PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... ·...

8
AREA OF WORK AREA OF WORK ELEC ROOM LOCKER ROOM ENTRANCE LOBBY WEST END OF STADIUM These documents indicate materials and methods of interior construction to set the standard quality and/or performance. Other materials and/or methods shall be considered for acceptance by the Architect/Owner, provided they do not affect the visible appearance from that indicated whatsoever. The term “work” means the construction and services required by the contract documents and includes all labor, materials, equipment and services required to complete the work. All work shall be limited to that shown on the contract documents. No additional work shall be done without prior written approval of the Architect. Any additional work performed without the Architect’s consent shall be done at the Contractor’s sole expense. The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the contract documents before commencing work. The Contractor shall notify the Architect at once of any errors, inconsistencies or omissions. “Typical” means the condition is the same for all similar conditions, unless noted otherwise. Unless otherwise provided in the contract documents, the Contractor shall secure and pay for all building permits and governmental fees, licenses and inspections necessary for proper execution and completion of the work. The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on the performance of the work. The Contractor, promptly after being awarded the contract shall prepare and submit for the Owner’s and Architect’s information a contractor’s construction schedule for the work. The Contractor shall notify the Architect of any items which may cause the project to be delayed. The Contractor shall not knowingly purchase or order any material or equipment whose delivery schedule could cause the project to be delayed. Materials, dimensions and other conditions not otherwise indicated in the drawings shall be interpreted as having the same meaning as the most similarly detailed detail if not more fully defined elsewhere on the drawings. All dimensions are considered critical and are to be as indicated on the drawings, unless discrepancies are discovered as per general note #3. Do not scale from the drawings to determine dimensions for construction. The Architect has not conducted any investigation as to the presence of any hazardous material including asbestos, within the extent of the work. The Architect will not accept responsibility for the identification and removal of any hazardous material or for any effect from its presence. If any such material is found in the project, the Contractor should notify the Owner's representative and the Architect immediately. The Contractor shall not use any materials containing asbestos or other hazardous material for the construction of the project. CLEANING Do not use materials which will create hazards to health or property, or which will damage surfaces. Provide covered containers for deposit of waste materials, debris, and rubbish. Execute periodic cleaning to keep building, site, and adjacent areas free of accumulations of waste materials, rubbish, and debris resulting from construction operations. Prior to Substantial Completion, remove construction tools, scaffolding, equipment, machinery, and surplus materials. Broom clean and vacuum interior areas prior to start of surface finishing, and continue cleaning to eliminate dust. Schedule cleaning operations so that dust and other contaminants will not fall on or adhere to wet or newly coated surfaces. Remove debris and rubbish from pipe chases, plenum, and other closed or remote spaces, prior to enclosing space. Store volatile wastes in covered metal containers and remove from premises daily. Prevent accumulation of waste which creates hazardous conditions. Provide adequate ventilation during use of volatile or noxious substances. Collect and remove waste materials, debris and rubbish from site periodically until execution of final cleaning and dispose off site in lawful manner. Do not burn or bury rubbish and waste materials on Project site. Do not dispose of volatile wastes or hazardous materials such as mineral spirits, oil, or paint thinner in storm or sanitary drains. Do not dispose of wastes into streams or waterways. Conduct cleaning and disposal operations to comply with local ordinances and anti-pollution laws. Clean exposed interior hard-surfaced finishes to dirt-free condition, free of stains, films, and similar foreign substances. Remove labels which are not required as permanent labels. Clean glossy materials to polished condition; remove foreign substances, polish reflective surfaces to clear shine. Clean carpet and similar soft surfaces, removing debris, soil, and excess nap. Clean resilient flooring and associated bases. Clean light fixtures and lamps; replace burned-out lamps. Maintain cleaning until Project is accepted by Owner. Perform all cleaning of manufactured items and finishes in compliance with manufacturer’s recommendations. Contractor may utilize adjacent restroom facilities. After construction is completed, restrooms shall be cleaned. During dusty activities provide plastic protection to contain dust and debris to limited area (shower and toile room area). Clean dust and debris within reasonable time frame. Schedule loud activities with owner prior to beginning (i.e. removal of ceramic tile and concrete slab). Protect existing carpet in locker room and existing rubber flooring in existing Lobby area. Lay down plastic or paper or plywood to protect existing flooring from dirt, debris, dents, depressions, marks, etc. Protect all existing lockers and doors within existing locker room from damage and dust. Protect all existing toilet fixtures, urinals, shower heads, soap dispensers, etc. to remain. