portfolio

33
ARCHITECTURE P O R T F O L I O Marceline Dalimarta

description

Architecture portfolio

Transcript of portfolio

ARCHITECTURE P O R T F O L I O Marceline Dalimarta

ARCHITECTURE P O R T F O L I O

ARCHITECTURE P O R T F O L I O ARCHITECTURE P O R T F O L I O

BIKE RACK STATION

THE “IT” SHOE STORE

OLYMPIC HANGOVER

RE-USE PAVILION

INDEX

4

10

32

16

RE(illinois)ING KASKASKIA 22

RIBBONING THEATRE 28

This project is focusing on the post olympic site in Rio de Janeiro. Looking at AECOM proposal in designing the post olympic site and critically try to take a step forward towards the design. Then pick a specific area to further develop it with design building process.

OLYMPIC HANGOVER

I modify the site to allow more water edge for the housing . By using the push and pull technique i am able to bring in the water to create water edge hous-

ings which values more to that area.

There are 3 layers of programs in every “finger”. people circulate through the second layers . The second layers then become the public spaces which

also acomodate residents to go to their private spaces on the first and third layers.

This project is a project designed for a competition (Archmedium)The competition is about designing a theatre complex in Manhattan, New York City that can bring culture from around manhattan inside to the theatre.

RIBBONING THEATRE

Ribboning theatre is a complex of concert hall that serves as a representation of the surrounding neighbourhood. The idea of this building is that it will form from a continuous ribbon that will overlap and intersect each other allowing

spaces to form inside. The programs inside then places ad an object within its spaces.

The site for this project is in a neighbourhood that can be placed in Broad-way, Queens, etc. The building is a 2 level building where in the first floor, it is a shoe store and on the second floor is a tango club.

THE “IT” SHOE STORE

I am interested in the CMYK color, and how they can create a true color that we usually see when they combined together. I mix it with the tango dance step to

create the diagram which i wil use to create a different shape of “funnel”. Each funnel have a use to divert the sight of people who’s walking in front of the store.

BIKE RACK STATION

This project took near Ohio State University. It’s in the middle of ohio bike trail, and in front of the olentangy river.The objective of this project is to make a bike station that can accomodate 100+ bikes, cafe and restroom.

I started this project by create a pattern from a circle. I overlay the circle and overlap it so that it generate a flowery and organic form.

Then i took the interesting shape out of the pattern, superimposed it and use it as the form for my building.

The bike rack system that i am interested to use is a hanging bike rack system. By using this system,i can maximize the use of space so that i can accomodate more bikes in smaller space. I am interested in using a curved branches pole so that the bike rack will look organic.

There will be 3 level of my bike station. The first one is the ground lever where peopele can sit and relax after their tired biking exercise. The second one is the toilet level and lastly the cafe level which can be reached from the top of this hilly landscape.

B

A

C

D

E

RE-USE PAVILION

The basic idea of this project is to create a welcoming center for a huge land-fill near columbus, Ohio. The existing landfill named SWACO is a huge landfill that works in managing the district municipal solid waste stream to achieve environmentally responsible and cost-effective disposal

860

I am interested in using a uniform geometry, i choose circle because its a pure geometry that has no front, back or side facade since welcoming center should be accesible from any side. I then put all

the programs inside the circle and arrange it as a different pavillions.Permanent ex. Permanent ex.

Auditorium

Library

Permanent ex.

Auditorium

Library

OfficeRestroom

Lobby

Restroom

Classroom

Permanent ex.

Auditorium

Library

OfficeRestroom

Lobby

Restroom

Classroom

OutdoorCafe

Temporary Ex.

Small Park

The different circulation, when all the facility are being used (on the left), and when just walking around (on the right).

Extruded landscape Vegetation When the opening opens

Extruded landscape Vegetation When the opening opens

Vegetation Extruded Landscape

Normal situation When the openings are open

To start this project, i did some research on materials in the landfill that can actually be used to create spaces and can accomodate activities. And i find that the mose sucessful of all is the parking cone because its not only generate spaces that reasonable for human activities, but it also create an interesting surface in the facade.

RE(illinois)ING KASKASKIA

In this project we are facing an island called kaskaskia. it is illinois land that’s seperated by missisippi river. This island has a flooding problem which lead to the decrease of its population.

Site strategy that we took here is instead of block the water to flood the island, we engage the flooding to several area to allow new islands to occur

depend on the percentage of the flooding.

Gallery

Lobby

IMAX

Meeting

RestaurantStorage

Gift

The design of the museum comes from an arrangement of programms inside. I overlap some area which then become the circulation area. the rest then become the program area and it will have different height. The overlap part then become an elevated surface which differentiate the circulation and viewing area.

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

Circulation

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

Stairs Ramps

IMAX

G

ALE

RY

1

G

ALE

RY

2

G

ALER

Y 3

G

IFT IMAX

CCCCCC

RestroomRe mtroeestrooo

1st Floor Plan 2nd Floor Plan

AB

IMAX

GALERY 1

GALERY 2

GALERY 3

GIFT

C

A

B

C