REGULATOR NFORMATION DISTR 03UTION S EM ('RIDS) ACCESSION NBR;8309020361 DOC ~ DATE: 83/08/24 NOTARX2ED; YES FACIL:STN 50 528 Palo Verde Nuclear Stations Unit ir Ar izona Publi STN 50 529 Palo Verde Nuclear Station~ Unit 2i Arizona Publi STN 50 530 Palo Verde Nuclear Station< Unit 3i Arizona Publi AUTH ~ NAME AUTHOR AFFILIATION VAN BLUNTISH,'E, Arizona Public Service Co, RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONiG ~ Licensing Branch 3 DOCKET 05000528 05000529 05000530 "SUBJECT: Forwards updated resumes of appointees to key managerial 8 supervisory positions through -shift supervisor level, Changes previously provided by ltr of FSAR amend, DISTRIBUTION CODE: S001S COPIES RECEIVED:LTR g ENCL Z SIZE: TXTLE: Licensing 'Submittal: 'PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized -plant ~ 'Standardized plant:0 Standardized plant ~ 05000528 05000529 05000530 RECIPIENT .ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ELD/HDS3 IE/DEPER/EPB'36 LE/DEQA/QAB 21 NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 2Q NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26 NRR/DSI/CPB 10. NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23. RGN5 EXTERNALS ACRS 41 DMS/DSS (AMDTS) LPOR 03 NSIC 05 COPIES LTTR ENCL 0 1 0 1 0 3 3 1 1 1 2. 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 13 f II3 6 6 1 1 1 1 1 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAg6 ~ Oi IE FILE IE/DEPER/I'RB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 NRR/DS I/RAB 22 FI 04 /MIB BNL (AMDTS ONlY) FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 0 1 1 2 2 1 1 1 1 1 1 1 0 1 1 1 1, 1 1 1 1 1 1 1 0 1 1- 1 1 1 1 1= TOTAL NUMBER OF COPIES REQUIRED'. LTTR ",53 ENCL 06

Transcript of positions ltr -shift level, FSAR · REGULATOR NFORMATION DISTR 03UTION S EM ('RIDS) ACCESSION...

REGULATOR NFORMATION DISTR 03UTION S EM ('RIDS)

ACCESSION NBR;8309020361 DOC ~ DATE: 83/08/24 NOTARX2ED; YESFACIL:STN 50 528 Palo Verde Nuclear Stations Unit ir Ar izona Publi

STN 50 529 Palo Verde Nuclear Station~ Unit 2i Arizona PubliSTN 50 530 Palo Verde Nuclear Station< Unit 3i Arizona Publi

AUTH~ NAME AUTHOR AFFILIATIONVAN BLUNTISH,'E, Arizona Public Service Co,

RECIP ~ NAME RECIPIENT AFFILIATIONKNIGHTONiG ~ Licensing Branch 3

DOCKET050005280500052905000530

"SUBJECT: Forwards updated resumes of appointees to key managerial 8

supervisory positions through -shift supervisor level, Changespreviously provided by ltr of FSAR amend,

DISTRIBUTION CODE: S001S COPIES RECEIVED:LTR g ENCL Z SIZE:TXTLE: Licensing 'Submittal: 'PSAR/FSAR Amdts 8, Related Correspondence

NOTES;Standardized -plant ~

'Standardized plant:0Standardized plant ~

050005280500052905000530

RECIPIENT.ID CODE/NAME

NRR/DL/ADLNRR LB3 LA

INTERNAL: ELD/HDS3IE/DEPER/EPB'36LE/DEQA/QAB 21NRR/DE/CEB 11NRR/DE/EQB 13NRR/DE/MEB 18NRR/DE/SAB 2QNRR/DHFS/HFEB40NRR/DHFS/PSRBNRR/DS I/AEB 26NRR/DSI/CPB 10.NRR/DSI/ICSB 16NRR/DSI/PSB 19NRR/DSI/RSB 23.RGN5