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 101A DETAIL NUMBER PLAN DETAIL REFERENCE WALL SECTION / DETAIL SECTION REFERENCE ELEVATION REFERENCE BUILDING SECTION REFERENCE ALTERNATE ELEVATION REFERENCE ROOM TAG SYMBOL DOOR TAG SYMBOL ROOM NAME ROOM NUMBER ROOM NET AREA (WHERE SHOWN) DOOR NUMBER OFFICE 101A 150 SF SCALE: 1 DRAWING TITLE 1/8" = 1'-0" A1.1 SHEET NUMBER WHERE DETAIL IS SHOWN A1.1 1 SIM 1 A1.1 DETAIL NUMBER SHEET NUMBER WHERE DETAIL IS SHOWN DETAIL NUMBER SHEET NUMBER WHERE SECTION / DETAIL IS SHOWN 1 1 A1.1 SECTION NUMBER SHEET NUMBER WHERE SECTION IS SHOWN 1 A1.1 W1 WINDOW / STOREFRONT / CURTAIN WALL / LOUVER TYPE 1 A1.1 ELEVATION NUMBER SHEET NUMBER WHERE ELEVATION IS SHOWN 1 A1.1 3 2 4 PARTITION TYPE REVISION SYMBOL CLOUD AROUND REVISION TA TOILET ACCESSORY SYMBOL FIRE EXTINGUISHER IN WALL MOUNTED CABINET (SURFACE MOUNTED) FEC-A FEC-B FIRE EXTINGUISHER IN WALL MOUNTED CABINET (SEMI-RECESSED) DRAWING REFERENCE SIM SIMILAR CONDITION OH OPPOSITE HAND OPP OPPOSITE HAND ROT ROTATED CONDITION FIRST FLOOR +10'-0" ITEM IDENTIFIED ELEVATION ABOVE FINISH FLOOR 7'-0" DETAIL TITLE DIMENSION TO FACE OR EDGE 7' - 0" DIMENSION TO CENTERLINE FE-B FIRE EXTINGUISHER ON WALL BRACKET FD FD - FLOOR DRAIN BRICK VENEER / CMU CONTROL JOINT GYPSUM BOARD CONTROL JOINT CJ CJ ONE-HOUR FIRE RATED WALL ASSEMBLY TWO-HOUR FIRE RATED WALL ASSEMBLY THREE-HOUR FIRE RATED WALL ASSEMBLY FOUR-HOUR FIRE RATED WALL ASSEMBLY FIRE RATED WALL SYMBOLS NOTE: SEE PARTITION TYPES FOR UL DESIGNATION NO.'S SMOKE PARTITION AFF AFG ALUM ARCH BLKG BU CL CJ CLG CTR CONC CMU CONT DIA DS DWG EXT EXIST EA EJ ELEC EL ELEV EQUIP EWC FIN FD FOF FOS FR FV GA GALV GYP BD HM HORIZ HT HVAC ID INSUL JT LAV MAX MECH MFR MIN MO NIC NOM NTS OC OD OH ORD OS P PL PR PT R, RAD REQD RD RO SF SIM SPEC SS STD STR SUSP TOS TOW TYP UNO VERT VCT W/ WC WR WWF WD WP VTR ABOVE FINISH FLOOR ABOVE FINISHED GRADE ALUMINUM ARCHITECTURAL BLOCKING BUILT-UP ROOF CENTERLINE CONTROL JOINT CEILING CENTER CONCRETE CONCRETE MASONRY UNIT CONTINUOUS DIAMETER DOWN SPOUT DRAWING EXTERIOR EXISTING EACH EXPANSION JOINT ELECTRICAL ELEVATION ELEVATOR EQUIPMENT ELECTRIC WATER COOLER FINISH FLOOR DRAIN FACE OF FINISH FACE OF STUD FIRE RETARDANT FIELD VERIFY GAUGE GALVANIZED GYPSUM BOARD HOLLOW METAL HORIZONTAL HEIGHT HEATING VENTILATION AIR-CONDITIONING INSIDE DIAMETER INSULATION JOINT LAVATORY MAXIMUM MECHANICAL MANUFACTURER MINIMUM MASONRY OPENING NOT IN CONTRACT NOMINAL NOT TO SCALE ON CENTER OUTSIDE DIAMETER OPPOSITE HAND OVERFLOW ROOF DRAIN OVERFLOW SCUPPER PAINT PLATE, PROPERTY LINE PAIR PRESSURE TREATED RADIUS REQUIRED ROOF DRAIN ROUGH OPENING SQUARE FEET SIMILAR SPECIFICATIONS STAINLESS STEEL STANDARD STRUCTURAL SUSPENDED TOP OF STEEL TOP OF WALL TYPICAL UNLESS NOTED OTHERWISE VERTICAL VINYL COMPOSITION TILE WITH WATER CLOSET WATER RESISTANT WELDED WIRE FABRIC WOOD WORKING POINT VENT THROUGH ROOF S T A T E OF S O U T H C A R O L I N A A D R C H I T E C T E R E T S I G R E QUACKENBUSH ARCHITECTS + PLANNERS LLC Columbia, SC No. 100028 S SHEET NO TITLE ISSUE DATE PROJECT NO. STATE PROJECT NO. CORPORATE SEAL A/E SEAL PROJECT TITLE PHASE REVISION DATE CONDITIONS OF USE: THIS DRAWING AND THE DESIGN THEREON ARE THE PROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS. THE REPRODUCTION, COPYING, OR USE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS + PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BE SUBJECT TO LEGAL ACTION. COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS CP00419682 C:\Users\Wendy Bertani\Documents\162.00_USC Football Shower_Wendy Bertani.rvt 3/5/2015 9:46:29 AM T1 COVER SHEET, INDEX OF DRAWINGS PLUMBING REPAIRS AND MODIFICATIONS, WBS UNIVERSITY OF SOUTH CAROLINA GEORGE RODGERS BLVD. AND BLUFF ROAD BID DOCUMENTS 15.162.00 02/27/15 GENERAL NOTES DESIGN TEAM INDEX OF DRAWINGS ARCHITECTURAL ARCHITECT QUACKENBUSH ARCHITECTS + PLANNERS 1217 HAMPTON STREET COLUMBIA, SC 29201 T: 803-771-2999 F: 803-771-2858 MECHANICAL ENGINEER SWYGERT & ASSOCIATES 1315 STATE STREET CAYCE, SC 29033 T: 803-791-9300 F: 803-791-0830 ELECTRICAL ENGINEER BELKA ENGINEERING ASSOCIATES INC 7 CLUSTERS COURT COLUMBIA, SC 29210 T: 803-731-0650 F: 803-731-2880 T1 COVER SHEET, INDEX OF DRAWINGS A1 DEMOLITION FLOOR PLAIN, CEILING PLAN, AND NOTES A2 RENOVATION FLOOR PLAN, CEILING PLAN, AND NOTES MECHANICAL M1 FLOOR PLAN, NOTES, SCHEDULES, AND LEGEND SYMBOLS PLUMBING REPAIRS AND MODIFICATIONS WBS STATE PROJECT NUMBER CP00419682 ARCHITECT'S PROJECT NUMBER 15.162.00 FEBRUARY 27, 2015 KEY PLAN PLAN NORTH KEY PLANS ABBREVIATIONS PLUMBING P1 GROUND LEVEL FLOOR PLAN - A P2 GROUND LEVEL FLOOR PLAN - B P3 FLOOR PLANS, NOTES, SCHEDULE, AND LEGEND ELECTRICAL E1 ELECTRICAL DEMOLITION & RENOVATION PLANS

