Port of Anchorage Intermodal Expansion Project Concept ...

51
1 March 67, 2013 Mayor and Assembly Briefings Mayor and Assembly Briefings Port of Anchorage Intermodal Expansion Project Concept Design Study

Transcript of Port of Anchorage Intermodal Expansion Project Concept ...

Page 1: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

1

March 6‐7, 2013

Mayor and Assembly 

Briefings

Mayor and Assembly 

BriefingsPort of Anchorage Intermodal Expansion Project Concept Design Study

Page 2: Port of Anchorage Intermodal Expansion Project Concept ...

Briefing Outline

2

• Recap the Design Charrette

• Overview of the 3 Concept Plans using visual simulations

• Cost and Schedule Risk Assessment (CSRA) 

• Selection Criteria and Recommended Option

• Attributes of the Recommended Option

Page 3: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

3

Design CharretteDesign Charrette

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 4: Port of Anchorage Intermodal Expansion Project Concept ...

Charrette Goals for the POA

4

• Provide adequate facilities at POA to support local commerce 

and the National Strategic Military Transport

• Provide modern, safe and efficient facilities

• Expand and maintain existing port property

• Encourage natural resource exports and attract new business

Page 5: Port of Anchorage Intermodal Expansion Project Concept ...

Organizations Represented

5

• US Maritime Administration (MARAD)

• Municipality of Anchorage (MOA)

• Port of Anchorage (POA)

• Totem Ocean Trailer Express (TOTE)

• Horizon Lines

• Cook Inlet Tug & Barge

• Southwest Alaska Pilots Association

• US Army Corps of Engineers Alaska District (USACE)

Page 6: Port of Anchorage Intermodal Expansion Project Concept ...

Option 1 – Charrette

6

Page 7: Port of Anchorage Intermodal Expansion Project Concept ...

Option 2 – Charrette

7

Page 8: Port of Anchorage Intermodal Expansion Project Concept ...

Option 3 – Charrette

8

Page 9: Port of Anchorage Intermodal Expansion Project Concept ...

Option 4 – Charrette

9

Page 10: Port of Anchorage Intermodal Expansion Project Concept ...

Option 5– Charrette

10

Page 11: Port of Anchorage Intermodal Expansion Project Concept ...

Option 5‐1 Hybrid ‐ Charrette

11

Page 12: Port of Anchorage Intermodal Expansion Project Concept ...

Charrette Direction

12

• Option 1 should be carried forward

• Option 2 wasted too much backlands and should be dropped

• Options 3 and 4 were dropped for several reasons:

• Pushing further offshore is outside the permit area

• Pushing further offshore creates more challenges for vessel 

approach and mooring

• Pushing further offshore exacerbates shoaling at Terminal 3 

• Option 5 should be carried forward (popular with carriers)

• Option 5 – 1 Hybrid should be developed further

Page 13: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

13

Option 1 ‐ VisualizationsOption 1 ‐ Visualizations

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 14: Port of Anchorage Intermodal Expansion Project Concept ...

14

Page 15: Port of Anchorage Intermodal Expansion Project Concept ...

15

Page 16: Port of Anchorage Intermodal Expansion Project Concept ...

16

Page 17: Port of Anchorage Intermodal Expansion Project Concept ...

17

Page 18: Port of Anchorage Intermodal Expansion Project Concept ...

18

Page 19: Port of Anchorage Intermodal Expansion Project Concept ...

Hybrid Reinforced Concrete Piling

19

Page 20: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

20

Option 5 ‐ VisualizationsOption 5 ‐ Visualizations

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 21: Port of Anchorage Intermodal Expansion Project Concept ...

21

Page 22: Port of Anchorage Intermodal Expansion Project Concept ...

22

Page 23: Port of Anchorage Intermodal Expansion Project Concept ...

23

Page 24: Port of Anchorage Intermodal Expansion Project Concept ...

