POI_End User Manual_New POI and Decommissioning_V 3.1.docx

59
BSNL User Manual Sales and Distribution POI-New Point Of Interconnect & Decommissioning of Ports Reference BPML No.-BSNL_BBP_SD_CM Version: 3.1 26.12.2012

Transcript of POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Page 1: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

BSNL

User ManualSales and Distribution

POI-New Point Of Interconnect & Decommissioning of Ports

Reference BPML No.-BSNL_BBP_SD_CM

Version: 3.1

26.12.2012

Page 2: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Version Control

Date Version Author Change Description23.06.2010 1.0 M.Sindhu Draft07.01.2011 2.0 M.Sindhu Pre FIT version Release31.10.2012 3.0 M.Trivikram AT version (Draft)26.12.2012 3.1 M.Trivikram Post AT Version Release

The document has been prepared to be used by the following stake-holders:

End Users Performing day to day transaction as per their roles and authorization in SAP System.

Core Team -Directly involved in project and supporting various activities of project phases.

Business Process Owners - Respective business leaders, involved in validating the process design.

IMP note: The information in this document is only meant to be a reference for ERP process configured as per the business process approved by BSNL management for Sales and Distribution Module and is not a complete description of the SAP product and its functionalities. Its main purpose is to serve as a reference document for user training and support.

Page 3: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Table of Content

S.No

Description Page Number

1 Course Overview 52 Business Process Overview 6

2.1 Important Points to note 63 New POI Order 6

3.1 Create POI Order 63.AD1

Update Additional Data B Tab 15

3.2 Change POI Order 173.NS Send Messages as Attachments & Note

sheet19

3.US1 Update User Status 11 203.AD2

Update Additional Data B Tab 21

3.US2 Update User Status 12 213.US3 Update User Status 13(only if the order

is not technically feasible)22

3.3 Update POI Order Text 224 Change POI Order 22

4.1 Update User Status 14 224.2 Check Configuration for all Line Items 23

5 Performa Invoice 245.1 Create Performa Invoice 24

6 Create Demand Note Output Preview 257 Change POI Order 26

7.US1 Update User Status 15 267.US2 Update User Status 16 267.US3 Update User Status 17 26

8 Create Demand Note Output 279 Create Payment Receipt 2810 Change POI Order 30

10.AD1

Update Additional Data B Tab 30

10.US1

Update User Status 18 30

10.US2

Update User Status 19(only if SUR) 31

10.US Update User Status 20 31

Page 4: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

311 Create Advice Note Output 3112 Change POI Order 32

12.US1

Update User Status 21 32

13 Create Readiness Letter Output 3314 Change POI Order 34

14.US1

Update User Status 22 34

14.AD1

Update Additional Data B Tab 34

14.US2

Update User Status 23 35

14.AD2

Update Additional Data B Tab 35

14.US3

Update User Status 24 36

14.AD3

Update Additional Data B Tab 36

14.US4

Update User Status 25 37

15 Create Acceptance Test Output 3716 Change POI Order 38

16.AD1

Update Additional Data B Tab 38

16.US1

Update User Status 26 39

17 Create Letter for AT Schedule Output 3918 Change POI Order 40

18.AD1

Update Additional Data B Tab 40

18.US1

Update User Status 27 41

18.US1

Update User Status 28 41

19 Change POI Order 4219.AD1

Update Additional Data B Tab 42

19.US1

Update User Status 29 44

20 Create Commissioning Approval Letter Output

44

21 Change POI Order 4521.AD1

Update Additional Data B Tab 45

Page 5: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

21.US1

Update User Status 30 46

22 Billing Document 4622.1 Create Billing Document 4622.2 Releasing the Billing Document 47

23 Decommissioning of ports 4824 Create Invoice List 5125 Create Invoice List Output 5126 Individual Invoice Output 52

1. Course Overview

SAP Sales and Distribution provides an overview of the sales process (sales, shipping and billing) organizational structures and master data in sales and distribution.

Target Audience

This course is intended for the following audiences:

Page 6: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

AGM DE and SDE JTOs

Course Prerequisites

Knowledge of navigating SAP systems Basic knowledge of S&D.

