SEMINAR OF“CHALLENGES AND OPPORTUNITIES IN THE IMPLEMENTATION OF THE NATIONAL LOGISTICS STRATEGY
IN INDONESIA”
Jakarta – November 2013
INDONESIA :
ONE OF THE LARGEST MARITIME COUNTRY IN THE WORLD
ONE OF THE LARGEST MARITIME COUNTRY IN THE WORLD
THE LARGEST ARCHIPELAGIC COUNTRY IN THE WORLD THE LARGEST ARCHIPELAGIC COUNTRY IN THE WORLD
MALACCA & SINGAPORE STRAIT (WITH MALAYSIA & SINGAPORE)
MALACCA & SINGAPORE STRAIT (WITH MALAYSIA & SINGAPORE)
BETWEEN TWO CONTINENTS, ASIA AND AUSTRALIA BETWEEN TWO CONTINENTS, ASIA AND AUSTRALIA
3 ARCHIPELAGIC SEA LANES 3 ARCHIPELAGIC SEA LANES
1
2
3
4
5
6
7
FEEDER PORTS
Sabang, Belawan, Dumai, Batam (3 terminal), Palembang, Panjang, Banten, Tanjung Priok, Cilamaya, Cilacap, Semarang, Tanjung Perak, Tanjung Bulu Pandan, Benoa, Socah, Teluk Lamong, Pontianak, Sampit, Banjarmasin, Tanah Ampo, Kupang, Balikpapan, Bitung, Makassar, Ternate, Pantoloan, Ambon, Sorong, Jayapura, Merauke
Malahayati, Tanjung Balai Asahan, Selat Panjang, Bengkalis, Tanjung Buton, Pekanbaru, Tanjung Batu, Tanjung Pinang, Jambi, Pangkal Balam, Tanjung Pandan, Bojonegara, Sunda Kelapa, Kep. Seribu, Tegal. Batang, Gresik, Sampang, Bima, Kumai, Pelaihari, Garongkong, Luwuk, Tangkiang, Nunukan, Tarakan, Samarinda, Maloy, Manado, Banggai, Bau-bau, Waingapu, Ende, Manado, Pare-Pare, Kendari, Biak, Manokwari, Fak-Fak
Susoh, Idi, Air Bangis, Serasan, Nipah Panjang, Malakoni, Bagan Siapi-Api, Toboali,Karang Agung, Teluk Betung, Brebes, Jepara, Tuban, Tuban, Buleleng, Sape, Reo, Lirung, Lawele, Jailolo, Sanana, Serui
TOTAL : 1240 PORTS
MAIN PORTS
COLLECTOR PORTS
BASED ON MINISTER OF TRANSPORTATION DEGREE NO. KP. 414 YEAR 2013
TYPE OF CARGO
YEAR
2012(Million Ton)
2030(Million Ton)
TOTAL 1122.2 2114.2
DRY BULK599 (53,4 %)
75% Coal960.2
LIQUID214.5 (19,1%)
86 % Petroleum & CPO413.2
GENERAL CARGO 182.1 (16,2%) 293.2
CONTAINER CARGO 126.6 (11,3%) 477.7
DOMESTIC(TEUs)
INTERNATIONAL(TEUs)
TOTAL(TEUs)
2012 4.768.192 7.873.150 12.641.342
2030 18.344.644 29.423.403 47.768.047
INDONESIAN CONTAINER THROUGHPUT INCREASING FROM 12 MILLION TEUs IN 2012 BECOME MORE THAN 40 MILLION TEUs IN 2030
ECONOMIC CORRIDORS
TERMINALCDC/
MULTIMODECRUISE
TERMINAL
LAND/INFRASTRU
CTURE
TOTAL(US$ BILLION)
CONTAINER CPOPETROL
EUMCOAL
OTHERS BULK
OTHERS TERMINAL
SUMATERA 6.975 1.758 1.395 1.283 0.432 0.163 0.025 - 0.835 12.866
JAVA 8.556 0.008 1.674 0.240 0.236 0.624 0.720 0.620 2.642 15.321
BALI-NT 0.097 - 0.080 - 0.146 0.850 - 0.862 0.373 2.408
KALIMANTAN 0.644 0.550 0.356 1.405 0.535 0.924 - - 0.213 4.626
