking the progress of work

Page 22: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Grid Documentation from GIS used in grid planning

The same GIS data is used for advanced network analyses and grid planning using

PSS®ODMS / PSS®E.

This is enabled using an integration based on the IEC CIM standard as

recommended by ENTSO-E.

Page 23: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Results Visualized in The Map

Visualizing results in a map

reveals patterns / contexts

that often are hard to

deduct from spreadsheets /

KPI’s etc.

These examples of GIS

visualizing results from

network analyses speak for

themselves. GIS heat maps using PSS analysis results

Page 24: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Business value as of now – network analysis-wise

• Grid planning and grid optimization in electric transmission always means big expenditures / big potential savings.

• The consolidated data strategy and corresponding standard-based integration between GIS and analysis tools ensures the data required for planning / analysis

• By providing the very high quality of data that is required for analyses, power engineers may focus their time on actually analyzing rather than providing data.

• By subsequently applying the analysis data in GIS • Patterns become clear• Assets exposed to heavy loading may be pinpointed and offered extra attention.

Page 25: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Ensuring a High Data Quality

With GIS responsible for these crucial data,

ensuring high data quality becomes a central concern.

The recent data migration from various sources led to impressive results.

The chosen Esri ArcGIS solution holds inherent functionality streamlining the

ongoing processes maintaining the required data quality at the source.

Keeping in mind that

A high data quality is the foundation for any qualified decision making

this is pivotal.

Page 26: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Concluding so far…

With the ELVIS project

Fingrid has established a setup

streamlining crucial business processes related to

asset management and to grid analysis

The success is to a large extent based on a coherent use of data from GIS.

Page 27: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Concluding so far…

At Fingrid spatial information now constitutes key

corporate data that is used by all business functions,

i.e. planning, operation, construction, maintenance,

accounting, etc.

Page 28: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

And there is more to come

Fingrid has plans for further developing the ELVIS solution.

Page 29: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

By bringing real time - and historical data originating from SCADA into ELVIS Fingrid plan on further

streamlining:

• Outage switching planning and execution

• Asset management and fault predicting

• More widespread access to and use of

this essential set of data

Real Time Data / Big Data

Electron CAPERelay simulation

Maximo Spatial

SAPWork Manager

Oracle PrimaveraProject Management

IBM MaximoAsset Management

ESRI ArcGISGIS

Siemens PSS®ODMSGrid modeling

Primavera Adapter

Siemens PSS®EGrid Calculation

IPS RelexRelay Management

OSIsoft PI AF &

ProcessBook

OSIsoft PIReal-time & data storage

SCADA

Buzz word alarm

Page 30: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Summary and Conclusion

• The fundamental electrical grid model is documented in GIS.

GIS

• Integration between GIS and the Maximo asset management solution ensures • optimized grid design • optimized maintenance processes • data consistency throughout the asset life cycle.

Asset Management

• Integration between GIS and ODMS ensures grid data for electrical design, analysis and calculation

Network Analysis

Data is entered once and distributed as needed

Page 31: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Summary and Conclusion

GIS

Maximo

PSS®ODMS PSS®E

IPS CAPEPrimavera

1. Complete grid documentation in one place

2. Integrated with asset and work management

3. Integrated project planning

4. CIM based electrical grid model generated from GIS model

5. Electrical calculations and analysis

6. Relay management and calculations

Data is entered once and distributed as needed

Page 32: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Summary and Conclusion

The clue regarding business process optimization

lies in seeing the big picture

and implementing a data sharing strategy.

Behind the Fingrid success lie

a thorough analysis and description of business processes in their entirety

and the subsequent consolidated system architecture being based here upon.

Page 33: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Any transmission or large distribution company

aiming at optimizing processes across GIS, enterprise asset

management and electrical grid calculation / design

should take a look at the Fingrid ELVIS solution.

Summary and Conclusion

Page 34: Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Management Exchange 2015

2015

Copyright Powel. Do not use content or parts hereof without written consent by Powel.

Thank You for Your Interest

The new point-of-reference tool

for Electricity Transmission

Asset and Operation

Management