Por to Folio - Tony

download Por to Folio - Tony

of 21

Transcript of Por to Folio - Tony

  • 8/9/2019 Por to Folio - Tony

    1/21

  • 8/9/2019 Por to Folio - Tony

    2/21

  • 8/9/2019 Por to Folio - Tony

    3/21

  • 8/9/2019 Por to Folio - Tony

    4/21

  • 8/9/2019 Por to Folio - Tony

    5/21

  • 8/9/2019 Por to Folio - Tony

    6/21

  • 8/9/2019 Por to Folio - Tony

    7/21

    Page

    5 Academic Projects -- 5th Semester

    TELKOM TRAINING CENTER

    This was my assignmentfor the the fifth semester.This was my first timedesigning a building complex.The whole complex consistedof three buildings ,theadministration office , themulti function hall ,and theTELKOM trainee housing ,aswell as a few supportingfacilities.

    I decided to rotate the generalaxis of the complex to complywith the climate condition ,so

    that the facade of the buildingcan face accordingly the to thedirection of the sun.

    About the Facilities

  • 8/9/2019 Por to Folio - Tony

    8/21

    Frank L.WRights Falling Water Sketch

    Cikapundung Apartment Complex -- Row House Section

    Community Meeting Hall - 1st Alternative Sketch

    Community Meeting Hall - -- 2nd Alternative Sketch

    OTHER FREEHAND SKETCHESAs a method of design exploration ,I often sketches my initialdesign ideas ,as well as other architects works to study their design.Below are some of my conceptual sketches.

    Page 6 Freehand Sketches -- Academic Projects & Other Works

  • 8/9/2019 Por to Folio - Tony

    9/21Page 7

  • 8/9/2019 Por to Folio - Tony

    10/21

    Page 8

  • 8/9/2019 Por to Folio - Tony

    11/21

    Page 9

  • 8/9/2019 Por to Folio - Tony

    12/21

    My final project for the seventh semester was a Robotic Center in Surabaya ITS -- the site was located in Surabaya instead of Bandung because this project was actually a collaboration projectstudio between ITB ( Institut Teknologi Bandung ) ,ITS ( InstitutTeknologi Sepuluh November ) and FHE ( Fachhochschule ErfurtUniversity of Applied Sciences ).

    As one of the r epresentatives from ITB ,Ive had the chance togo to Surabaya and work with students from other participatinguniversities.

    My groupmates from the collaboration studioprogramme.were Imaddudin Odi, Ronald .J.Pandjaitan ,Thomas Kleinow and Elisabeth Schulz.

    As a team,we designed the basic massing of the building complexand we also made a site analysis together.Further design develop-ment were done separately by each students.

    My personal concept for this building complex were joints ,connection and mechanical assembly.This were shown on theschematic design drawings shown below.

    ( A building made of various-sized masses to show the assembly concept ,and inter-connecting building as an analogy of a machinethat has to be connected to other parts of it in order for it to work )

    Page 10

  • 8/9/2019 Por to Folio - Tony

    13/21Page 11

    MARIA ANGELINAS GREENHOUSE

  • 8/9/2019 Por to Folio - Tony

    14/21

    Personal Projects -- 2008

    BCCF CONTAINER

    Project Description :

    Initiated by Micheala Anggono and Agam Dwi Prabowo ,this container was originally meant to display the studentsof ITBs (represented by I3M) research papers for the public in Bandungs Helarfest.However ,due to financial restri ctions

    the design will most likely fail to be delivered in time for the festival.Therefore the team decided to sell this design to potentialbuyers ,instead of looking for sponsors and renting it later for commercial purpose.

    This design was finalized after a few months of discussion amongst the team members ,and several changes had to be madefor this design to work as planned.The team was divided again into a few teams ,I was part of the construction team together with Alfonsus W.M ( a student at Mechanical Engineering ,ITB) and Sebastian Tryans ( an architecture student from Unpar).Considering the number of people involved in the design process ,it is only fair to mention their names and roles in this projects.

    PROJECT MANAGER DESIGN TEAM

    PROPOSAL TEAM TECHNICAL TEAM

    Agam Dwi Prabowo and Micheala Anggono,asthe two people that initiated the project these twoholds the project manager position ,setting uptimelines ,and communicating the design withpotential clients.

    Bayu Prayudhi (AR ITB 06) and Raden Ahmad GrenaldyKertawidjaja (Ars Unpar 06),they are in charge of developingthe designs for this project.The developed form of thiscontainer came from Bayu.

    Desiree Syahnaz (AR ITB 06) ,Ardania Rheswari (AR ITB 06),Wendy Pratama (AR ITB 07) tasked to develop projectproposals and documenting the project so that the projectmanagers had something to brought up to the clients,as wellas advertising the product and handling general administrationsand management.

    Tony Hartanto (AR ITB 06) ,Alfonsus W.M ( MS ITB 05)Sebastian Tryans ( Ars Unpar 06),our task was to ensurethe structural integrity of the design ,as well as to findalternative methods of construction and making technicaldrawings to make sure the product worked as the teamhad hoped.

    Page 12

    APPLIED SUSTAINABLE CONCEPT

    The project never got realized ,it remained an idea created by team.But the teammanaged to get some appreciation from the local newspaper.