SULAWESI 0.477 0.043 0.282 - 0.483 2.053 0.075 - 0.459 3.871
PAPUA 0.550 0.010 0.179 - 0.439 5.443 - - 1.351 7.972
TOTAL 17.299 2.369 3.965 2.927 2.273 10.058 0.820 1.482 5.872 47.064
NO PLANTOTAL GOVERNMENT PRIVATE
US$ BILLION % US$ BILLION % US$ BILLION %
1
2
3
2011-2015
2016-2020
2021-2030
12.212
12.389
22.464
100
100
100
5.202
3.423
6.281
42.6
27.6
28.0
7.010
8.965
16.183
57.4
72.4
72.0
TOTAL 47.064 100 14.906 31.7 32.158 68.3
YEAR 2014YEAR 2014
YEAR 1990YEAR 1990
YEAR 2013YEAR 2013
Critical Project – Fast TrackTanjung Priok New Container Terminals
Tanjung Perak New Container Terminals
Belawan Extension of Container Terminal
Port projects to be completed in next five yearBanjarmasin New Container Terminal
Pontianak Extension of Container Terminal
Batam Container Terminal
Madura Development of new port area
Cilamaya (West Java) Development of new port area
Palembang General cargo or bulk handling facilities
Kuala Tanjung New Container Terminal
Panjang General cargo or bulk handling facilities
Ambon, Dumai, Teluk Bayur, Makassar, Banjarmasin, Bitung, Tanjung Emas, Probolinggo, Balikpapan/Kariangau, Jayapura, Sorong, Pasean, Maloy, Pelaihari, Sei Gintung, Gorontalo, Pantoloan, Pare-pare.
General Cargo, Container and Bulk Terminal
BIDDING PROCESS :-DEVELOPMENT OF CRUISE TERMINAL IN TANAH AMPO-SURABAYA WEST ACCESS CHANNEL
BIDDING PROCESS :-DEVELOPMENT OF CRUISE TERMINAL IN TANAH AMPO-SURABAYA WEST ACCESS CHANNEL
PRIORITY PROJECTS :-CILAMAYA PORT DEVELOPMENT PROJECT
PRIORITY PROJECTS :-CILAMAYA PORT DEVELOPMENT PROJECT
POTENTIAL PROJECTS (BASED ON DEMAND) :-GARONGKONG PORT DEVELOPMENT PROJECT-BAU-BAU PORT DEVELOPMENT PROJECT-LUWUK (TANGKIANG) PORT DEVELOPMENT PROJECT-PROBOLINGGO PORT DEVELOPMENT PROJECT-MAKASSAR NEW PORT DEVELOPMENT PROJECT
POTENTIAL PROJECTS (BASED ON DEMAND) :-GARONGKONG PORT DEVELOPMENT PROJECT-BAU-BAU PORT DEVELOPMENT PROJECT-LUWUK (TANGKIANG) PORT DEVELOPMENT PROJECT-PROBOLINGGO PORT DEVELOPMENT PROJECT-MAKASSAR NEW PORT DEVELOPMENT PROJECT
KUALA TANJUNG PORT
KALIBARU TERMINAL
MALOY PORT
MAKASSAR NEW PORT
BITUNG PORT
DEVELOPMENT PROJECTS :KUALA TANJUNG PORT - NORTH SUMATERABATAM PORT – KEPULAUAN RIAUKALIBARU TERMINAL – JAKARTACILAMAYA PORT – WEST JAVAGRESIK PORT – EAST JAVASOCAH TERMINAL – EAST JAVATELUK LAMONG TERMINAL – EAST JAVAMALOY PORT - EAST KALIMANTANMAKASSAR NEW PORT - SOUTH SULAWESIBITUNG PORT - NORTH SULAWESISORONG/SEGET TERMINAL
BATAM PORT
CILAMAYA PORT
TELUK LAMONG TERMINALGRESIK PORT
SOCAH TERMINAL
SORONG/SEGET TERMINAL
PORT OF KUALA TANJUNG
