OVERVIEW OF PROJECT / TIMELINE

Project Budget $28 Million

2016 Facility Program

$28M and 78,000 SF

October 2, 2017

$27.94 Million and 74,815 SF

Council desires a traditional design theme

November 9, 2017

Present three new conceptual designs for review and direction

Conceptual designs inspired by Melissa, Southlake, & Lewisville, Texas

Design Features

Pitched roof, arches, columns, brick

Gateway sign color scheme

CONCEPT 1 INSPIRED BY SOUTHLAKE, TX

CONCEPT 1 - DESIGN CONSIDERATIONSINSPIRED BY SOUTHLAKE, TX

Exceeds the current budget of $28M

Costly exterior detailing

No exterior window shading

High floor to floor and roof volume

Interior plan must align with façade design

Interior design needs to match exterior traditional aesthetic

Covered entry porch

CONCEPT 2INSPIRED BY MELISSA, TX

CONCEPT 2 – DESIGN CONSIDERATIONSINSPIRED BY MELISSA, TX

Close to the current budget of $28M

Simple and less costly exterior detailing

Overhang to shade exterior windows

Covered entry porch

Low second floor to roof volume

Façade is modulated and flexible to interior layout

Interior design aesthetic is flexible

Strong street presence

Integral side balconies with roof overhang

CONCEPT 3INSPIRED BY LEWISVILLE, TX

CONCEPT 3 - DESIGN CONSIDERATIONSINSPIRED BY LEWISVILLE, TX

Exceeds current budget of $28M

Simple exterior detailing

No exterior window shading

Covered entry porch

High floor to floor and roof volume

Interior design aesthetic is flexible

Interior plan must align with façade design

Strong street presence

Large vertical façade openings

ASSOCIATED DESIGN AND CONSTRUCTION COST

Modifications to the design will require:

Additional time

Additional funds OR

A reduction in the size of the building

Interior plan / layout must be changed to align with façade design

Minimum of 8 weeks for redesign

Concept 2 offers the least amount of changes needed to the interior layout

Estimated additional construction costs

All three concepts will exceed the programmed budget of $28M

Concept 2 is the closest to the programmed budget

NEXT STEPS

Project Schedule

Council’s implementation of their Strategic Plan – construction to begin in FY18

From date of selected design concept, a minimum of 8 weeks for program development

Council Approval / Architectural Advisory Committee Review

Will the Architectural Advisory Committee be reviewing and providing a recommendation to Council?

Architectural Advisory Committee appointments - January 11, 2018

Design Concept Approval

Received November 9th

Begin developing drawings immediately

Council review of final design concepts and programming early 2018

Received after Architectural Advisory Committee review / recommendation

Begin developing drawings early 2018

Council review of final design concepts and programming spring 2018

SEEKING DIRECTION

Council approval of one of the concepts presented

Council direction on the involvement of the Architectural Advisory Committee

NEW POLICE HEADQUARTERSCITY COUNCIL REVIEW - NOVEMBER 9, 2017

CITYOF MELISSA CITY

HALL

CITY OF LEWISVILLE CITY

HALL

CITY OF SOUTHLAKE CITY

HALL

DESIGN

PRECEDENTSCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL WORKSHOP | NOVEMBER 9,

2017

CITYOF SOUTHLAKE CITY

HALL

CITYOF MELISSA CITY

HALL

CITYOF LEWISVILLE CITY

HALL

CITY OF COLLEGESTATION

NEW POLICE HEADQUARTERSCITY COUNCIL REVIEW | OCTOBER 02,

2017

SECURE POINT

SECURE POINT

NEW CURB CUT

FE

NC

ED

M

EC

HA

NIC

AL

YA

RD

FUTUREEXPANSION

AREA

PRE-CAST CONCRETE SECURITY WALL

CHAINLINK FENCE,TYP. ON NON ROAD

FACING FENCE

PRE-CAST CONCRETE SECURITY WALL

PROPERTY LINE& SETBACK

TRUENORTH

Graphic Scale: 1 inch = 30 feet

0 30' 60' 90' 120'

CENTRAL PARK

KR

EN

EK

TA

PR

D.