Course Goals

This course will prepare you to: Execute the most important functions in the process chain from presales phase to the incoming payment in the system Understand the main business processes in sales processing Gain an extensive overview of the sales and distribution area as a part of the SD component in the SAP System.

Course Objectives

After completing this course, you will be able to: Work with various documents in the Sales and Distribution. Perform analysis for the Sales and Distribution Processes. Execute the different functions with the distribution processing.

2. Business Process Overview: POINT OF INTERCONECTION (POI) is a point at which the GMSC of Fully Mobile network of UASL and Gateway Switch of BSNL or local / tandem / TAX exchange of the basic service network of UASL and local / Tandem / TAX of BSNL are interconnected by the facility of interconnection seeker and where the specified Network-Network Interface Standards are applicable.

POI business processes addressed in SAP are the following four types of processes.

Page 7: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

New Point of Interconnect Process (POI) Augmentation of POI Process Media Migration in POI ProcessDecommissioning Process

2.1. Important information to be note Down:-

Note down the Order Numbers that has been created All documents are to be created in reference to the preceding document. All transaction can be created either by selecting the required transaction from menu path or by simply entering the Transaction Code for the respective transaction in the menu bar. 3. New POI Sales Order:

I) CREATING NEW POI REQUEST

A sales order is an electronic document that captures and records the customer’s request for goods and services. A sales order contains all pertinent information’s to process the customer’s request throughout the whole process cycle.

The sales components thus automatically suggest data from the master records. As a result, possible input errors occurring during sales order processing and entering of redundant data is avoided. 3.1. Steps for Creating Sales Order for POI

3.1.1. Select the below mentioned menu path to Create a Sales Order in SAP Easy Access: SAP Menu Logistics Sales and Distribution Sales Order Create.

Page 8: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Or Enter the Transaction code VA01 in the menu bar.

3.1.2. Press Enter and an initial screen for order creation will open up.

3.1.3. Select an Order Type (from the selection list in the initial screen) for

which you need to create Order. The Order Type for POI is ZPOI 3.1.4. Enter the relevant sales area in which the order will be created and press Enter.

Sales Organization : 1021 - Karnataka POIDistribution Channel: 01 - Direct SalesDivision : 15 - POISales Office : 2102 SSA-BANGALORE

3.1.5. The “Create POI Order - Overview” screen will open up.

Page 9: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Overview screen for creating POI sales Order 3.1.6. Enter the relevant fields in the Header level and Item level. Fields required to be entered at Header level are Sold to Party, Ship to Party (if it differs from Sold to Party), PO Number and PO date. Click on Item overview, Enter relevant Material Number and Order Quantity at Item level. BAY - Depends on City classification (each classification is having different rate) and load chargesDUCT - Depends on Formulae (No of cables*Factor*Cost of Duct /No of pipes)TOWER - Depends on tower heightPORT - Different rates are applicable as per slabs on number of ports (1-16, 17-32, 33-64, 65-128,129-256 and above 256)3.1.7. “Characteristic Value Assignment” screen will open up for respective ordered materials .Enter all the relevant characteristic values for all characteristic description for the respective ordered material and press ENTER

Do not enter any value, system picks value from “Additional Data B Tab”, Click on icon.

Page 10: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Select “TOWER HEIGHT” depending on the business requirement. Press ENTER.

Press ENTER

Click on icon.

Page 11: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Enter values as per business requirement, for example we entered as below:

Press ENTER

System calculates “DUCTCHARGES” and displays as above.Enter the remaining values as per requirement

Page 12: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER

System displays “COUNT” value as above. Click on icon.

Select values as per requirement

Page 13: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Select values as per requirement

Page 14: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER

Click on icon

Select values as per requirement

Page 15: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER

Select value as per requirement

Press ENTER

COUNT value will be displayed by the system, click on icon

Page 16: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on icon

Overview screen of POI sales order after entering characteristics values for all the materials.

Click on header icon, click on Additional data B Tab

3.AD1. UPDATE Additional data B Tab

Page 17: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Select SDCA drop down under for new request tab for a pop up like below

Select relevant entries from the pop up and also fill values in to the fields – “Request type” and “Link Type” from Drop down. Fill values manually into fields “No. of E1 Port” and “Comment”.