TOTAL LAND AREA : 19,07 Ha
WHARF OF MNA COMPANY
C WHARF (PELINDO I)
A B WHARF (INALUM)
EXISTING CONDITION
PROPOSEDHUB INTERNATIONAL PORT
CONTAINER TERMINAL
Length : 9237,43 m
CONTAINER TERMINAL
Length : 9237,43 m
CO
NTA
INER
TER
MIN
AL
Leng
th :
3000
m
DRY BULK TERMINAL
Length : 2000 m
CONTAINER YARD
CPO TERMINAL
MULTIPURPOSE TERMINAL
TOTAL AREA OF PORT DEVELOPMENT : 1400,02 HaContainer : 1078.00 HaContainer Depot : 114.47 HaLiquid Bulk : 44.26 HaDry Bulk : 143.00 HaMultipurpose : 15.40 HaOffice Area : 4,99 Ha
PROJECT UPDATE :
1.PORT MASTERPLAN HAS ESTABLISHED2.AMDAL (EIA) ON GOING
KABIL TERMINAL/TG. SAUH
Kabil’s CPO Terminal
Container Cargo Zone
General Cargo Zone
Domestic Passenger Terminal
Commercial Terminal
Port Management Area
SEKUPANG TERMINAL
General Cargo Zone
Domestic Passenger Terminal
Commercial Terminal
Port Management Area
NONGSA TERMINAL
Domestic Passenger Terminal
Int’l Passenger Terminal
Commercial Terminal
Port Management Area
BATU AMPAR PORT
Passenger and govermnent shipping zone
General Cargo Zone
Container Cargo Zone
Commercial Terminal
Port Management Area
BATAM CENTER TERMINAL
Domestic Passenger Terminal
Int’l Passenger Terminal
Commercial Terminal
Port Management Area
BASED ON MINISTERIAL DECREE NO. 77 YEARS 2009 REGARDING MASTERPLAN OF BATAM PORT
/Tg. Sauh
NO DEVELOPMENT PLANNING SHORT TERM MEDIUM TERM LONG TERM
TOTAL 2012-2017 2012-2023 2012-2030
A INTERNATIONAL CONTAINER TERMINAL
1 Container Terminal Wharf Length (m) 900,0 800,0 800,0 2.500,0
2 Container Terminal Yard Area (Ha) 32,0 48,0 48,0 128,0
B LIQUID BULK TERMINAL
1 Liquid Bulk Wharf Length (m) - 800,0 800,0 1.600,0
2 Liquid Bulk Terminal Area (Ha) - 24,0 24,0 48,0
C RESERVE AREA Area (Ha) - 36,0 - 36,0
D HANDLING EQUIPMENTS
1 Quay Container Crane Unit 10,0 10,0 10,0 30,0
2 MRGC Unit 30,0 30,0 30,0 90,0
3 Terminal Tractor Unit 70,0 70,0 70,0 210,0
4 Chasis Unit 80,0 80,0 80,0 240,0
E ACCESS ROAD Length (m) 2.803,0 - - 2.803,0
F DREDGING Volume (m3) 27.801.655,0 - - 27.801.655,0
KALIBARU TERMINAL
NEW PORT CILAMAYA DEVELOPMENT PROJECT
VILLAGE : SUMBERJAYADISTRICT : TEMPURANREGENCY : KARAWANGPROVINCE : WEST JAVA
TELUK LAMONG TERMINAL
TANJUNG PERAK PORTTELUK LAMONG TERMINAL
EXTENSION OF TANJUNG PERAK PORT
MULTIPURPOSE TERMINAL
26 Ha
88,9 Ha
GAR
IS P
ANTAI
-14.00
basi
n
turn
ing
GAR
IS P
ANTAI
210,1 Ha
-14.00-14.00
5.6 Ha
10.3 Ha
36.8 Ha
CONTAINER
TERMINAL AREA
DRY BULK
TERMINAL AREA
CONTAINER DEPO & CONSOLIDATION/DISTRIBUTION
CONTAINER AREAPAI (PORT ASSOCIATED INDUSTRIES)
151,7 Ha
57,6 Ha
PAI (