TRASH

38

VIS

ITO

R P

AR

KIN

GS

PA

CE

S

110 SECURE STAFF PARKING SPACES

224 SECURED PARKING SPACES

78 PUBLIC PARKING SPACES

317 TOTAL

FUTUREPARKING

EXPANSION

114 SECURE STAFF PARKING SPACES

ANNEX

BUILDING

40

PD

VIS

ITO

R&

P

UB

LIC

PA

RK

PA

RK

ING

SP

AC

ES

EXISTINGSIDEW ALK

EXISTINGSIDEW ALK

CE

NT

RA

L P

AR

K

13

3'

262'-6" 268'-6"

47'

ENTRYPLAZA

MAIN

BUILDING

DARTMOUTH ST.

EXISTINGSIDEWALK

NEW CURB CUT

PRE-CAST CONCRETE SECURITY WALL

DROP-OFF AND TRUCKTURN AROUND

24

'

24

'

44

0'

30

'

786'30'

BUILDINGENTRANCE

16

2'-1

1/2

"

560'-6 7/8"

1 1"=30'-0" A2- SITE PLAN - PRESENTATION OVERALL

OVERALL SITE PLAN - SCHEMATIC

DESIGNCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

UP

DN

STAIR216 SF

(200 SF)

UP

DN

2

3

4

5

MNOPQRS

2A

3A

4A

5A

6A

G

F

E

D

C

A

27'-6

"27

'-6"

27'-6

"27

'-6"

TRAINING

LARGE

ASSEMBLY2,331 SF

(2,500 SF)

FORENSIC

EXAMINATION

BAY564 SF

(550 SF)

MECHANICAL B340 SF

(0 SF)

CRIME SCENE CRIME SCENEFORENSIC LAB

484 SF

(160 SF)

COPY34 SF

(60 S

RECORDS

STORAGE126 SF

(200 SF)

MECHANICAL A614 SF

(400 SF)

JANITOR49 SF

(80 SF)

ACO

WORKSPACE /REPORT

WRITING189 SF

(208 SF)

SUPPORT

SERVICES

MANAGER151 SF

(150 SF)

COPY/COFFEE98 SF

(100 SF)

INFORMATION

SERVICES

MANAGER155 SF

(150 SF)

LOBBY MENS

RR184 SF

(200 SF)

LOBBY

WOMENS RR184 SF

(200 SF)

INTERVIEW

ROOM110 SF

(100 SF)

EL EVATOR

INFO/SERVICE

POLICE ASSIST.73 SF

(64 SF)

TECHNICAL

SERVICES

COORD.115 SF

(120 SF)

GIS ANALYST108 SF

(81 SF)

IT SERVER RM613 SF

(750 SF)

EV

EN

ING

SH

IFT

LIE

UT

EN

AN

T15

6S

F

(150

SF)

AD

MIN

IST

RA

TIV

E

LIE

UT

EN

AN

T18

7S

F

(150

SF)

BRIEFING

ROOM770 SF

(735 SF)

CRIME SCENE CRIME SCENE FORENSICTECHNICIAN SPECIALIST

131 SF

(120 SF)

111 SF

(120 SF)

TECHNICIAN TECHNICIAN117 SF

(120 SF)

DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFTSERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT

85 SF

(81 SF)

NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT

SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT85 SF

(81 SF)

83 SF

(81 SF)

84 SF

(81 SF)

84 SF

(81 SF)

84 SF

(81 SF)

83 SF

(81 SF)84 SF

(81 SF)

84 SF

(81 SF)

84 SF

(81 SF)

85 SF

(81 SF)

85 SF

(81 SF)

EVENING SHIFTCSTEP SERGEANT

94 SF

(81 SF)SERGEANT91 SF

(81 SF)

EVENING SHIFTSERGEANT

92 SF

(81 SF)

SERGEANT ADMIN.SERGEANT

92 SF

(81 SF)

EVENING SHIFT

91 SF

(81 SF)

ADMIN.SERGEANT

94 SF

(81 SF)

JANITOR48 SF

(50 SF)

UNISEXRESTRM

74 SF

(80 SF)

UNISEXRESTRM

74 SF

(80 SF)

