Portfolio

29
d p o r t f o l i o

description

Undergrad Work.

Transcript of Portfolio

Page 1: Portfolio

d

p o r t f o l i o

Page 2: Portfolio
Page 3: Portfolio

d a s

cont

ents

design 3fall 2009

design 3fall 2009

design 4spring 2010

studio 1fall 2010

studio 2 spring 2011

studio 3fall 2011

studio 4spring 2012

wall design

articulation

usgbc competition

homeless facility

italy

health center

poth restrooms 1-3

4-7

8-11

12-15

16-17

18-19

20

graphic designspring 2012

final

museum

event 21-23

note all projects in this portfolio are academicand created by david speedlin

Page 4: Portfolio
Page 5: Portfolio

poth

rest

room

s

This research studio had anopportunity to work with the townof poth, located approximately35 miles southeast of san antonio. A park master plan and newlyconstructed amphitheater hasemphasized the need for a newrestroom facility. The restroompavilion is to be totally accessibleand the fully developed designswill be presented to the edc forselection and implementation.A second phase of design willbe required after selection to incorporate client input andrequested revisions.

rendering

site plan

process

1

Page 6: Portfolio

poth

rest

room

s

plan

rendering

rendering

side elevation

front elevation

2

Page 7: Portfolio

poth

rest

room

s

detail model

model

detail model

3

Page 8: Portfolio

heal

th c

ente

r

rendering

process

site and ground floor plan

For this project the programwanted a facility that is a centerfor people in san antonio to comeand engage in the interrelatedissues of food, nutrition, exercise,preventive screening, and ahealthy lifestyle.

The client is a private, nonprofit institution that recievesfunding from both public andprivate resources. They askedthat the facility be a memorableexperience for the visitor afterthey leave, as well as for the staffwho use it daily. There is arestaurant and gym that are forprofit which is to support the clinicand the doctors whom donatetheir time.

4

Page 9: Portfolio

heal

th c

ente

r

rendering

process

second floor plan

5

study model

Page 10: Portfolio

heal

th c

ente

r

west elevation

north elevation

east elevation

longitudinal and cross sections

The site is located onmartin st between flores st andmain ave. The city has asked thatthe building relate to the heightand massing of the adjacentartpace gallery and that it belimited to 3 stories above gradewith a possible basement.The main entrance must be at thesouth east corner where martin stmeets main ave and the restaurantmust occur at ground floor.The building or a wall must comeup to the sidewalk edge on eachside for at least 60% of eachproperty line facing a street.The wall facing artpace will be a2 hour fire wall with an allowed8 foot maximum wide opening.

6

Page 11: Portfolio

heal

th c

ente

r

renderings

The design focused onestablishing many connectionswith the city of san antonio andan interaction with the immediatearea. How visitors and staffexperience the space was veryimportant in the design of the layout.The use of vernacular materials andhow those materials touch was akey element in the project.

7

Page 12: Portfolio

italy

plan+elevations+transverse sections

process

photo montage panorama

The architectural designstudio at santa chiara incastiglione fiorintino, italyfocused on and incorporatedwithin the structure, content, andopportunities offered by the cityitself as well as its surroundingareas. The semester long projectasked the student to design aseries of interventions along astreet in the nearby city of cortona.

The series of interventionsmust include one facade (a placethat is a threshold between publicand private, inside and outside),places for people to sit, places forpeople to stand, a place that isan entry to an urban room/piazza,and one water fountain.

8

Page 13: Portfolio

italy

process

process

9

Page 14: Portfolio

axonometric

The design focused on movement along the street, witha sequence of elements that notonly brought people onto it butprovided a passageway to achurch and park. The interventionswere a response to thearchitecutural language,characteristics, patterns, andmaterials of the place.

The goal of the design wasto find a resolution for an inhabitable facade whileintegrating the area around it bygeometetric organization andproportional understanding.Defining inside and outside aswell as public versus private wasa key element in the design. New interventions, existingelements, and structure were allintegrated to create a clear part to whole relationship.

italy

10

Page 15: Portfolio

italy

trellace system details

water fountain axonometric detail

axonometric detail section

exploded axonometric

11

Page 16: Portfolio

hom

eles

s fac

ility

The objective of theassignment was to explore asystems approach to the designof the built environment at a smallscale. The project asked for thedesign of a temporary shelter forthe homeless. The facility must beable to be broken down andmoved to other locations. It mustalso have a kitchen to supplydaily meals, restrooms, and actas a shelter during emergencycircumstances.

The design is based on amodular bay system that sits onconcrete pillars. Since there is nohvac, the buildings have beensituated on the site to allow for asouth eastern breeze to blowthrough the louvered walls andscreened openings. The materialsare simply wood with a corrugatedmetal roof.

model

process

12

Page 17: Portfolio

hom

eles

s fac

ility

model

plan

structural floor plan

13

Page 18: Portfolio

hom

eles

s fac

ility

The roof on each of themodules is sloped inwards to agutter system thats feeds into anabove ground round metal watercollection cistern.

model

detail

sections

14

Page 19: Portfolio

The model is built out ofbasswood, chipboard, andcorrugated paper.

model

elevations

structural roof plan

hom

eles

s fac

ility

15

Page 20: Portfolio

usgb

c co

mpe

titio

n

site plan

first floor plan

second floor plan

rendering

In 2010, usgbc held a naturaldesign competition focusing onaffordable housing, universaldesign, and functionality for elderlyoccupants. Entry requirementsspecified that the design be anaffordable single-family home thatis leed certified and contains 720to 880 square feet of living space.The home was to be designed withthe client in mind, as well as guestsand future homebuyers.