Also fill relevant entries under “Operator Infrastructure Requirements” Tab

Press ENTER and click on SAVE

Page 18: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

3.2. Change POI Order:

SAP allows you to carry out certain changes in the already created sales order in case any changes are required to be made ( For Example: Order Quantity). The POI request will be opened repeatedly in the Change Mode (T-Code: VA02) by the respective SSA user or CIRCLE user in order to change the User Status and update details in Additional Data B Tab.

Steps to change a sales order: Select the below mentioned menu path to “Change POI Order” in SAP Screen. SAP Menu Logistics Sales and Distribution Sales Order Change

Page 19: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Or Enter the T-code VA02 in the menu bar in the SAP Easy Access

Press ENTER

Change POI order initial screen will be as above.

3.NS. Send Messages as Attachments & Note sheet

Page 20: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on (Services for Object)

Choose (Send object with note) from the tab

That opens up “Create Document and Send” screen.

Page 21: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Enter the document content in the tabEnter the Recipient Name in the tab

Click on to attach documents.

Press to send or press (Shift + F8)

System generates message as below:

3. US1. Update User Status 11In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER.

Click on

Page 22: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Note: By default “Object Status” is PBG. Change Status from 10 to 11 as shown in below.

Note: Before changing object status confirm “Trunk Diagram” is attached or not.

Click on to come back

Click on to save the changes.

3.AD2. Update Additional Data B Tab In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on and choose tab

Note: The Feasibility Submission Report section will now be enabled for Input entries.

SSA user should fill the appropriate information under this Tab.

Page 23: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER. Click on to save the changes.

3.US2. Update User Status 12

In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status

Press ENTER, Click on to come back, Click on to save the changes.

3.US3. Update User Status 13(only if the order is not technically feasible)

Note: This status should only be set if the order is not technically feasible, else user can directly go to next status.

Note: By mistake if user selected status 13, “Do NOT Save the Order” comes out of the order by clicking

on .

In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status 13

Note: Choose status 13, if POI “Technically Not Feasible” , otherewise do not select this option and directly go to next step.

3.3 Update POI Order Text In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on type the required Text information

Page 24: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to come back

4. Change POI Order 4.1. Update User Status 14

In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status as shown below:

Click on to come back and Click on to save the changes.

Note: while saving if any error comes, follow the below steps:

4.2. Check Configuration for all Line Items

In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Double Click on Line Item 10, Click on TAB,

Page 25: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on system displays below screen,

Click on Icon

Click on , for next line item, Repeat these steps to all the line items present in the order to get “Net” and “Tax” values of the respective line items.

Page 26: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to save the changes.

5. Performa Invoice5.1. Create Performa Invoice

In the Menu Bar, Enter T-code VF01, press ENTER for below screen:

Enter the POI Order number as above.Enter Billing Type: ZPF5 as below.

Press ENTER and Click on to save the Document.The System saves the Invoice and generates a message as below:

6. Create Demand Note PreviewIn the Menu Bar, Enter T-code ZPOI, press ENTER

Page 27: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Enter the Billing Document Number and Click the Execute Button

Click on to preview Demand Note and then Click Print

Click on to come out of the screen.

7. Change POI Order 7.US1. Update User Status 15

In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status , Press ENTER

Page 28: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to come back and Click on to save the changes.

7.US2. Update User Status 16 In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status , Press ENTER

Click on to come back and Click on to save the changes.

7.US3. Update User Status 17 In the Menu Bar, Enter T-code VA02, Enter the following Order number and press ENTER

Click on Choose status , Press ENTER

Page 29: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to come back and Click on to save the changes.

Click on to come out of the change screen.

8. Create Demand Note Output

In the Menu Bar, Enter T-code ZPOI, press ENTER

Enter the Billing Document Number and Click the Execute Button

Page 30: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to preview Demand Note and then Click Print

Click on to come out of the screen.

9. Create Payment ReceiptIn the Menu Bar, Enter T-code FBCJ, press ENTER

Click on tab

Based on Payment Type: Choose “Cash payments/Cash receipts/Cheque Receipts”

Page 31: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Enter the following details as below:

Press Enter.

Select respective line item and click on light will turn to Yellow,

Again click on light turns to Green from Yellow.

