Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx...

50
Steve Harrell, LEED AP, CEM, CxA SSRCx Post Occupancy Building Commissioning Successes through Continuous Commissioning ® Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University

Transcript of Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx...

Page 1: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Steve Harrell, LEED AP, CEM, CxASSRCx

“Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University

Page 2: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

AIA Quality Assurance

The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

This presentation on Continuous Commissioning will

build the case for commissioning, explain the differences

between CCx and Retro Cx, describe the results of

several facilities that engaged in this service, and

highlight the importance of persistence.

Course Description

Page 4: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

At the end of this session, participants will be able to:

1. Understand the value of “tuning up” or continuously commissioning an existing building

2. Appreciate the value of existing building commissioning3. Understand the differences in multiple commissioning services4. Understand that performance decay WILL occur in an existing

building – you can count on it, year in and year out

Learning Objectives

Page 5: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Agenda for Today……

A. Building challenges today

B. Typical causes found in most buildings today

C. Can Continuous Commissioning make a difference?

D. Case Studies

E. Value of Persistence (ongoing)

F. Wrap Up

Page 6: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Buildings are complex, inefficient, and expensive.

Challenges…

Page 7: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

The End Game

-$4,000.00

-$2,000.00

$0.00

$2,000.00

$4,000.00

$6,000.00

$8,000.00

$10,000.00

$12,000.00

Cum

ulat

ive

Savi

ngs

($)

ElectricitySavings

Page 8: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Energy Operations Comfort Training

-$4,000.00

-$2,000.00

$0.00

$2,000.00

$4,000.00

$6,000.00

$8,000.00

$10,000.00

$12,000.00

July 2011 August 2011 September2011

October 2011 November 2011 December 2011 January 2012 February 2012

Cum

ulat

ive

Savi

ngs

($)

Electricity Savings

Gas Savings

The End Game

Page 9: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Challenges…

Higher costsLower RevenuesShrinking MarginsCash Flow/Funding StaffingReduced Operating BudgetsHIGHER ENERGY COSTS

You’ve heard it all before

Page 10: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Some of the causes in your world…

• Control system may be consistent with design intent but does it operate in accordance with the building needs?

• Air Terminal programming is almost always incorrect

• Takes time, time is money• Air side economizers very seldom

fully utilized• Simultaneous heating and cooling• Occupied / Unoccupied scheduling

very rarely perfected, if used at all• Surgery suites

• Constant setpoints in lieu of resets

Poorly tuned control loops (PID)

SETPOINT

Page 11: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Some of the causes in your world…

Specs say…. “must be capable of…”• Hot water supply reset• Supply Air Temperature reset• Static Pressure reset• Condenser water temperature reset• Scheduling

Almost NEVER implemented during construction phase

New Facilities are built to higher energy standards than ever before, but do they operate more efficiently?

Page 12: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Commissioning Timeline…

Project Timeline

PLANNING DESIGN CONSTRUCTION TURNOVER OPERATIONS

Page 13: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

RCx

?

Energy Audit

What service can solve my problems?

Page 14: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Continuous Commissionin

g

Page 15: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Benchmark & Assess

Implement

Continuously Improve

Page 16: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Can Continuous Commissioning make a difference…?

William A. Harrison, P.E. in ASHRAE presidential address in

2008“Energy use in buildings could be reduced by 10 to 40 percent by improving

operational strategies in buildings.”

Gordon Holness, P.E., ASHRAE President 2009-2010

ASHRAE Journal August 2009“While we can build the seemingly most efficient buildings, that means nothing if

we cannot keep them operating efficiently. We need to learn why building

performances typically deteriorate as much as 30% in the first three to four years

of operation and the role that commissioning and retro-commissioning can play

to reduce that performance decay.” PROOF OF THIS LATER!

Page 17: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Can Continuous Commissioning make a difference…?

Lawrence Berkeley National Laboratory“energy savings from a utility-sponsored retro-commissioning (building tune-up) program targeted to

large commercial buildings ranged from 3% up to 19%, but that those savings may not persist beyond a few years.¹……..The reasons for savings degradation include operator error (disabling optimized control sequence), sensor and device failures, and operator turn-over.”

California Commissioning Collaborative”that the new construction Cx will result in a range of energy savings between $0.02 to $0.19 and non

energy savings between $0.23 to $6.96 per sq.ft. – a total opportunity of $0.25 to $7.15 per sq.ft.”

Portland Energy Conservation Incorporated“a new 100,000 sq.ft. building that is NOT commissioned is likely to have $19,000 of higher energy

costs per year. Almost $200,000 over a ten year period with potential non-energy increased cost as high as $715,000.”

Energy Systems Laboratory (Texas A&M University)“continuous commissioning projects undertaken in various building types across the U.S. the average

annual energy bill savings opportunity is 22% (ranged from 8% to 45%).”