EXTERNALS ACRS 41DMS/DSS (AMDTS)LPOR 03NSIC 05

COPIESLTTR ENCL

0

1 0

1 0

3 31

1 1

2. 21 1

1

1

1 1

1 1

1 1

1 1

11

13 f II3

6 61 1

1 1

1

RECIPIENTID CODE/NAME

NRR LB3 BCLICITRAg6 ~ Oi

IE FILEIE/DEPER/I'RB 35NRR/DE/AEABNRR/DE/EHEBNRR/DE/GB 28NRR/DE/MTEB 17NRR/DE/SGEB 25NRR/DHFS/LQB 32NRR/DL/SSPBNRR/DSI/ASBNRR/DSI/CSB 09NRR/DSI/METB 12NRR/DS I/RAB 22

FI 04/MIB

BNL (AMDTS ONlY)FEMA REP DIV 39NRC PDR 02NTIS

COPIESLTTR ENCL

1 01 1

1 1

1 1

1 01 1

2 21 1

1 1

1 1

1 01 1

1 1,1 1

1 1

1 1

1 0

1 1-

1

1 1

1 1=

TOTAL NUMBER OF COPIES REQUIRED'. LTTR ",53 ENCL 06

It)i w>) M,l 1 I ~1

C 1 I ~ Hwtl

«1

«'1 t M

I 1 I' k,,t«IN

XC«1

kl t ~ CM

»rHC 1

p,t)

')M .)

1„I,J)

«H11 I) r) wt

1

'f1

tWMCW

I1 ~ f twfM

I «

kft ') f,kf qt

hl 4

«Mw wt

"'r'-'1

II««

... ~ M I Il '

I HC«)

lH

f'1 1 C'I ~ 'kkx C)

w H, «H . p ~ I "I

«1 IH 1 f) wI r M«C

'1

~''

rc) r)fr

1) t,'l'1M

r) g W.I w )wtt «WH') [~I> ')

~ C)™r g f,MHHM) kt')rlkt

y I p Wwc) r Htt e'> 1

~ I )xf J1„',

w'1

j

~ Jx fr),)*M 1 g ll 'kI'I'«M 1 ~ III fw'I lI k ~ Tcw'I«X

C',1 ~ ff ear 4»''«r,",CHt'>or J: 'Ji1 1

f 1 '1% f >)")(t C))>

4 C)fi f '3 " 1'jl cw f I 1 )I I 'r)WM

9 f) c li' ' '~ r <» f,. f) H

),I

M I

~ 'q f J,,lI

x),I Jf MI .) I "1

'HM SH.iM«) M I

"1

> 1

t)C

(* j W M,

I MI« IH

C'1""

')xf,f

»I teal *

II y

«1 I

w $« Ik

,MMH

HMH lk 1 Mw

I«I M

C) )

g« f

1IHMM) I ki" Jtk "» c 1

''I I

i W,X k)4„I

')W4 MW

w MM '"'II

w'HH,

j)

M M I,k M H HM I t wJ HM

J

+ I "1

,'il'M (w" l

1

M g C1

$ w(

1

Arizona Public Service CompanyP.o. BOX 21666 ~ PHOENIX, ARIZONA 65036

August 24, 1983ANPP-27634 — WFQ/JYM

Director of Nuclear Reactor RegulationAttention: Mr. George Knighton, ChiefLicensing Branch No. 3Division of LicensingU.S. Nuclear Regulatory CommissionWashington, D.C. 20555

Subject: Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3Docket Nos. STN-50-528/529/530File: 83-056-026; G.l.01.10

Dear Mr. Knighton:

Attached are updated resumes of appointees to key managerial andsupervisory positions through the Shift Supervisor level whose positionsor responsibilities have changed. The changes have been previouslyprovided to you by letter or FSAR amendment.

If you have any questions concerning this matter, please contact me.

Very truly yours

Q3.gE. E. Van Brunt, Jr.APS Vice PresidentNuclear Projects ManagementANPP Project Director

EEVB/JYH/spAttachment

cc: E. A. LicitraA. C. Gehr

83090203bi 830824PDR ADOCK '05000528H PDR

Mr. G. W. KnightonPage 2August 24, 1983A'NPP-27634 — WFQ/JYM

bcc:

A. C. RogersW. F. QuinnT. F. QuanK. E. JonesJ. Sarver (6075)F. Benich (6075)G. C. AndogniniK. W. GrossS. R. FrostJ. M. AllenJ. R. BynumT. G. Woods

I

STATE OF ARIZONA )) ss.