Select respective line item and Double click, in the next screen system will displays “Document Number” under note down that number. Ex: 309

Page 32: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

10. Change POI Order In the Menu Bar, Enter T-code VA02, press ENTER10.AD1. Update Additional Data B Tab

Click on and choose tab, under tab.Enter Document number in “Payment Receipt number” field & “Payment recorded date”.

Note: System automatically displays dates in the fields “Date of Deemed Commissioning”

and “Billing Date” , Under TAB based on

the field “Payment Recorded Date” , default as plus one month.

Click on to save the changes.

10.US1. Update User Status 18 In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status 18, press ENTER

Page 33: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to come back and Click on to save the changes.

10.US2. Update User Status 19(only if SUR) In the Menu Bar, Enter T-code VA02, press ENTER

Click on

Imp Note: Choose status 19 only if Customer wants to surrender before commissioning of the PORT, else directly go to Status 20.

Note: By mistake if user selected status 19, do not click on , come out of the order by clicking on

10.US3. Update User Status 20 In the Menu Bar, Enter T-code VA02, press ENTERChoose status as below:

Click on to come back and Click on to save the changes.11. Create Advice Note Output

In the Menu Bar, Enter T-code ZPOII, press ENTER

Page 34: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click the Execute Button

In the next screen enter the Sales Order Number

Click the Execute Button

Click on to preview Advice Note and then Click Print,

Click on to come out of the screen.

12. Change POI Order

In the Menu Bar, Enter T-code VA02, press ENTER

12.US1. Update User Status 21

Click on Choose status

Page 35: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER, Click on to come back and Click on to save the changes.

Click on to come out of the change screen.

13. Create Readiness Letter Output

In the Menu Bar, Enter T-code ZPOII, press ENTER

Choose Customer Readiness Letter as below:

Click the Execute Button Enter the Sales Order Number

Click the Execute Button

Page 36: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to preview Advice Note and then Click Print,

Click on to come out of the screen.

14. Change POI Order In the Menu Bar, Enter T-code VA02, press ENTER14.US1. Update User Status 22

Click on Choose status

Press ENTER, Click on to come back and Click on to save the changes.

14.AD1. Update Additional Data B Tab

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Enter all the relevant details except IOBAS Provisioning Date, (IOBAS Provisioning Date can be filled later also) in the tab as below:

Page 37: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.

14.US2. Update User Status 23

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Press ENTER, Click on to come back and Click on to save the changes.

14.AD2. Update Additional Data B Tab

In the Menu Bar, Enter T-code VA02, press ENTER

Click on

Enter the details in fields “Operator Letter No.” & “Operator Letter Date” as below:

Page 38: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.14.US3. Update User Status 24

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status

Press ENTER Click on to come back and Click on to save the changes.

14.AD3. Update Additional Data B Tab

In the Menu Bar, Enter T-code VA02, press ENTER

Click on and choose tab

Enter IOBAS Provisioning Date under tab

Page 39: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.

14.US4. Update User Status 25 In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Press ENTER, Click on to come back and Click on to save the changes.15 . Create Letter Requesting for AT Dates In the Menu Bar, Enter T-code ZPOII, press ENTERChoose Acceptance Testing Letter as below:

Page 40: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click the Execute Button Enter the Sales Order Number

Click the Execute Button

Click on to preview Advice Note and then Click Print

Click on to come out of the screen.16 . Change POI Order 16.AD1. Update Additional Data B Tab

In the Menu Bar, Enter T-code VA02, press ENTER

Click on and choose tab

Fill data into fields “A/T Date” & “Desig/Name of AT” under tab as below:

Page 41: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.

16.US1. Update User Status 26 In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Press ENTER, Click on to come back and Click on to save the changes.

17. Create Letter for AT Schedule Output In the Menu Bar, Enter T-code ZPOII, press ENTERChoose Letter for AT Schedule as below:

Page 42: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click the Execute Button

Enter the Sales Order Number

Click the Execute Button

Click on to preview Advice Note and then Click Print

Click on to come out of the screen.

18. Change POI Order

In the Menu Bar, Enter T-code VA02, press ENTER

18.AD1. Update Additional Data B Tab

Click on and choose tab, Fill data into fields “A/T Completion Date” & “AT Report Date” under tab as below:

Page 43: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.