UNISEXRESTRM RESTRM

75 SF 74 SF

(80 SF)

CHARGINGROOM

195 SF

(120 SF)

NISEX

(80 SF)

UNISEX

RESTRM75 SF

(80 SF)

DIGITAL

FORENSICS102 SF

(100 SF)

POWDER

PROCESSING148 SF

(0 SF)

ALTERNATE

LIGHT SOURCE121 SF

(0 SF)

COUNSELING

ROOM120 SF

(225 SF)

INVENTORY

TECHNICIAN99 SF

(120 SF)

R/T ARMORY556 SF

(200 SF)

LOADING301 SF

(300 SF)

ASSISTANT

BUYER99 SF

(120 SF)

COPY72 SF

(60 SF)

COMMUNITY

ENHANCEMENT

SERGEANTS677 SF

(800 SF)

TRAFFIC

Department Legend

ADMIN

ADMIN SERVICES BUREAU

CIRCULATION

CORE

FIELD OPERATIONS

GENERAL

LOBBY

OPERATION SUPPORT BUREAU

RECORDS

TRAINING

FIRST FLOOR: 40,775 GSF

SECOND FLOOR : 22,815 GSF

MAIN BUILDING: 63,590 GSF

ANNEX: 11,225 GSF

GRAND TOTAL: 74,815 GSF

MENS LOCKERS:

24" X 24": 206

12" X 12": 0

TOTAL: 206

AUGUST 10, 2017

J

3B

H

K

1

L

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"

COMMUNITY/MEDIA

MEETING ROOM920 SF

(650 SF)

MOTO REPORT

WRITING520 SF

(800 SF)

BREAK ROOMNot Enc losed

(800 SF)

VOLUNTEER

STAFF64 SF

(50 SF)

VOLUNTEER

STAFF63 SF

(50 SF)

DAY SHIFT NIGHT SHIFTLIEUTENANT LIEUTENANT LIEUTENANT

166 SF

(150 SF)

166 SF

(150 SF)

DAY SHIFT

165 SF

(150 SF)

PO'S REPORT

WRITING328 SF

(320 SF)

SPECIAL OP

(TRAFFIC)

LIEUTENANT165 SF

(150 SF)

SERGEANT WRITER80 SF

(80 SF)

MOTOR

SERGEANT81 SF

(81 SF)

PROPERTY1,277 SF

(450 SF)

INFO/SERVICE72 SF

(64 SF)

MAIN LOBBY1,260 SF

(500 SF)

STAIR218 SF

(200 SF)

TRUE NORTH

TRAINI

STORAGE94 SF

(200 SF)

INFORMATION

SERVICES

SUPERVISOR117 SF

(120 SF)

ACOSUPERVISOR

121 SF

(120 SF)

117 SF

(120 SF)

SUPERVISOR165 SF

(150 SF)

CRIME ANALYST CRIME ANALYST120 SF

(120 SF)

120 SF

(120 SF)

AD

MIN

IST

RA

TIV

E

LIE

UT

EN

AN

T16

3S

F

(150

SF)

(2) FIELD

OPERATIONS

POLICE ASST74 SF

(64 SF)

COMMUNITY

ENHANCEMENTOFFICER

119 SF

(120 SF)

MAIL B OXES /

C OF FEE BAR

59 SF

(80 SF )

STOR.64 SF

(0 SF)

ELECTRICAL &

TELE / DATA225 SF

(100 SF)

RECORD TECH63 SF

(64 SF)

RECORD TECH63 SF

(64 SF)

RECORD TECH

RECORD TECH63 SF

(64 SF)

63 SF

(64 SF)

TRAINING

LOBBY253 SF

(150 SF)

PATROL

81 SF

(80 SF)

PATROL

WRITER79 SF

(80 SF)

PATROLWRITER

80 SF

(80 SF)

CIT RM108 SF

(0 SF)

RSTRM72 SF

(0 SF)

RECORD TECH63 SF

(64 SF)

RECORD TECH63 SF

(64 SF)

RECORDS

CLOSET105 SF

(0 SF)

INTERVIEW

ROOM113 SF

(100 SF)

(2) FIELD

OPERATIONS

POLICE ASST73 SF

(64 SF)

(2) FIELD

OPERATIONS

POLICE ASST74 SF

(64 SF)

RECORDS

CLOSET77 SF

(0 SF)

IDF RM95 SF

(0 SF)

ANIMAL

CONTROL &

STORAGE195 SF

(0 SF)

1A

EVIDENCE TECH EVIDENCE

STORAGE2,261 SF

(900 SF)

EVIDENCEROCESSING

101 SF

(0 SF)

EV

IDE

NC

ELO

C.