Page 18: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

VA VISN 16 SUMMARY

8,934,299 square feet

Page 19: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Contract Summary

October 2009 thru September 2011VA VISN 16

• Prime Contractor○Energy Systems Lab/Texas A&M

- SSRCx – Sub Consultant- Command Commissioning – Sub Consultant- Sub Consultant

19

Page 20: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

20

Page 21: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

21

Page 22: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Pensacola VA Outpatient Hospital

Built 20081 main building, 3 stories206,000 square feetEnergy Use Index (EUI) – 240.5 kBtu/ft2/yr

• ASHRAE/IES Std 100-2006R target = 143 kBtu/ft2/yr

Energy Cost Index (ECI) -- $4.50/ft2/yr

Energy Star ~ 35

Page 23: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Pensacola VA Outpatient Hospital

Assessment identified a total of 10 CC opportunities that were implemented.

Estimated Savings

1. Optimize Chilled Water Temperature Reset. $ 12,5002. Optimize Chilled Water Loop Differential Pressure Control. $ 2,0003. Reduce Amount of Outside Air Required by AHUs 1, 2, 3, 4, 5, and 10. $ 21,000 4. Optimize AHU Discharge Air Temperature Reset and Static Pressure Reset. $ 30,0005. Optimize Unoccupied Period Shutdown/setback $ 95,0006. Optimize the Heating Hot Water Supply Temperature Reset. $ 10,5007. Optimize the Operation of Heating Hot Water Bypass Valve. $ 5,0008. Optimize Minimum Airflow Setpoint for Terminal Boxes. $ 30,000 9. Optimize Chiller Staging Control. $ 30,00010. Cooling Tower Temperature Reset Based on System Capability. $ 18,000

TOTAL ESTIMATED SAVINGS DURING ASSESSMENT PHASE $254,000

TOTAL ACTUAL SAVINGS MOST RECENT 12 MONTHS $249,511

Page 24: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Pensacola VA Outpatient Hospital

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

10 20 30 40 50 60 70 80 90 100

Billing

 Period Daily Average

 Electric

ity Use (k

Wh/da

y)

Billing Period Daily Average Outside Air Dry‐Bulb Temperature (oF)

Pensacola VA Outpatient ClinicPensacola, FL

Baseline (Oct 08‐Sep 09)

CC (Jan 10‐May 11)

0

50

100

150

200

250

300

10 20 30 40 50 60 70 80 90 100

Billing

 Period Daily Average

 Natural Gas Use 

(MMBtu/da

y)

Billing Period Daily Average Outside Air Dry‐Bulb Temperature (oF)

Pensacola VA Outpatient Clinic Pensacola, FL

Baseline (Oct 08‐Sep 09)

CC (Jan 10‐Apr 11)

Electricity Gas

Page 25: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Pensacola VA Outpatient Hospital

0

10

20

30

40

50

60

70

80

90

100

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

Jun‐08 Sep‐08 Dec‐08 Mar‐09 Jul‐09 Oct‐09 Jan‐10 May‐10Aug‐10 Nov‐10 Feb‐11 Jun‐11 Sep‐11

Billing

 Period Daily Average

 Tem

perature (oF)

Billing

 Period Da

ily Average

 Electric

ity USe

 (kWh/da

y)

Pensacola VA Outpatient ClinicPensacola, FL

Daily Average Electricity UseDaily Average Temperature

Baseline CC Period

0

20

40

60

80

100

120

0

20

40

60

80

100

120

140

160

180

Jun‐08 Sep‐08 Dec‐08 Mar‐09 Jul‐09 Oct‐09 Jan‐10 May‐10 Aug‐10 Nov‐10 Feb‐11 Jun‐11

Billing

 Period Daily Average

 Tem

perature (oF)

Billing

 Period Daily Average

 Matural Gas USe

 (M

MBtu/da

y)

Pensacola VA Outpatient ClinicPensacola,FL 

Daily Average Natural Gas UseDaily Average Temperature

Baseline CC Period

Electricity Gas

Page 26: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Pensacola VA Outpatient Hospital(~27% savings raised Energy Star rating by ~35 points ~70)

322,130 

‐$50,000

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

$400,000

Jan‐10 Feb‐10 Mar‐10 Apr‐10 May‐10 Jun‐10 Jul‐10 Aug‐10 Sep‐10 Oct‐10 Nov‐10 Dec‐10 Jan‐11 Feb‐11 Mar‐11 Apr‐11 May‐11

Cumulative Savings ($)

Pensacola VA Outpatient ClinicPensacola, FL

Electricity Savings

Natural Gas Savings

Total $322,130Savings for 12 months $249,511

Simple Payback 0.68 years

ROI 147%

Page 27: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Jackson VA Outpatient Hospital

Built 1961 with additions in1977, 1991701,760 total square feetEnergy Use Index (EUI) – 246.77 kBtu/ft2/yr

ASHRAE/IES Std 100-2006R target = 141 kBtu/ft2/yr

Energy Cost Index (ECI) -- $3.45/ft2/yr

Page 28: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Jackson VA Outpatient Hospital10 CC opportunities that were implemented.