18.US1. Update User Status 27

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Press ENTER, Click on to come back and Click on to save the changes.

18.US2. Update User Status 28

Click on Choose status as below:

Page 44: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER, Click on to come back and Click on to save the changes.In the Menu Bar, Enter T-code VA02, press ENTER

Imp Note: After payment if customer wants to surrender before commissioning of the PORT (any point in between Status PMR and AAT can set the status to SUR)

Choose status

Else follow the below step19. Change POI Order 19. AD1. Update Additional Data B Tab

In the Menu Bar, Enter T-code VA02, press ENTER

Click on and choose tab, Fill Details in the TAB as below:

Page 45: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Note: System compares date and date and finds which date is earlier, and the same date will be displayed by system in the “Billing Date” field.

Note: Fill Details in field

If the entered “Date of Inf. Comm” is not equal to “billing date” then system displays error message as below: “Billing Date Should be Equal to Infra Commissioned Date”.

To remove the errors do as below:-

Note: Change the start date under “Billing plan” Tab for all respective Infra materials in POI order line items, by double clicking on those infra materials.

Click on Tab, remove tick mark from field , so that system will allow to changes the

date in field. This “start date” and “Date of Infra Comm.” Under Additional Date B should be

equal. Should be changed to the last day of the financial year (Ex: 31.03.2013).

Page 46: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to save the changes.19.US1. Update User Status 29

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Press ENTER, Click on to come back and Click on to save the changes.

20. Create Commissioning Approval Letter Output In the Menu Bar, Enter T-code ZPOII, press ENTERChoose Letter for AT Schedule as below:

Page 47: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click the Execute Button Enter the Sales Order Number

Click the Execute Button

Click on to preview Advice Note and then Click Print

Click on to come out of the screen.

21. Change POI Order

In the Menu Bar, Enter T-code VA02, press ENTER

21.AD1. Update Additional Data B Tab

Click on and choose tab, Fill Details in the TAB as below:

Page 48: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Press ENTER and Click on to save the changes.21.US1. Update User Status 30

In the Menu Bar, Enter T-code VA02, press ENTER

Click on Choose status as below:

Click on to come back and Click on to save the changes.

22. Billing Document22.1. Create Billing DocumentIn the Menu Bar, Enter T-code VF01, press ENTER

Page 49: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Enter POI order number as above and press ENTER

Click on to save the changes.

Note: If Infra commissioning dates are different than Port commissioning dates then system will split the billing document.22.2. Releasing the Billing Document

In the Menu Bar, Enter T-code VF02, press ENTER

Enter Billing Document Number as above

Click on Icon – Release to Accounting. System displays message as below:

Page 50: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

23. Decommissioning of ports

In the Menu Bar, Enter T-code ZPOIDE, press ENTER

Enter values into fields Customer, Circle, SSA and Service Type.

Press ENTER button. Now system enables POI code field.

Page 51: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Select POI code from drop down

Click on Note: For decommissioning system will first propose the last commissioned POI port order for the provided combination of Customer, Circle, SSA, Service Type and POI code.

Input the following details: “No. of Ports to be Decommissioning”, “Date of decommissioning” – DD.MM.YYYY

Click on System will show “proportionate Qty” value.

Page 52: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on

System pop-up “Customer Updation Status” screen with details like: DOCUMENT NUMBER, STATUS, MESSAGE

Click on .

Page 53: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

24. Create Invoice List

In the Menu Bar, Enter T-code VF21, press ENTER

Enter the list of Invoice numbers:

Click on

Select all the Billing Documents and Click on to save the changes.

System will generate an Invoice list Number.

25. Create Invoice List Output

In the Menu Bar, Enter T-code ZPIV, press ENTER

Enter the Billing Document Number

Click the Execute Button

Page 54: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to preview Invoice and then Click Print

Click on to come out of the screen

26. Create Individual Invoice Output

In the Menu Bar, Enter T-code ZINV, press ENTER

Enter the Billing Document Number

Click the Execute Button

Page 55: POI_End User Manual_New POI and Decommissioning_V 3.1.docx

Click on to preview Invoice and then Click Print

Click on to come out of the screen