PLUVIA MODULE3, Assembly Guidelines, May 2006

16
Geberit Pluvia Training Module 3: Assembly Guidelines

description

PLUVIA MODULE3, Assembly Guidelines, May 2006

Transcript of PLUVIA MODULE3, Assembly Guidelines, May 2006

Page 1: PLUVIA MODULE3, Assembly Guidelines, May 2006

Geberit PluviaTraining Module 3: Assembly Guidelines

Page 2: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 2

ø 56 mm

Geberit PluviaAssembly Guidelines

Page 3: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 3

ø 56 mm

90° bend directly after outlet

ø 56 mm

Pipe with 90° bend

Geberit PluviaOutlet connection

Page 4: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 4

Expansion after outlet dia.56mm (12l/s) max. ø 90 mm

NO EXPANSION for outlet dia. 90mm (25l/s) max. ø 90 mm

Reducer after outlet dia.56mm (12l/s) max. ø 40 mm

outlet dia. 90mm (25l/s) max. ø 75 mm

Geberit PluviaOutlet connection with expansion and reducer

Page 5: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 5

All types of reducers permitted!

Recommended vertical:

concentric reducerPosition 2

Recommended horizontal:

eccentric reducerPosition 1

Position 1 Position 2 Position 3

Geberit PluviaReducers

Page 6: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 6

Plu

via

Below foundation slab

Pluvia

Above foundation slab

Geberit PluviaConnection to conventional system

Page 7: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 7

Inside manhole Pluvia

conventional

Before manhole

min. 2 m

Plu

via

conv

entio

nal

Geberit PluviaConnection to conventional system

Page 8: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 8

after manhole

open Pluvia systems are NOT PERMITTED!

Pluviaconventional

Pluviaconventional

Geberit PluviaConnection to conventional system

Page 9: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 9

transition from Pluvia to conventional

Direct into lake or river

Pluvia

Pluvia

Geberit PluviaConnection to conventional system

Page 10: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 10

Overflows on both side must always be provided!

No Overflow

No Guarantee

Geberit PluviaSafety overflow for gutter

Page 11: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 11

Always provide at least 2 overflows!

No Overflow

No Guarantee

Geberit PluviaSafety overflow for flat roof

Page 12: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 12

After finishing of waterproofing layer, the Pluvia outlet can be used as an outlet for temporary drainage. For this application the protection cover has a small opening which can be opened through removing of the label.

Geberit PluviaTemporary roof drainage

Page 13: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 13

If flat roofs are covered with slaps instead of gravel, ensure that only plastic bound slaps are use wherever possible. The outlets must be protected against sintering if the slaps containing cement are used. This protection should take the form of a bed of gravel approx. 1 m x 1 m in extend around the inlet.

Reason, the rainwater washes the lime out of the cement slaps, this lime is flushed into the Pluvia pipe system. Lime deposits on the inner wall of the pipe reduces slowly the diameter.

Geberit PluviaProtection against sintering

Page 14: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 14

Scratch stainless steel sheet with sand paper or steel brush

Fix one layer of bitumen foil onto concrete slab

Flame outlet onto layer of bitumen foil

Fix outlet onto roof construction

Geberit PluviaMounting instruction for bitumen foil onto contact sheet

Page 15: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 15

Install bitumen foils with a flame

Apply a layer of liquid bitumen

Clean contact sheet

Cover contact sheet with bitumen primer completely

Geberit PluviaMounting instruction for bitumen foil onto contact sheet

Page 16: PLUVIA MODULE3, Assembly Guidelines, May 2006

Name der Präsentation, Moderator, Datum 16

Flat roofs and gutters have to be serviced regularly. This requires the removal of any leaves, dirt or plants to avoid any blockage. This regular maintenance has to be done in accordance with the prevailing environmental conditions (weather, trees, etc. ) and has to include the cleaning of the Geberit Pluvia outlets and baskets.

In doing so, the cover basket has to be removed to enable access for the cleaning of the outlet element itself. The frequency of cleanings through the year has to be defined by the proprietor within the planned maintenance programme.

Pluvia outlet 25 l/s

Pluvia outlet 12 l/s

Geberit PluviaMaintenance instructions !