Transcript of PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... ·...

Page 1: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

AREA OF WORK

AREA OF WORK

ELECROOM

LOCKER ROOM

ENTRANCE LOBBY

WEST END OFSTADIUM

These documents indicate materials and methods of interior construction to set the standard quality and/or performance. Othermaterials and/or methods shall be considered for acceptance by the Architect/Owner, provided they do not affect the visibleappearance from that indicated whatsoever.

The term “work” means the construction and services required by the contract documents and includes all labor, materials,equipment and services required to complete the work. All work shall be limited to that shown on the contract documents. Noadditional work shall be done without prior written approval of the Architect. Any additional work performed without theArchitect’s consent shall be done at the Contractor’s sole expense.

The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurementsand conditions and other information known to the Contractor with the contract documents before commencing work. TheContractor shall notify the Architect at once of any errors, inconsistencies or omissions.

“Typical” means the condition is the same for all similar conditions, unless noted otherwise.

Unless otherwise provided in the contract documents, the Contractor shall secure and pay for all building permits andgovernmental fees, licenses and inspections necessary for proper execution and completion of the work.

The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of publicauthorities bearing on the performance of the work.

The Contractor, promptly after being awarded the contract shall prepare and submit for the Owner’s and Architect’s informationa contractor’s construction schedule for the work. The Contractor shall notify the Architect of any items which may cause theproject to be delayed. The Contractor shall not knowingly purchase or order any material or equipment whose deliveryschedule could cause the project to be delayed.

Materials, dimensions and other conditions not otherwise indicated in the drawings shall be interpreted as having the samemeaning as the most similarly detailed detail if not more fully defined elsewhere on the drawings.

All dimensions are considered critical and are to be as indicated on the drawings, unless discrepancies are discovered as pergeneral note #3. Do not scale from the drawings to determine dimensions for construction.

The Architect has not conducted any investigation as to the presence of any hazardous material including asbestos, within theextent of the work. The Architect will not accept responsibility for the identification and removal of any hazardous material or forany effect from its presence. If any such material is found in the project, the Contractor should notify the Owner'srepresentative and the Architect immediately.

The Contractor shall not use any materials containing asbestos or other hazardous material for the construction of the project.

CLEANING

Do not use materials which will create hazards to health or property, or which will damage surfaces.

Provide covered containers for deposit of waste materials, debris, and rubbish.

Execute periodic cleaning to keep building, site, and adjacent areas free of accumulations of waste materials, rubbish, anddebris resulting from construction operations.

Prior to Substantial Completion, remove construction tools, scaffolding, equipment, machinery, and surplus materials.

Broom clean and vacuum interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

Schedule cleaning operations so that dust and other contaminants will not fall on or adhere to wet or newly coated surfaces.

Remove debris and rubbish from pipe chases, plenum, and other closed or remote spaces, prior to enclosing space.

Store volatile wastes in covered metal containers and remove from premises daily. Prevent accumulation of waste which createshazardous conditions. Provide adequate ventilation during use of volatile or noxious substances.

Collect and remove waste materials, debris and rubbish from site periodically until execution of final cleaning and dispose off sitein lawful manner. Do not burn or bury rubbish and waste materials on Project site. Do not dispose of volatile wastes orhazardous materials such as mineral spirits, oil, or paint thinner in storm or sanitary drains. Do not dispose of wastes intostreams or waterways.

Conduct cleaning and disposal operations to comply with local ordinances and anti-pollution laws.

Clean exposed interior hard-surfaced finishes to dirt-free condition, free of stains, films, and similar foreign substances. Removelabels which are not required as permanent labels. Clean glossy materials to polished condition; remove foreign substances,polish reflective surfaces to clear shine.

Clean carpet and similar soft surfaces, removing debris, soil, and excess nap. Clean resilient flooring and associated bases.

Clean light fixtures and lamps; replace burned-out lamps.

Maintain cleaning until Project is accepted by Owner.

Perform all cleaning of manufactured items and finishes in compliance with manufacturer’s recommendations.

Contractor may utilize adjacent restroom facilities. After construction is completed, restrooms shall be cleaned.

During dusty activities provide plastic protection to contain dust and debris to limited area (shower and toile room area). Cleandust and debris within reasonable time frame.

Schedule loud activities with owner prior to beginning (i.e. removal of ceramic tile and concrete slab).

Protect existing carpet in locker room and existing rubber flooring in existing Lobby area. Lay down plastic or paper or plywoodto protect existing flooring from dirt, debris, dents, depressions, marks, etc.

Protect all existing lockers and doors within existing locker room from damage and dust.