COUNTY OF MARICOPA)

August 24, 1983ANPP-27634 - MFQ/JYH

I, Edwin E. Van Brunt, Jr., represent that I am Vice PresidentNuclear Projects of Arizona Public Service Company, that the foregoingdocument has been signed by me on behalf of Arizona Public ServiceCompany with full authority so to do, that I have read such documentand know its contents, and that to the best of my knowledge and belief,the statements made therein are true.

Edwin E. Van Brunt, Jr.

Smote to befote me tbie~8day of , il983.

My Commission expires:

Sty Commfsston @plays Apgl 6, gyp

Notary Public'

IA

eC

A

~"

wn", „$ '<,v= i~ r

HEADQUARTERS PERSONNEL RESUMES

ARIZONA NUCLEAR POWER PROJECT EXECUTIVE

VICE PRESIDENT

Responsible for all engineering, construction,licensing and operation of Arizona Nuclear PowerProject for Arizona Public Service Company onbehalf of all participants.

Educational Background Professional Level Experience

University of Arizona,„B.S..in ElectricalEngineering

Phoenix College

t~

'

Allison Steel ManufacturingCompany

Electrician (1945-1950)

Arizona Public Service CompanyElectrician's Helper,Substation Maintenance

(1950-1951)'ngineer,

Engineering(1951-1953)

'I

Engineering Supervisor,.Engineering (1953-1956)

Supervisor, Division.Engineering (1956-1961)..

lManager, Four CornersTransmission Project(1961-1965)

Manager, OrganizationDevelopment (1965-1966)

Manager, ManagementServices (1966-1967)

Vice President,Management Services(1967-19?0)

r

1

(con')

Professional Level Experience

Vice President, EngineeringServices (1970-1972)

Vice President, Engineeringand Nuclear Services(1972-1974)

Vice President, Operations(1974-1976)

Executive Vice President,Operations (1976-1981)

Executive Vice Presidentand Chief Operating Officer(1981-1982)

Executive Vice President,Arizona Nuclear Power Project(1982-Present)

\

'PVNGS FSAR

" HEADQUARTERS PERSONNEL RESUMES

Vice President, Nuclear Operations

Responsible for startup, testing, training,staffing, and operations of the Palo Verde

Generating Station

Educational Background Professional Level Experience

University of MassachusettsB.S. — Mechanical Engineering(1954-1958)

Bailey Meter CompanyHeat Cycle Analysis Workshop(1961)

Yankee Atomic Electric CompanyEngineer on loan to Stone &

websterEngineering Corporation duringconstruction of the Yankee.Plant(June, 1958-March, 1959)

Yankee Atomic Electric CompanyReactor Operator LicenseOP-929(1961)

Dale Carnegie .

Human Relations & PublicSpeaking; upon completion,assisted instructor asgraduate assistant(1962)

Engineer at plant site workingon pre»operational areamonitoring and environmentalsurveys(March, 1959-September, 1959)

Technical Assistant to ReactorEngineer

Shift Experimental Supervisor(September, 1959-December, 1963)

Massachusetts Enstitute ofTechnologyNuclear Power Reactor, Safety(1966)

General Electric~ Fuel Management Technology

(1968)

Assistant Reactor Engineer(December, 1963-July, 1965)

Reactor Engineer(July, 1965-February, 1967)

Technical Assistant to PlantSuperintendent at Connecticut-Yankee(February, 1967-November, 1967)

0'eadquarters Personnel Resumes

Vice President, Nuclear Operationshi

Page Two

Educational Background Professional Level Experience

Electric Councel of New England

Skills of UtilityManagement(1971)

Kepner - Tregoe

APEX II(1976)

Assistant to the Manager ofOperations at Westboro Officeof Yankee Nuclear ServicesDivision(November, 1967-April, 1973)

Manager of Plant Support(April, 1973-June, 1974)

MacKenzie

Time Management(1978)

Registered Professional Engineer-Massachusetts and Vermont

ANS-3 — prepared such AmericanNational Standards Institute(ANSI) as:

N18.1 Selection and Trainingof Nuclear Plant PersonnelN18.7 Administrative Controlsfor Nuc'.ear Power PlantsN18.17 Industrial Securityfor Nuclear Power Plants

Assistant to the Vice President(June, 1974-October, 1975).

