Play Fairway AnalysisProject Elements
Tony LaPierre
Vice President
![Page 2: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/2.jpg)
Play Fairway Concept
•• For a given depositional sequence A For a given depositional sequence A Play FairwayPlay Fairway is the is the present day area of a potential reservoir unit, with the possibipresent day area of a potential reservoir unit, with the possibility lity of having a complete working petroleum system (seal, charge of having a complete working petroleum system (seal, charge and trap)and trap)
•• Play Fairway AnalysisPlay Fairway Analysis examines relative risks and total volume examines relative risks and total volume potentialpotential
•• Play Fairway AnalysisPlay Fairway Analysis examines four play components (reservoir, examines four play components (reservoir, seal, charge, trap)seal, charge, trap)
Splay fairway area no chargeno seal
RC
![Page 3: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/3.jpg)
Play Fairway Analysis Flowchart
Geological Model
Gross Depositional Environment Map(incorporating play cross-section)
Play Fairway Risk Map(Composite Common Risk Segments)
Reservoir Presence
Reservoir Effectiveness Seal Petroleum
Charge
RISK MAPSRISK MAPS
![Page 4: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/4.jpg)
Common Risk Segment Overlay Process(to get to the Composite Risk)
Reservoir PresenceReservoir Presence
Reservoir EffectivenessReservoir Effectiveness
Seal Presence + EffectivenessSeal Presence + Effectiveness
Petroleum ChargePetroleum Charge
Composite Common Risk Segment Map Composite Common Risk Segment Map (shows overall play risk)(shows overall play risk)
1.1.
2.2.
3.3.
ResultResult
4.4.
![Page 5: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/5.jpg)
Project Elements
• Seismic Database Preparation / Synthetics
• Plate Tectonics• Biostratigraphy• Geochemistry• Reprocessing of Seismic Lines• Salt Structural Interpretation• Reservoir Quality• Play Fairway Analysis (PFA)
![Page 6: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/6.jpg)
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Program Management
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
![Page 7: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/7.jpg)
Seismic Data Conditioning
![Page 8: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/8.jpg)
![Page 9: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/9.jpg)
![Page 10: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/10.jpg)
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Program Management
![Page 11: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/11.jpg)
Biostratigraphy
• New analyses (team work)– Micropalaeontology, nanofossil,
palynological– 900 samples, 6 wells
• Review of existing analyse 14 wells
• Integrated with seismic to develop a sequence strat. framework
• Academic panel
![Page 12: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/12.jpg)
BiostratigraphyOETR Play Fairway Analysis -Biostratigraphy
• map
(After Wade 2000 & Shimeld 2004)
Glooscap C-63
Cohasset L-97
Bonnet P-23
Chebucto K-90
South Griffin J-13
Glenelg J-48
New biostratigraphy data
Alma F-67
Shelburne G-29
Albatross B-13
Shubenacadie H-100
Annapolis G-24Crimson F-81
Balvenie B-79
Evangeline H-98Newburn H-23
Weymouth A-45
Tantallon M-41
West Esperanto B-78Dauntless D-35
Hesper P-52
Pre-existing biostratigraphy data
![Page 13: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/13.jpg)
Seismic Tie Lines
![Page 14: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/14.jpg)
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Bible Line Reprocessing
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Program Management
![Page 15: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/15.jpg)
TGS Seismic Reprocessing
• Reprocessing of – 4000 km of conventional 2D
selected to tie key wells– Due end June 2010– Detailed in TGS presentation
![Page 16: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/16.jpg)
Reprocessed TGS Tie Lines
![Page 17: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/17.jpg)
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Bible Line Reprocessing
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Program ManagementPlate Tectonics Project
Plate Tectonics – 3D Basin Evolution Model
Reprocessing Regional
Framework Data
Refraction Line
Forward Model Reconstruction
Grav Mag ReprocessingSISMAR Reprocessing
![Page 18: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/18.jpg)
Magnetic reprocessing
Refraction Line SISMAR reprocessing
Plate reconstruction
Integrated interpretation
Structural modelling
Magnetic reprocessingMagnetic reprocessing
Refraction Line SISMAR reprocessingSISMAR reprocessing
Plate reconstructionPlate reconstruction
Integrated interpretationIntegrated interpretation
Structural modellingStructural modelling
![Page 19: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/19.jpg)
Magnetic reprocessing
Refraction Line SISMAR reprocessing
Plate reconstruction
Integrated interpretation
Structural modelling
Magnetic reprocessingMagnetic reprocessing
Refraction Line SISMAR reprocessingSISMAR reprocessing
Plate reconstructionPlate reconstruction
Integrated interpretationIntegrated interpretation
Structural modellingStructural modelling
GEOPRO
GSC
IFREMER
DALHOUSIE
DALHOUSIE
GSC + IFREMER