1. Optimized cooling tower staging and CW setpoint control. 2. Optimized staging of secondary ChW pumps based on AHU control valve positions.3. Optimized staging of tertiary ChW pump control. 4. Optimized HHW supply temperature reset schedules. 5. Implemented scheduling for STM to HHW heat exchangers. 6. Implemented shutdown schedule for AHU preheat heat exchanger systems –7. Implemented AHU discharge air temperature setpoint reset control8. Optimized AHU economizer operation 9. Optimized AHU preheat control 10. Implemented AHU discharge air temperature setpoint reset control

Recommended but not approved for implementation (1 of several)1. Implement optimal AHU unoccupied period shutdown or setback schedule where appropriate –

1. This CC measure was not implemented due to complaints from the facility occupants.

TOTAL ANNUAL PROJECTED SAVINGS $412,000

TOTAL ACTUAL SAVINGS MOST RECENT 12 MONTHS $168,276

Page 29: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Jackson VA Outpatient Hospital

0

20,000

40,000

60,000

80,000

100,000

120,000

10 20 30 40 50 60 70 80 90 100

Billing

 Period Daily Average

 Electric

ity Use (k

Wh/da

y)

Billing Period Daily Average Outside Air Dry‐Bulb Temperature (oF)

Jackson VA Medical CenterJackson, MS

Baseline (Oct 08‐Sep 09)

CC (Jan 10‐Mar 11)

0

100

200

300

400

500

600

700

800

900

10 20 30 40 50 60 70 80 90 100

Billing

 Period Daily Average

 Natural Gas Use 

(MMBtu/da

y)

Billing Period Daily Average Outside Air Dry‐Bulb Temperature (oF)

Jackson VA Medical CenterJackson, MS

Baseline (Oct 08‐Sep 09)

CC (Jan 10‐Mar 11)

Electricity Gas

Page 30: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Jackson VA Outpatient Hospital

0

10

20

30

40

50

60

70

80

90

100

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Jun‐08 Sep‐08 Dec‐08 Mar‐09 Jul‐09 Oct‐09 Jan‐10 May‐10Aug‐10 Nov‐10 Feb‐11 Jun‐11 Sep‐11

Billing

 Period Daily Average

 Tem

perature (oF)

Billing

 Period Da

ily Average

 Electric

ity USe

 (kWh/da

y)

Jackson VA Medical CenterJackson, MS

Daily Average Electricity UseDaily Average Temperature

Baseline CC Period

0

20

40

60

80

100

120

0

100

200

300

400

500

600

Jun‐08 Sep‐08 Dec‐08 Mar‐09 Jul‐09 Oct‐09 Jan‐10 May‐10Aug‐10 Nov‐10 Feb‐11 Jun‐11 Sep‐11

Billing

 Period Daily Average

 Tem

perature (oF)

Billing

 Period Daily Average

 Matural Gas USe

 (M

MBtu/da

y)

Jackson VA Medical CenterJackson, MS

Daily Average Natural Gas UseDaily Average Temperature

Baseline CC Period

Electricity Gas

Page 31: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

196,391 

‐$50,000

$0

$50,000

$100,000

$150,000

$200,000

$250,000

Jan‐10 Feb‐10 Mar‐10 Apr‐10 May‐10 Jun‐10 Jul‐10 Aug‐10 Sep‐10 Oct‐10 Nov‐10 Dec‐10 Jan‐11 Feb‐11 Mar‐11 Apr‐11 May‐11

Cumulative Savings ($)

Jackson VA Medical CenterJackson, MS

Natural Gas Savings

Electricity Savings

Total

Jackson VA Outpatient Hospital

Savings for 12 months $168,276 

Simple Payback 2.39 years

ROI 41.80%

$196,391

Page 32: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

HISTORY OF CC

Page 33: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

33

Continuous Commissioning® (CC®)

• CC® Reduces Energy Use by 15-25% with ½ - 3 Year Payback

• History• 1992 - CC® started by ESL as part of Texas LoanSTAR Program• 1996 CC® implementation on A&M Campus started• 2000/2001 IP strategy planned, applied for first patents • 2005 first patent issued• 2006 first licensee• 2011 - Implemented in hundreds of buildings with more than $200

million in savings to date

Page 34: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

34

Objectives of CC®

• Identify and solve existing operating problems• Improve building thermal comfort and

indoor air quality• Minimize building energy consumption• Minimize total operating cost

Page 35: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

PERSISTENCE

“Ongoing”“Continuous”

“Monitoring Based”

Page 36: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

How important Is performance degradation?

