SM CENTER LAS PIÑASEngineering Weekly ReportNovember 19-25 November, 2012
Engineering
Design &
Development
SMPN GENERAL INFORMATION SHEET
ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIÑAS C ITY
DATE OF OPENING: OCTOBER 02, 2009 LAND AREA: 28,626 sq. m.
CFA: 40,267 sq. m. TOTAL LEASABLE AREA: 16,308.54 sq. m.
FOOD TENANTS: 12 NON-FOOD TENANTS: 41
OPEN PARKING: 311 slots MOTORCYCEL PARKING: 80 slots
PARKING FOR PWD: 6 slots
CINEMA SEATING CAPACITY (NO CINEMA)
CINEMA N/A CINEMA N/A CINEMA N/A CINEMA N/A
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
SMPN GENERAL INFORMATION SHEETALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIÑAS C ITY
ELECTRICITY DISTRIBUTOR: MERALCO CKT. #49xd
SUBSTATION CAPACITY: 1x3MVA; 13.5KV/460V; 3Ø; 60Hz; ELE TTROMECCANICA COLOMBO
GENSETS CAPACITY: 2x21.25MVA; 460V; 3Ø; 60Hz; CATSYNCHRO PANEL:Ed. Ent.
SHOCKBLOCK: YES
DIESEL TANK CAPACITY: 2x4642gal. (9284L – GROSS)
CHILLERS CAPACITY: 2x500TR; CVHF485; 275KW; TRANE
COOLING TOWER CAPACITY: 2x500TR; 50Hp; BAC STP CAPACIT Y: SBR TYPE; 142 cu.m.
TOTAL NO OF AHU: 24 UNITS PRIMARY AERATION BLOWERS: 1x7 .5Hp TECO
TOTAL NO OF FCU: 5 UNITS SECONDARY AERATION BLOWERS: 2 x7.5Hp TECO
TOTAL NO OF KEF: 8UNITS TTP FILTER PUMPS 2x2Hp
TOTAL NO OF KSF: 6 UNITS LPG FARM CAPACITY: 8x250kg(MA CRO)
TOTAL NO OF FAF: 7 UNITS FDAS ADDRESSABLE TYPE
TOTAL NO OF EF: 6 UNITS CPS PUMP (POTABLE): 2x7.5Hp
TOTAL NO OF SF 2 UNITS CPS PUMP (NON-POTABLE): 2x7.5Hp
TOTAL NO OF SEF: 4 UNITS FIRE PUMP: 1x75Hp
TOTAL NO OF PB: JOCKEY PUMP: 1x5Hp
TOTAL NO OF LEF: CISTERN TANK CAPACITY: 363.8cu.m.
WALKALATOR: (HYUNDAI): 2x7.5Hp; FIRE TANK CAPACITY: 459 .8cu.m.
FREIGHT ELEVATORS (HYUNDAI): 4x15Hp; 1200kg cap. NON-P OTABLE TANK CAPACITY: 21 cu.m.
PASSENGER ELEVATORS (HYUNDAI):
1x15Hp; 60m/min. 1200kg cap.
Engineering
Design &
Development
REPORT OUTLINE:
1. FACILITIES STATUS UPDATES.
2. EQUIPMENTS BREAKDOWN REPORT.
3. SMR UPDATES.
4. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES.
5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY AND UPDATES.
(BUILDING AND PERIMETER)
6. BUSTED LIGHTS MONITORING UPDATES.
7. COMFORT ROOMS MONITORING UPDATES.
8. ISSUES AND NEEDS LIST.
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
1. FACILITIES STATUS UPDATES.
CATEGORY 19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV
POWER INTERRUPTIONS 0 0 0 0 0 0 0
WATER SUPPLY INTERRUPTIONS 0 0 0 0 0 0 0
GAS SUPPLY INTERRUPTIONS 0 0 0 0 0 0 0
TOTAL INCIDENTS: 0 0 0 0 0 0 0
DESCRIPTION OF INTERRUPTION INCIDENTSCATEGORY DESCRIPTION
POWER INTERRUPTIONS
WATER SUPPLY INTERRUPTIONS
GAS SUPPLY INTERRUPTIONS .