American Nuclear SocietyPast Chairman of ANS-3

American Society of MechanicalEngineersMember of Performance TestCode Committee (PTC-32)

Boston Edison CompanySuperintendent, NuclearOperations Department(October, 197S-September, 1980)

Institute of Nuclear PowerOperationsCharter Member, Board ofDirectors

EEI Nuclear Power Subcommittee

AIF (TMI) Subcommittee onOperations

Technical Advisor to State ofMassachusetts Nuclear IncidentAdvisory Team

Arizona Public Service CompanyVice. President, ElectricOperations(September, 1980-November, 1982

Vice President, Nuclear Operations(November 1982-Present)

C

NUCLEAR PROJECTS PERSONNEL RESIPi1E

MNAGER OF NUCLEAR OPERATIONS

Educational Background Professional Level Experience

GEORGIA INSTITUTE OF TECHNOLOGYB. S. Electrical Engineering(1969)

GEORGIA. INSTITUTE OF TECHNOLOGYH. S. Nuclear Engineering (1970)

Tennessee Valley Authority (TUA)Browns Ferry Nuclear Plant, StartupEngineer - Shift test engineer forinitial startup Units 1 and 2.(1972-1975)

GEORGIA INSTITUTE OF TECTOLOGY"PhD preliminary examNuclear Engineering (1972)

TVA, ;emporary assignment with West-inghouse Electric Corporation—completed Westinghouse Station NuclearEngineers Course (12 weeks) and parti-pated on reactor physics testing andpower distribution measurements atvarious Westinghouse plants. (1975)

TVA, Startup and Plant Support SectionSupervisor, Division of Nuclear PowerCoordinated Startup and OperationsSupport for Division of Nuclear Power(1976-1980}

TVA, Sequoyah Nuclear"Plant, SpecialTest Coordinator and Assistant PlantSuperintendent for Health and SafetyServices — Coordinated Natural Circula-tion test program; responsible forHealth Physics, Quality Assurance,Security and Management Services.(1980-1981)

TVA, Browns Ferry Nuclear Plant, Assis-tant Superintendent Operations andEngineering - responsible for Operations,Engineering, Security, met BFNP Tech-nical Specification requirement fortraining equivalent to SRO. (1981-1982)

lAPS, Palo Verde Nuclear Generating Station,Manager of Nuclear Operations-Responsiblefor Operations, Maintenance, On SiteEngineering, and Administration ofthree nuclear generating units.

~ ~~ ~ e/1a./ey

STATION PERSONNEL RES121E

(Sheet 1 of 2)

TECHNICAL SUPPORT ii1ANAGER

Responsible for Engineering Department, Radiation Protectionand Chemistry Section, Licensing Department, Shift TechnicalAdvisor/Independent Safety Engineering Group, and the HaterReclamation Facility.

Educational Background

SOUTHERN OREGON COLLEGEB. S. Hathematics (1967)

IVERSITY OF SANTA CLARA.Engineering (1968)

UNIVERSITY OF i~LMYLcQK)

Engineering (1969)

UND'ERSITY OF 'WASHINGTON

.'1. S. Engineering (Nuclear)(1970)

Professional Level E~eriencePhilco Ford Space Re-EntrySystems, Palo Alto, California

Systems Analyst for spacesystems (1967-1968)

U. S. Atomic Energy Commission-Division of Reactor Developmentand Technology.

I&C Engineer — assignments.included Power Burst Facility,Loss of Fluid Test and EBR-II(1968-1970)

Professional Engineer,Control Svstems(California)

Sacramento '1unicipal UtilityDistrict, Sacramento, California

Assistant Plant I&C Engineerfor the Rancho Seco NuclearGenerating Station(1970-1973)

Salt River ProjectSenior X&C Engineer, NuclearServices (1973-1976)

Lead I&C Engineer, NuclearServices (1976)

Nuclear Engineering Supervisor(1976-1978)

AP

STATION PERSONNEL RESUa~fE

(Sheet 2 of 2)

TECHNICAL SUPPORT ifANAGER

Educational Background Professional Level Experience

Arizona Public Service CompanyNuclear EngineeringSupervisor, Nuclear Services(1978-1979)

Nuclear Engineering Nanager,Niuclear Engineering(1979-1982)

\

Technical Support ManagerPWi GS (1982-Present)

STATION PERSONNEL RESUME

Administrative Support ManagerPVNGS

Educational Background Professional Level Experience

U.S. Naval AcademyBS Degree, General Engineering

Nuclear Power Training 1963

U.S. Navy (1959-1981)Junior Officer, ShipboardNuclear Propulsion Billets1964-1966

