Portfolio
-
Upload
walter-di-giorgio -
Category
Documents
-
view
223 -
download
0
description
Transcript of Portfolio
PORTFOLIO
Walter Di Giorgio
Walter Di Giorgio17*07*86Via Francesco Sforza n° 15, 20122 _ Milan, Italy.+39 [email protected]
Place:
Porta Genova Station, Milan - Italy
Dates:
OCT-2007 / FEB-2008
Abstract: A flexible box-like building where there aren’t apparent rules and division of space. There is only an open space that can change following and fitting to the assets and events inside.
Working models step
plan 2° floor
front
section section
section
front
section
section
model
program assets
lift and stairs connections
walk connection
Place:
Desio, Milan - Italy
Dates:
OCT-2008 / FEB-2009
Abstract:
Design forecast expansion of Desio city near Milan.The aim is to forecast and rule the expansion of the town of Desio, near Milan through a structured program based on “functional bands” that can connect the different kinds of urban space.
concept bands
area of intervention
analysis map
masterplan
floor plan type
front
Luogo:
Scalo Farini area, Milan - Italy
Dates:
MAR-2009 / JUL-2009
Abstract:
The design of Scalo Farini masterplan is based on the topic of sustainability. The morpholo-gical system concept chosen is a huge “boule-vard building” that encloses different activi-ties like residential building, shops, malls, leisure, sports activities, university in re-newable energy studies. Moreover, a large park hosts outdoor laboratories and greenhouses for growing plants and experimentation on them for energy production.The second part of the project focuses on de-signing a “bridge building” that connects the two parts of the masterplan area divided by train track.
concept step
boulevard
flows
private activities
public activities
energy concept flow concept
masterplan
3d view
section
section
plan + 7,5 m
section
plan + 1,5 m
render
render
Place:
Intra, Verbania - Italy
Dates:
OCT-2009 / FEB-2010
Abstract:
Competition - A theater for intra. Through the two theater rooms, the building rises to create a continuous public space con-nected to the market square.On the inside, the public walk way shapes a unique continuous space on tree levels.
plan concept
3d concept
flow concept
plan ground floor 2,50 m
inside front/section central bridge
walk way
facility - leisure
theater rooms
east front/section first theater room
section second theater room
section central bridge, stairs and elevators connections
exploded structural joint
section first theater room
exploded 3d steps
section on the central part of the bridge
view from the river
view from the square
view back
Place:
Milan - Italy
Dates:
MAR-2010 / JUL-2010
Abstract:
Design and realization of the scenography for the play “La caduta dell’impero di...” (“The fall of the empire...”) taken from Aeschylus’s The Persians.
STEP-CONCEPT
contest levels
unfinished floor
direction hanging
imbalance division space
slope
plan
render
section
render
during the show
after the show
Place:
Bering (st. Lawrence island) - Alaska
Dates:
MAR-2010 / SEP-2010
Abstract:
To design in a extreme landscape. The loca-tion is near the Bering strait in St. Lawrence island between Russia and Alaska.The idea has been to try to design and pro-vide a possible growth of the population in Gambell village through different social me-eting points like “cluster” where the people can live inside it all the year especially in the cold month during the winter. Another im-portant aspect was the design of a structured system for renewable energy production exploi-ting the natural landscape resources. There are different devices that can produce free and clean energy falling down the general cost of life in the village.
climate diagrams
existing services diagrams
energy production program
3d landscape pattern
LOWER HOUSE
UP HOUSE
OPEN SPACE
LOW BUILDING
TALL BUILDING CONCENTRATION
HOW?
HYBRIDIZATION - ENLARGEMENT
SEPARATE & NEW BUILDINGS
EMBEDDING
INTERSECTION
SEPARETE
HYBRIDIZATION - ENLARGEMENT
EXISTING BUILDING EXISTING BUILDING
EXISTING BUILDING EXISTING BUILDING
SEPARATE & NEW BUILDINGS
EMBEDDING
INTERSECTION
SEPARETE
PLAN SECTIONOPERATION
+ 10 ° C
- 20 ° C
SUMMERWINTER
RAIN PRECIPITATION
SNOW PRECIPITATION
GREENHOUSE - ICING
VENTILATION
LANDMARK
WHY ?