24

Page 25: Port of Anchorage Intermodal Expansion Project Concept ...

25

Page 26: Port of Anchorage Intermodal Expansion Project Concept ...

26

Page 27: Port of Anchorage Intermodal Expansion Project Concept ...

27

Page 28: Port of Anchorage Intermodal Expansion Project Concept ...

28

Page 29: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

29

Option 5‐1 Hybrid ‐ VisualizationsOption 5‐1 Hybrid ‐ Visualizations

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 30: Port of Anchorage Intermodal Expansion Project Concept ...

30

Page 31: Port of Anchorage Intermodal Expansion Project Concept ...

31

Page 32: Port of Anchorage Intermodal Expansion Project Concept ...

32

Page 33: Port of Anchorage Intermodal Expansion Project Concept ...

33

Page 34: Port of Anchorage Intermodal Expansion Project Concept ...

34

Page 35: Port of Anchorage Intermodal Expansion Project Concept ...

35

Page 36: Port of Anchorage Intermodal Expansion Project Concept ...

36

Page 37: Port of Anchorage Intermodal Expansion Project Concept ...

37

Page 38: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

38

Cost and Schedule Risk 

Assessment  (CSRA)

Cost and Schedule Risk 

Assessment  (CSRA)Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 39: Port of Anchorage Intermodal Expansion Project Concept ...

Cost and Schedule Risk Assessment

39

• Typical deterministic method estimates costs then adds contingency (e.g. 20%)

• Benefits of the CSRA– Identifies high risk items to cost and schedule

– Provides leadership contingency information for scheduling and budgeting

– Allows management of risks through a formal process throughout the design process.   

– Provides a  proven structure for communicating project costs with stakeholders.

Page 40: Port of Anchorage Intermodal Expansion Project Concept ...

Cost Estimates

60% Confidence 80% Confidence 100% Confidence

Option 1 $363M $377M $447M

Option 5 $618M $642M $763M

Option 5‐1 Hybrid $582M $602M $735M

40

Notes:1.All options assume construction start 2015, with construction midpoint 20172.All options use surplus sheet piling3.All berths designed to MCE level earthquake

Page 41: Port of Anchorage Intermodal Expansion Project Concept ...

41

Page 42: Port of Anchorage Intermodal Expansion Project Concept ...

42

Page 43: Port of Anchorage Intermodal Expansion Project Concept ...

43

Page 44: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

44

Selection Criteria and Scoring Selection Criteria and Scoring 

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 45: Port of Anchorage Intermodal Expansion Project Concept ...

Qualitative Scoring Factors

• The evaluation team consisted of members from the POA, MARAD, MOA, USACE, and CH2M HILL. 

– 1.0 Outstanding

– 0.8 Excellent

– 0.6 Good

– 0.4 Fair

– 0.2 Poor

– 0.0 Unsatisfactory

45

Page 46: Port of Anchorage Intermodal Expansion Project Concept ...

Selection Criteria and Recommended Option

46

Page 47: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

47

Recommended Option AttributesRecommended Option Attributes

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013

Page 48: Port of Anchorage Intermodal Expansion Project Concept ...

Option 5‐1 Hybrid Attributes

48

• Has the lowest initial investment cost 

• Phase 1 $327M (North End Hybrid Berth)

• Phase 2 $275M  (Terminal 2 and 3)

• Total      $602M

• Hybrid Berth serves both barge and deep draft customers

• Retains most backlands at North End (32 acres)

• Allows for expansion to the south in the future

• Less maintenance dredging anticipated

• Improved vessel approach

Page 49: Port of Anchorage Intermodal Expansion Project Concept ...

49

Page 50: Port of Anchorage Intermodal Expansion Project Concept ...

50

Page 51: Port of Anchorage Intermodal Expansion Project Concept ...

September 1, 2011

51

QuestionsQuestions

Port of Anchorage Intermodal Expansion Project Concept Design Study

March 6‐7, 2013