PN Facility Report WEEK 48

18
Engineering Design & Development SM EDD OPERATIONS Prepared by: Julius O. Salacup Resident Engineer SM Center Las Piñas SM CENTER LAS PIÑAS Engineering Weekly Report November 19-25 November, 2012

description

Facility Report for commercial establishment to help Facility Manager to get a glimpse of the weekly status of facilities

Transcript of PN Facility Report WEEK 48

Engineering

Design &

DevelopmentSM EDD OPERATIONS

Prepared by:Julius O. SalacupResident EngineerSM Center Las Piñas

SM CENTER LAS PIÑASEngineering Weekly ReportNovember 19-25 November, 2012

Engineering

Design &

Development

SMPN GENERAL INFORMATION SHEET

ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIÑAS C ITY

DATE OF OPENING: OCTOBER 02, 2009 LAND AREA: 28,626 sq. m.

CFA: 40,267 sq. m. TOTAL LEASABLE AREA: 16,308.54 sq. m.

FOOD TENANTS: 12 NON-FOOD TENANTS: 41

OPEN PARKING: 311 slots MOTORCYCEL PARKING: 80 slots

PARKING FOR PWD: 6 slots

CINEMA SEATING CAPACITY (NO CINEMA)

CINEMA N/A CINEMA N/A CINEMA N/A CINEMA N/A

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

SMPN GENERAL INFORMATION SHEETALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIÑAS C ITY

ELECTRICITY DISTRIBUTOR: MERALCO CKT. #49xd

SUBSTATION CAPACITY: 1x3MVA; 13.5KV/460V; 3Ø; 60Hz; ELE TTROMECCANICA COLOMBO

GENSETS CAPACITY: 2x21.25MVA; 460V; 3Ø; 60Hz; CATSYNCHRO PANEL:Ed. Ent.

SHOCKBLOCK: YES

DIESEL TANK CAPACITY: 2x4642gal. (9284L – GROSS)

CHILLERS CAPACITY: 2x500TR; CVHF485; 275KW; TRANE

COOLING TOWER CAPACITY: 2x500TR; 50Hp; BAC STP CAPACIT Y: SBR TYPE; 142 cu.m.

TOTAL NO OF AHU: 24 UNITS PRIMARY AERATION BLOWERS: 1x7 .5Hp TECO

TOTAL NO OF FCU: 5 UNITS SECONDARY AERATION BLOWERS: 2 x7.5Hp TECO

TOTAL NO OF KEF: 8UNITS TTP FILTER PUMPS 2x2Hp

TOTAL NO OF KSF: 6 UNITS LPG FARM CAPACITY: 8x250kg(MA CRO)

TOTAL NO OF FAF: 7 UNITS FDAS ADDRESSABLE TYPE

TOTAL NO OF EF: 6 UNITS CPS PUMP (POTABLE): 2x7.5Hp

TOTAL NO OF SF 2 UNITS CPS PUMP (NON-POTABLE): 2x7.5Hp

TOTAL NO OF SEF: 4 UNITS FIRE PUMP: 1x75Hp

TOTAL NO OF PB: JOCKEY PUMP: 1x5Hp

TOTAL NO OF LEF: CISTERN TANK CAPACITY: 363.8cu.m.

WALKALATOR: (HYUNDAI): 2x7.5Hp; FIRE TANK CAPACITY: 459 .8cu.m.

FREIGHT ELEVATORS (HYUNDAI): 4x15Hp; 1200kg cap. NON-P OTABLE TANK CAPACITY: 21 cu.m.

PASSENGER ELEVATORS (HYUNDAI):

1x15Hp; 60m/min. 1200kg cap.

Engineering

Design &

Development

REPORT OUTLINE:

1. FACILITIES STATUS UPDATES.

2. EQUIPMENTS BREAKDOWN REPORT.

3. SMR UPDATES.

4. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES.

5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY AND UPDATES.

(BUILDING AND PERIMETER)

6. BUSTED LIGHTS MONITORING UPDATES.

7. COMFORT ROOMS MONITORING UPDATES.

8. ISSUES AND NEEDS LIST.

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

1. FACILITIES STATUS UPDATES.

CATEGORY 19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV

POWER INTERRUPTIONS 0 0 0 0 0 0 0

WATER SUPPLY INTERRUPTIONS 0 0 0 0 0 0 0

GAS SUPPLY INTERRUPTIONS 0 0 0 0 0 0 0

TOTAL INCIDENTS: 0 0 0 0 0 0 0

DESCRIPTION OF INTERRUPTION INCIDENTSCATEGORY DESCRIPTION

POWER INTERRUPTIONS

WATER SUPPLY INTERRUPTIONS

GAS SUPPLY INTERRUPTIONS .

