POD POD (PLAN OF DEVELOPMENT)(PLAN OF DEVELOPMENT)
20032003
BPMIGASBPMIGASBPMIGAS
22
PlanPlan Of Of Development TeamDevelopment Team
1.1. AdvisorAdvisor : : MulyaniMulyani WahyonoWahyono2.2. ChairmanChairman : : Ira Ira MiriawatiMiriawati3.3. MembersMembers : : HeruHeru DjoniDjoni PP
Eko Hari Eko Hari EndrartoEndrartoNizarNizar MujahidinMujahidinBayu KristantoBayu Kristanto
BPMIGASBPMIGASBPMIGAS
33
SystematicsSystematics
I.I. ObjectiveObjective
II.II. DefinitionDefinition
III.III. Types of PODTypes of POD
IV.IV. POD Approval ProcessPOD Approval Process
V.V. POD HandlingPOD Handling
VI.VI. POD RevisionPOD Revision
BPMIGASBPMIGASBPMIGAS
44
To convey Approval Procedure/Process for PSC To convey Approval Procedure/Process for PSC PlanPlan of of Development(POD) Development(POD)
I. I. ObjectiveObjectiveBPMIGASBPMIGASBPMIGAS
55
Plan of Development :Plan of Development :
Plan to develop one or more oil and gas field in an integrated way in order to produce the hydrocarbon reserves optimally by considering the technical, economics and HSE aspects.
II. D e f i n i II. D e f i n i tt i oni onBPMIGASBPMIGASBPMIGAS
III. III. Types of POD Types of POD
BPMIGASBPMIGASBPMIGAS
77
Types ofTypes of PODPOD1. Plan of Development I1. Plan of Development I
•• Prior to Law No. 22 of 2001, approval of the Development Plan foPrior to Law No. 22 of 2001, approval of the Development Plan for the first field r the first field within a given Block/Work Area only required approval from Pertawithin a given Block/Work Area only required approval from Pertamina’s Managing mina’s Managing Director, which also served as commerciality for the work area. Director, which also served as commerciality for the work area.
•• Since Law No. 22 of 2001 came into force:Since Law No. 22 of 2001 came into force:In accordance with Article 21, Development Plans for the first fIn accordance with Article 21, Development Plans for the first field in a given ield in a given Block/Work Area must obtain the approval of the Minister of EnerBlock/Work Area must obtain the approval of the Minister of Energy and gy and Mineral Resources, based on considered opinions from BPMIGAS aftMineral Resources, based on considered opinions from BPMIGAS after er consultation with the government of the Province concerned.consultation with the government of the Province concerned.
In accordance with Article 17, if, after approval has been grantIn accordance with Article 17, if, after approval has been granted for the First ed for the First POD in a given work area, activities are not carried out within POD in a given work area, activities are not carried out within a maximum a maximum period of five (5) years from the end of the exploration period,period of five (5) years from the end of the exploration period, the entire work the entire work area must be returned to the Minister.area must be returned to the Minister.
BPMIGASBPMIGASBPMIGAS
88
Types of PODTypes of POD
2. Plan of Development 2. Plan of Development II and thereafter :II and thereafter :
The purpose is to develop one or more oil and gas field in an inThe purpose is to develop one or more oil and gas field in an integrated tegrated
way to develop/produce hydrocarbon reserves optimally with consiway to develop/produce hydrocarbon reserves optimally with consideration deration
to technical, economic, and HSE aspects.to technical, economic, and HSE aspects.
BPMIGASBPMIGASBPMIGAS
POD proposal is submitted to BPMIGAS, based on actual conditions
and approval by the Head of BPMIGAS.
Validity period of the POD is two (2) years from the date of approval.
Changes in Scope of Work or delay in implementation of the POD
without notification and approval will cause it to be consideredcanceled/expired.
99
3. POP (Put On Production)
Aim : To produce from a field with relatively
small reserves, using nearby production facilities through “tie in” with existing facilities.