  • 8/9/2019 Por to Folio - Tony

    15/21

    BATAM TOWNHOUSE

    Page 13 Personal Project - 2008

    My very srt project outside of my school project.I wasrecruited into the project by my seniors which were HamalO.Pangestu (left) and Alderino Irzawandi (right) .

    This was my rst project as a 3D artist ,as such ,myresponsibility went only as far as drafting the basic geometryof the building and photo-montaging rendered drawings andcolor retouching.

    For this project,we modeled 5 building complex in total :- Apartment complex A- Apartment complex B- Clubhouse- Gateway to the complex- Retail Stores

  • 8/9/2019 Por to Folio - Tony

    16/21

    BSDcity COMPETITION

    Page 14 Personal Project - 2009

    A house design competition held by the developer of BSD City.Each participants must submitthree designs, each corresponds to the speci ed speci cation from the jury of the competition.

    The designs failed to receive any mention or awards though.

    For this design I tried to apply as much as possible any sustainable concept that could beapplied to these designs,mostly those related to water reusability issues and control overthe interior temperature of the house by utilizing shadings and passive cooling throughvarious means.

    I generally look at design competitions as a chance to test-out theories or as a way to practicedesigning.

    Water Recycling Schematic

    Evaporative Cooling Schematic

  • 8/9/2019 Por to Folio - Tony

    17/21

    Personal Project - 2009

    BARUS FAMILY INTERIOR On the early 2009,the Barus family decided to do a renovation of the house to accomodatethe return of the familys daughter after studying abroad.The request for me to work on thisproject were made by Reinard.A .Barus ,the son of the family.

    During the project ,I mostly talked to Cecilia Barus and Reinard .A.Barus to confirmthe agreement of the family of the design.

    The family did not wish for a total renovation,and so an add-on design that complies withthe existing structure were much more desireable.

    In the the final design proposed to open the ceiling platforms on the first level to reveal amuch more spacious airspace to give a free and brighter atmosphere into the room andalso a detail that blocks rainwater from getting into the room through the ventilation windowas well as providing the object for the interior plants to grow.

    Page 15

  • 8/9/2019 Por to Folio - Tony

    18/21

    HEAT EXCHANGERS

    Page 16 Personal Project - 2009

    AXONOMETRIC VIEW SIDE ELEVATION VIEW

    A project with the students from ITBsdepartment of chemical engineering.

    This project had nothing to do with artor architecture in any way .My involvement

    in this project were merely as a 3D artistthat visualize the 3D representation of thedevice and the animation of how the particlesinside the heat exchanger works.

    Although this project had nothing to do witharchitecture,by doing an animation of howthis device works ,I managed to understandthe basic principles of a heat exchangersworkflow,which were very interesting in myopinion.

  • 8/9/2019 Por to Folio - Tony

    19/21

    Page

    17 Personal Projects -- 2010

    CAJUPUT OLEUMPLANTATIONA project of the students of Indutstrial Engineering of ITB, the Cajuput Oleum Plantation wasa ctional project ,designed for the students to practice project management which includesrisk management ,cost estimation ,marketing and investment management.

    I was involved in this project as an architect that were requested to design a building that wereto function as the administration of the complex.The project was located in Papua ,on theeastern part of Indonesia ,and the budget allocated for the design were around 100 million IDRfor a 40 sq meter building.

    Designing the building by using concrete materials would de nitely resulted in an overpricedbudget,and so I was forced to design a building by using alternative materials.

    Honai,the traditional houses of the tribes of Irian Jaya ,Papua were made of mostly bamboo andstraws,so the materials are abundant in the area.Making it a very cheap and compatible alternativematerial for the design.

    C f

  • 8/9/2019 Por to Folio - Tony

    20/21Personal Project -- 2010

    CADL Competition

    Page 18

    Top : Aerial Perspective of the entire site. Top - right : day view of thesouthern part of the building. Lower - left : nightscene view of thenorthern part of the building.

    FLOOR PLANS

    CADL

    enter of rtesign &anguage ITB

    This work was actually part of a competition work ,done bymy team.The entire competition involves the redesigningof 3 buildings and the campus north gate.Whereas in myteam,I was in charge of designing the Center of Art ,Designand Language.

    Seni Budaya which means Arts and Culture as a concept areimplemented directly into the building as masses.The alphabetwhich makes up the word were stacked together to make thisbuilding.

    The implementation of letters also made itpossible for this otherwise thick building tobe slim ,allowing sunlight and air to penetratethe building from the atrium which werecreated from the form of the letters.

    The overlapping shapes of the stacked letters created a lot of social spaces around the corners of thebuilding -- which were essential in my opinion to provide,as the students of arts and languages wouldneed a lot of discussion and interaction amongst themselves in order to improve their design.

  • 8/9/2019 Por to Folio - Tony

    21/21

    OTHER

    ARCHITECTURALVISUALIZATION

    P

    AGE21

    Personal Pro ject

    The buildings in shown in thepictures are examples of projects which I am in chargeof making the visualization.I am experienced in usingvisualization softwares suchas 3D Studio Max and RevitArchitecture.

    These pictures were mostlymade for classmates / under-classmates / upper classmatesasking for help in visualizingtheir project.

    My student organization alsoheld classes to teach primarilymy underclassmates of thesesoftwares (educational version ),which I have been involvedas the main tutor for one and ahalf year.