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
2. EQUIPMNENTS BREAKDOWN REPORT.EQUIPMENT DESCRIPTION
CAUSE OF DOWNTIME DATE OF DOWNTIME
DAYS NON-OPERATIONAL STATUS/REMARKS
FREIGHT ELEVATOR 1 (HYPERMARKET)
DAMAGE CAR DOOR 25SEP2012 63Already had a quotation, the document is foregoing for the rectification of the said elevator
Engineering
Design &
Development
3. SMR UPDATES.RECEIVED SMR
11NOV TO 18NOV2012COMPLETED SMR
1JAN2012 TO 25NOV2012TOTAL RECEIVED SMR
1JAN2012 TO 25NOV2012PENDING 2012 PROJECTS FOR
SMR PREPARATION
0 25 39 6
SMR BREAKDOWNCATEGORY / NATURE OF
WORKSCOMPLETED SMR
1JAN2012 TO 25NOV2012TOTAL RECEIVED SMR
1JAN2012 TO 25NOV2012PENDING 2012 PROJECTS FOR
SMR PREPARATION
ELECTRICAL AND AUXILLIARY 13 14 1
PLUMBING AND SANITARY 3 4 1
AIR CONDITIONING AND VENTILATION
9 10 1
LPG SUPPLY 0 0 0
CIVIL AND WATERPROOFING 2 4 2
PUMPS AND MOTORS 7 7 0
FDAS 0 1 1
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
4. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATESDESCRIPTION 19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV
ELECTRICITY CONSUMPTION 10kWh 10kWh 9kWh 10kWh 10kWh 9kWh 11kWh
DIESEL FUEL CONSUMPTION 43.81Li
DIESEL FUEL DELIVERIES
POTABLE WATER CONSUMPTION 319 cu.m.
367 cu.m.
235 cu.m.
366 cu.m.
356 cu.m.
415 cu.m.
376 cu.m.
RE-USE WATER CONSUMPTION 116 cu.m.
116 cu.m.
110 cu.m.
112 cu.m.
112 cu.m.
118 cu.m.
116 cu.m.
RE-USE WATER PRODUCTION 120 cu. m.
125 cu.m
117 cu. m
115 cu. m
123cu. m
124 cu. m
118 cu. m
COOLING TOWER POTABLE WATER CONSUMPTION
0 cu.m. 0 cu.m. 0 cu.m. 8 cu.m.11
cu.m.12
cu.m.12
cu.m.
COOLING TOWER RE-USE WATER CONSUMPTION
39 cu.m.
39 cu.m.
49 cu.m.
37 cu.m.
33 cu.m.
38 cu.m.
38 cu.m.
LPG CONSUMPTION 585kg 545kg 478kg 446kg 395kg 378kg 389 kg
LPG DELIVERIES 1530.7 Li
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY - T ENANTS
CATEGORY TENANT SERVICE CALLS
SERVICE REQUESTS
ELECTRICAL AND AUXILLIARY 2 0
PLUMBING AND SANITARY 0 0
AIR CONDITIONING AND VENTILATION 0 0
LPG SUPPLY 0 0
WATER LEAKS 0 0
5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY – B UILDING AND PERIMETER
CATEGORY NEW INSTALLATION
PREVENTIVE CORRECTIVE
ELECTRICAL AND AUXILLIARY 1 0 0
PLUMBING AND SANITARY 0 0 0
AIR CONDITIONING AND VENTILATION 0 0 0
LPG SUPPLY 0 0 0
CIVIL 0 0 0
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT
DESCRIPTION DESCRIPTIONHyundai PM of Elevator Hyundai PM of Elevator
Engineering
Design &
Development
5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
DESCRIPTION DESCRIPTIONRectification of busted light inside the Elevator Rectification of busted light inside the Elevator
Engineering
Design &
Development
5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER TENANT
DESCRIPTION DESCRIPTIONRectification of the damaged Diffuser at STP Chamber
Rectification of the damaged Diffuser at STP Chamber
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Engineering
Design &
Development
5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT
DESCRIPTION DESCRIPTIONRe-painting of Gen-Set base platform Re-painting of Gen-Set base platform
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Engineering
Design &
Development
LOCATIONQTTY. OF BUSTED
LIGHTSQTTY OF REPLACED
BUSTED LIGHTSREMARKS
MALL INTERIOR AREA
MALL AREA 1F 0 0
MALL AREA 2F 0 0
TENANT FRONT SIGNAGES 0 0
AD BOXES 0 0
OFFICES 0 0
UTILITY ROOMS 0 0
COMFORT ROOMS 0 0
ELEVATORS 0 0
MALL NIGHT LIGHTS 0 0
TENANT NIGHT LIGHTS 0 0
BACK ALLEYS, HALLWAYS AND STAIRCASES.