26S

F

(20

SF)

EVIDENCE

PROCESSING

AREA127 SF

(100 SF)

EVIDENCE

56 SF

(63 SF) TECH56 SF

(63 SF)

EVIDENCE

SUPERVISOR122 SF

(120 SF)

COLD STORAGE84 SF

(20 SF)

VAULT122 SF

(120 SF)

VO

LU

NT

EE

R

STA

FF

61

SF

STA

FF

57

SF

VO

LU

NT

EE

R

MENS LOCKER

ROOM (206 2x2

LOCKERS)2,578 SF

(2,080 SF)

MENS RR211 SF

MENS SHWR77 SF

MENS RR191 SF

WOMENS RR192 SF

CEU STORAGE368 SF

(800 SF)

CSTEP

STORAGE362 SF

(0 SF)

SIU STORAGE367 SF

(300 SF)TRAINING

STORAGE241 SF

(200 SF)

TRAINING

STORAGE95 SF

(200 SF)

WOMENS

LOCKER ROOM

(33 2X2)516 SF

(68 SF)

WOMENS RR223 SF

M A

345:41:1

FIRSTFLOOR

PLANCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

DN

216 SF DN

2

3

4

5

MNOPQRS

K

2A

2A

3A

4A

5A

G

F

E

D

C

A

J

1

L

H

30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"

27'-6

"27

'-6"

27'-6

"27

'-6"

STAIR

(200 SF)

OPEN TO

BELOW

OPEN?106 SF?

(0 SF)(?)

EL EVATOR

ROOF DECK

PATIO

3B

COMM.

BREAKROOM203 SF

(200 SF)

RECRUITING /

TRAINING

OFFICER124 SF

(120 SF)

CIVILIAN

TRAINING

COORDINATOR124 SF

(120 SF)

COMM.

MANAGER149 SF

(150 SF)

PUBLIC SAFETY VOLUNTEERTELECOM

SUPERVISORS327 SF

(140 SF) RECRUITING /

TRAINING

OFFICER85 SF

(80 SF)

RECRUITING /

TRAINING

LIEUTENANT149 SF

(150 SF)

BREAK ROOM187 SF

(150 SF)

UNISEX

RSTRM61 SF

(80 SF)UNISEX

RSTRM61 SF

(80 SF)

UNISEX

RSTRM63 SF

(80 SF)

UNISEX

RSTRM62 SF

(80 SF)

ELECTRICAL178 SF

(200 SF)

MECHANICAL393 SF

(400 SF)

ADMIN

CONFERENCE

ROOM701 SF

(500 SF)

PERSONNEL

FILES93 SF

(120 SF)

ADMIN IA

LIEUTENANT147 SF

(150 SF)

ADMIN

SECRETARY117 SF

(120 SF)

BUDGET

ANALYST125 SF

(120 SF)

ASSIST. CHIEF

OPER.

SUPPORT

BUREAU194 SF

(200 SF)

(2) VOLUNTEER

COORDINATOR

ASSIST.184 SF

(240 SF)

IA SERGEANT147 SF

(120 SF)

OFF DUTY ASSISTANT PIO VOLUNTEER/ VOL. COORD.

