    1.Known as the Water Code of the Philippines

    A. RA 1080

    B. PD 1067

    C. RA 1037D. PD 856

    2.The Revised National Plumbing Code of the Philippines of 1999 was approved on

    A. June 18, 1955

    B. January 28, 1959

    C.November 28,

    1967

    D. December 21, 1999

    3. Expiration of plumbing permit if suspended or abandoned for a periodof

    A. 60 days

    B. 365 days

    C. 120 days

    D. 180 days

    4.NAMPAP was organized and registered to SEC

    A.

    195

    4

    B.199

    9

    C.193

    5

    D.195

    0

    5.Known as the Code on Sanitation of the Philippines

    A.PD 907

    B. PD 865

    C. PD 856

    D. PD 586

    6. The two causes of fixture trap seal loss that vent systems protect against in normal

    fixture use are

    A. backflow and back-pressure

    B. siphonage and back-pressure

    C. vacuum and backflow

    D. vacuum breaker and backflow preventer

    7. Another term used to described a continuous vent is

  • 7/27/2019 Plumbing Practice Questions.doc

    2/9

    A. vent pipe

    B. vent stack

    C. stack vent

    D. soil stack

    8. The trade name for relief vent

    is

    A. dual vent

    B. re-vent

    C. back vent

    D. cicuit vent

    9. A vent connecting to a horizontal drain pipe through a fitting at an angle not greater the

    45 degrees to the vertical is

    A. side vent

    B. back vent

    C. common vent

    D. yoke vent

    10. The dry portion of a soil or waste pipe that extends above the highest horizontal drain

    connected to the stack and terminates above the roof is

    A. vent stack

    B. yoke vent

    C. stack vent

    D. dual vent

    11. The function is to connect two or more vent pipes to the main vent at one point, or

    extend through the roof separately is

    A. vent exposed

    B. vent line

    C. vent header

    D. vent cap

    12.The purpose is to prevent the pressure changes in the stack

    A. relief vent

    B. yoke vent

    C. re-vent

    D. loop vent

    13.A positive pressure is

    A. siphonage

    B. back pressure

    C. vacuum

    D.backflo

    w

  • 7/27/2019 Plumbing Practice Questions.doc

    3/9

  • 7/27/2019 Plumbing Practice Questions.doc

    4/9

    D. color

    20.Kitchen sinks located away from walls or partitions are called

    A. slop sink

    B. center sinkC. island sink

    D. isolated sink

    21.Maximum length of horizontal wet vent is

    A. 0.50 foot

    B. 1 foot

    C. 1 1/2 feet

    D. 2 feet

    22. Also known as the RA 9275

    A. Water Code of the Philippines

    B. National Building Code of the Philippines

    C. Philippine Clean Water Act of 2004

    D. Code on Sanitation of the Philippines

    23. The first amendment of the National Plumbing Code which includes Asbestos-Cement

    pipe as approved plumbing materials was

    A. June 18, 1955

    B. December 21, 1999

    C.November 28,

    1967

    D. January 28, 1959

    24.How many provision of the Master Plumber Code of Ethics

    A.6

    B.7

    C.

    8

    D.9

    25.How many set of plans return to the applicant after approval of permit

    A.6

    B.1

    C. 2

  • 7/27/2019 Plumbing Practice Questions.doc

    5/9

    D.4

    26.How many set of plans retain to the jobsite after approval of permit

    A.1

    B.2

    C.3

    D.4

    27.How many set of plans retain to the Administrative Authority after approval of permit

    A.1

    B.2

    C.3

    D.4

    28.National Plumbing Code of the Philippines approved by the Malacaang

    A. June 18, 1955

    B. January 28, 1959

    C.November 28,

    1967

    D. December 21, 1999

    29.Minimum volume of the digestive chamber of a septic tank

    A. 1 cu.m

    B. 2 cu.m

    C. 1.5 cu.m

    D. 2.5 cu.m

    30.The minimum difference in elevation of the inlet and outlet pipe of the septic tank

    A. 50.8 mm

    B. 102.8 mm

    C. 152.8 mm

    D. 204.8 mm

    31. Standard conversion factor to multiply the TDH in feet to acquire the pressure in psi of

  • 7/27/2019 Plumbing Practice Questions.doc

    6/9

    water in a pipe to a certain elevation

    A.62.