Postgraduate SchoolMS Degree, Personnel Management

Engineer Officer, NuclearPowered Submarine 1966-1968

Material Officer, NuclearSubmarine Squadron 1968-1970

Commanding Officer, NuclearSubmarine 1975-1970

Arizona Public Service CompanyTraining Manager, PVNGS1981-1982

Admin. Support Manager, PVNGS1982-Present

PVNGS FSAR

PVNGS PERSONNEL RESUMES

Radiation Protection and Chemistry Manager

Responsible for plant radiation protection, chemistry,and radioactive waste management.

Educational Background Prof essional Level Experience

Michigan TechnologicalUniversity

BS — Chemistry (1967)

MS - Nuclear Engineering(1969)

Federal Emergency Management .

Agency Staff College

Industry/Business EmergencyPlanning Course (1 week)

Harvard School of Public Health

Planning for NuclearEmergencies (1 week)

Atomics International HealthPhysics (2 weeks)

Argonne National LaboratoryAUA Summer Engineering

Practice School

Wisconsin Electric Power CompanyPoint Beach Nuclear PlantTechnical Assistant, Chemistryand Health Physics Group(1969-1971)

Babcock and Wilcox CompanyNuclear Engineer, PlutoniumRecycle Group, Nuclear PowerGeneration Division(1971-1973)

Wisconsin Electric Power CompanyPoint Beach Nuclear PlantRadiochemical Engineer.Responsible for plant chemistry,radiation protection, emergencyplanning, environmental, andindustrial safety activities(1973-1977)

Arizona Public Service CompanyRadiation Protection Superviso'r,PVNGS(December, 1977-Apxil, 1978)

Radiological and EnvironmentalSupervisor, PVNGS(April, 1978-April, 1979)

PVNGS Personnel Resumes

Radiation Protection and Chemistry ManagerPage Two

Professional Level Experience

Radiological and ChemistrySupervisor, PVNGS(April, 1979-November, 1980)

Corporate Health Physicistand Emergency Planner(November, 1980-April, 1982)

Radiation Protection andChemistry Manager, PVNGS(April, 1982-Present)

PVNGS PERSONNEL RESUME

Radiation Protection Supervisor

EDUCATION PROFESSIONAL LEVEL EXPERIENCE

Aqua Fria Union High SchoolAvondale, AZ 1964

University of Arizona 1964-1966

U.S. Navy — Nuclear ProgramEngine Room SupervisorEngineering Laboratory Technician1972-1975

U.S. Navy Nuclear Power Program1972-1975Engineering Laboratory TechSIC Nuclear Power PrototypeNuclear Power PrototypeSubmarine SchoolMachinist Mate School

Crystal River Florida, Unit 3Chemistry and Radiation ProtectionTechnician ,.1972-1975Health Physics SupervisorChemistry and Radiation Protection ManagerPlant Health Physicist 1980-1983

APS/PVNGSRadiation Protection Supervisor

II

'h

~ ~ ~

t ~ ~ ~

~ ~

~ ~

I ' '' ~ I ~ ~~ ~ ~

~~ ~ ~ .. ~

~ ~

~ ~

~ ~

~ ~

~ ~~ ~

0 ~ ~ ~ ~ ~ ~ ~ ~

~~ ~ ~

~ I-

~ ~~ ~

~ o - . ~

o '

~ ~ . ~

~ ~

~ ~

~ ~

~ ~ ~ ~ ~

~ ~

'oi

4

8/15/83

/PVNGS PERSONNEL RESUME

Maintenance Superintendant

EDUCATION PROFESSIONAL LEVEL EXPERIENCE

Fremont High School, Fremont, MI 1963

Palisades Nuclear Plant

Reactor Operator License TrainingSenior Reactor Operator License TrainingCE PWR SimulatorsNUS Instructor skills trainingConsumers Power First Line SupervisorSkillsConsumers Power Communication SkillsWorkshop

Consumers Power CompanyPalisades NuclearLicensed Reactor Operator 1970-1975Licensed Training Coordinator 1975-1978Outage Supervisor 1978-1980

Combustion Engineering Inc. —Windsor, CT.Nuclear Service Site ManagerResident Site Service Manager at San Onofrefor C.E.Resident Site Service Manager at PVNGSfor C.E.