Types of PODTypes of PODBPMIGASBPMIGASBPMIGAS
BPMIGASBPMIGASBPMIGAS
IV.IV.POD APPROVAL POD APPROVAL PROCESS PROCESS
1111
CONSIDERED OPINIONS
APPROVAL
FLOW CHART: APPROVAL PROCESS FOR FIRST POD
MINISTER OF ENERGY& MINERAL RESOURCES
MINISTER OF ENERGY& MINERAL RESOURCES
BPMIGASBPMIGAS
CONSULTATION WITHLOCAL REGIONAL GOVERNMENT
THROUGH DIRECTORATE GENERAL OF OIL AND GAS
CONSULTATION WITHLOCAL REGIONAL GOVERNMENT
THROUGH DIRECTORATE GENERAL OF OIL AND GAS
BPMIGASBPMIGASBPMIGAS
PSCPSC
NOT APPROVED
1212
DEPUTY OFPLANNING
PSC
RESEARCHDIVISION
POD Team Coordinator
APPROVED
NOT APPROVED
FLOW FLOW OF POD EVALUATIONOF POD EVALUATION
DISCUSIONPOD Team with PSC& Evaluation Result
PRELIMINARYMEETING
BPMIGASBPMIGASBPMIGAS
FINAL
PRESENTATION
POD Team
RESEARCH & DEVELOPMENT
EXPLOITATION
Other FUNCTIONS
OPERATIONS
Finance- Eco &MARKETING
EXPLORATION
2 2 weeksweeks 3 3 weeksweeks 2 2 weeksweeks 3 3 weeksweeks
APPROVALPROCESS
(Research Division)
Head ofBPMIGAS
PSC(FINAL POD)
DRAFT POD
Total: 10 Total: 10 weeksweeks
Head of Division Research &
Development
DEPUTY OFPLANNING
POD Team
HEAD OFBPMIGAS
DEPUTY OFPLANNING
1313
FLOW CHART FLOW CHART -- POD APPROVALPOD APPROVAL
Process under condition - no principle problems (10 weeks)Process under condition - there are problems which still need further discussion with the team (12 weeks)Process under condition - there are management problems and or non technical problems (>12 weeks)
FieldEconomicSection/
Research & DevDivision
Deputy of PlanningBPMIGAS
P P S CS C
EvaluationResult
ApprovalProcess
POD
* For POD - I - need approval from Minister
EvaluationResult
Sub Surface Aspects
Coordinator : EPT StudyTeam : EPT, EKS,
Other Functions
Technical Operations Aspects
Coordinator : Field Economic
Team : Operations, EPT,Other Functions
Coordinator : FieldEconomic
Team : PDA, EPT, Marketing,Other Functions
Economic Aspects
Discussion
PRELIMINARYPRESENTATION
Discussion
EvaluationResult
Discussion
Head of BPMIGAS *
BPMIGASBPMIGASBPMIGAS
HEAD OF BPMIGAS
PSC(FINAL POD)
FINAL PRESENTATION
DRAFT POD
2 2 weeksweeks 3 3 weeksweeks 3 3 weeksweeks22 weeksweeks
1414
Volume, Schedule, Price
HOAGSA
• Geology, ReservoirModelling
• DevelopmentProduction & Facilities(Conceptual).
Discovery
Pre POD
Study
Market
• ReservesCertificationP1, P2, P3
• Development& productionScenario(detail study)
FacilityConstruction
Design(FEED,
Benchmarking)
Economic
Facility & Construction Re- Design
SubsurfaceRe Evaluation
ApprovalEvaluation
POD
Yes
No
APPROVAL PROCESSAPPROVAL PROCESSGAS DEVELOPMENTGAS DEVELOPMENT
BPMIGASBPMIGASBPMIGAS
V. V. POD HandlingPOD Handling
BPMIGASBPMIGASBPMIGAS
1616
Content of Content of PODPOD
1. Geological Findings2. Reservoir Description3. Drilling Results4. Field Development Facilities5. Project Schedule6. Exploration Incentives7. Production Results8. Project Economics
1. Executive Summary2. Geological Findings3. Exploration Incentives4. Reservoir Description5. Secrec/EOR Incentives6. Field Development Scenarios7. Drilling Results8. Field Development Facilities9. Project Schedule10. Production Results11. HSE & Community Development12. Abandonment13. Project Economics14. Conclusion
OldOld NewNew
BPMIGASBPMIGASBPMIGAS
1717
1. Executive Summary1. Executive Summary
Summary of Plan of Field Development which consist of
Technical, Economical and HSE
BPMIGASBPMIGASBPMIGAS
1818
2. Geological Findings2. Geological FindingsExplain the geological finding for oil and gas by using the latest geological data based on logs and cutting analysis which is usedto revise geological map.
Geologycal Overview :– Regional Geology:
Boundary (If any), Formation, faults, sedimentary type, age of corresponding formation
– Stratigraphy
– Structure : Types of Folding, faulting, or unconformities
– Correlations : correlation among wells (structural / Stratigraphic)
– Maps : Top & bottom structures, Net sand/carbonate Isopach, revised as new data available.