0 0
TOTAL: 0 0
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
6. BUSTED LIGHT MONITORING UPDATES
Engineering
Design &
Development
LOCATIONQTTY. OF BUSTED
LIGHTSQTTY OF REPLACED
BUSTED LIGHTSREMARKS
MALL EXTERIOR AREA
CANOPY LIGHTS, AL FRESCO LIGHTS. 0 0
SM LOGO (FAÇADE) 1 1There are some busted LED in SM logo, that had been replaced last Nov. 22, 2012
LIGHTED SIGNAGES (FAÇADE) 0 0
DROPDOWN SIGNAGES 0 0
ACCENT LIGHTS 0 0
SM LOGO (PYLON TOWER) 0 0
SIGNAGES (PYLON TOWER) 5 0Defective wiring, already request for quotation
CINEMA SIGNAGES N/A N/A
COVERED WALKWAYS AND PEDESTRIAN OVERPASS
0 0
PARKING LIGHTS 25 3
Defective emergency lights at covered car park and one 36W lighting 2-fluorescent lamp, already withdrawbattery
PARKING TOWER LIGHTS 0 0
TRANSPORTATION TERMINAL LIGHTS 0 0
PEDESTRIAN OVERPASS 0 0
TOTAL: 31 4
6. BUSTED LIGHT MONITORING UPDATES
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Engineering
Design &
Development
7. COMFORT ROOMS MONITORING UPDATES
LOCATION
EVENT CENTER
FOODCOURT RDU1 CINEMA 1&2 CINEMA 3&4EMPLOYEECR SCMC
ADMIN
DF RDF DF RDF DF RDF DF RDF DF RDF DF RDF
ELECTRICAL WIRINGS 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0
GENERAL LIGHTS 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0
PLUMBING AND SANITARY 0 0 n/a n/a 0 0 n/a n/a n/a 0 1 0
AIRCONDITIONING & VENTILATION 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0
CIVIL 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
Employees CR SCMC ADMIN:
.
Engineering
Design &
Development
SM CENTER LAS PIÑAS
WEEKLY REPORT (19NOV TO 25NOV 2012)
8. ISSUES AND NEEDS LIST
DESCRIPTION STATUS REMARKS
REPLACEMENT OF THE BURN-OUT DRUM EXTENSION BY SOUTHERNSTAR(JANITORIAL)
NOT YET REPLACED
ALREADY SENT MESSAGE TO BAO’S FOR THE REPLACEMENTOF THE SAID EXTENSION
DEFECTIVE LADDER LIFT BY (TRIPPLE SEVEN AND SOUHTERNSTAR)
NO INITIATED REPAIRALREADY SENT MESSAGE TO BAO’S FOR THE REPLACEMENTOF THE SAID EXTENSION
GATE PASSING OF THE COOLING TOWER GATE VALVE IS ALREADY
AVAILABLEGATE VALVE ALREADY RECTIFIED LAST WEEK
TROUBLE SHOOTING OF PYLON TOWER SPOT LIGHTS
ALREADY REQUESTED FOR QUOTATION
QUOTATION ALREADY SENT AND THE DOCUMENTS IS ON-PROCESS