THE CHESAPEAKE BAY TMDL: Restoring Waters of Pennsylvania and the Chesapeake Bay
Potomac Round Table Bay TMDL Update 4/1/2011. Schedule Dec 29,2010 EPA established Bay TMDL Dec...
-
Upload
morgan-pierce-moore -
Category
Documents
-
view
215 -
download
0
description
Transcript of Potomac Round Table Bay TMDL Update 4/1/2011. Schedule Dec 29,2010 EPA established Bay TMDL Dec...
Potomac Round TablePotomac Round TableBay TMDL UpdateBay TMDL Update
4/1/20114/1/2011
ScheduleSchedule Dec 29,2010 EPA established Bay TMDLDec 29,2010 EPA established Bay TMDL March/April/May/June 2011 EPA Model March/April/May/June 2011 EPA Model
Updates – Updates – loadings will change for urban (land use loadings will change for urban (land use update) and agriculture (nutrient management plans)update) and agriculture (nutrient management plans)
June/September 2011 Draft State Phase June/September 2011 Draft State Phase 2 WIP to EPA2 WIP to EPA
November 2011/March 2012 Final State November 2011/March 2012 Final State Phase 2 WIP to EPAPhase 2 WIP to EPA
Phase 2 GoalsPhase 2 Goals EPAEPA
Provide Roadmap at scale that helps partnersProvide Roadmap at scale that helps partners Engage local decision makersEngage local decision makers Provide specific controls to be implemented by 2017Provide specific controls to be implemented by 2017 Ensure no backslidingEnsure no backsliding Endorsement from local officialsEndorsement from local officials
StateState Allow Flexibility in implementationAllow Flexibility in implementation Extensive implementation of resource management Extensive implementation of resource management
plans on Agricultural landsplans on Agricultural lands Vastly improved accounting of voluntary practicesVastly improved accounting of voluntary practices Develop local profiles – collect information from Develop local profiles – collect information from
localitieslocalities Refine allocations- goalsRefine allocations- goals Work with stakeholders to develop planWork with stakeholders to develop plan
State ProcessState Process Stakeholder Advisory Group (SAG) – Stakeholder Advisory Group (SAG) –
April 26, 2011 – First MeetingApril 26, 2011 – First Meeting
State holding meetings with 16 State holding meetings with 16 Planning District Commissions – to Planning District Commissions – to get their helpget their help
Non-Environmental Bay Non-Environmental Bay StuffStuff
American Farm Bureau vs. EPAAmerican Farm Bureau vs. EPA TMDL is Arbitrary and CapriciousTMDL is Arbitrary and Capricious Inadequate Notice and CommentInadequate Notice and Comment EPA Exceeded its AuthorityEPA Exceeded its Authority
Hampton Roads Planning District – Hampton Roads Planning District – considering challengeconsidering challenge
EPA’s Peer Review – Model not EPA’s Peer Review – Model not appropriate for use at local levelappropriate for use at local level
SB 1099 Offsets – Allows Nutrient SB 1099 Offsets – Allows Nutrient TradingTrading
SB155/HB1831 FertilizersSB155/HB1831 Fertilizers
Fairfax CountyFairfax County Appendix Q – Specific Allocations to Va. Phase Appendix Q – Specific Allocations to Va. Phase
1 MS4s1 MS4s Bay TMDL Specifics are in Draft MS4 PermitBay TMDL Specifics are in Draft MS4 Permit
Different loads to 3 different river segmentsDifferent loads to 3 different river segments Only applies to MS4 Service AreaOnly applies to MS4 Service Area
Limits Project SelectionLimits Project Selection Eliminates Stream RestorationEliminates Stream Restoration
EPA & State BMP efficiencies differEPA & State BMP efficiencies differ How does this align with local TMDLs?How does this align with local TMDLs? Sediment may preclude tradingSediment may preclude trading
Positive MovementPositive Movement HB1831/SB155 Fertilizer BillHB1831/SB155 Fertilizer Bill SJ 334 Trading ExpansionSJ 334 Trading Expansion Phase 1 WIP – Urban SidePhase 1 WIP – Urban Side
Non retrofit actions part of strategy Non retrofit actions part of strategy MS4 – 5% load reductions in first permit cycleMS4 – 5% load reductions in first permit cycle Plan and ramp up during first permit cyclePlan and ramp up during first permit cycle Flexibility – “any mix of practices”Flexibility – “any mix of practices”
Sewage Treatment Plants meeting goalsSewage Treatment Plants meeting goals
Thank youContact Information:
Randy Bartlett, P.E. Department of Public Works and Environmental ServicesFairfax County12000 Government Center ParkwayFairfax, Virginia 20035703-324-5732 TTY 711www.fairfaxcounty.gov/dpwes