Protect all existing toilet fixtures, urinals, shower heads, soap dispensers, etc. to remain.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

101A

DETAIL NUMBER

PLAN DETAIL REFERENCE

WALL SECTION / DETAIL SECTION REFERENCE

ELEVATION REFERENCE

BUILDING SECTION REFERENCE

ALTERNATE ELEVATION REFERENCE

ROOM TAG SYMBOL

DOOR TAG SYMBOL

ROOM NAME

ROOM NUMBER

ROOM NET AREA (WHERE SHOWN)

DOOR NUMBER

OFFICE101A

150 SF

SCALE:1 DRAWING TITLE

1/8" = 1'-0"A1.1

SHEET NUMBER WHERE DETAIL IS SHOWN

A1.11

SIM

1A1.1

DETAIL NUMBER

SHEET NUMBER WHERE DETAIL IS SHOWN

DETAIL NUMBER

SHEET NUMBER WHERE SECTION / DETAIL IS SHOWN

1

1A1.1

SECTION NUMBER

SHEET NUMBER WHERESECTION IS SHOWN

1A1.1

W1 WINDOW / STOREFRONT /CURTAIN WALL / LOUVER TYPE

1

A1.1

ELEVATION NUMBER

SHEET NUMBER WHEREELEVATION IS SHOWN

1

A1.1

3

24

PARTITION TYPE

REVISION SYMBOL

CLOUD AROUND REVISION

TA TOILET ACCESSORY SYMBOL

FIRE EXTINGUISHER INWALL MOUNTED CABINET(SURFACE MOUNTED)

FEC-A

FEC-B FIRE EXTINGUISHER INWALL MOUNTED CABINET(SEMI-RECESSED)

DRAWING REFERENCE

SIM SIMILAR CONDITIONOH OPPOSITE HANDOPP OPPOSITE HANDROT ROTATED CONDITION

FIRST FLOOR+10'-0"

ITEM IDENTIFIED

ELEVATION ABOVE FINISH FLOOR

7'-0"

DETAIL TITLE

DIMENSION TO FACE OR EDGE

7' - 0" DIMENSION TO CENTERLINE

FE-B FIRE EXTINGUISHER ONWALL BRACKET

FD FD - FLOOR DRAIN

BRICK VENEER / CMU CONTROL JOINT

GYPSUM BOARD CONTROL JOINT

CJ

CJ

ONE-HOUR FIRE RATED WALL ASSEMBLY

TWO-HOUR FIRE RATED WALL ASSEMBLY

THREE-HOUR FIRE RATED WALL ASSEMBLY

FOUR-HOUR FIRE RATED WALL ASSEMBLY

FIRE RATED WALL SYMBOLSNOTE: SEE PARTITION TYPES FOR UL DESIGNATION NO.'S

SMOKE PARTITION

AFFAFGALUMARCHBLKGBUCLCJCLGCTRCONCCMUCONTDIADSDWGEXTEXISTEAEJELECELELEVEQUIPEWCFINFDFOFFOSFRFVGAGALVGYP BDHMHORIZHTHVACIDINSULJTLAVMAXMECHMFRMINMONICNOMNTSOCODOHORDOSPPLPRPTR, RADREQDRDROSFSIMSPECSSSTDSTRSUSPTOSTOWTYPUNOVERTVCTW/WCWRWWFWDWPVTR

ABOVE FINISH FLOORABOVE FINISHED GRADEALUMINUMARCHITECTURALBLOCKINGBUILT-UP ROOFCENTERLINECONTROL JOINTCEILINGCENTERCONCRETECONCRETE MASONRY UNITCONTINUOUSDIAMETERDOWN SPOUTDRAWINGEXTERIOREXISTINGEACHEXPANSION JOINTELECTRICALELEVATIONELEVATOREQUIPMENTELECTRIC WATER COOLERFINISHFLOOR DRAINFACE OF FINISHFACE OF STUDFIRE RETARDANTFIELD VERIFYGAUGEGALVANIZEDGYPSUM BOARDHOLLOW METALHORIZONTALHEIGHTHEATING VENTILATION AIR-CONDITIONINGINSIDE DIAMETERINSULATIONJOINTLAVATORYMAXIMUMMECHANICALMANUFACTURERMINIMUMMASONRY OPENINGNOT IN CONTRACTNOMINALNOT TO SCALEON CENTEROUTSIDE DIAMETEROPPOSITE HANDOVERFLOW ROOF DRAINOVERFLOW SCUPPERPAINTPLATE, PROPERTY LINEPAIRPRESSURE TREATEDRADIUSREQUIREDROOF DRAINROUGH OPENINGSQUARE FEETSIMILARSPECIFICATIONSSTAINLESS STEELSTANDARDSTRUCTURALSUSPENDEDTOP OF STEELTOP OF WALLTYPICALUNLESS NOTED OTHERWISEVERTICALVINYL COMPOSITION TILEWITHWATER CLOSETWATER RESISTANTWELDED WIRE FABRICWOODWORKING POINTVENT THROUGH ROOF

STATE

OFSO

UTH

CAROLINA

AD

RCH

IT

ECT

ERETSIGRE

QU

ACKE

NBU

SHAR

CH

ITEC

TS +

PLAN

NER

S LL

CC

olum

bia,

SC

No.

100

028

S

SHEET NO

TITLE

ISSUE DATE

PROJECT NO.

STATE PROJECT NO.

