Please fill details as applicable.

5
SI. No. Category (i) (ii) (iii) (iv) (v) For a load of 100kw to 300 kw or the plot size of 300 sq. meter to 1000 sq. meter For a load of 100kw to 300 kw or the plot size of 300 sq. meter to 1000 sq. meter For a load above 300kw to 700 kw or the plot size of 1000 sq. meter to 2000 sq. meter For a load above 700kw to 1500 kw or the plot size of 2000 sq. meter to 4000 sq. meter Cases not covered above Installation of one number of 11kv Pole Mounted Distribution Transformer Description Minimum Size (Meters) Installation of one number of 11kv Plinth Mounted Distribution Transformer Installation of one number of 11kv Plinth Mounted Distribution Transformer Installation of two number of 11kv Plinth Mounted Distribution Transformer 4Mx 4M 8Mx 5M 9Mx 5M 10Mx 8M Actual size based on load requirement 5 BRPL BRPL BRPL BRPL BRPL Rajdhani Power Limited. 39999707 . CIN : U40109DL2001PLC111527, This manual helps you with applying to BRPL for a permanent new electricity connection. As an Applicant for such a connection, you need to fill up the following forms and submit specified documents as per of your application. Space Requirement The minimum space required to be provided by the developer / applicant for installation of distribution transformers shall be as under : Please fill details as applicable.

Transcript of Please fill details as applicable.

SI. No. Category

(i)

(ii)

(iii)

(iv)

(v)

For a load of 100kw to 300 kw or the plotsize of 300 sq. meter to 1000 sq. meter

For a load of 100kw to 300 kw or the plotsize of 300 sq. meter to 1000 sq. meter

For a load above 300kw to 700 kw or the plotsize of 1000 sq. meter to 2000 sq. meter

For a load above 700kw to 1500 kw or the plot size of 2000 sq. meter to 4000 sq. meter

Cases not covered above

Installation of one number of 11kv PoleMounted Distribution Transformer

Description Minimum Size (Meters)

Installation of one number of 11kv PlinthMounted Distribution Transformer

Installation of one number of 11kv PlinthMounted Distribution Transformer

Installation of two number of 11kv PlinthMounted Distribution Transformer

4Mx 4M

8Mx 5M

9Mx 5M

10Mx 8M

Actual size based onload requirement

5

BRPL

BRPL

BRPLBRPL

BRPL

Rajdhani Power Limited.

39999707

.

CIN : U40109DL2001PLC111527,

This manual helps you with applying to BRPL for a permanent new electricity connection. As an Applicant for such a connection, youneed to fill up the following forms and submit specified documents as per of your application.

Space Requirement

The minimum space required to be provided by the developer / applicantfor installation of distribution transformers shall be as under :

Please fill details as applicable.

6CIN : U40109DL2001PLC111527,

The charges payable by you to BSES for New connection depends on the Tariff Category and sanctioned load :

(i) Advance Consumption Deposit / Security Deposit depending on your Sanctioned load and tariff category, as Specified in Table 1 below :

Charges payable for New Connection

(ii) In case area / Colony is electrified, the SLD charges shall be payable by all the consumer irrespective ofwhether it is electrified or Unelectrified area, The SLD charges as given in Table no. 2 would be leviable.

TABLE - 2

1

S.No. Type of area

I

II

III

i

ii

iii

IV

V

VI

2 3

Sanctioned Load

Electrified Area

Un-electrified Area

Upto 5 KW

6KW - 150KW

151KW-200 KW/ 215 KVA

Upto 4 KW

(Other than Agriculture)

5KW - 10KW

(Other than Agriculture)

11KW - 200 KW/ 215 KVA

(Other than Agriculture)

Upto 4 KW

(Agriculture)

5 KW - 10 KW

(Agriculture)

11KW - 200 KW/ 215 KVA

(Agriculture)

Amount (Rs.)

4 5

Road RestorationCharges

Total

3000

Maximum of 25000 (3000+ 500 per KW or KVA)

25000 + 400 per KW orKVA

8000 per KW

12000 per KW

20000 per KW or KVAas may be

1600 per KW

2400 per KW

4000 per KW or KVAas may be

Actual RR chargesfor service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

Actual RR charges for service line

4+5

4+5

4+5

4+5

4+5

4+5

4+5

4+5

4+5

TABLE - 3OTHER MISCELLANEOUS CHARGES

S. No. Description Charges (Rs.)1234iii5iii6iiiiiiiv

Non-refundable registration cum processing fee of EHT and HT connectionField Inspection to be scheduled on a holiday for the LicenseeSecurity towards pre-payment meterOne time non-refundable charges for temporary connectionsLT SupplyHT SupplyShifting of meter and service line 1 on the same premisesSingle phase connection Three phase connection Installation Inspection Fee other than at the time of energising new connectionUpto 5 kWMore than 5kW upto 10 kWMore than 10 kWHT Installation

10005003000

250 per KW(Max 25000)

1000 per KW

5001000

1202004001000

S. No.

(1)

1

(i)

(ii)

(iii)

2

3

4

5

6

7

8

9

10

Domestic

Upto 2kW

Above 2kW upto 5kW

Above 5kW

Non-Domestic

Industrial

Agriculture

Public Lighting

Railway, DMRC, DIAL DJB

Mushroom Cultivation

Advertisement and Hoardings

Charging stations for E-Rickshaw/E-vehicle

Tariff Category (as per Tariff Order) Security Deposit for Permanent Connection(Rs. Per kW or per kVA as the case may be)

600

900

1200

4500

4500

300

3000

3000

600

4500

2500

Security Deposit for Temporary Connection(Rs. Per kW or per kVA as the case may be)

3000

S. No.

1 Refundable Security towards pre paymentmeter

Any Other Category not Speci?ed above To be decided by commission

Tariff Category (as per Tariff Order)

(2) (3)

7iii8iii9iiiiiiiv10

Special Meter Reading chargesLT connectionHT connectionCharges for reconnection in case of change of occupancy or temporary disconnection Single phase connectionThree phase connectionMeter testing chargesSingle phaseThree phaseCT meterHT meterCopy of duplicate bill (> one)

50200

200500

2005001000400020

Code 6. Charging of E-Rickshaw / E-Vehicle

6.1

6.2

Charging Stations for E-Rickshaw / E-Vehicle on Single

Delivery point

Charging E-Rickshaw / E-Vehicle at own premises other

than Charging Station

7CIN : U40109DL2001PLC111527,

8

BRPL.BRPL

CIN : U40109DL2001PLC111527,

9

To : M/s. BSES Rajdhani Power Limited (Name of the Licensee)

with your mains (As per CEA measures relating to safety and electric supply) regulation 2015 was tested by us on date .........................and

the installation resistance as per regulation 34 was ................................. mega ohms.

ELCB (as per regulation 42) found installed : Yes ( ) NO ( ) Make : ............................ Capacity : ............................

Licensed wiring Contractor Name, Seal & Signature

As per CEA guideline Regulation 14 Suitable cut out should be provided at the consumer premises.As per CEA guideline Regulation 16 earth terminal on consumer premises.As per CEA guideline Regulation 42 earth leakage circuit breaker whose maximum earth leakage thershold for tripping should notexceed 30 milli amp. for domestic connection and 100 milli amp. for all other installation.

Inspection Report

Reg. No.........................................................................

Signature of AMPS/DGM (Licensee)

(This Installation Test Report is to be certified by a Licensed Electrical Contractor. This is for reference of consumer.)

CIN : U40109DL2001PLC111527,

Foot/Reflex Valves in