BPMIGASBPMIGASBPMIGAS
1919
a.a. New Field :New Field :- Incentive package is given to motivate the Contractor to
keep doing exploration activities. Procedure to obtain the incentive is refered to the ”guidance”which was issued by the Exploration Division. The price difference between Old Oil and New Oil is intended to encourage the PSC to keep conducting the exploration activities during the first 60 months (incentive period)
- Incentive : DMO Fee New Oil & Investment credit
b.b. PraPra--TertierTertier Reservoir Reservoir incentiveincentive (as per PSC Contract)(as per PSC Contract):- DMO Fee New Oil & Investment credit- Change of Split
3. Exploration 3. Exploration IncentiveIncentiveBPMIGASBPMIGASBPMIGAS
2020
PROPOSAL GUIDANCE FOR DETERMINING NEW FIELDPROPOSAL GUIDANCE FOR DETERMINING NEW FIELDBPMIGASBPMIGASBPMIGAS
POINTCRITERIA
EXPLORATION CONCEPT
STRATIGRAPHICPOSITION
STRUCTURAL TREND
DISTANCE FROMEXISTING FIELD
RISK
GEOLOGICALRISK
APIDEF.
LOGISTICALRISK
DISTANCE FROMEXISTING INFRASTRUCTURE
2.5 5 7.5 10TOTALPOINT
OLDEXISTING MODELIN NEAREST STR.
OLDEXISTING MODEL
IN WORKING AREA
NEWEXISTING MODEL
IN ADJACENT
NEWNO MODEL
IN ADJACENT
- FORM- MEMB.- ZONE
- FORM- MEMB.
NEW - ZONE
- FORMNEW - MEMB.NEW - ZONE
NEW - FORMNEW - MEMB.NEW - ZONE
SAMESAME CULMINATION
SEALING FAULT
SAMESEPARATE
CULMINATION
SAMEPARALELPOSITION
NEWNOT
PARALEL
< 5 KM 5 - 10 KM 10 - 25 KM > 25 KM
< 50 KM 50 - 100 KM 100 - 200 KM > 200 KM
Geological risk = 60% x total point = Logistical risk = 40% x total point =Weighted Grand Total =
> 20 NEW FIELD
15 – 20 OTHER FACTOR TO BE CONSIDERANCE
< 15 NO INCENTIVE
2121
4. Reservoir Description4. Reservoir Descriptiona. Reservoir Conditiona. Reservoir Condition
– Initial condition :Pi, Ti, Bgi, Rsi, Boi, Pb,
– Rock characteristic :H, Vcl, porositas, Sw, K, Cr
– Fluid properties :Bg, Bo, Bw, Rs, Viscosity (Oil & Gas)
– Driving Mechanism :Gas cap drive, solution gas drive, expansion gas drive, water drive, and combination drive.For production forecast and recovery factor calculation.
b.b. Hydrocarbon InHydrocarbon In--placeplaceUtilize the Volumentric Method and reservoir simulation.
BPMIGASBPMIGASBPMIGAS
2222
4. Reservoir Description4. Reservoir Descriptionc. Hydrocarbon Reservesc. Hydrocarbon Reserves
Reserves are divided into 3 categories:Reserves are divided into 3 categories: Proved, Probable, PossibleProved, Probable, Possible
Proved ReservesProved Reserves ::The quantities of crude oil, condensate, natural gas, natural gas liquids and associated substances which geological and engineering data demonstrate with reasonable certainty to recoverable in the future from known oil and gas reservoirs under existing economic and operating conditions (P-90).
ProbableProbable ReservesReserves ::
Probable reserves are less certain than proved reserves and can be estimated with a degree of certainty sufficient to indicate they are more likely to be recovered than not. This estimate takes into consideration known geology, previous experience with similar types of reservoir and seismic data, if available. (P-50)
PossiblePossible ReservesReserves ::Possible reserves are less certain than probable reserves and can be estimated only with a low degree of certainty. Insufficient information is available to indicate whether they are more likely to be recovered than not. (P-10).
BPMIGASBPMIGASBPMIGAS
2323
d.d. Production Forecast/Incremental Production Forecast/Incremental ProductionProductionForecast hydrocarbon production in the future by using the methods/assumptions which is used in the calculation, as follows :
- Decline curve analysis
- Reservoir Simulation
4. Reservoir Description4. Reservoir DescriptionBPMIGASBPMIGASBPMIGAS
2424
Secondary RecoveryImprove the hydrocarbon recovery by adding the natural energy by injecting fluid (water flooding and gas flooding).