CORP

ORAT

E SE

ALA/

E S

EAL

PROJ

ECT

T ITL

E

PHASE

REVISION DATE

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CP00419682

C:\U

sers\

Wen

dy B

ertan

i\Doc

umen

ts\16

2.00_

USC

Footb

all S

howe

r_W

endy

Ber

tani.rv

t

3/5/20

15 9:

46:29

AM

T1

COVER SHEET,INDEX OFDRAWINGS

PLUM

BING

REP

AIRS

AND

MODI

FICA

TION

S, W

BSUN

IVER

SITY

OF

SOUT

H CA

ROLIN

AGE

ORGE

ROD

GERS

BLV

D.AN

D BL

UFF

ROAD

BID DOCUMENTS

15.162.00

02/27/15

GENERAL NOTES

DESIGN TEAM INDEX OF DRAWINGSARCHITECTURALARCHITECT

QUACKENBUSH ARCHITECTS + PLANNERS1217 HAMPTON STREETCOLUMBIA, SC 29201

T: 803-771-2999F: 803-771-2858

MECHANICAL ENGINEER

SWYGERT & ASSOCIATES1315 STATE STREETCAYCE, SC 29033

T: 803-791-9300F: 803-791-0830

ELECTRICAL ENGINEER

BELKA ENGINEERING ASSOCIATES INC7 CLUSTERS COURTCOLUMBIA, SC 29210

T: 803-731-0650F: 803-731-2880

T1 COVER SHEET, INDEX OF DRAWINGSA1 DEMOLITION FLOOR PLAIN, CEILING PLAN, AND NOTESA2 RENOVATION FLOOR PLAN, CEILING PLAN, AND NOTES

MECHANICAL

M1 FLOOR PLAN, NOTES, SCHEDULES, AND LEGEND

SYMBOLS

PLUMBING REPAIRS ANDMODIFICATIONS

WBSSTATE PROJECT NUMBER CP00419682

ARCHITECT'S PROJECT NUMBER 15.162.00

FEBRUARY 27, 2015

KEY PLAN

PLAN NORTH

KEY PLANS

ABBREVIATIONS

PLUMBING

P1 GROUND LEVEL FLOOR PLAN - AP2 GROUND LEVEL FLOOR PLAN - BP3 FLOOR PLANS, NOTES, SCHEDULE, AND LEGEND

ELECTRICAL

E1 ELECTRICAL DEMOLITION & RENOVATION PLANS

Page 2: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

FD

FD

FD

FD

FD

FD

D1

SHOWER101

VESTIBULE100

TOILET102

D2

D3D3

D4

D4

D6 D5

--

-

A2

1

D1

D1

D10

TOILET102

VESTIBULE100

SHOWER101

D7

D8

D8

D8

D9

D9

D9

DEMOLITION LEGEND:

EXISTING CONDITIONS ILLUSTRATED AS OF FEBRUARY 16, 2015.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH EXISTING CONDITIONS FOR SIZES, QUANTITIES,AND LOCATIONS.

ALL EXISTING ITEMS TO REMAIN SHALL BE PROTECTED DURING DEMOLITION AND NEWCONSTRUCTION. PROTECT EXISTING CARPET AND LOBBY FLOOR FINISHES DURING DEMOLITION ANDNEW WORK.

IN AREAS OF WORK, AT EXISTING WALLS TO REMAIN WHERE OUTLETS, THERMOSTATS, LIGHTFIXTURES, PIPING, ATTACHMENTS AND DEVICES ARE REMOVED, PATCH AND REPAIR WALL TOMATCH EXISTING WALL TEXTURE. PREPARE WALL TO RECEIVE NEW FINISHES TO MATCH ADJACENT.FINISH WALL TO MATCH ADJACENT.

PROTECT ALL EXISTING WALL ITEMS TO REMAIN (HOOKS, ELECTRIC HAIR DRYERS, ETC).

OWNER TO REMOVE AND REINSTALL EXISTING SOAP DISPENSERS.

GENERAL DEMOLITION NOTES:A.

B.

C.

D.

E.

F.

DEMOLITION NOTES TO SHEETD1 EXISTING TILE FLOOR TO REMAIN; PROTECT EXISTING FLOORING DURING DEMOLITION AND

CONSTRUCTION IN AFFECTED AREA.

ALL EXISTING SHOWER PARTITIONS TO BE REMOVED PRIOR TO DEMOLITION AND NEWCONSTRUCTION. CONTRACTOR SHALL NUMBER PARTITIONS AS TO LOCATION AND PLACE ALLFASTENERS IN NUMBERED BAGS. STORE PARTITIONS IN LOCATION PROVIDED BY OWNER.CONTRACTOR IS RESPONSIBLE TO REPLACE ALL DAMAGED OR UNUSABLE FASTENERS.COORDINATE REMOVAL WITH OWNER AND ARCHITECT PRIOR TO MOVING.

REMOVE EXISTING WALL TILE AND ASSOCIATED GROUT IN THEIR ENTIRETY AT ALL WALLSAROUND ROOM. TILE BASE TO REMAIN; PROTECT EXISTING TILE BASE DURING DEMOLITION ANDCONSTRUCTION IN AFFECTED AREA. REMOVE MASONRY WALL FROM A HEIGHT OF 2'-8" AFF ANDABOVE AS REQUIRED TO ACCESS PIPING - CONTRACTOR IS RESPONSIBLE FOR MAINTAININGSTABILITY OF WALL DURING CONSTRUCTION; REFER TO PLUMBING FOR DETAILS REGARDINGNEW PIPING. PATCH MASONRY WALL WITH CMU TO MATCH EXISTING. SMOOTH FLUSH ANDPREPARE SURFACE TO RECEIVE NEW WALL TILE.

REMOVE EXISTING WALL TILE AND ASSOCIATED GROUT IN THEIR ENTIRETY AT ALL WALLSAROUND ROOM. TILE BASE TO REMAIN; PROTECT EXISTING TILE BASE DURING DEMOLITION ANDCONSTRUCTION IN AFFECTED AREA. PREPARE SURFACE TO RECEIVE NEW WALL TILE.

