Potential Future Regional Modeling Center Cumulative Analysis

19
WRAP Workshop July 29-30, 2008 Potential Future Regional Modeling Center Cumulative Analysis Ralph Morris ENVIRON International Corporation Novato, California [email protected] Workshop on Regional Emissions and Air Quality Modeling Studies Western Regional Air Partnership Denver, Colorado July 29, 2008

description

Potential Future Regional Modeling Center Cumulative Analysis. Ralph Morris ENVIRON International Corporation Novato, California [email protected] Workshop on Regional Emissions and Air Quality Modeling Studies Western Regional Air Partnership Denver, Colorado July 29, 2008. - PowerPoint PPT Presentation

Transcript of Potential Future Regional Modeling Center Cumulative Analysis

Page 1: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Potential Future Regional Modeling Center

Cumulative Analysis

Ralph Morris

ENVIRON International Corporation

Novato, California

[email protected]

Workshop on Regional Emissions and Air Quality Modeling Studies

Western Regional Air Partnership

Denver, Colorado

July 29, 2008

Page 2: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Purpose• To discuss potential activities to be included in a 2009

Scope of Work (SoW) for the next generation of the WRAP Regional Modeling Center (RMC)

• One potential future RMC task could be to provide regional air quality modeling support to the air quality components of NEPA and PSD modeling activities:– Ensures consistent approaches– Uses latest inventories, meteorology and models– Transparent assessments in the open– Serves as a repository of databases– Accounts for cumulative assessment across all potential new

projects in western U.S.• This work would be broken into a Core Effort that

provides regional modeling support across western States and Optional Efforts to provide project-specific support as requested

Page 3: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Background• Oil and Gas (O&G) development in the western states has grown

substantially in recent years

• Under NEPA, new O&G development projects must disclose potential environment impacts due to the Project alone and Project plus all other new developments in the region (Cumulative Assessment)

• New sources also need to estimate their potential AQ and AQRV impacts under PSD permitting process

• NEPA and PSD not limited to O&G development projects

Page 4: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Example Evolution of O&G EIS in SWWY• Jonah Infill Drilling Project EIS completed 2006

(Sublette County in Southwest Wyoming)– AQ and AQRV analysis using AERMOD & CALPUFF

• Draft Supplemental EIS for Pinedale Anticline development project completed in 2007– AERMOD and CALPUFF used

• In 2005, elevated winter ozone measurements are recorded in Sublette County (repeated in 2006 and 2008) – Pinedale Anticline SEIS performs ozone modeling

assessment– Final Pinedale Anticline SEIS released June 2008

showed exceedances of the 8-hour ozone NAAQS (0.075 ppm)

Page 5: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Running 8-Hour Ozone at Jonah Monitoring Site February 2005

8-Hour Ozone Measured at the Jonah Monitor in Southwest Wyoming: February, 2005

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 28

Day

8-H

ou

r O

zon

e (

pp

b)

Page 6: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Example Evolution of O&G EIS in SWWY• BLM Hiawatha and Moxa Arch O&G development

projects in SWWY– Modeling Protocol proposes AERMOD and CALPUFF (NRG,

2006)– Need to address ozone due to high ozone measurements in

Feb/Mar 2005/2006• CAMx model applied for just ozone using 36/12/4 km grid• 4 km ozone impacts in SWWY

• Questions Regarding Adequacy of Emissions in SWWY– Current-year WRAP Phase II O&G emissions deficient in VOC

emissions (designed for regional haze modeling)– Future-year Reasonable Foreseeable Development (RFD)

scenarios from past EISs also deficient in VOCs• VOCs not reported in RFD inventories as ozone modeling wasn’t

performed

– Need to redo AERMOD, CALPUFF and CAMx ozone modeling w/ corrected inventories for Hiawatha and Moxa Arch O&G EISs

Page 7: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Oil and Gas Development in SWWY

Page 8: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Example Evolution of O&G EIS in SWWY

• 2007 BLM Continental Divide-Creston (CD-C) EIS in SWWY– Propose to use CMAQ or CAMx for all far-field AQ

and AQRV as well as for ozone (No CALPUFF)– Detailed emissions updates for 2005 and 2006 in

SWWY (O&G VOC emissions increase from 200 TPY from WRAP Phase II to >100,000 TPY)

– CMAQ/CAMx evaluation comparison and model selection

• Updated SWWY O&G emissions to be used in revised Hiawatha and Moxa Arch EIS modeling– Drop CALPUFF and use CAMx for ozone as well as

far-field AQ/AQRV

Page 9: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

CD-C EIS 36/12/4 km Modeling Domains

-2520 -2160 -1800 -1440 -1080 -720 -360 0 360 720 1080 1440 1800 2160 2520

-1800

-1440

-1080

-720

-360

0

360

720

1080

1440

1800

CAMx 36/12/4 Modeling Domain

36 km: 148 x 112 (-2736, -2088) to (2592, 1944)12 km: 89 x 68 (-1452, -84) to (-384, 732)04 km: 101 x 110 (-1084, 32) to (-680, 472)

