Page 1: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Polytect Security SystemPolytect Security System

Senior Design II ProposalApril 20, 2006

Group # 3Sheena Ingram

Kerece RichardsonHai Nguyen

Diego Amezquita

Page 2: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Overview• Problem StatementProblem Statement• BackgroundBackground• ObjectivesObjectives• Intended Users and UsesIntended Users and Uses• Need/Feasibility AnalysisNeed/Feasibility Analysis• Concept DevelopmentConcept Development• StandardsStandards• Ethical ConsiderationsEthical Considerations• BudgetBudget• End Product DescriptionEnd Product Description• ConclusionConclusion

Page 3: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Problem StatementProblem Statement

– The need for integrated sensors– Detects gas, smoke, and home invasion

(burglar alarm )– Web-Based platform – Pre-defined Actions

Page 4: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

BackgroundBackground

• Wireless Fire Alarm System (University of Connecticut)

• Portable Gas Sensor (Iowa State University)

• Speech Synthesized Temperature Sensor (University of Illinois)

Page 5: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

ObjectivesObjectives

• This system should activate an alarm

• This system should be accessible

• The device should be useful

• The system should be Marketable

• The system should be valuable

• Monitored status should be accessible remotely, private, user friendly

Page 6: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Intended Users and UsesIntended Users and Uses

• UsersUsers

– Computer LiterateComputer Literate

• UsesUses

– monitor the status of gas and smoke monitor the status of gas and smoke concentrations, and intrusionconcentrations, and intrusion

Page 7: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Needs / Feasibility Analysis • Needs AnalysisNeeds Analysis

– Question 1: Why is there a problem with sensors locating a Question 1: Why is there a problem with sensors locating a specific threat?specific threat?

– Question 2: Why does the threat have to be located specifically if Question 2: Why does the threat have to be located specifically if the alarm alerts the user with sound?the alarm alerts the user with sound?

– Question 3: Why is there a need to have three separate sensors Question 3: Why is there a need to have three separate sensors for one system instead of integrating them into one?for one system instead of integrating them into one?

– Question 4: Why is there a need for web-based monitoring when Question 4: Why is there a need for web-based monitoring when some systems can be monitored using a LCD panel?some systems can be monitored using a LCD panel?

– Question 5: Why is there a need for the system to control Question 5: Why is there a need for the system to control functions in the home to eliminate certain threats?functions in the home to eliminate certain threats?

Page 8: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Feasibility AnalysisFeasibility Analysis

Page 9: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Concept DevelopmentThe pros and cons of selections• Advantages:

– Power – Wireless– Serial– Individual connections

• Disadvantages: – Wired systems may be more costly – Cumbersome– Constant battery replacement– Signal interferance– Serial Signal Delays

Page 10: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Standards

• ISO 7240-1– connected to control and indicating equipment

• AS/NZS 4379.2:1996 – the remote database access client, when

database language used is SQL

• ITS-90– t90 / °C = T90/K - 273.15

Page 11: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

Ethical ConsiderationsEthical Considerations • DilemmaDilemma

– unauthorized access to private information – security risk from altered information

• StakeholdersStakeholders– The stakeholders involved in this project will be the owner or

other users of the security system, hackers, and the general public.

• Determining the optionsDetermining the options – Best extreme – Worst extreme – Compromise

• Application of Ethical TheoriesApplication of Ethical Theories – Ethical egoism – Utilitarianism – Ethics of care

Page 12: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

BudgetBudgetCost Category Price

Components Max. $700

Time $15/hr * 10hr/wk * 4wk/mn * 4mn * 4people = $9600

Lab Space $400/mn * 1mn/4wk * 1wk/168hr * 15hr/wk * 4 wk/mn * 4 mn = $250

Lab Equipment $300/wk * 15hr/168hr * 4 wk/mn * 4 mn = $428

Fringe Benefit .30 * $7200 = $2880

Instructor Salary

$200/hr * 1hr/wk * 4wk/mn * 4mn = $3200

Grand Total $14178

Page 13: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

End Product DescriptionEnd Product Description• Functions

– Functional Block Diagram

Page 14: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.

ConclusionConclusion

• After performing a Feasibility Analysis, Gant chart, and budget it is concluded that the project is feasible and will be accomplished within the allotted time.

Page 15: Polytect Security System Senior Design II Proposal April 20, 2006 Group # 3 Sheena Ingram Kerece Richardson Hai Nguyen Diego Amezquita.