SERGEANT134 SF

(120 SF)

CHIEF OF

POLICE254 SF

(300 SF)

ASSISTANT CHIEF ADMIN

FIELD OPERATIONS

BUREAU251 SF

(200 SF)

ASSISTANT

CHIEF ADMIN

SERV. BUREAU195 SF

(200 SF)

MDF ROOM159 SF

(100 SF)

CRIME VICTIM

COORDINATOR131 SF

(165 SF)

(3) CRIMINAL

INVESTIGATIONS

POLICE

ASSISTANTS165 SF

(192 SF)

INV

ST

GT

RS

53S

F

(64

SF)

2ND FLOOR

LOBBY631 SF

(0 SF)

CONFERENCE

ROOM261 SF

(0 SF)

CO

FFE

E/

PAN

TRY

/M

AIL

/C

OP

Y

53

SF

(10

0S

F)

STAFF ASSIST128 SF

(120 SF)

SIU STORAGE146 SF

(0 SF)

SECRETARY109 SF

(120 SF)

VOLUNTEER57 SF

(50 SF)

TRAINING

ROOM193 SF

(0 SF)

TRAINING

FILES /COPY115 SF

(120 SF)

C L OSET

TRAINER52 SF

(0 SF)

TRAINER52 SF

(0 SF)

TRAINER52 SF

(0 SF)

BCKGRND

INVEST.76 SF

(0 SF)

ACADEMY

COORD.76 SF

(120 SF)

TRAINEE52 SF

(0 SF)

TRAINEE52 SF

(0 SF)

TRAINEE52 SF

(0 SF)

55 SF

(50 SF)

RECRUITING /

TRAINING

SERGEANT133 SF

(120 SF)

RECRUITING /

TRAINING

SERGEANT125 SF

(120 SF)

(2) DETECTIVES127 SF

(128 SF)

CRIMINAL

INVESTIGATIONS

SERGEANT151 SF(81 SF)

(2) DETECTIVES157 SF

(128 SF)

(2) DETECTIVES127 SF

(128 SF)

(2) DETECTIVES157 SF

(128 SF)

CRIMINALINVESTIGATIONS

SERGEANT121 SF

(81 SF)

CRIMINAL

INVESTIGATIONS

SERGEANT121 SF

(81 SF)

CRIMINAL

INVESTIGATIONS

LIEUTENANT153 SF

(150 SF)

CRIMINAL

INVESTIGATIONS

LIEUTENANT184 SF

(150 SF)

(2) DETECTIVES157 SF

(128 SF)

(2) DETECTIVES157 SF

(128 SF)

(2) DETECTIVES157 SF

(128 SF)

(2) DETECTIVES157 SF

(128 SF)

(2) DETECTIVES160 SF

(128 SF)

(2) DETECTIVES160 SF

(128 SF)

FILES

INTERVIEW110 SF

(100 SF)

FILES

CRIMINAL

INVESTIGATIONS

WAR ROOM310 SF

(350 SF)

INTERVIEW110 SF

(100 SF)

TECH CLOSET92 SF

(0 SF)

ADMIN

CONF.STOR.61 SF

(75 SF)

JANITOR71 SF

(70 SF)

STAFF123 SF

(120 SF)

CO

NF

ST

O.

47

SF

(100

SF)

ACCREDITATION

MANAGER150 SF

(150 SF)

MA

BO

XES

CO

FFE

EB

AR

45

SF

(50

SF

)

PIO /

COORD.

LIEUTENANT134 SF

(150 SF)

COORD.Redundant Room

(0 SF)

COMPLIANT /

RESEARCH /ACRED

ASSISTANT134 SF

(120 SF)

(2) VOLUNTEER191 SF

(100 SF)

EL EVATOR

EQU IPMENT

R OOM

40 SF(50 SF )

Department Legend

ADMIN

ADMIN SERVICES BUREAU

CIRCULATION

CORE

FIELD OPERATIONS

GENERAL

FIRST FLOOR: 40,775 GSF

SECOND FLOOR : 22,815 GSF

MAIN BUILDING: 63,590 GSF

ANNEX: 11,225 GSF

GRAND TOTAL: 74,815 GSF

LOBBY

OPERATION SUPPORT BUREAU

TRAINING AND RECRUITING

MENS LOCKERS:

24" X 24": 20612" X 12": 0

TOTAL: 206

AUGUST 10, 2017

TRUE NORTH

IT ROOM60 SF

(150 SF)

DISPATCH

ROOM1,694 SF

(1,500 SF)

CONF. ROOM119 SF

(120 SF)

RECRUITING /

TRAINING

OFFICER85 SF

(80 SF)

COMM.

