DIREC 2010
Workshop on Bio-methanation - Upscaling
Challenges and Opportunities
Policy Development Requirements for Biogas
Upscaling in India
Dr. A.R. Shukla
Adviser (Bio-energy)
Ministry of New and Renewable Energy
Email: [email protected]
27th October 2010
mailto:[email protected]:[email protected] -
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
2/13
Ministry of New and Renewable Energy
Bio-energy Technology Development Group
Biogas Dissemination Programmes:
National Biogas and Manure Management
Programme (NBMMP).
Biogas Based Distributed/Grid Power Generation
Programme.
Recovery of Energy from Industrial Wastes.
Recovery of Energy from Urban Wastes.
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
3/13
Ministry of New and Renewable Energy
Bio-energy Technology Development Group
Biogas R&D and Technology Demonstration Programme:
Demonstration of Integrated Technology Package on
Biogas-Fertilizer Plants (BGFP) for Generation,
Purification/ Enrichment, Bottling and Piped
Distribution of Biogas.
Establishment of Business Model for Demonstration of
an Integrated Technology Package for creation of
smokeless villages using biogas/ bio-energy systems and
meeting Life-line Energy envisaged in Integrated
Energy Policy
R&D and technology development in biogas, bio-
fertilizer and bio-energy refinery.
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
4/13
11/16/2010 4
CFA/ Subsidy for installation 20-50% of cost Administrative costs
Capacity building through:
Training of officials, plant operators/users
Information dissemination
Sponsorship for Research and Development
Provisions in the Electricity Act 2003
Open access to grid for RE power
Preferential tariffs by State regulators
Targets for RE power
Introduction of Renewable Energy Certificates
Captive generation decontrolled
Government Support for BiogasProgrammes
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
5/13
5
Approved CFA under National Biogas and
Manure Management Programme for 11th Plan
Category CFA (2-4 m3
Plant) (Rs.)CFA (1 m3 Plant)
(Rs.)
1. NER States 14,700/- 14,700/-
2. Notified hillyareas, J&K and Plain
areas of Assam
10,000/- 9,000/-
3. All other States 8,000/- 4,000/-
4. Support for
Training courses
2000 67,500/-
5. Turn key Job-fee
1500/-
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
6/13
Large Sized Biogas-Fertilizer Plant
Technology Demonstration Projects**
Proposals have been received under Demonstration of Integrated Technology Package on BGFPs for generation,purification, bottling and piped distribution of biogas in thecapacity range of 20020,000 m3 and above in response to EOIof the Ministry.
* Excluding cost of land.
**Limited nos.
Sl. No. Biogas Generation
Capacity (m3)
CFA for Biogas Purification,
Bottling/ Distribution Applications*
1. 200-1000 50% of the cost of the project
2. 1,100 - 5,000 40% of the cost of the project
3. 5,100 - 10,000 35% of the cost of the project
4. 10,100 - 20,000 and above 30% of the cost of the project
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
7/13
Biogas based Distributed/ Grid Power
Generation Programme: Central Financial
AssistancePower generating
capacity
Biogas plant
capacity
CFA/subsidy limited to the
following ceiling or 40% of the
cost of the system whichever
is less.
3 -20 kW 25 cu. m to 85 cu.m `40,000 per kW
>20 kW to 100 kW Any combination of
above plants or
alternate capacity/design
`35,000 per kW
>100 kW to 250 kW Any combination of
above plants or
alternate capacity /
design
`30,000 per kW
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
8/13
11/16/2010 8
Programme for Energy Recovery from
Industrial Wastes: Central Financial
Assistance*Bio-methanation of
Low Energy Density &
Difficult Wastes:
`10 million/ MWeq (12000
Cu.m. biogas per day)
Power generation
from Solid Industrial
Waste (Boiler +
Steam Turbine):
`2.0 million/ MW
Power generation from
Biogas
(Boiler + Steam Turbine):
`2.0 million/ MW
Bio-methanation of other
Wastes: `5.0 million/
MWeq (12000 Cu.m.
biogas per day)
Power generation
from Biogas
(Biogas Engine/
Turbine):
`10 million/ MW
*Limited to 20% of Project
cost *Limited to `50
million per Project
*For Special Category
States: 20% higher than
that of other States
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
9/13
11/16/2010 9
Programme for Energy Recovery from
Urban Wastes: Central Financial Assistance
Projects based on Bio-
methanation Technology
from cattle dung, vegetable
market & slaughterhousewastes generated in urban
areas:
For Power generation:
`30 million*/ MW
For Thermal Applications:
`10 million*/ MWeq
(12000 Cu.m. biogas per day)
*Limited to 50% of Project
cost
Projects based on
Bio-methanation
Technology from a
mix of cattle dung,vegetable market &
slaughterhouse
wastes and
agricultural Wastes:
For Power
generation:
`20 million*/ MW
*Limited to 30% of
Project cost
Projects based on
Biogas generated at
Sewage Treatment
Plants:
For Power
generation:
`20 million*/ MW
*Limited to 40% ofProject cost
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
10/13
11/16/2010 10
Revenue sources from the project
Sale of Power
Sale of Biogas
Sale of Bio-fertilizer and Bio-pesticideCERs
Sale of CO2 Government Support
Financial Incentives Fiscal Incentives
Customs and Excise Duty Exemption
Income Tax concessions
Financial Viability of Biogas-FertilizerProjects
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
11/13
Application-wise Biogas Plants installed,
Estimated Biogas Production and Power
Generation capacity
Sl.
No.
Type of Biogas Plants No. of
Biogas
Plants
installed
Estimated Biogas
Production capacity
In million
m3 per day
Power
Generation
1. Family size Biogas Plants for
cooking applications.
4,274,831 8.5072 For cooking
requirement
2. Small size Biogas plants for
electricity generation.
73 0.0042 0.44 MW
3. Large size Biogas Plants based
on Urban and Industrial wastes
for power generation.
70 0.5466 91.11 MW
Total 4,274,974 9.0580 91.55 MW
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
12/13
11/16/2010 12
Mandatory provision for installation of Biogas-Fertilizer plants.
Introduction of Generatation based Incentives forbiogas based Power.
Introduction of financial incentives for Bio-fertilizers and Bio-pesticides similar to chemicalfertilizers.
Exemption from VAT and other taxes.
Preparation of Standards for Compressed Biogas(CBG) and Bio-fertilizer and bio-pesticide.
Acceptance as vehicular fuel.
Development of CBG cylinders.
Desired Policy for PromotingBio-methanationSector
-
7/28/2019 Policy Development Requirements for Biogas Upscaling in India
13/13
THANK YOU
Website: mnre.gov.in