The competition site is locatedin the broadmoor neigherborhoodof new orleans, and is a response tokatrina and the rebuilding phaseof the lower 9th ward. The housemust also be 7 feet off the groundand fit within a 40’ x 120’ lot.

16

Page 21: Portfolio

17

north elevation

south elevation

east elevation

west elevation

rendering

usgb

c co

mpe

titio

n

Page 22: Portfolio

artic

ulat

ion

project group

amber kinslowdavid speedlin: design/drawings/modelmatt mcgowen

Pick an existing building thatexhibits some form of structuralarticulation and study its beams,columns,and connections.

Our group chose the museoalameda and built a modelrepresenting its unique shadingelement. We also studied theconnections by doing detaildrawings to understand how theshading structure went together.

detail

elevations

detail18

Page 23: Portfolio

artic

ulat

ion

The model was built frombasswood, cardboard, plaster,tinted plastic, and metal.

model

detail

model

19

Page 24: Portfolio

wal

l des

ign

model

assembly

project group

amber kinslowdavid speedlin: design/modelmatt mcgowen

The design classes wereasked to create a modular wallthat would go between eachclass to obstruct noise and act asa physical barrier.

Our goal was to design awall that visually separated eachclass while also serving a usefulpurpose by allowing students tostore drawings in louverd shelves.

20

Page 25: Portfolio

shosta

kovic

hsym

pho

ny no. 4

8:00 pm saturdayapril 7, 2012

Kirov Orchestra

www.performingarts.utsa.edu/[email protected] 495 0945free admission

sponsored byThe Center of Modern ArtsUTSA Department of ArchitectureUTSA Department of Music

Valery Gergiev

UTSA performing arts hall

DAS,12

0305,P

6,v4

DAS

even

t

21

poster 20x30

process

project

20x30 poster for a performanceof symphony no. 4 composed byshostakovich.

required

photograph of instrument(s)name of conductor and orchestrasponsored by utsa department of architecture utsa department of music the center of modern artlocation utsa performing arts halltime 8:00pm saturday april 7, 2012free admission210.495.0945www.performingarts/utsa/[email protected]

Page 26: Portfolio

22

mus

eum

poster 20x30

process

DAS,12

0323,P

7,v1

DAS

San

muesem

of

Cultu

ral

Literacy

Anto

nioSa

muesem

of

Cultura

lL

iteracy

photo exhibition celebrate

who randy tower steven m. keller kelsey trevino

photography workshop saturday april 7 1:00pm to 5:00pm $25 per person

where san antonio museum of cultrual literacy

when

lecture series photo workshop

photo exhibition monday april 2 to sunday april 8 museum hours free

lecture series monday april 2 7:00pm Randy Tower wednesday april 4 7:00pm Steven M. Keller friday april 6 7:00pm Kelsey Trevino free

contact 1100 broadway st. san antonio tx 78215 (210) 386 0892 saclmuseum.org

the three photographers in this exhibition were born and raised in san antonio. they were asked to celebrate culture through their photography in their city and not only exhibit the photos but lecture and teach about the culture of san antonio.

celebra

tesa

n anto

nioapril 2

- april 8

san antonio

broa

dw

ay st

w jone

s ave

broadway stn a

lam

o st

n alam

o st

broa

dw

ay st

austin st

austin st

n ha

ckber

ry

35

35

281

281

sama

peal brewery

sam

cl

cultural d

epth p

resented

to the senses

project

20x30 poster for a photographyexhibition located at a newmuseum in san antonio.

required

content appropriate imagesand photosthe museum statementthe museum logowherewhenwhowhyhow muchcontact informationadditional sponsors

a portion of the poster must beable to be cut and assembledinto a 4 inch cube.

Page 27: Portfolio

urbinospring

logo

DAS,12

0411,fina

l,v2

DAS

urbinospring

2013

urb

ino

faculty

first

agenda

urbinospring

sprin

g 2

013

mark blizardcurtis fish

monday april 16 5:00 pm louis kahnmeeting

general informationq + aschedulecoursework

this is an alternative to the current fall program

final

23

logo

faculty

first

2013

sprin

g 2mark blizard

curtis fish

monday april 165:00 pm louis kahnmeeting

poster 20x30

final

20x30 poster for the first meetingdiscussing a new study abroadprogram in italy. must be completed in 4 hours.

required

content appropriate photo(s)an urbino spring 2013 logofaculty mark blizard curtis fishfirst meeting monday april 16 5:00pm louis kahn roomagenda general information q+a schedule courseworkidentify as a different programfrom the current fall one.

Page 28: Portfolio
Page 29: Portfolio

d a s

p o r t f o l i o