POINT CIRCUIT(COLOUR).ppt
Transcript of POINT CIRCUIT(COLOUR).ppt
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
1/19
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
2/19
POINT ORDERING CIRCUIT
(INT)N24V
(INT)B24V
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
3/19
POINT ODERING CIRCUIT.
Actuate for both auto route setting and
manual operation.
Use of magnetically latch relay to act asa memory during power failure case (as
the PIs are of push button type).
Track locking achieved during orderingof points.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
4/19
Provision of operation of points duringpoint zone track circuit failure.
Prevention of ordering the points whenit is engaged with other conflictingroutes (may be set or initiated).
Crank handle locking incorporated onlyduring auto route setting leaving formanual operation for easymaintenance.
Latching/delatching circuit is providedwith double cutting features.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
5/19
POINT TIMER CIRCUIT
20,000 MFD50V5W
100 OHM
(INT)B24V
(INT)N24V
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
6/19
Prevents over-rubbing of friction clutch.
Ceases the driving feed as soon as point
set and locked. Condenser value may be adjusted to
200% of normal operating time of the
motor at site. Certain time delay provided between two
successive operation.
POINT TIMER CIRCUIT
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
7/19
POINT OPERATION CIRCUIT
(INT)B24
N24
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
8/19
POINT DRIVING CIRCUIT
Heavy duty biased contactor relays used.
Cross protection of contactor relays
provided against false feed. Use of separate contactor relay for each end
of crossover to prevent self-unlocking.
Double cutting features provided forcontactor relays.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
9/19
POINT DETECTION CIRCUIT
(INT)
N24
B24
(EXT)
2A
59RWKR NWR
59
(POINT)
N110
B110
(POINT)
2A
B110
(POINT)
(POINT)N110
NWPR59B
RWPR59B
59BNWPR
59B
RWPR
NW
RW
CW
NWPR59A
RWPR59A
59ANWPR CW
RW
NW
RWKPR59
59NWKR
NWKPR59
59NWR
RWR59
59RWR
59
NWKRR1 R2
59
RWKRR1 R2
59ARWPR
'F'
'E'
'D'
'C'
'B'
'A'
LOCATION
BOX
RELAY ROOM
LOCATION
BOX
JB
59A
JB
59B
POINT
MACHINE
59B
POINTMACHINE
59A
ND
ND
RD
RDRD
RD
ND
ND
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
10/19
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
11/19
IMPROVEMENT OF POINT CIRCUIT
Suitable for Push Button, Route Setting typePanel.
Emergency point operation under Point ZoneTrack Fail condition introduced.
Crank Handle Interlocking introduced in PointDriving Circuit during auto route setting.
Separate tail cable used to prevent unwantedsituation due to multiple cable fault.
Using latch relay ensures the last operatedposition of the point like point switch.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
12/19
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
13/19
COMMENTS ON CSTE/SECRS LETTER
NO. SECR/S&T/DRG./1965 DATED
18.11.2008 This may be possible if contactor relay /
contactor group placed in the Track RelayLocation Box for Point Zone Track Circuit
i.e. for local feeding arrangement. Using contacts of normal Q-Series Relays
in the 110 V point driving circuit is notadvisable particularly during obstruction.
Parallelism of contacts cannot increase thecurrent carrying capacity because failureof any contacts / soldering may createunwanted situation.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
14/19
Another heavy duty contactor relay is to beused affecting the economy.
Extra requirement of cable core for
generating repeater of WLR & EWNR atLocation Box.
Maximum relay wiring involves at LocationBox.
The total enhancement of safety dependsupon the relay named TPZR. The integrity ofTPZR relay is nowhere proved in interlockingand hence if it is forcefully picked up, then
normal working will not be disturbed buttotal expenditure / sophistication against theabnormal working of TPR and operation ofpoint under lock condition will become nulland void.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
15/19
Using of one time time-delay for extracting ofno. of keys may not be advisable because this
operation is very rare and will be performedunder abnormal condition. So, individual time-delay for each crank handle group may becontinued. This is not affecting the economy.
As per Eastern Railway practice, the crossprotection against false feed on the contactorrelays will take care.
As per Eastern Railway practice, the emergencyoperation of point is provided.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
16/19
COMMENTS ON TYPICAL
POINT CONTROL CIRCUIT OF
SE RLY. 24 Volt Siemens contactor unit used.
Cross protection against false feed in 110 V DC
circuit provided. Local control feeding for point drive.
Crank Handle contact used in Detection Circuit in
stead of 110 V circuit.
Detection Circuit is Cross protected during operation.
Driving Relays (WNPR/WRPR) is not cross
protected.
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
17/19
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
18/19
PROVISION OF X-PROTECTION IN POINT DRIVE
CIRCUIT
(INT)
N24
B24
(EXT)
2A
59RWKR NWR
59
(POINT)
N110
B110
(POINT)
2A
B110
(POINT)
(POINT)
N110
NWPR59B
RWPR59B
59BNWPR
59BRWPR
NW
RW
CW
NWPR59A
RWPR59A
59ANWPR CW
RW
NW
RWKPR59
59NWKR
NWKPR59
59NWR
RWR59
59RWR
59
NWKRR1 R2
59
RWKRR1 R2
59ARWPR
'F'
'E'
'D'
'C'
'B'
'A'
LOCATION
BOX
RELAY ROOM
LOCATION
BOX
JB59A
JB
59B
POINT
MACHINE59B
POINT
MACHINE
59A
ND
ND
RD
RDRD
RD
ND
ND
59BNWPR
RWPR59B
RWPR59B
59BNWPR
NWPR59A
59ARWPR
59ARWPR
NWPR59A
-
7/28/2019 POINT CIRCUIT(COLOUR).ppt
19/19