REMOVE CMU AS REQUIRED TO INSTALL PIPING, VALVE AND 16" x 16" ACCESS PANEL - SEEPLUMBING FOR DETAILS.

REMOVE CMU AS REQUIRED TO INSTALL PIPING, VALVE AND 24" x 24" ACCESS PANEL - SEEPLUMBING FOR DETAILS.

EXISTING CEILING AND ASSOCIATED STRUCTURE TO BE REMOVED IN THEIR ENTIRETY REMOVEAND CLEAN ALL LOOSE DEBRIS, INSULATION, ETC. ABOVE CEILING AREA. ALLOW ARCHITECT ANDOWNER TO REVIEW PRIOR TO INSTALLING NEW CEILING.

EXISTING LIGHT FIXTURES TO BE REMOVED; SAVE AND PROTECT FOR REINSTALLATION IN SAMELOCATION. CLEAN AND RELAMP PRIOR TO REINSTALLING.

EXISTING GRILLE TO BE REMOVED IN ITS ENTIRETY - SEE MECHANICAL.

EXISTING SHOWER HEADS TO BE REMOVED - SEE PLUMBING.

D2

D3

D4

D5

EXISTING WALL TO REMAIN

EXISTING ITEM TO BE REMOVED

AREA NOT INCLUDED IN SCOPE

EXISTING CEILING TO BE REMOVED

EXISTING LIGHT FIXTURE TO BE REMOVED;SAVE AND PROTECT FOR REINSTALLATION

EXISTING GRILLE TO BE REMOVED

EXISTING GRILLE TO BE REMOVED

D6

D7

D8

D9

D10

STATE

OFSO

UTH

CAROLINA

AD

RCH

IT

ECT

ERETSIGRE

QU

ACKE

NBU

SHAR

CH

ITEC

TS +

PLAN

NER

S LL

CC

olum

bia,

SC

No.

100

028

S

SHEET NO

TITLE

ISSUE DATE

PROJECT NO.

STATE PROJECT NO.

CORP

ORAT

E SE

ALA/

E S

EAL

PROJ

ECT

T ITL

E

PHASE

REVISION DATE

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CP00419682

C:\U

sers\

Wen

dy B

ertan

i\Doc

umen

ts\16

2.00_

USC

Footb

all S

howe

r_W

endy

Ber

tani.rv

t

3/5/20

15 9:

46:55

AM

A1

DEMOLITIONFLOORPLAN,CEILING PLAN ANDNOTES

PLUM

BING

REP

AIRS

AND

MODI

FICA

TION

S, W

BSUN

IVER

SITY

OF

SOUT

H CA

ROLIN

AGE

ORGE

ROD

GERS

BLV

D.AN

D BL

UFF

ROAD

BID DOCUMENTS

15.162.00

02/27/15

SCALE: 1/4" = 1'-0"A11 DEMOLITION FLOOR PLAN

SCALE: 1/4" = 1'-0"A12 DEMOLITION CEILING PLAN

Page 3: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

FD

FD

FD

FD

FD

FD

-

5

SHOWER101

VESTIBULE100

TOILET102

1

22

2

2

4 3

-

6

.

6 .

--

-

A2

1

2A2

3A2

5

5

7 7

TOILET102

VESTIBULE100

SHOWER101

INSTALL "V" PLASTICCONTROL JOINT ATCEILING

EXHAUST FAN (EF-1)- SEE MECHANICAL

EXISTING LIGHT FIXTUREFROM DEMOLITION -REINSTALL IN SAMELOCATION; TYP

NEW GRILLE -SEE MECHANICAL

NEW GRILLE -SEE MECHANICAL

INSTALL "V" PLASTICCONTROL JOINT ATCEILING

REPAINT CEILING TOMATCH EXISTING

FIRE ALARM A/V -SEE ELECTRICAL

RENOVATION NOTES TO SHEET1 REINSTALL ALL SHOWER PARTITIONS IN SAME LOCATIONS AS REMOVED.

INSTALL NEW WALL TILE TO FULL HEIGHT OF WALLS STARTING ABOVE EXISTING TILE BASE; REFER TOTYPICAL TILE PATTERN ELEVATION FOR DETAILS. PROVIDE BULLNOSE AT ENTRANCE AREA CORNERS.

INSTALL NEW 16" x 16" ACCESS PANEL (STAINLESS STEEL) FOR PLUMBING VALVE - SEE PLUMBING.EACH ACCESS PANEL TO RECEIVE MORTISE CYLINDER LOCK (1E74-C4 BEST LOCK CYLINDER - ORAPPROVED EQUAL PRODUCT).

INSTALL NEW 24" x 24" ACCESS PANEL (STAINLESS STEEL) FOR PLUMBING VALVE - SEE PLUMBING.EACH ACCESS PANEL TO RECEIVE MORTISE CYLINDER LOCK (1E74-C4 BEST LOCK CYLINDER - ORAPPROVED EQUAL PRODUCT).

EXISTING TILE FLOOR TO REMAIN; PROTECT EXISTING FLOORING DURING DEMOLITION ANDCONSTRUCTION IN AFFECTED AREA.

PAINT WALLS FROM CORNER TO CORNER; PAINT TO MATCH EXISTING.

NEW SHOWER HEADS - SEE PLUMBING.

