Portfolio EG
description
Transcript of Portfolio EG
![Page 1: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/1.jpg)
EUGENIA GOTTIportfolio 2014
![Page 2: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/2.jpg)
arch. Eugenia Gotti1988 Trieste, [email protected]+39 3334443779+44 7742166412
2014 Master IUAV Venezia, Italy Sustainable Constructive Process2014 Leed Green Associate2012 MArch. University of Trieste, Architecture (hon) 110/110 e lode2007-2008 Escuela Superior de Architectura, Politecnico Valencia attended
+Gronda lagunare, Gorizia ItalyLow Up 1
+Banne, Trieste ItalyEterotopie 4
+Helsinki, FinlandPublic Library 8
+Manzano, ItalyInSediamenti 12
+London, UKWhite’s ground 16
+Trieste, ItalyWebfit Excelsior 22
+IUAV Venezia, ItalySimulation Based Design 19
+references 26
![Page 3: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/3.jpg)
1 | eugenia gotti
Low UpGronda lagunare, Gorizia Italytags: sections, landscape, university of fruit, production chain, density, soil modeling, windows modeling
produzione frutticola
raccolta
lavorazione-consumo
< 1 km
capannone industriale, controllo unico di un vasto territorio.
produzione industriale -> veloce
strutture 5m x 5m, controllo puntuale del territorio.
+site plan 1.2000
+rithyhm map
+low and up Gronda Lagunare’s movements
+landscape
+productive’s process
+transportations systemand distances
+density and void
![Page 4: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/4.jpg)
eugenia gotti I 2
+wireframesoil
+soilforming
pathsforming
+buildingmodeling
+plan 1.500
![Page 5: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/5.jpg)
3 | eugenia gotti
sezioneest-ovest
sezionelongitudinale
piantatipologia
tipologia
ABACO LUCERNARI
ABACO FINESTRE ELENCO APERTURE
finestra 1
finestra 2
finestra 3
lucernario 1
lucernario 2
lucernario 1
sezionesud
int.30 cm
int.
int. 1
3
245
6 7
1
2
3
4
5
6
7
+cross section
+library detail
+window’s studies
![Page 6: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/6.jpg)
eugenia gotti I 26
EterotopieBanne, TS Italy
+site map and connections
+strategy
+before and after
+matrix courtyard
+plan 1.2000
tags: dismiss, reuse, ex military army, wall, stone, void, park event, transformation, sections, construcion phases, mark, ruin
![Page 7: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/7.jpg)
+type 1
+type 2
+type 3
+type 4
+type 5
+plan 1.200
5 | eugenia gotti
![Page 8: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/8.jpg)
+3.0
+3.0
+0.0
+0.0
patio
spazio venditastudio registrazione
patio
+axonometry
+roofing construction system
+plans 1.100
+section 1.100
+elevation 1.100
eugenia gotti I 6
![Page 9: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/9.jpg)
+roofing concept
+assembly
+exploded
+construction system
+transportation
+usability
+detail
7 | eugenia gotti
![Page 10: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/10.jpg)
Public Library HelsinkyHelsinki, Finland
+site plan
+main hall
tags: library, pattern, trasparency, open space, flexibility, multi-porpose, domestic, lights
eugenia gotti I 8
![Page 11: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/11.jpg)
+cross section AA
+cross section BB
9 | eugenia gotti
![Page 12: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/12.jpg)
+plan 1.200 floor 1
+plan 1.200 floor 2
eugenia gotti I 10
![Page 13: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/13.jpg)
InSEDIAmentiManzano, UD Italy
+circulation diagram
+new constructions
intervention A
intervention B
intervention D
intervention C
+plans 1.500
tags: chair district, water use, atelier, auditorium, construction steps, sustintability living
11 | eugenia gotti
![Page 14: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/14.jpg)
+solar concept
+INTERNVENTION A
+elevation
+water use
+numbers
+air circulation
eugenia gotti I 12
![Page 15: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/15.jpg)
White’s groundLondon, UK
+roof plan
+roof view
+roof view
tags: transparency, retrofit, existing building, geometry, tiles, lights
13 | eugenia gotti
![Page 16: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/16.jpg)
eugenia gotti I 14
+plan
+roof detail
+roof detali
![Page 17: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/17.jpg)
Webfit ExcelsiorTrieste, Italy
+on site
+viale XX settembrebuilding’s view
+project algorithm
tags: gym, materials, ex-cinema, reuse, flows, comunications, graphic, flows, usability, maintenance
15 | eugenia gotti
![Page 18: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/18.jpg)
B E N E S S E R Euna postazione pulita migliora la qualità del nostro allenamento
MAIN HALLelevations
B E N E S S E R Euna postazione pulita migliora la qualità del nostro allenamento
MAIN HALLelevations
a. b.
d.
e.
f.
g.
h.
i.
l. m.
o.
p.
q.
r.
n.
c.
MALE LOCKER ROOMSPOGLIATOIO MASCHILEL 0
o. spogliatoio maschile
p. ingresso principale
q. wcr. docce
l. spogliatoio femminilem. doccen. wc
a. sala principaleb. bard. corridoio cardioe. sala tatamif. atriog. spogliatoio femminileh. reception
i. soppalco
FEMALE LOCKER ROOMSPOGLIATOIO FEMMINILEL 2
MAIN HALLSALA PRINCIPALEL 1
MEZZANINESOPPALCOL 1
+plans main room
+view main room
+elevation main room
+elevation main room
eugenia gotti I 16
![Page 19: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/19.jpg)
+main room
17 | eugenia gotti
![Page 20: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/20.jpg)
a. b.
d.
e.
f.
g.
h.
i.
l. m.
o.
p.
q.
r.
n.
c.
MALE LOCKER ROOMSPOGLIATOIO MASCHILEL 0
o. spogliatoio maschile
p. ingresso principale
q. wcr. docce
l. spogliatoio femminilem. doccen. wc
a. sala principaleb. bard. corridoio cardioe. sala tatamif. atriog. spogliatoio femminileh. reception
i. soppalco
FEMALE LOCKER ROOMSPOGLIATOIO FEMMINILEL 2
MAIN HALLSALA PRINCIPALEL 1
MEZZANINESOPPALCOL 1
+chaniging room
+chaniging room plan
eugenia gotti I 18
![Page 21: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/21.jpg)
Simulation Based DesignIUAV, Venezia
+mind map
+parameters
+LEED protocol credit references
tags: paramaters, LEED protocol, simulations, optimization, sustainability, strategy, phases, algorithm
19 | eugenia gotti
![Page 22: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/22.jpg)
+cycle process
geometric forming
envelope forming
opening forming
material analysis
eugenia gotti I 20
![Page 23: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/23.jpg)
+sustainabilityformingdiagram
21 | eugenia gotti
![Page 24: Portfolio EG](https://reader030.fdocuments.in/reader030/viewer/2022013123/568c56bd1a28ab4916c7cb6c/html5/thumbnails/24.jpg)
+Low and upproposal2010position: designer
+(Cover) Living the ruin of Aquileiaphotomontage2012position: designer
+Etereotopieresearch2012position: reseatcher and designer
+Public Library Helsinkycompetition2012position: collaborator studio IJP coorporation, London UKdrawings: plans, sections, elevations, graphic layout
+InSediamentiproposal2012position: designer
+White’s groundrealized2011position: collaborator in studio Guranieri Architects, London UKdrawings: executive project, on site collaboration
+Webfit Excelsiorrealized2013position: designer, on site director
+Simulation Based Designresearch2014position: reseatcher
eugenia gotti I 26