exploded of the geodetic dome like a roof sistem for cluster
possible cluster compositions
benefits
CLUSTER 1
CLUSTER 4
CLUSTER 2
CLUSTER 5
CLUSTER 3
CLUSTER 6
masteplan
Main tracks
Edge of pipe
Existing fuel oil fill line
Existing water line
Existing sewer line
Existing electric line
Existing wind generation line
Existing solar panel
Geoid / meeting point / cover space
New sewer line
New electric line
New Water line
Cultural and historycal site - archaeological excavation
photovoltaic panel
New houses
New wind tower
Sanitary Landfill
West Tank Farm
Fuel Station
Dump
West Tank Farm
Fuel Oli Tank
Water Treatment Plant
Higt School Fuel Tank
Fuel Tank Farm
Water Pump
Wind Generator TowerWind enerato
dfillndfillLandfiSanit
Dump
mm
Main tracks Geoid / meeting point / cover space
Edge of pipe
Existing fuel oil fill line
Existing water line
Existing sewer line
Existing electric line
Existing wind generation line
Existing solar panel
Container
Water conservation / pump
Disel and gasol tank
Existing wind tower
Cultural and historycal site - archaeological excavation
photovoltaic panel
New houses
New wind tower
Meeting point between:Native storePresbiterian church
COVER OPEN SPACE Teacher HousingOld Grade SchoolNurses Quarter
Meeting point between:- 7th Day Adventist Buildig
- OPEN SPACE FOR THE CHURCH- Lybrary
- ENLARGEMENT LIBRARY- Gerard’s Store
- HISTORICAL MUSEUM
Meeting point between:- Dump
- WASTE INCENERATOR- MORE JOBS
Meeting point between:- High School
- ENLARGEMENT SCHOOL- OPEN SPACE TO PLAY- SPORTS CENTER- City Office
- MORE JOBS- Washeteria
Meeting point between:- Open space
- MORE HOMES- MORE JOBS
nt Plant
Meeting point between:- archaeological excavation- Cultural and historycal site- Comunication History
section cluster 7
Sistem of renewable energy
Sanitary Landfill
West Tank Farm
Fuel Station
Dump
West Tank Farm
Fuel Oli Tank
Water Treatment Plant
Higt School Fuel Tank
Fuel Tank Farm
Water Pump
Wind Generator TowerWind enerato
dfillndfillLandfiSanit
Dump
mm
Main tracks Geoid / meeting point / cover space
Edge of pipe
Existing fuel oil fill line
Existing water line
Existing sewer line
Existing electric line
Existing wind generation line
Existing solar panel
Container
Water conservation / pump
Disel and gasol tank
Existing wind tower
Cultural and historycal site - archaeological excavation
photovoltaic panel
New houses
New wind tower
Meeting point between:Native storePresbiterian church
COVER OPEN SPACE Teacher HousingOld Grade SchoolNurses Quarter
Meeting point between:- 7th Day Adventist Buildig
- OPEN SPACE FOR THE CHURCH- Lybrary
- ENLARGEMENT LIBRARY- Gerard’s Store
- HISTORICAL MUSEUM
Meeting point between:- Dump
- WASTE INCENERATOR- MORE JOBS
Meeting point between:- High School
- ENLARGEMENT SCHOOL- OPEN SPACE TO PLAY- SPORTS CENTER- City Office
- MORE JOBS- Washeteria
Meeting point between:- Open space
- MORE HOMES- MORE JOBS
nt Plant
Meeting point between:- archaeological excavation- Cultural and historycal site- Comunication History
Place:
Milan - Italy
Dates:
OCT-2010 / SEP-2011
Abstract: Master degree project.
“The generic city is sociology is event”Rem Koolhaas, Junkspace
MANIFESTO [There is a changing city, a protagonist city, with no architecture. A discontinuous place, a city without law that overlaps over the real and historic city, a city that appears, amazes, and then disappears, a unique city without rules, subjective.
In short: an “event city”]
The thesis faces the theme of the use of the city space during spontaneous social events like “Movida” (nightlife), and investigates the possibility to analyze and redesign the same public space proposing different configu-rations like a city that overlaps to another existing city.