![Page 20: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/20.jpg)
GXT NovaSpan Lines & GSC Magnetic
![Page 21: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/21.jpg)
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Plate Tectonics Project
Salt Interpretation
Plate Tectonics – 3D Basin Evolution Model
Reprocessing Regional
Framework Data
Refraction Line
Forward Model Reconstruction
Grav Mag ReprocessingSISMAR Reprocessing
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Bible Line Reprocessing
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Program Management
![Page 22: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/22.jpg)
Salt Structural Interpretation
• Mapping distribution and depth to top and base of allochthonous and autochthonous salt
• Seismic interpretation of salt morphology and their evolution over time to develop predictive models for sediment distribution
• CNSOPB led initiative
![Page 23: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/23.jpg)
Salt Structural Interpretation
• Research project to forward model salt dynamic processes to compare with the understanding of features seen on seismic data
• Dalhousie Geodynamics Group
![Page 24: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/24.jpg)
Salt Structural Interpretation
http://sopalepc.ocean.dal.ca/salt-ScotianBasin/Animation_A-1.gif
![Page 25: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/25.jpg)
Reservoir Quality
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Plate Tectonics Project
Salt Interpretation
Plate Tectonics – 3D Basin Evolution Model
Reprocessing Regional
Framework Data
Refraction Line
Forward Model Reconstruction
Grav Mag ReprocessingSISMAR Reprocessing
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Bible Line Reprocessing
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Program Management
![Page 26: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/26.jpg)
Reservoir Quality
• To develop an understanding of the variation of diagenesis and effects on reservoir quality as well as studying the provenance of sediments and the history of volcanism
• SMU team
![Page 27: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/27.jpg)
Reservoir Quality
SeismicInterpretation
StratModel
GDE Maps
CRSMapping
Petroleum Systems
Volumes& Risks
BuildDatabase
Plate Tectonics Project
Salt Interpretation
Plate Tectonics – 3D Basin Evolution Model
Reprocessing Regional
Framework Data
Refraction Line
Forward Model Reconstruction
Grav Mag ReprocessingSISMAR Reprocessing
Synthetics / Data Conditioning / Base Maps / Reports and
Wells
Bible Line Reprocessing
Biostratigraphy
PFA Project - BEICIP External Contractors Halifax Academia / GSC /CNSOPBProg Management - RPS
Thermal Evolution of basin
Vitrinite Reflectance
Rock Eval
AFTA
Geochemistry Project
Source Rock Identification and Type
Oil Typing from Seeps and Shows
Fluid InclusionsFluid Inclusions
Program Management
![Page 28: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/28.jpg)
Geochemistry
• Source rock evaluation
• Evaluation of thermal history of the basin
![Page 29: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/29.jpg)
Geochemistry• 780 samples were collected at the GSC-
Calgary and submitted to TOC/Rock-Eval analysis.
• Another 60 samples were picked and submitted to Vitrinite Reflectance analysis.
• TOC/Rock-Eval analysis measures organic carbon content of the rock and other characteristics, which are used to identify hydrocarbon source rocks.
• Vitrinite Reflectance measures maturity
![Page 30: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/30.jpg)
Erie D-26
Sambro I-29
Chippewa L-75
Ojibwa E-07
Wells for Geochemistry Work
![Page 31: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/31.jpg)
Geochemistry
• HFI in salt, phase 1) – sampling work completed and analysis underway at Glooscap C-63, Weymouth A-45
• HFI (clastics/carbonates, phase 2) sampling work plannedWyandot E-53, Acadia K-62 MicMac H-86, Margaree F-70
• Sample Analysis
![Page 32: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/32.jpg)
GLOOSCAP C-63 (4245 m)Petroleum fluid inclusions as a net spread along a cleavage or fracture plane. They show
fluorescence in Ultra violet (UV) and at both ends of visible spectrum (green and red)
![Page 33: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/33.jpg)
GLOOSCAP C-63 (4425 m)Petroleum Fluid Inclusions (PFI) usually exist along linear features such as cleavage planes
and fractures. They show fluorescence in Ultra violet (UV) and at both ends of visible spectrum (green and red)
![Page 34: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/34.jpg)
PFA Team• A dedicated client organization• International exploration scientists • Regulators with vast experience• PFA geoscience consultancy• Geophysical data owners • Legal contracting expertise• World leading researchers• Top government researchers• Specialist in exploration, crustal seismic
acquisition, seismic imaging, biostratigraphy, geochemistry and other geoscience sub-disciplines
• Project managers
![Page 35: PlayFairway Analysis Project Elements · Play Fairway Concept • For a given depositional sequence A Play Fairway is the present day area of a potential reservoir unit, with the](https://reader031.fdocuments.in/reader031/viewer/2022011801/5afaf9267f8b9a2d5d8ef540/html5/thumbnails/35.jpg)