36 km

4 km12 km

Page 10: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

CD-C 12/4 km Modeling Domain

-1440 -1320 -1200 -1080 -960 -840 -720 -600 -480

0

120

240

360

480

600

720

CAMx 12/4 Modeling Domain

12 km: 89 x 68 (-1452, -84) to (-384, 732)04 km: 101 x 110 (-1084, 32) to (-680, 472)

C lass I A reasIM PR O VEC ASTN ETN ADPO ther PM m onitorsO zone m onitors

-1440 -1320 -1200 -1080 -960 -840 -720 -600 -480

0

120

240

360

480

600

720

CAMx 12/4 Modeling Domain

12 km: 89 x 68 (-1452, -84) to (-384, 732)04 km: 101 x 110 (-1084, 32) to (-680, 472)

C lass I A reasIM PR O VEC ASTN ETN ADPO ther PM m onitorsO zone m onitors

Page 11: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Relationship with other future RMC Activities

• Much of emissions, meteorological and air quality regional modeling to support EIS and PSD needs is also applicable to information needed for 8-hour ozone and PM2.5 SIPs/TIPs and 2012 regional haze SIP checks.

• Regional 36/12 km modeling can be used to provide BCs to states for focused 12/4 km modeling to address 8-hour ozone and PM2.5 SIP attainment demonstration, including regional control strategies

• New 36/12 km base year and 2013 and 2018 year modeling can be used in the 2012 regional haze SIP check analyses

• Rural/remote areas and Class I areas can be analyzed down to 12/4 km resolution for impacts and regional control strategies across state, tribal, and federal lines

• Science updates of the future RMC can be implemented in EIS modeling

• Documentation and delivery of results through WRAP TSS

Page 12: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

RMC Support to EIS/PSD Modeling• Core Support for EIS/PSD and Other Regional Air Quality

Management– Periodic Updates of Base-Year and Future-Year Emissions

Inventories – meets key need for emissions data management• Update Project-Specific information as it becomes available• Repository for emissions data and modeling files

– Base-Year 36/12 km MM5/WRF Meteorological Modeling• Western US 12 km Domain

– SMOKE Emissions and CMAQ/CAMx AQ Modeling on 36/12 km domain for Base- and Future-Years

• Model Performance Evaluation• Visibility and AQ Projections• BCs for more local-scale 12/4 km domains

– Documentation & delivery of results through WRAP TSS

Page 13: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

WRAP 36/12 km Modeling Domains

• RMC would periodically update 36/12 km modeling and provide BCs to local-scale 12/4 modeling studies– EIS

– PSD

– NAAQS

– Other?

Page 14: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

RMC Support to EIS/PSD Modeling

• Optional Support to EIS/PSD Studies– Project-Specific Modeling Protocol– 4 km MM5/WRF Meteorological Modeling

• MM5/WRF Data Processing to Project-Specific 12/4 km Domain

– SMOKE Emissions Modeling 12/4 km– CMAQ/CAMx 12/4 km Base- and Future-Year Modeling

• Zero-Out or Source-Apportionment modeling to address project-specific and cumulative new source impacts

• Address Ambient Standards, PSD I and II, Visibility, Deposition, ANC, etc.

– Documentation of Results in Technical Support Documents (TSDs) and/or

– Documentation & delivery of results through WRAP TSS

Page 15: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

RMC Support to EIS/PSD Modeling• Additional Optional RMC Support to EIS/PSD

– Processing of MM5/12/4 km data for CALMET– Processing of surface, upper-air and precipitation data

for CALMET– Processing of future-year project-specific and cumulative

emissions for CALPUFF– CALMET meteorological modeling or use of new MM5

translator to map MM5 data directly to CALPUFF inputs– CALPUFF modeling of project-specific and cumulative

sources• Post-processing for Ambient Standards, PSD Increments,

visibility, deposition and ANC– Documentation in a TSD and/or– Documentation & delivery of results through WRAP TSS

Page 16: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Relationship with Regional AQ Planning Efforts

• EIS and PSD Modeling Efforts– Continuous Support Needed

• New 35 µg/m3 24-h PM2.5 NAAQS (revised 2006)– New Area Designations:November 2009– New SIPs: April 2012– Attainment Deadline: April 2015

• New 0.075 ppm 8-Hour Ozone NAAQS (revised March 2008)– New Area Designations:2010 (2007-2009 data)– New SIPs: 2013– Attainment Deadline: 2016 (Moderate) to 2030 (Extreme)

• Regional Haze 2012 SIP Check analyses

Page 17: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

• Potential 8-hour ozone nonattainment areas under the new 2008 0.075 (pink) NAAQS [and 0.070 ppm (pink+blue) NAAQS]

8-Hour Ozone NAAQS

Current nonattainment areas under 1997 0.08 ppm 8-hour ozone NAAQS

Page 18: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

2006 PM2.5 NAAQS

PM2.5 NAAQS

1997 PM2.5 NAAQS

Page 19: Potential Future Regional Modeling Center Cumulative Analysis

WRAP Workshop July 29-30, 2008

Next Generation of the WRAP Regional Modeling Center (RMC)

• Questions

• Comments

• Discussion