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
activity layer new signs and languages of the city
temporal patterns activities
SALONE DEL MOBILE MOVIDAOPEN MARKETHISTORICAL FAIR
rhythm
porosity
elastic section
noise
light
flow
Sensory map
Colonne S. Lorenzo square box devices Vetere street roof device P.ta Ticinese street portals device
planivolumetric P.ta Ticinese street
section on P.ta Ticinese street
S. Eustorgio square devices combination XXIV Maggio square screen devices P.ta Ticinese street portals device
SEZIONE TRASVERSALEscala 1:100
section on Naviglio Grande
3d steps devices
section steps devices
Naviglio section
assembly diagram model
SEZIONE TRASVERSALEscala 1:100
1- AVVOLGIBILE COPERTURA2- CATENA DI AGGANCIO3- MONTANTE COPERTURA4- PAVIMENTAZIONE ATTREZZATO5- STRUTTURA PORTANTE6- GALLEGGIANTE7- RUOTA PER MOBILITAZIONE A SECCO8- PARAPETTO A SCOMPARSA9- SISTEMA DI MOVIMENTAZIONE10- GANCIO DI ANCORAGGIO11- SEDUTA A SCOMPARSA
1
23
4
5
7
6
8
9
10
11
Darsena section
assembly diagram construction details
render
planimetry XXIV Maggio Plaza
10
03
11
INFO
TRAFFICO
CONCERTO
ESTATE
SUI
NAVIGLI
plan XXIV Maggio Plaza
led screen
water screen
cloth/led screen
render
Cinema combination
plan
section
section
assembly diagram
3d assembly steps
Rink combination Playground combination
plan
section
section
assembly diagram
3d assembly steps
plan
section
section
assembly diagram
3d assembly steps
Cinema combination swimming pool combination Market combination
plan
section
section
assembly diagram
3d assembly steps
plan
section
section
assembly diagram
3d assembly steps
plan
section
section
assembly diagram
3d assembly steps
model
model
SPRING
SUMMER
AUTUMN
WINTER
Vitis aestivalis - ( primavera-estate )
Parthenocissus quinquefolia “Vite americana” - ( autunno )
Plumbago auriculata - ( primavera estate )
Rose - Albéric Barbier - ( autunno )
Rose - Albertine - ( primavera )
Rose - Adélaide d’Orléans - ( primavera )
Rose - Blue magenta - ( primavera )
Wisteria sinensis “Glicine comune” - ( estate )
Wisteria sinensis ‘Alba’ - (estate )
Aconitifolia Ampelopsis - ( estate-autunno )
Campsis radicans Bignoniaceae “Bignonia” - ( inverno-estate-autunno )
Clematide Clematis “Lady Betty Balfour” ( estate )
Rosa �lipes kiftsgate - ( primavera )
Vitis Coignetiae “Vite kaempferi” - ( autunno )
Hedera helix “Edera” - ( sempreverde )
l’Hypericum calycinum “Iperico arbustivo” - ( sempreverde )
Vetere street - roof structure - flower essences program
SPRING
SUMMER
AUTUMN
WINTER
Vitis aestivalis - ( primavera-estate )
Parthenocissus quinquefolia “Vite americana” - ( autunno )
Plumbago auriculata - ( primavera estate )
Rose - Albéric Barbier - ( autunno )
Rose - Albertine - ( primavera )
Rose - Adélaide d’Orléans - ( primavera )
Rose - Blue magenta - ( primavera )
Wisteria sinensis “Glicine comune” - ( estate )
Wisteria sinensis ‘Alba’ - (estate )
Aconitifolia Ampelopsis - ( estate-autunno )
Campsis radicans Bignoniaceae “Bignonia” - ( inverno-estate-autunno )
Clematide Clematis “Lady Betty Balfour” ( estate )
Rosa �lipes kiftsgate - ( primavera )
Vitis Coignetiae “Vite kaempferi” - ( autunno )
Hedera helix “Edera” - ( sempreverde )
l’Hypericum calycinum “Iperico arbustivo” - ( sempreverde )
Seasonal essences
ground floor plan
section
section
section
section
render
longitudinal section on vetere street
model
cover plan
planivolumetric S.Lorenzo square
PIANTA ESTRUSIONE “UMIDITA’”scala 1:50
SEZIONE LOCALEscala 1:50
SEZIONE MOVIDAscala 1:50
SCHEMI DI MONTAGGIO
SCHEMA MICROCLIMA
20°C 25°C 30°C 35°C 40°C
PIANTA ESTRUSIONE “VENTO”scala 1:50
SEZIONE LOCALEscala 1:50
SEZIONE MOVIDAscala 1:50
SCHEMA MICROCLIMA
SCHEMI DI MONTAGGIO
SENSORY BOXESwarm ventilation
plan
section
section
microclimate model
assembly diagram
plan
section
section
microclimate model
assembly diagram
PIANTA ESTRUSIONE “NEBBIA”scala 1:50
SEZIONE LOCALEscala 1:50
SEZIONE MOVIDAscala 1:50
SCHEMI DI MONTAGGIO
SCHEMA MICROCLIMA
PIANTA ESTRUSIONE “UMIDITA’”scala 1:50
SEZIONE LOCALEscala 1:50
SEZIONE MOVIDAscala 1:50
SCHEMI DI MONTAGGIO
SCHEMA MICROCLIMA
0 %
10 %
20 %
30 %
40 %
50 %
60 %
70 %
80 %
90 %
100 %
SENSORY BOXESfog wet
plan
section
section
microclimate model
assembly diagram
plan
section
section
microclimate model
assembly diagram
seating combinationsmodel
seating combinations model