2

3

RENOVATION LEGENDAREA NOT INCLUDED IN SCOPE

NEW GYPSUM BOARD CEILING - MATCHPREVIOUSLY EXISTING CEILING HEIGHT(SEE SPECS FOR SYSTEM)SEAL PERIMETER WITH SILICONE SEALANT4

A. CONTRACTOR SHALL COORDINATE ALL WORK WITHIN EXISTING AREA WITH OWNER.

B. CONTRACTOR TO CLEAN ENTIRE WORK AREA PRIOR TO BEGINNING WORK. PREPAREALL SURFACES AS REQ'D TO RECEIVE NEW FINISHES.

C. SEAL PERIMETER OF CEILINGS W/ SILICONE, ANTIMICROBIAL.

D. OWNER TO REMOVE AND REINSTALL EXISTING SOAP DISPENSERS.

E. PATCH CMU INFILL TO MATCH EXISTING AT ALL AREAS REMOVED FOR PLUMBING WORK.

GENERAL RENOVATION NOTES:

5

6

7

CT-1

WALL TILE LEGENDEXISTING TILE WALL BASE TO REMAIN

REMARKSINSTALL NEW WALL TILE TO FULL HEIGHT OF WALLS STARTING ABOVE EXISTING TILEBASE; REFER TO TYPICAL TILE PATTERN ELEVATION FOR DETAILS.1.

GENERAL FINISH NOTESPREPARE ALL EXISTING WALLS, CEILING, AND FLOORS TO RECEIVE NEW FINISHES AS SCHEDULED.

EXISTING WALLS AND EXISTING CEILINGS: AFTER REMOVING PEELING PAINT FROM WALLS, PRIME WITH XIMPEEL BOND PRIMER #1146 AND PAINT WITH 2 COATS OF SHERWIN WILLIAMS PRE-CATALYZED WATERBASEDEPOXY EG-SHEL (COLOR TO MATCH EXISTING)

NEW CEILING - GYPSUM BOARD ASSEMBLY:1 LAYER OF 1/2" THICK USG DUROCK EXTERIOR CEMENT BOARD OR APPROVED EQUAL (MAX FASTENERSPACING 6" OC W/ MANUFACTURER APPROVED FASTENERS) W/ 1 LAYER OF 1/2" THICK USG FIBEROCKINTERIOR PANEL AQUA-TOUGH OR APPROVED EQUAL WITH MANUFACTURER APPROVED JOINT FINISHINGCOMPOUND

PREP RITE 200 LATEX PRIMER WITH 2 COATS OF SHERWIN WILLIAMS PRE-CATALYZED WATERBASED EPOXYEG-SHEL (COLOR TO MATCH EXISTING)

PROVIDE 1 GALLON MINIMUM OF EACH PAINT TYPE OF EXTRA PAINT TO OWNER AFTER PROJECT IS FINISHED

PAINT ALL EXPOSED CONDUIT (NEW/EXISTING) TO MATCH ADJACENT WALL.

A.

B.

C.

D.

E.

F.

CERAMIC TILE (CT)

CT-1 MANUFACTURER: ROCASERIES: LIFECOLOR: PERLASIZE: 10" x 28"

INTERIOR FINISH MATERIALSGROUT (GR)

GR-1 MANUFACTURER: LATICRETECOLOR: 24 - NATURAL GREY

PAINT (P)

P-1 EPOXY CEILING PAINT TO MATCH EXISTING (WHITE)

INSTALL NEW WALL TILE TO FULL HEIGHT OF WALL; TOSTART ABOVE EXISTING TILE BASE

EXISTING TILEBASE TO REMAIN

JOINT ABOVE EXISTING COVE AND NEW WALLTILE TO BE SEALED WITH SINGLE COMPONENT,WATERPROOF SEALING AND BONDINGCOMPOUND; SCHLUTER- KERDI FIX - GREYFINISH (OR APPROVED EQUAL PRODUCT)

CONTINUOUS PLIABLE, SHEET APPLIED, BONDEDWATERPROOF MEMBRANE; SCHLUTER - KERDI-DS 20 MILTHICK (OR APPROVED EQUAL PRODUCT) APPLIED TO FULLHEIGHT OF WALL; TO START ABOVE EXISTING TILE BASE

EXISTING TILEBASE TO REMAIN

TILE TO BE CENTERED ON EXISTING TILEBASE. REVIEW START PLACE FORINSTALLATION OF TILE W/ ARCHITECT.

CONTINUOUSSEALANT

EXISTING TROUGH@ FLOOR DRAIN

CUT TILE (CUT EDGEON CEILING SIDE)

OF WALL

8" BOND BEAM W/ CONT#4 LAP 2'-4" AT SPLICES

HORIZ JOINT REINF@ 16" OC MAX

CONT SEALANT

2'-8"AFF

EXISTING CMU TOREMAIN

A24

8" CMU W/ #4 VERT @48" OC HORIZONTALSPACING- LAP 2'- 4" ATSPLICES. EXTEND BARS2'-0" INTO EXISTING CMUAT BOTTOM ANDGROUT

TYP 3/16"

TYP 3/16"

L - 4" x 4" x 1/4" EACHSIDE OF CMU WALL

L - 2" x 2" x 1/4"

STEEL JOIST

L - 2" x 2" x 1/4"

STEEL JOIST

SUPPORT AND GUIDE ANGLESMAX SPACING @ 6'-0" OC

CONCRETE MASONRY UNITS: ASTM C90, GRADE N, LIGHTWEIGHT.

GROUT: 2500 PSI COARSE GROUT IN ACCORDANCE WITH ASTM C476, WITH8" TO 11" SLUMP. GROUT ALL CELLS WHICH CONTAIN REINFORCEMENT.

MORTAR: TYPE S IN ACCORDANCE WITH ASTM C270

LAP ALL #4 BARS 2'-4"

CMU NOTES:A.

B.

C.

D.

