Portishead Branch Line (MetroWest Phase 1)
TR040011 Applicant: North Somerset District Council 2.21 Cattle Creep Proposed General Arrangement (Sheets 1 and 2) The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o) Planning Act 2008 Author: Arup Date: November 2019
Document Index 2.21 Cattle Creep: Proposed General Arrangement (Sheet 1 & 2) The Infrastructure Planning (Applications: Prescribed Forms
and Procedure) Regulations 2009, regulation 5(2)(o) W1097B-ARP-DRG-ECV-300003-4 Rev A01
Sheet Size A1 594 x 841
Dra
win
g N
um
ber
Scale(s)
Drawing Number Revision
of
Sheet
Signed
Signed
Signed
Project
Status
Rev Date Description of Revisions Drawn
Designed
Drawing Title
Contractor(s)
DateSigned
Drawn
Checked
Approved
Chkd Appr
Date
Date
Date
ELR & Mileage
Alternative Reference
Suitability
Legend/Notes
Gate
WL 1
07.2
1
WL 1
07.2
7
Post
WL 1
07.3
7
MKR Unknown
WL 1
07.3
9
WL 1
07.4
2
MKR UnknownFE 107.56 W
L 1
07.5
8
FE 107.65
BoB 107.83
TW
L 1
08.7
9
Soffit1
08.8
8
TW
L 1
08.9
1
TW
L 1
08.9
4
TW
L 1
08.9
8
Soffit1
08.9
8
Soffit1
09.0
7
Soffit1
09.1
7
Soffit1
09.2
3
Soffit1
09.2
6
109.52
BoB 109.66 Tree Line
ToB 110.02
Farm Access Underpass
HRToB 110.23
HR
110.30Farm Access Underpass
HR
HR110.52
ToB 110.56
www.arup.com
Tel +44(0)117 976 5432 Fax +44(0)117 976 5433
Bristol BS1 6JZ
63 St Thomas Street
A01 JB RS RS
S2
POD
A01
As Shown
R. SNELL
R. SNELL
I.MUKOV
21
W1097B-ARP-DRG-ECV-300003
W1097
B-A
RP-D
RG-E
CV-3
00003
SCALE 1:100
PLAN
Safety, Health and Environmental Information
Construction
normally associated with this type of work:
Notes below are additional to hazards/risks
using an approved safe method of working.
and competent contractors carrying out the work
These notes are based on the use of experienced
SCALE 1:25
A SECTION OF SADDLE
000004
A
300003
B
300004
N
PROPOSED HAND RAIL
PROPOSED HANDRAIL
POST AND WIRE ON EACH WINGWALL
EXCAVATED AREA
PIPE
360
200
460
300
140
1
300003
2
300003
SCALE 1:25
1
000004
ELEVATION - SOUTH
SCALE 1:25
2
000004
ELEVATION - NORTH
PROPOSED HANDRAIL
PROPOSED HANDRAILPARAPET EXTENSION
FIT FOR INFORMATION
EXTENSION
CONCRETE SUPPORT FOR PARAPET
EXTENSION
CONCRETE SUPPORT FOR PARAPET
PROPOSED HANDRAILPARAPET EXTENSION
TROUGH ROUTE
20mm MOVEMENT JOINT20mm MOVEMENT JOINT
GROUND LEVEL
PROPOSED
LEVEL
GROUND
PROPOSED
677
606
CONCRETE SADDLE
LEVEL
PROPOSED RAIL
LEVEL
PROPOSED PARAPET
LEVEL
PROPOSED PARAPET
CATCHPIT
CONCRETE SADDLE
EXISTING PARAPET
677
300
WATERPROOFING
EXTENT OF
CPOS
CATCHPIT
INSPECTION CHAMBER
PERFORATED PIPE
SHORT POST AND WIRE FENCE
EXTENSION
PARAPET
LEVEL
PROPOSED RAIL
EXISTING PARAPET
EXISTING BACKING
CONCRETE SADDLE
EXISTING BACKING
606
EXISTING ABUTMENT COUNTERFORT
EXISTING ABUTMENT COUNTERFORT
Ci.
Ci.
Cv. Cv.