RSTRM76 SF

(80 SF)

FILES AND

STOR. RM100 SF

(0 SF)

CRIME VICTIM

COORDINATOR133 SF

(165 SF)

PR IN T

(2)D

ET

EC

TIV

ES

209

SF

(128

SF)

(2) DETECTIVES154 SF

(128 SF)

COMM.

RSTRM73 SF

(80 SF)

SIU SECRETARY210 SF

(120 SF)

INV

ST

GT

RS

53S

F

(64

SF)

INV

ST

GT

RS

53S

F

(64

SF)

INV

ST

GT

RS

52S

F

(64

SF)

INV

ST

GT

RS

53S

F

(64

SF)

INV

ST

GT

RS

53S

F

(64

SF)

COMM DOWN103 SF

(0 SF)

1A

1A

SLO

PE

DM

ET

AL

RO

OF

FLAT TPO

ROOF

FUTURE240 SF

(150 SF)

M A

555:4:

SECOND FLOOR

PLANCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

A3

A2

A1

AA AB BB CC DD EE

30'-0

"30

'-0"

30'-0" 32'-0" 26'-0" 32'-0" 27'-6" 27'-6"

OUTDOOR

EVIDENCE

STORAGE1,928 SF

(800 SF)

COMMAND

CENTER BAY964 SF

(960 SF)

HOSTAGE

NEGOTIATIONS

TRAILER BAY994 SF

(640 SF)

HNT STORAGE257 SF

(200 SF)

BOMB

TRUCK/TRAILER

BAY992 SF

(600 SF)

SWAT TEAM

BAY686 SF

(640 SF)

VEHICLE

MAINTENANCE

BAY523 SF

(640 SF)

POLICE VAN

BAY487 SF

(640 SF)

FORENSIC

TRUCK BAY487 SF

(640 SF)

STORAGE157 SF

(300 SF)

BOMB

STORAGE198 SF

(0 SF)

STORAGE53 SF

(300 SF)

MOTORCYCLE

GARGE635 SF

WORKOUT

ROOM1,302 SF

(500 SF)

RESTROOM64 SF

(100 SF)

STORAGE119 SF

RESTROOM64 SF

(100 SF)

TEAM LEADER

RM102 SF

SPECIAL

OPERATIONS

ROOM455 SF

8'-0"

6

CIRCULATION55 SF

ANNEX FLOOR

PLANCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

MATERIAL

CONCEPTSCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

AERIAL PERSPECTIVE - NORTHEAST

CORNERCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - KRENEK TAP

VIEWCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - NORTHFACADE @ TURN

AROUNDCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - CORNER

VIEWCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - MAINBUILDING

ENTRANCECITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |MATERIAL

CONCEPTSCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |AERIAL PERSPECTIVE - NORTHEAST

CORNERCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - KRENEK TAP

VIEWCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - NORTHFACADE @ TURN

AROUNDCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - CORNER

VIEWCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - MAINBUILDING

ENTRANCECITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

SECURE POINT

PROPERTY LINE& SETBACK

SECURITY FENCE/WALL

SECURE POINT

PU

BL

ICP

AR

KIN

G

PUBLIC PARKING

JAIL PARKING

DROP-OFF

SECURE EMPLOYEE PARKING

FENCEDMECHANICAL YARD

FUTURE

EXPANSION

AREA

SECURITY FENCE/W ALL

SECURITY FENCE/WALL

TRUENORTH

60' 90' 120'

Graphic Scale: 1 inch = 30 feet

0 30'

CENTRAL PARK

1 1"=30'-0" A2- SITE PLAN - PRESENTATION OVERALL

OVERALL SITE PLAN - ORIGINALCONCEPT

DESIGNCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - LOBBY

WESTCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

PERSPECTIVE - LOBBY

EASTCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - LOBBY

WESTCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017

ALTERNATE FACADE OPTION |PERSPECTIVE - LOBBY

EASTCITY OF COLLEGE

STATIONNEW POLICE HEADQUARTERS

CITY COUNCIL REVIEW | OCTOBER 02,

2017