    4

    B.0.43

    3

    C.32.

    2

    D.9.8

    1

    32.1 cubic meters of water is equal to

    A. 250 gallons

    B. 1500 liters

    C.1000 kgs

    D. 2500 lbs.

    33.1 cubic meters of water is equal to

    A. 10 liters

    B. 100 liters

    C. 1000 liters

    D. 10,000 liters

    34.1 cubic meters is how many gallons

    A. 105 gallons

    B. 264 gallons

    C. 285 gallons

    D. 365 gallons

    35.1 psi is equal to

    A. 6.895 kpa

    B. 9.876 kpa

    C.3.678 kpa

    D. 7.365 kpa

    36. Known as the Sanitary Engineering

    Law

    A. RA 9275

    B. RA 1378

    C. RA 1364

    D. RA 9514

    37.Known as the Fire Code of the Philippines of 2008

  • 7/27/2019 Plumbing Practice Questions.doc

    7/9

    A. RA 9275

    B. RA 9514

    C. RA 1368

    D. RA 9250

    38.

    The requirement of the Dry Standpipe in every 4 storey or more was stated in

    A. PD 907

    B. PD 1093

    C. PD 2596

    D. PD 1025

    39. A pipeline system filled with water and connected to a constant water supply for the

    used of the BFP for Fire Suppression purposes is

    A. Dry Standpipe

    B.Wet Standpipe

    C. Combination Standpipe

    D. Standard Standpipe

    40.The minimum size of Dry Standpipe is

    A.64mm (2

    1/2")

    B. 52mm (2")

    C.38mm (1

    1/2")

    D. 102mm (4")

    41. Is a technique whereby air is blown into spaces which are designed to be kept clear

    smoke

    A. Aeration

    B. Pasteurization

    C. Pressurization

    D. Compressed Air

    42. The pipes are normally not filled with water. Water is introduced into the system thru

    fire service connection is

    A. Dry Standpipe

    B. Wet Standpipe

    C. Combination Standpipe

    D. Standard Standpipe

    43. The maximum travel distance of a Dry Standpipe outlet connection to any point in a

    building is

    A. 20 meters

    B. 30 meters

    C. 40 meters

    D. 50 meters

  • 7/27/2019 Plumbing Practice Questions.doc

    8/9

    44. Is an auxiliary fireline system with constant water supply installed primarily for

    emergency use

    A. Dry Standpipr

    B. Wet StandpipeC. Combination Standpipe

    D. Standard Standpipe

    45.The maximum height of a Fire Service Connection above gradeline is

    A. 460mm

    B. 1200mm

    C. 1220mm

    D. 2110mm

    46. The valve diameter must be installed in every floor for a Wet Standpipe is

    A. 32mm (1")

    B.38mm (1

    1/4")

    C. 52mm (2")

    D.64mm (2

    1/2")

    47.Standard slope of all horizontal runs of a Dry Standpipe is

    A.5

    %

    B.10

    %

    C.15

    %

    D.20

    %

    48.Minimum height of a Wet Standpipe above floor is

    A. 810mm

    B. 910mm

    C. 1100mm

    D. 2100mm

    49.The minimum pressure of the hydrostatic testing for the Dry Standpipe is

    A. 50psi (3.5kg/cm2)

    B. 60psi (4.5kg/cm2)

    C. 70psi (5.0kg/cm2)D. 80psi (6.5kg/cm2)

  • 7/27/2019 Plumbing Practice Questions.doc

    9/9

    50. What is the maximum Dry Standpipe design pressure to withstand water pressure when

    ready for service?

    A. 100psi

    B. 200psi

    C. 300psiD. 400psi