APS/PVNGSMaintenance Superintendant 1983-Present

N

PVNGS Personnel Resume

Shift Supervisor

Educational Background Professional Level ~erience

Paducah Community College 1969

U.S. NavyMachinist Mate "A" School 1971Nuclear Power School, 1971SIN Nuclear Training Unit, 1972

Glendale Community CollegeAA, 198O

Arizona State University, 1980—present

FVNGSPlant Specific Courses 1978—present

Memphis State University 3.978-presen

U.S. NavySIW Nuclear Power Training Unit1971-1974Mechanical OperatorMechanical Instructor

USS Philadelphia, 1974-1978Mechanical OperatorEngineering Watch SupervisorLeading Mechanical Petty Officer

PVNGSNuclear Operator 1978-1980Assistant Shift Supervisor1980 - 1983Shift Supervisor1983-present

1

8/ls/83

PANGS Personnel Resume

Shift Supervisor

Educational Background Professional Level-Experience

U.S.N. Electronics School 1971

U.S.N. Nuclear Power School 1972

PUNGS Plant Specific1979 — present

Nuclear Submarine Qualified ReactorOperator 1973 — 1976

Fort Calhoun Nuclear StationLicensed Reactor Operator1976 — 1979

PVNGSAssistant Shift Supervisor

1979 — 1983Shift Supervisor1983 — present

PVNGS Personnel Resume

Shift Supervisor

Educational Background Professional Level Experience

Redondo Beach Generating StationPlant Equipment OperatorApprenticeship 1974-1975

San Onofre Nuclear GeneratingStationReactor Operator Training Program1975-1978Reactor Operator RetrainingProgram 1976-1978

PVNGSCompleted plant specific training;CE-NSSS General Electric andBalance of Plant 1978-1981

Memphis State University, 46semester hours 1978-1981

Redondo Beach Generat'ing StationApprentice Plant Equipment Operator1974-1975

San Onofre Nuclear GeneratingStationNuclear Plant Equipment Operator1975-1976Received Reactor Operator Licence1976Nuclear Assistant Control Operator1976-1978

PVNGSControl Room Operator 1978-1980Assistant Shift Supervisor1980-1983Shift Supervisor 1983-present

,i]

PVNGS Personnel Resume

Shift Supervisor

Educational Background Professional Level Experience

U.S. NavyMM/A SchoolNuclear Power School 1968Prototype Training SIC 1968Nuclear Operator Training ClassSONGS 1977

PVNGSPlant Specific Training Courses1978 — 1981Memphis State Courses 1978 — 198146 credit hours

Various Community Colleges1973 — 1981 39 credit hours

U.S. Navy~

Mechanical Operator, UssHaddock 1969 — 1970

USS Guitanto, Engine RoomSupervisor 1970 — 1972

Marine Power Plants, pipefitter1973 — 1977

Nuclear Plant EquipmentOperator SONGS 1977 — 1978

PVNGSNuclear Operator 1978- 1980Assistant Shift-Supervisor1980 — 1983 Shift Supervisor present

I

/PVNGS PERSONNEL RESUME

8/(spa~

Shift Supervisor

EDUCATION PROFESSIONAL LEVEL EXPERIENCE

Upland High School, Upland, CA 1966

College of Lake County, Grayslake, ILL34 credit hours 1975-1977

Joliet Junior College, Joliet, ILL 198138 credit hours

Rock Valley College, Rockford, ILL 19816 credit hours

U. S. Nav

Basic Propulsion and Engineering School1967Machinists Mate "A" School 1968Nuclear Power School 1968Prototype Training 1969Engineering Laboratory TechnicianTraining 1969Zion Nuclear Power StationSenior Reactor Operator License Training1976Westinghouse Simulator Training 1976

U. S. Navy 1967-1973Engineroom SupervisorLeading Engineering Laboratory Technician

Commonwealth Edison CompanyByron Nuclear Power Station, Byron, ILLEquipment Attendant 1973-1975Engineering Assistant 1975-1976Shift Foreman 1976-1978Shift Engineer 1978-1981

