PLP flow chart extract from Defra report on post installation effectiveness of PLP
-
Upload
jbaconsulting -
Category
Environment
-
view
86 -
download
0
Transcript of PLP flow chart extract from Defra report on post installation effectiveness of PLP
Extract from the Defra report on Post-Installation Effectiveness of Property Level Protection, due to be published in April 2014.
Appraisal of eligibility and all sources of risk
Inception meeting with residents to raise awareness
Sign-up and early communication
Surveyor appointed
Independent survey and homeowner
reports
Surgery with residents to discuss recommendations
Product selection
Surveyor provides Bill of Quantities
Procurement: installer appointed
Issue (and return) of residents agreements
Consider upgrade options / contributions
Installation of Kitemark approved products
Homeowner product training & handover of instructions
Independent post-installation inspections, wet test and sign-off
Issue of Flood Risk Report
Residents enter warranty and maintenance agreements
Residents provide Flood Risk Report to insurers
Community flood plan updated to reflect measures provided.
Annual independent inspections and re-issue of Flood Risk Report certificates
Emergency plans tested annually.