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

2. EQUIPMNENTS BREAKDOWN REPORT.EQUIPMENT DESCRIPTION

CAUSE OF DOWNTIME DATE OF DOWNTIME

DAYS NON-OPERATIONAL STATUS/REMARKS

FREIGHT ELEVATOR 1 (HYPERMARKET)

DAMAGE CAR DOOR 25SEP2012 63Already had a quotation, the document is foregoing for the rectification of the said elevator

Engineering

Design &

Development

3. SMR UPDATES.RECEIVED SMR

11NOV TO 18NOV2012COMPLETED SMR

1JAN2012 TO 25NOV2012TOTAL RECEIVED SMR

1JAN2012 TO 25NOV2012PENDING 2012 PROJECTS FOR

SMR PREPARATION

0 25 39 6

SMR BREAKDOWNCATEGORY / NATURE OF

WORKSCOMPLETED SMR

1JAN2012 TO 25NOV2012TOTAL RECEIVED SMR

1JAN2012 TO 25NOV2012PENDING 2012 PROJECTS FOR

SMR PREPARATION

ELECTRICAL AND AUXILLIARY 13 14 1

PLUMBING AND SANITARY 3 4 1

AIR CONDITIONING AND VENTILATION

9 10 1

LPG SUPPLY 0 0 0

CIVIL AND WATERPROOFING 2 4 2

PUMPS AND MOTORS 7 7 0

FDAS 0 1 1

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

4. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATESDESCRIPTION 19NOV 20NOV 21NOV 22NOV 23NOV 24NOV 25NOV

ELECTRICITY CONSUMPTION 10kWh 10kWh 9kWh 10kWh 10kWh 9kWh 11kWh

DIESEL FUEL CONSUMPTION 43.81Li

DIESEL FUEL DELIVERIES

POTABLE WATER CONSUMPTION 319 cu.m.

367 cu.m.

235 cu.m.

366 cu.m.

356 cu.m.

415 cu.m.

376 cu.m.

RE-USE WATER CONSUMPTION 116 cu.m.

116 cu.m.

110 cu.m.

112 cu.m.

112 cu.m.

118 cu.m.

116 cu.m.

RE-USE WATER PRODUCTION 120 cu. m.

125 cu.m

117 cu. m

115 cu. m

123cu. m

124 cu. m

118 cu. m

COOLING TOWER POTABLE WATER CONSUMPTION

0 cu.m. 0 cu.m. 0 cu.m. 8 cu.m.11

cu.m.12

cu.m.12

cu.m.

COOLING TOWER RE-USE WATER CONSUMPTION

39 cu.m.

39 cu.m.

49 cu.m.

37 cu.m.

33 cu.m.

38 cu.m.

38 cu.m.

LPG CONSUMPTION 585kg 545kg 478kg 446kg 395kg 378kg 389 kg

LPG DELIVERIES 1530.7 Li

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY - T ENANTS

CATEGORY TENANT SERVICE CALLS

SERVICE REQUESTS

ELECTRICAL AND AUXILLIARY 2 0

PLUMBING AND SANITARY 0 0

AIR CONDITIONING AND VENTILATION 0 0

LPG SUPPLY 0 0

WATER LEAKS 0 0

5. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY – B UILDING AND PERIMETER

CATEGORY NEW INSTALLATION

PREVENTIVE CORRECTIVE

ELECTRICAL AND AUXILLIARY 1 0 0

PLUMBING AND SANITARY 0 0 0

AIR CONDITIONING AND VENTILATION 0 0 0

LPG SUPPLY 0 0 0

CIVIL 0 0 0

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT

DESCRIPTION DESCRIPTIONHyundai PM of Elevator Hyundai PM of Elevator

Engineering

Design &

Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

DESCRIPTION DESCRIPTIONRectification of busted light inside the Elevator Rectification of busted light inside the Elevator