E O RAll methods related to the use of the external energy resource to recover the oil which is not produced under conventional methods (Primary and Secondary Recovery), For example: steam flood and chemical flood.
IncentiveSecrec and EOR will obtain incentive in the form of investment credit dan DMO
5. 5. SecrecSecrec/EOR /EOR InsentifInsentifBPMIGASBPMIGASBPMIGAS
2525
6. Field Development Scenarios6. Field Development Scenarios
Explain the field development scenario which consist of :
• Phasing Development
• Full Development
• Development Strategy
• Production Optimization
• Local Content : The products and services that will be used directly to structural building and infrastructure development with regard to the field development should prioritise the domestic product/service.
• etc
BPMIGASBPMIGASBPMIGAS
2626
Consist of Consist of ::a.a. Platform/cluster/well locationPlatform/cluster/well location
onshore, offshoreonshore, offshoreb.b. Well design : Well design :
vertical, deviated, horizontal, radial, slim holevertical, deviated, horizontal, radial, slim holec. c. Drilling ScheduleDrilling Scheduled.d. Drilling reportDrilling reporte.e. Completion Completion
7. Drilling7. DrillingBPMIGASBPMIGASBPMIGAS
2727
8. Field Development Facilities8. Field Development Facilitiesa.a. Primary Recovery FacilitiesPrimary Recovery Facilities
1. Offshore Production Facilities- Offshore Platform Facilities
Jacket, Deck, Processing Facilities, etc. - Other Offshore Facilities
Sub marine pipeline production junction facilities, Disposal Facilities, Storage etc.
- Additional FacilitiesCivil construction, Office, Living Quarter, etc.
2. Onshore Production FacilitiesConsist of : Processing facilities, Flow-line and storage facilities, Disposal facilities.
3. Artificial Lift Equipment
b.b. Enhanced Oil Recovery FacilitiesEnhanced Oil Recovery Facilities
BPMIGASBPMIGASBPMIGAS
2828
9. Project Schedule9. Project Schedule
Describe the sequences of the completion target of activities during the filed development, such as :
•• Planning :Planning :- Screening study- Feasibility study- Conceptual Engineering
•• Execution :Execution :- Detail Engineering- Procurement- Fabrication- Installation- Commissioning
•• OperationOperation
BPMIGASBPMIGASBPMIGAS
2929
10. Production Results10. Production Results
Describe the activities to lift the hydrocarbon and to increase the production (if any) by means of :
1. Stimulation
2. Gas Lift
3. Pumping
4. Sec.Rec.
5. Enhanced Oil Recovery
BPMIGASBPMIGASBPMIGAS
3030
11. HSE & Community Development11. HSE & Community Development
Comprehensive study related to the effects of a certain field development to the Health, Safety and Environment (HSE) in the areas close to the field that will be developed. There are four stages :
• Pre-Contruction,
• Construction,
• Operation,
• Post-Operation
BPMIGASBPMIGASBPMIGAS
3131
12. Abandonment & Site Restoration12. Abandonment & Site Restoration
Explain the technical and cost study with regard to the field abandonment mechanism both onshore and offshore in case the field is no longer economics to be produced and will be permanently abandont.
BPMIGASBPMIGASBPMIGAS
3232
13. Project Economics13. Project EconomicsEconomics Analysis Calculation based on the latest data :
– Certified Reserves.
– Production forecast
– Development cost:
Investment : Well cost, production facilities cost, pipeline cost, compressor, platform.
Operating cost : Direct production cost, work over/stimulation, maintenance, G&A
BPMIGASBPMIGASBPMIGAS
3333
•• Economics Indicator Economics Indicator – Government :
GOI (Government Income) and Percentage of Government Income to the Gross Revenue.
– Contractor : Net Cashflow (NCF), Internal Rate of Return (IRR), Net Present Value (NPV).
– Profit to Investment Ratio (PIR), Pay out Time (POT)– Sensitivity Spider diagram
Based on 4 parameters : Price (Oil & Gas), Capex, Opex and Production
13. Project Economics13. Project EconomicsBPMIGASBPMIGASBPMIGAS
3434
14. Conclusion14. Conclusion
Conclude the field development by selecting the best alternative from Technical and
Economical Perspective
BPMIGASBPMIGASBPMIGAS
VI. VI. POD RevisionPOD Revision
BPMIGASBPMIGASBPMIGAS
3636
POD RevisionPOD Revision
POD POD that has been approved can be revised with that has been approved can be revised with considerations : considerations :
• Change in Development Scenario
• Change in oil and gas reserves significantly compare to the initial plan.
• Change in Investment Cost