PORT
ASS
OCIA
TED
INDU
STRI
ES)
DRY
BULK
BATAS KLHS UNIBRAW
TAHAP III
1
3
5
7
9
1
3
5
7
9
11
13
15
17
19
23
21
CFS
24.45 HA
36.80 HA
26.00 HA
88.90 HA
210.10 HA
ITEM DIMENSION
INT WHARF 1780 X 50 M
DOMESTIC WHARF 2390 X 30 M
C2 TRESTLE 1000 X 16 M
CAUSEWAY 1931 X 50 M
C1 TRESTLE 800 X 20 M X 2
ACCESS ROAD 1130 X 50 M
TOTAL RECLAMATION 386,12 HA ULTIMATE PHASE
GRESIK PORT
TANJUNG PERAK PORT
DRY AND LIQUID BULK ZONE
PARKING ZONE
GREEN AREA
WAREHOUSE ZONE
OFFICE AREA
MULTIPURPOSE ZONE
INDUSTRIAL ZONE
TANJUNG PERAK PORT
WHARF AREA
GENERAL CARGO ZONE
CONTAINER YARD AREA
DRY BULK ZONE
LIQUID BULK ZONE
INDUSTRIAL & LOGISTIC ZONE
OFFICE AND BUSSINESS AREA
PUBLIC UTILITY AREA
ACCESS ROAD
INDUSTRIAL AREAS & INTERNATIONAL PORT
INDUSTRIAL AREAS & INTERNATIONAL PORT
OF MALOY
PROJECT BACKGROUND
INTEGRATED RESOURCES & PLANTATION ZONE – INDUSTRIAL AREAS AND
INTERNATIONAL PORT
MALOY IS ONE OF PRIORITY PROJECT LOCATION FOR ECONOMIC ACCELERATION BASED ON MP3EI (INDUSTRIAL AREAS & INTERNATIONAL PORT OF MALOY)
HAS A STRATEGIC POSITION (SEA LANE – ALKI II) MALOY PORT IS DESIGNED INITIALLY TO
HANDLE CPO EXPORTS. TERMINALS ARE ALSO PLANNED FOR COAL, CONTAINERS AND GENERAL CARGO (SUPPORTED INDUSTRIAL AREAS AND NATURAL RESOURCES DISTRIBUTION)
DEVELOPMENT PLANNING
GENERAL CARGO & CONTAINER
TERMINAL
FISHERY PORT OF
BUAL-BUAL
COAL TERMINAL
INTERNATIONAL CPO TERMINAL
EXISTING PORT FOR SHIP < 5000 DWT
INDUSTRIAL AREA
CPO YARD & TANK FOR LIQUIDS : ± 51.00 HA
CARGO & CONTAINER YARD : ± 205.00 HA
SUPPORTING FACILITIES : ± 81.00 HA
BUFFER ZONE : ± 86.10 HA
MANGROVE AND REEF : ± 450.90 HA
AMOUNT OF TOTAL AREA : ± 874.00 HA
PROJECT UPDATE :
1.PORT MASTERPLAN HAS ESTABLISHED2.FS AND DED OF AREA HAS ESTABLISHED
EXISTING FACILITIES
HATTA TERMINALWharf : 850 M Depth : - 12 M LwsWarehouse CFS : 4.000 M2CY : 11,4 HaCapacity : 700.000 TEUs
SOEKARNO TERMINALWharf : 1.360 M Depth : - 9 M LwsWarehouse : 19.800 M2Storage Yard : 6,4 HaCapacity : ± 5 Million Ton
PAOTERE TERMINALWharf : 526 M Depth : - 4 M Lws
PORT WORKING AREA :Land : 119,3 HaWater : 2.978 HaBASIN : 319 Ha
LONG TERM PLAN
PROJECT UPDATE :
PORT MASTERPLAN ON GOING
CONTAINER TERMINALIN SHORT & MEDIUM TERM PLANNING
(78 HA)
CONTAINER TERMINAL (30,8 HA)
RO-RO TERMINAL (5,8 HA)
DREDGING AREA (27 HA)
PROPOSEDHUB INTERNATIONAL PORT
EXISTING WHARF
OFFICE AREA
CONTAINER YARD
RESERVE AREA
PARKING ZONE
WHARF ZONE
WAREHOUSE ZONE
PUBLIC UTILITY ZONE
MINISTRY OF TRANSPORTATION - REPUBLIC OF INDONESIA
Merdeka Barat Street No. 8, Jakarta 10110, Indonesiawww.dephub.go.id