8" BOND BEAM W/ CONT #4 LAP2'-4" AT SPLICES

HORIZ JOINT REINF @ 16" OC MAX

1/4" x 3" X 8" PLATE W/ (2)1/2" DIA x 4" STUDS

L - 3" x 3" x 1/4" x 4"LONG W/ 1/2" DIA x3" SIMPSON TITEN HDANCHOR

L - 2" x 2" x 1/4" - FIELD WELD TO ANGLEAND EMBED PLATE WITH 2" OF 3/16"FILLET WELD EACH END

BRACE WALL @ 6'-0" OC MAX

CONT SEALANT

2'-8"AFF

EXISTING CMU TOREMAIN

EXISTING CONCRETEWALL PANELS

DO NOT DAMAGE OUTSIDEFACE OF CONCRETEWALL WHEN DRILLINGFOR CONCRETEANCHORS

A24

8" CMU W/ #4 VERT @48" OC HORIZONTALSPACING- LAP 2'- 4" ATSPLICES. EXTEND BARS2'-0" INTO EXISTING CMUAT BOTTOM AND GROUT

STATE

OFSO

UTH

CAROLINA

AD

RCH

IT

ECT

ERETSIGRE

QU

ACKE

NBU

SHAR

CH

ITEC

TS +

PLAN

NER

S LL

CC

olum

bia,

SC

No.

100

028

S

SHEET NO

TITLE

ISSUE DATE

PROJECT NO.

STATE PROJECT NO.

CORP

ORAT

E SE

ALA/

E S

EAL

PROJ

ECT

T ITL

E

PHASE

REVISION DATE

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CP00419682

C:\U

sers\

Wen

dy B

ertan

i\Doc

umen

ts\16

2.00_

USC

Footb

all S

howe

r_W

endy

Ber

tani.rv

t

3/5/20

15 9:

47:25

AM

A2

RENOVATIONFLOOR PLAN,CEILING PLAN, ANDNOTES

PLUM

BING

REP

AIRS

AND

MODI

FICA

TION

S, W

BSUN

IVER

SITY

OF

SOUT

H CA

ROLIN

AGE

ORGE

ROD

GERS

BLV

D.AN

D BL

UFF

ROAD

BID DOCUMENTS

15.162.00

02/27/15

SCALE: 1/4" = 1'-0"A25 RENOVATION FLOOR PLAN

SCALE: 1/4" = 1'-0"A26 RENOVATION CEILING PLAN

ROOM FINISH SCHEDULE

ROOM NOROOMNAME

FLOOR WALLS CEILINGFINISH REMARKSFINISH BASE NORTH SOUTH WEST EAST

101 SHOWER EXISTING EXISTING CT-1, GR-1 CT-1, GR-1 CT-1, GR-1 CT-1, GR-1 P-1 1

SCALE: 1 1/2" = 1'-0"A24 WALL TILE SECTION

SCALE: 1/2" = 1'-0"A21 TYPICAL WALL TILE

SCALE: 3/4" = 1'-0"A22 WALL DETAIL

SCALE: 3/4" = 1'-0"A23 WALL DETAIL 1

CONCRETE SLAB PATCHING:AT AREAS SHOWN ON PLUMBING DRAWINGS FOR NEW VALVES ATCONCOURSE AREA, PATCH CONCRETE WITH 4,000 PSI CONCRETESMOOTHED FLUSH WITH ADJACENT CONCRETE. SEE P1 AND P2FOR ADDITIONAL INFORMATION.

Page 4: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

15.162.00

02.27.2015

CONSTRUCTION DOCUMENTS

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

DATEREVISION

PHASE

PROJECT NO.

ISSUE DATE

TITLE

SHEET NO

Swygert & Associates

CP00419682STATE PROJECT NO.

M1

FLOOR PLAN,NOTES,SCHEDULES, ANDLEGEND

Page 5: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

15.162.00

02.27.2015

CONSTRUCTION DOCUMENTS

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

DATEREVISION

PHASE

PROJECT NO.

ISSUE DATE

TITLE

SHEET NO

Swygert & Associates

CP00419682STATE PROJECT NO.

GROUND LEVELFLOOR PLAN - A

P1

U

P

A

M

P

UP

UP

UP

RAMP

Page 6: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

15.162.00

02.27.2015

CONSTRUCTION DOCUMENTS

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

DATEREVISION

PHASE

PROJECT NO.

ISSUE DATE

TITLE

SHEET NO

Swygert & Associates

CP00419682STATE PROJECT NO.

GROUND LEVELFLOOR PLAN - B

P2

UP

UP

RAMP

U

P

R

A

M

P

UP

Page 7: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r

15.162.00

02.27.2015

CONSTRUCTION DOCUMENTS

COPYRIGHT TM 2014 QUACKENBUSH ARCHITECTS + PLANNERS

CONDITIONS OF USE:THIS DRAWING AND THE DESIGN THEREON ARE THEPROPERTY OF QUACKENBUSH ARCHITECTS + PLANNERS.THE REPRODUCTION, COPYING, OR USE OF THIS DRAWINGWITHOUT WRITTEN CONSENT OF QUACKENBUSH ARCHITECTS+ PLANNERS IS PROHIBITED AND ANY INFRINGEMENT WILL BESUBJECT TO LEGAL ACTION.

DATEREVISION

PHASE

PROJECT NO.

ISSUE DATE

TITLE

SHEET NO

Swygert & Associates

CP00419682STATE PROJECT NO.

FLOOR PLANS,NOTES, SCHEDULE,AND LEGEND

P3

Page 8: PLUMBING REPAIRS AND MODIFICATIONS - Scpurchasing.sc.edu/solicitations/CP00419682 Plumbing... · plumbing repairs and modifications, wbs university of south carolina g e o r g e r