110.96110.96 110.96
PARAPET RAISE
PROPOSED
STONE
COPING
CABLE TROUGH
EMBANKMENT
THE TOE OF THE
THE DITCH AT
TO EXTEND TO
DRAINAGE PIPE
- INSTALL POST AND WIRE ON WINGWALLS
- CARRY OUT MASONRY REPAIRS TO THE REST OF THE STRUCTURE.
- INSTALL KEE KLAMP HANDRAILS.
- REPAIR, EXTEND AND RAISE BRIDGE PARAPETS.
LOADING OF THE ARCH.
- BACKFILL. TO BE CARRIED OUT IN STEPS MAINTAINING SYMMETRICAL
- INSTALL NEW DRAINAGE.
- INSTALL CONCRETE SADDLE AND WATERPROOFING.
- CARRY OUT MASONRY REPAIRS TO THE ARCH BARREL.
SYMMETRICAL LOADING OF THE ARCH.
SAFE ANGLE. EXCAVATION TO BE COMPLETED IN STEPS MAINTAINING
- EXCAVATION OF FILL. EXCAVATION TO BE BENCHED OR SLOPED AT A
- REMOVAL OF EXISTING TRACK FORMATION.
- DEVEGETATION ON AND WITHIN 3m OF THE STRUCTURE.
INDICATIVE CONSTRUCTION SEQUENCE
Cix. TOE OF EMBANKMENT STABILITY
Cviii. EXCAVATIONS
UNSYMMETRICAL LOADING
Cvii. INSTABILITY OF ARCH DUE TO
Cvi. CEMENTITIOUS MATERIALS
INSTABILITY
Cv. PARAPETS AND SPANDREL WALLS
Civ. WORKING AT HEIGHT
Ciii. LOOSE / UNSTABLE MASONRY
Ci. UTILITIES ARE PRESENT ACROSS THE SITE
Cix.
GCP ELIMINATOR OR SIMILAR APPROVED
GEOTEXTILE PROTECTION
TIGHT WATERPOOFING SYSTEM WITH
23/07/19
23/07/19
23/07/19
23/07/19
23/07/19
1745
PROPOSED PORTISHEAD SINGLE
250
1:30 GRADIENT
EXISTING TRACK
503
CONFIRMED AT DETAILED DESIGN.
OPENREACH CABLES TO BE DIVERTED. DETAILS TO BE
SOUTH SIDE OF TRACK TO ACCOMMODATE
DUCTS TO BE PROVIDED OVER DECK ON 4no. 100mm
FOR DCO APPLICATION
PORTISHEAD BRANCH LINE
SHEET 1 OF 2
J.BACINSKI
ARRANGEMENT
PROPOSED GENERAL
CATTLE CREEP
0 2 4 6 8 10m
SCALE 1:100 @ A1
0 0.5 1.5 2.0 2.5m1.0
SCALE 1:25 @ A1
64CH126MI
DESIGN.
EMBANKMENT. DRAINAGE DETAILS TO BE CONFIRMED AT DETAILED
12. SADDLE DRAINAGE TO OUTFALL AT DITCH AT TOE OF THE
INSTALLED ON EACH SIDE OF THE SOUTH BRIDGE PARAPET.
LENGTH OF THE BRIDGE. 'LIMITED CLEARANCE' SIGNS TO BE
11. CONTINUOUS POSITION OF SAFETY TO BE INTERRUPTED FOR THE
PARAPET WALLS IF NECESSARY.
10. TEMPORARY SUPPORT TO BE PROVIDED TO SPANDREL AND
MAINTAIN SYMMETRICAL LOADING OF THE ARCH.
9. EXCAVATION AND BACKFILL TO BE UNDERTAKEN IN STAGES TO
COLOUR AND FEATURES AS FAR AS IS PRACTICAL.
COPING STONES ON SOUTH FACE TO MATCH THE EXISTING IN
STONES ON NORTH FACE TO BE PRESERVED AND REUSED. NEW
8. NEW PARAPET TO BE BUILT IN ENGINEERING BRICKS. COPING
MOISTURE INSIDE THE STRUCTURE.
EXISTING. LIME MORTAR TO BE USED TO AVOID ENTRAPMENT OF
7. STONES AND BRICK MASONRY BONDS AND JOINTS TO MATCH
AND FEATURES AS FAR AS IS PRACTICAL.
6. NEW STONES AND BRICK MASONRY TO MATCH EXISTING IN COLOUR
IS PRACTICAL AND ANY STRUCTURAL ELEMENTS MADE GOOD.