• Broad agreement that building

performance degrades

• Commissioning measures can be disabled

• Components fail

• Less agreement on the impact and how

this should be addressed

Page 37: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Persistence of Savings from CC

•10 Buildings at Texas A&M

University, ChW and HHW

supplied by central plant

•1st round EBCx 1996-97

•Persistence of savings studied

through 2009

•Metering system upgraded for

eight of the buildings, beginning in

2005

Page 38: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Savings Persistence – 10 Bldgs.

First Year Savings: $1,191,999

2 years later: $ 984,516

Decrease: $ 207,483

Page 39: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Looking Deeper – After 2 Years

After 2 years

• 4 Bldgs – Savings increased by $31,507

• 4 Bldgs – Savings decreased by $88,774

• 2 Bldgs – Savings decreased by $150,216

Page 40: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Looking Deeper – After 2 Years

After 2 years

• 4 Bldgs – Savings increased by $31,507

• 4 Bldgs – Savings decreased by $88,774 due

to controls changes

• 2 Bldgs – Savings decreased by $150,216

due to component failures

Page 41: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Savings Persistence (cont.)

For each $100 in 1997 savings, savings for the most recent year are:

Year CHW HW Electricity

1997 $100 $100 $100

Most recent data year $87 $96 $183

Building Years Data 82 57 95

Page 42: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

10 Building Summary

• Savings persisted well for 11 years with follow-

up

• Without follow-up, if initial savings were $1,000,

they declined on average to $750 after:

• 3 years for heating

• 5 years for cooling

Page 43: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

On-going Commissioning Methods

• Periodic examination of the building and systems by

an experienced engineer

• Use of tracking software to indicate when savings

have decreased enough to pay for some follow-up

• Use of continuous fault detection and diagnostic

software

Page 44: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

OCx - Periodic Examination

•5 buildings had additional rounds of EBCx performed

•3 buildings had significant follow up investigation performed

•New Metering Installed in 6 Buildings in 2005-2006.

•Major Lighting Retrofits:

• 6 Buildings in 2006

• 3 Buildings in 2008

•Large Mainframe Computer at Zachry

• Removed sometime between 2001 and 2006

•Major Addition to Wehner in 2002

Page 45: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

OCx with Tracking Software

Page 46: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Fault Detection

• Intended to detect

• Excessive cooling energy consumption

• Excessive heating energy consumption

• Errors in energy metering

• Cumulative differences between measured and simulated

consumption found to be a key indicator of faults

• Excess consumption measures in multiple forms (%, $, Btu)

• Additional data visualization and manipulation option

• User can define several trigger levels, utility costs, view different

periods, compare to past data to determine fault condition

Page 47: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

-4500

-4000

-3500

-3000

-2500

-2000

-1500

-1000

-500

0

500

8/1/04 11/9/04 2/17/05 5/28/05 9/5/05 12/14/05 3/24/06 7/2/06

Cum

ulat

ive

Ener

gy D

iffer

ence

[Mea

s - S

im] (

MM

Btu

)

CHWSTM

Computing Services Building

10/28/2005

3850 MMBtu or

$38,500 @$10.00 per

MMBtu

~19 MMBtu/day deviation which is ~ - 10% for 29 weeks

Page 48: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Live Tracking ResultsBldg Site Time Results and Findings82,000 ft2

diningCollege Station,TX, USA

29 mo.

Detected excess cooling energy fault

480,000 ft2

computing services

Austin, TX, USA

27 mo.

Detected 10% decrease in cooling energyDetected excess cooling energy

180,000 ft2

OfficeAlbany, NY, USA

7 mo. No faults identified

189,000 ft2

high-rise office

Omaha, NE, USA

6 mo. Identified HW metering failure

280,000 ft2

office-class room

Eindhoven, Netherlands

24 mo.

Identified 5% increase in heatingconsumption

Page 49: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Conclusions

•Energy savings will persist for long periods of time in

SOME buildings without OCx

•$100 savings will decline to $75 ON AVERAGE in 3-5

years without OCx

•OCx can make commissioning savings persist indefinitely

Page 50: Post Occupancy Building Commissioning Successes through ......Steve Harrell, LEED AP, CEM, CxA SSRCx “Post Occupancy Building Commissioning Successes through Continuous Commissioning®”

Dr. David E. Claridge, P.E.Energy Systems Laboratory Texas A&M University System

Steve Harrell, LEED AP, CEM, CxASSRCx