APS/PVNGSShift Supervisor 1982-Present

jPVNGS PERSONNEL RES1BK

Shift Supervisor

EDUCATION PROFESSIONAL LEVEL EXPERIENCE

Peoria High School, Peoria, AZ 1967

U.S. Navy Nuclear Power Program 1967

Nuclear Prototype 1968

Submarine School 1968

Kansas State University - 65 hours

Glendale Community College — 30 hours

U.S. NavySubmarine — Engine RoomSupervisor 1969-1972

Cooper Nuclear StationBrownville, Nebraska 1972-1978Senior Reactor Operator

APS/PVNGSShift Supervisor 1979-1980

Wolf Creek Generating Station,Burlington, Kansas 1980-1983,Shift Supervisor

APS/PVNGS 1983-PresentShift Supervisor Unit 2

l

'L

/PVNGS PERSONNEL RESUME

Shift Supervisor

EDUCATION PROFESSIONAL LEVEL EXPERIENCE

William Horlick High School, Racine,Wise. 1965

Western Wisconsin Technical Institute1977

U.S. NAVYTheory of RX Plant OperationPrototype plant instruction

APS/PVNGS 1978-PresentMemphis State UniversityNuclear Fundamentals 1979

U S .Na.vSr 1965-1972Nuclear Propulsion PlantMaintenance and Operation

LaCrosse BWR, LaCrosse, Wise. 1972-1977Auxiliary OperatorTurbine OperatorReactor Operator

APS/PVNGS 1978-PresentSupervising Nuclear Plant OperatorShift ForemanAssistant Shift Supervisor

k

/PVNGS STATION PERSONNEL RESUME

Shift Supervisor

Educational Background Professional Level Experienc

Waukegan High SchoolWaukegan, Illinois — 1969

Attended College of Lake County,Grayslake, Ill— Physics &

Thermodynamics classes

Reactor Theory & KineticsPhase ISystems & Equip DescriptionPhase IISimulator Trng, Phase IIISRO AugumentationMSU Advanced Tech Trng.NRC Senior Reactor OperatingLicenseCalculus I & IICorrosion ChemistryIndustrial Material

Equipment Operator/AttendantCommonwealth Edison, Zion,Ill. 4/75 — 12/75

, Nuclear Station OperatorCommonwealth Edison, Zion,Ill. 12/75 — 4/78Shift breman, SRO

Commonwealth Edison, Zion,Ill. 4/78 — 10/78Operations Shift SupervisorCommonwealth, Edison, Zion,Ill. 10/78 — 1/82Operations Shift SupervisorAPS/PVNGS 4/82 — 9/82Operations Shift SupervisorAPS/PVNGS 9/82 — Present

'

I

~'VNGS

PERSONNEL RESUME8jie/8>

Supervisor STA/ISEGPVNGS

Responsible for the Shift Technical Advisor (STA)/Independent Safety Engineering Group (ISEG) atPalo Verde Nuclear Generating Station.

Educational Background Professional Level Experience

University of California(Davis)

B. S. M. E. (1974)

Senior Reactor OperatorLicense

SOP-3573 (1979)Trojan Nuclear Power Plant

Pacific Gas and Electric,Diablo Canyon Nuclear PowerPlant

Power Production Engineerin the Operations Engi-neering Department(1975-1977)

Portland General Electric,Trojan Nuclear Power Plant

Nuclear Plant Engineer(1977-1980)

Arizona Public Service,Palo Verde Nuclear Generat-ing Station

Supervising EngineerLicensing(1980-1981)Supervising EngineerTechnical(1981-1982)Supervisor STA/ISEG(1982-present)

PVNGS PERSONNEL RESUME

8/IS/8 3

Compliance Supervisor

Education Professional Level Background

Mingus Union High School,Cottonwood, AZ — 1975

Yavapai Community College,Prescott, AZ — 1976

University of Arizona,Tucson, AZBachelor of Science of NuclearEngineering — 1980

N.A.U. —Principles of Management1983

PVNGS STA/SRO License Training1982 — 1983

Arizona Public Service Co.

TONE Engineering Program1980 — 1981Nuclear Engineering — LicensingSaguaro Power PlantNuclear Engineering — Mechanical

ANPP/Nuclear Engineering —NuclearSafety and Licensing Group1981 — 1982

PVNGS/Shift Technical Advisor/Independent Safety EngineeringGroup 1982 — 1983

PVNGS/Compliance SupervisorJuly 1983 —Present

0 P~r'