TREATED AND REMOVED. ROOT SYSTEMS TO BE REMOVED AS FAR AS
5. ALL VEGETATION ON OR WITHIN 3m OF THE STRUCTURE TO BE
MORTAR LOSS TO THE FIRST ARCH RING.
THE FIRST ARCH RING. RA8 CAPACITY IS ACHIEVED WITH 30mm
INSUFFICIENT CAPACITY FOR RA8 LOADING ASSUMING FULL LOSS OF
4. THE STRUCTURAL ASSESSMENT OF THE UNDERBRIDGE SHOWS
3. NO PUBLIC RIGHT OF WAY TO BE MAINTAINED.
2. DO NOT SCALE FROM THIS DRAWING.
SURVEY.
LEVELS IN METRES IN RELATION TO METROWEST 1 SITE WIDE
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS STATED OTHERWISE.
(METROWEST PHASE 1)
Sheet Size A1 594 x 841
Dra
win
g N
um
ber
Scale(s)
Drawing Number Revision
of
Sheet
Signed
Signed
Signed
Project
Status
Rev Date Description of Revisions Drawn
Designed
Drawing Title
Contractor(s)
DateSigned
Drawn
Checked
Approved
Chkd Appr
Date
Date
Date
ELR & Mileage
Alternative Reference
Suitability
Legend/Notes
www.arup.com
Tel +44(0)117 976 5432 Fax +44(0)117 976 5433
Bristol BS1 6JZ
63 St Thomas Street
A01 JB RS RS
S2
POD
A01
As Shown
R. SNELL
R. SNELL
I.MUKOV
22
W1097B-ARP-DRG-ECV-300004
W1097
B-A
RP-D
RG-E
CV-3
00004
PROPOSED RAIL
BOTTOM OF SLEEPER
TOP OF SLEEPER
SCALE 1:25
B SECTION OF SADDLE
BALLAST
6N/6P FILL
EAST COUNTERFORT
WEST ABUTMENT
WEST COUNTERFORT
000004
FIT FOR INFORMATION
EXISTING BACKING
INDICATIVE EXCAVATION PROFILE
CONCRETE SADDLE
A393 REINFORCEMENT MESH
50mm CONCRETE BLINDING
Safety, Health and Environmental Information
Construction
normally associated with this type of work:
Notes below are additional to hazards/risks
using an approved safe method of working.
and competent contractors carrying out the work
These notes are based on the use of experienced
Cviii. EXCAVATIONS
UNSYMMETRICAL LOADING
Cvii. INSTABILITY OF ARCH DUE TO
Cvi. CEMENTITIOUS MATERIALS
INSTABILITY
Cv. PARAPETS AND SPANDREL WALLS
Civ. WORKING AT HEIGHT
Ciii. LOOSE / UNSTABLE MASONRY
Ci. UTILITIES ARE PRESENT ACROSS THE SITE
Ci.
Cviii.
Cviii.
PIPE
PERFORATED DRAINAGE GCP ELIMINATOR OR SIMILAR APPROVED
TIGHT WATERPROOFING SYSTEM
50mm CONCRETE BLINDING
EAST ABUTMENT
TRACK BED FORMATION LEVEL
23/07/19
23/07/19
23/07/19
23/07/19
23/07/19
WRAPPED IN GEOTEXTILE
NO FINES CONCRETE
PORTISHEAD BRANCH LINE
FOR DCO APPLICATION
SHEET 2 OF 2
J. BACINSKI
ARRANGEMENT
PROPOSED GENERAL
CATTLE CREEP
- W1097J-NRD-DRG-ECV-000005 - A2.
4. DRAWING IS BASED ON DESIGN DELIVERY NETWORK RAIL DRAWING
3. CONCRETE SADDLE TO HAVE A MINIMUM THICKNESS OF 200mm.
2018. DIMENSIONS TO BE CONFIRMED AFTER EXCAVATION.
DRAWING AND INTRUSIVE INVESTIGATION FROM 6th-7th NOVEMBER
2. BACKING DIMENSIONS SHOWN DERIVED FROM 1865 RECORD
1. FOR NOTES REFER TO DRAWING W1097B-ARP-DRG-ECV-300003
0 0.5 1.5 2.0 2.5m1.0
SCALE 1:25 @ A01
64CH128MI
(METROWEST PHASE 1)