Engineering

Design &

Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER TENANT

DESCRIPTION DESCRIPTIONRectification of the damaged Diffuser at STP Chamber

Rectification of the damaged Diffuser at STP Chamber

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering

Design &

Development

5. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES – B UILDING AND PERIMETER AND TENANT

DESCRIPTION DESCRIPTIONRe-painting of Gen-Set base platform Re-painting of Gen-Set base platform

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering

Design &

Development

LOCATIONQTTY. OF BUSTED

LIGHTSQTTY OF REPLACED

BUSTED LIGHTSREMARKS

MALL INTERIOR AREA

MALL AREA 1F 0 0

MALL AREA 2F 0 0

TENANT FRONT SIGNAGES 0 0

AD BOXES 0 0

OFFICES 0 0

UTILITY ROOMS 0 0

COMFORT ROOMS 0 0

ELEVATORS 0 0

MALL NIGHT LIGHTS 0 0

TENANT NIGHT LIGHTS 0 0

BACK ALLEYS, HALLWAYS AND STAIRCASES.

0 0

TOTAL: 0 0

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

6. BUSTED LIGHT MONITORING UPDATES

Engineering

Design &

Development

LOCATIONQTTY. OF BUSTED

LIGHTSQTTY OF REPLACED

BUSTED LIGHTSREMARKS

MALL EXTERIOR AREA

CANOPY LIGHTS, AL FRESCO LIGHTS. 0 0

SM LOGO (FAÇADE) 1 1There are some busted LED in SM logo, that had been replaced last Nov. 22, 2012

LIGHTED SIGNAGES (FAÇADE) 0 0

DROPDOWN SIGNAGES 0 0

ACCENT LIGHTS 0 0

SM LOGO (PYLON TOWER) 0 0

SIGNAGES (PYLON TOWER) 5 0Defective wiring, already request for quotation

CINEMA SIGNAGES N/A N/A

COVERED WALKWAYS AND PEDESTRIAN OVERPASS

0 0

PARKING LIGHTS 25 3

Defective emergency lights at covered car park and one 36W lighting 2-fluorescent lamp, already withdrawbattery

PARKING TOWER LIGHTS 0 0

TRANSPORTATION TERMINAL LIGHTS 0 0

PEDESTRIAN OVERPASS 0 0

TOTAL: 31 4

6. BUSTED LIGHT MONITORING UPDATES

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Engineering

Design &

Development

7. COMFORT ROOMS MONITORING UPDATES

LOCATION

EVENT CENTER

FOODCOURT RDU1 CINEMA 1&2 CINEMA 3&4EMPLOYEECR SCMC

ADMIN

DF RDF DF RDF DF RDF DF RDF DF RDF DF RDF

ELECTRICAL WIRINGS 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0

GENERAL LIGHTS 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0

PLUMBING AND SANITARY 0 0 n/a n/a 0 0 n/a n/a n/a 0 1 0

AIRCONDITIONING & VENTILATION 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0

CIVIL 0 0 n/a n/a 0 0 n/a n/a n/a n/a 0 0

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

Employees CR SCMC ADMIN:

.

Engineering

Design &

Development

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)

8. ISSUES AND NEEDS LIST

DESCRIPTION STATUS REMARKS

REPLACEMENT OF THE BURN-OUT DRUM EXTENSION BY SOUTHERNSTAR(JANITORIAL)

NOT YET REPLACED

ALREADY SENT MESSAGE TO BAO’S FOR THE REPLACEMENTOF THE SAID EXTENSION

DEFECTIVE LADDER LIFT BY (TRIPPLE SEVEN AND SOUHTERNSTAR)

NO INITIATED REPAIRALREADY SENT MESSAGE TO BAO’S FOR THE REPLACEMENTOF THE SAID EXTENSION

GATE PASSING OF THE COOLING TOWER GATE VALVE IS ALREADY

AVAILABLEGATE VALVE ALREADY RECTIFIED LAST WEEK

TROUBLE SHOOTING OF PYLON TOWER SPOT LIGHTS

ALREADY REQUESTED FOR QUOTATION

QUOTATION ALREADY SENT AND THE DOCUMENTS IS ON-PROCESS

Engineering

Design &

Development

END OF PRESENTATION-THANK YOU-

SM CENTER LAS PIÑAS

WEEKLY REPORT (19NOV TO 25NOV 2012)